1h. Change order No 1 Market square storm sewer, bus shelter relocate • CITYOF
1 CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1940 • FAX (612) 937 -5739
' MEMORANDUM
TO: Don Ashworth, City Manager
1 FROM: Charles Folch, City Engineer Dk
1 DATE: August 19, 1992
SUBJ: Approve Change Order No. 1 to Market Square Storm Sewer,
' Bus Shelter Relocation Project No. 90-13
The Market Square Shopping Center development is expected to open for business in
' October of this year. One of the development commitments made by the City was to
provide a right turn lane access to the site at mid -block between Kerber Boulevard and
Market Boulevard. This work was previously proposed to be included as a part of the
' overall West 78th Street Detachment Project; however, due to circumstances involving the
potential Target site to the west, the detachment project has been delayed and is not
expected to be constructed until 1993.
The City currently has an open contract with Ryan Construction Company for the Market
Square Storm Sewer Improvement Project and Bus Shelter Relocation. This project is
nearly complete. We have contacted the contractor about the possibility of adding a change
order to the original contract which would specify the specific work items for construction
of the right turn lane off of West 78th Street into the Market Square development. The
1 change order amounts to a total of $19,188.00.
Given the timing of the Market Square development project and previous commitments
1 made by the City, staff believes it is appropriate to remove this right turn lane improvement
work from the West 78th Street Detachment project and add it to the active Market Square
Storm Sewer improvement contract. This improvement could be completed yet this fall.
It is therefore recommended that Contract Amendment No. 1 for the Market Square Storm
Sewer Extension Project No. 90-13 be approved.
1 Attachment: Contract Amendment
c: Dave Hempel, Sr. Engineering Technician
Jon Horn, BRW
Todd Christopherson, AMCON
1
tOr PRINTED ON RECYCLED PAPER
AUG 19 '92 13:23 BRW INC° P.2
1
1 CITY OF CFIANHASSEN
CONTRACT AMENDMENT
I Square Market Project: uare Storm Sewer Extension
I City Project Number: 90-13
Amendment Number: (1) One
Date: August 18, 1992
I Contractor: Ryan Contracting, Inc.
I The additions, revisions and corrections contained herein shall be made to the contract
documents for the project and shall become a part of the Scope of Work.
1 Description of Changes:
A. The Contractor shall perform additional work for the construction of a right -turn lane
I on West 78th Street for the new Market Square development. The additional work
includes removals and new construction for the installation of a 100 -foot right -tum lane
on the south side of West 78th Street west of the new Market Square entrance
1 driveway. The attached plan details the additional work required.
The proposed turn lane construction work has resulted in the creation of a new bid
I schedule and pay items for the performance of the work. Contract unit prices for the
pay items have been obtained from the Contractor and reviewed and approved by the
Engineer and City staff. The new bid schedule is as follows:
Bid Schedule D - West 78th Street Turn Lane —
1 Seq. No/ Original Contract Amount
MnIDOT Unit Contract Increase/ Add/
I No. Item Unit Price Quantity (Decrease) (Deduct)
1! Clewing Tree $50.00 0.00 6.00 $ 300.00
2101.502
1 2/ Grubbing Tree 50.00 0.00 6.00 300.00
2101307
I • 3/ Remove Concrete Curb and IF 5.00 0.00 230.00 1,150.00
2104.501 Gutter
4/ Remove Bituminous SY 3.00 0.00 80.00 240.00
I _ 2104.505 Pavement
5/ Sawcut Bituminous LP 3.00 0.00 236.00 708.00
W 2104.513 Pavement _
I 6/ Common Excavation CY 10.00 0.00 225.00 2,250.00
2105.501
1 .
1111$3 CA1 -1
1
AUG 19 '92 13:24 BRW INC) P.3
1
SN
I
Seq. No/ Original Contract Amount
Mn/DOT Unit Contract Increase/ Add/
1 No. Item Unit Price Quantity (Decrease) (Deduct)
•
7/ Aggregate Base Placed, Ton $ 12.00 0.00 $ 275.00 $ 3,300.00
2211301 Class 5 I
81 Base Course Mixture, Ton 33.00 0.00 95.00 3,135.00
2331.514 Type 31
9/ Wearing Course Mixture, Ton 35.00 0.00 54.00 1,575.00 1
2331.508 Type 41
10/ Bituminous Material for Gal 2.00 0.00 25.00 50.00 I
2357.507 Tack Coat
11/ Concrete Curb and Gutter, LF 12.00 0.00 240.00 2,880.00
2531.501 Design B618M 1
12/ Reconstruct Manhole EA 800.00 0.00 1.00 800.00
2506.602
13/ 2" Non - Metallic Conduit LF 18.00 0.00 50.00 900.00
2545.523
14/ F &I Sign Panels, Type C, EA 300.00 0.00 1.00 300.00
I
2364331 Wood Posts
15/ 4" Solid Line, White - LF 1.00 0.00 100.00 100.00 I
2564.603 Paint
16/ Pavement Message, Type 1 EA 300.00 0.00 1.00 300.00
0564.602
I
17/ Relocate Sign EA 200.00 0.00 2.00 400.00
2104.523 1
18/ Sodding with 4" Topsoil SY 2.50 0.00 200.00 500.00
2575.502
Net Contract Change Add $19,188.00 1
1
SUMMARY
Current Contract Amount: $149,759.70 1
Item A Net Add $19,188.00
Contract Amendment No. 1 Add: 19.188.00 1
Amended Contract Amount: $168,947.70
1
1
nun CA1 -2
1
AUG 19 '92 13:24 BRW INC() P.4
1
1 APPROVALS
i RECOMMENDED BY: BRW, Inc.
By: Title Project Engineer Date
1
1
ACCEPTED BY: Ryan Contracting, Inc.
1 By: Title _ Date
1
1 APPROVED BY: City of Chanhassen
1 By: Title City Engineer Date