1h. Change order No 1 Market square storm sewer, bus shelter relocate • CITYOF 1 CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1940 • FAX (612) 937 -5739 ' MEMORANDUM TO: Don Ashworth, City Manager 1 FROM: Charles Folch, City Engineer Dk 1 DATE: August 19, 1992 SUBJ: Approve Change Order No. 1 to Market Square Storm Sewer, ' Bus Shelter Relocation Project No. 90-13 The Market Square Shopping Center development is expected to open for business in ' October of this year. One of the development commitments made by the City was to provide a right turn lane access to the site at mid -block between Kerber Boulevard and Market Boulevard. This work was previously proposed to be included as a part of the ' overall West 78th Street Detachment Project; however, due to circumstances involving the potential Target site to the west, the detachment project has been delayed and is not expected to be constructed until 1993. The City currently has an open contract with Ryan Construction Company for the Market Square Storm Sewer Improvement Project and Bus Shelter Relocation. This project is nearly complete. We have contacted the contractor about the possibility of adding a change order to the original contract which would specify the specific work items for construction of the right turn lane off of West 78th Street into the Market Square development. The 1 change order amounts to a total of $19,188.00. Given the timing of the Market Square development project and previous commitments 1 made by the City, staff believes it is appropriate to remove this right turn lane improvement work from the West 78th Street Detachment project and add it to the active Market Square Storm Sewer improvement contract. This improvement could be completed yet this fall. It is therefore recommended that Contract Amendment No. 1 for the Market Square Storm Sewer Extension Project No. 90-13 be approved. 1 Attachment: Contract Amendment c: Dave Hempel, Sr. Engineering Technician Jon Horn, BRW Todd Christopherson, AMCON 1 tOr PRINTED ON RECYCLED PAPER AUG 19 '92 13:23 BRW INC° P.2 1 1 CITY OF CFIANHASSEN CONTRACT AMENDMENT I Square Market Project: uare Storm Sewer Extension I City Project Number: 90-13 Amendment Number: (1) One Date: August 18, 1992 I Contractor: Ryan Contracting, Inc. I The additions, revisions and corrections contained herein shall be made to the contract documents for the project and shall become a part of the Scope of Work. 1 Description of Changes: A. The Contractor shall perform additional work for the construction of a right -turn lane I on West 78th Street for the new Market Square development. The additional work includes removals and new construction for the installation of a 100 -foot right -tum lane on the south side of West 78th Street west of the new Market Square entrance 1 driveway. The attached plan details the additional work required. The proposed turn lane construction work has resulted in the creation of a new bid I schedule and pay items for the performance of the work. Contract unit prices for the pay items have been obtained from the Contractor and reviewed and approved by the Engineer and City staff. The new bid schedule is as follows: Bid Schedule D - West 78th Street Turn Lane — 1 Seq. No/ Original Contract Amount MnIDOT Unit Contract Increase/ Add/ I No. Item Unit Price Quantity (Decrease) (Deduct) 1! Clewing Tree $50.00 0.00 6.00 $ 300.00 2101.502 1 2/ Grubbing Tree 50.00 0.00 6.00 300.00 2101307 I • 3/ Remove Concrete Curb and IF 5.00 0.00 230.00 1,150.00 2104.501 Gutter 4/ Remove Bituminous SY 3.00 0.00 80.00 240.00 I _ 2104.505 Pavement 5/ Sawcut Bituminous LP 3.00 0.00 236.00 708.00 W 2104.513 Pavement _ I 6/ Common Excavation CY 10.00 0.00 225.00 2,250.00 2105.501 1 . 1111$3 CA1 -1 1 AUG 19 '92 13:24 BRW INC) P.3 1 SN I Seq. No/ Original Contract Amount Mn/DOT Unit Contract Increase/ Add/ 1 No. Item Unit Price Quantity (Decrease) (Deduct) • 7/ Aggregate Base Placed, Ton $ 12.00 0.00 $ 275.00 $ 3,300.00 2211301 Class 5 I 81 Base Course Mixture, Ton 33.00 0.00 95.00 3,135.00 2331.514 Type 31 9/ Wearing Course Mixture, Ton 35.00 0.00 54.00 1,575.00 1 2331.508 Type 41 10/ Bituminous Material for Gal 2.00 0.00 25.00 50.00 I 2357.507 Tack Coat 11/ Concrete Curb and Gutter, LF 12.00 0.00 240.00 2,880.00 2531.501 Design B618M 1 12/ Reconstruct Manhole EA 800.00 0.00 1.00 800.00 2506.602 13/ 2" Non - Metallic Conduit LF 18.00 0.00 50.00 900.00 2545.523 14/ F &I Sign Panels, Type C, EA 300.00 0.00 1.00 300.00 I 2364331 Wood Posts 15/ 4" Solid Line, White - LF 1.00 0.00 100.00 100.00 I 2564.603 Paint 16/ Pavement Message, Type 1 EA 300.00 0.00 1.00 300.00 0564.602 I 17/ Relocate Sign EA 200.00 0.00 2.00 400.00 2104.523 1 18/ Sodding with 4" Topsoil SY 2.50 0.00 200.00 500.00 2575.502 Net Contract Change Add $19,188.00 1 1 SUMMARY Current Contract Amount: $149,759.70 1 Item A Net Add $19,188.00 Contract Amendment No. 1 Add: 19.188.00 1 Amended Contract Amount: $168,947.70 1 1 nun CA1 -2 1 AUG 19 '92 13:24 BRW INC() P.4 1 1 APPROVALS i RECOMMENDED BY: BRW, Inc. By: Title Project Engineer Date 1 1 ACCEPTED BY: Ryan Contracting, Inc. 1 By: Title _ Date 1 1 APPROVED BY: City of Chanhassen 1 By: Title City Engineer Date 1 . 1 1 1 1 ' I . • 1 1 1 club CA1 -3 1