Loading...
2u. City Trail Plan to specify Connections to Hwy 5 Overpass 1 �iC r CITYOF 04 , CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager 1 FROM: Todd Hoffman, Park and Recreation Director 1 DATE: September 1, 1993 ' SUM: Amendment to the City's Trail Plan to Specify Connections to Highway 5 Overpass 1 As a result of the the city receiving an ISTEA grant for a pedestrian overpass on Highway 5, the City's Comprehensive Trail Plan must be amended to reflect the specific connections required 1 as a part of this project. A map depicting these connections, both interim and permanent, is being prepared by Hoisington - Koegler Group for presentation to the City Council. The connections being proposed are: 1 South Side (Permanent): Connect to off - street sidewalk parallelling Lake Drive East. 1 North Side (Temporary): Connect to West 79th Street allowing an at -grade crossing of the railroad tracks and access to the central business district. 1 North Side (Permanent): Cross the railroad tracks to West 78th Street allowing access to the central business district, South Lotus Lake Park, and future Highway 101 North trail. 1 The Park and Recreation Commission unanimously approved such an amendment at their August Y PP g 24, 1993, meeting. 1 pc: Paul Krauss, Planning Director Bruce Chamberlain, Hoisington - Koegler Group, Inc. 1 1 1