8. Budget for Library SpaceCITY OF ~o: Todd Gerhardt, City Manager
C SEN
7700 Market Boulevard FROM: Todd Hoffman, Park & Recreation Director
PO Box 147 -
Chanhassen. MN 55317 DATE: October 21, 2003
Administration
Phone: 952.227.1100 SUB J: Consideration of Budget for Former Library Space,
Fax: 952.227.1110 Lower Level of City Hall
Building Inspecti0ns
Phone: 952.227.1180
Fax: 952.227.1190 On August 25, 2003, staff presented a concept plan and preliminary budget'
estimate for the remodeling of the old library space. Upon receiving this report
Engineering
Phone: 952,227.1160 and hearing from members of the Senior Commission, the City Council directed
Fax: 952.227.1170 staff to take additional time in developing the plan. The Council specifically
encouraged staff to solicit additional input from the Senior Commission.
Finance
Phone: 952.227.1140
Fax: 952.227,1110 On September 19, a meeting involving KKE Architects, members of the Senior
Commission, and staff was held at City Hall. The minutes of that meeting are
Park & Recreation included in the attached schematic design package. The Senior Commission
Phone: 952,227.1120
Fax: 952,227.1110 representatives were very appreciative of having the opportunity to state their
Recreation Center positions regarding the project. Following this meeting, you had the opportunity
2310 Coulter Boulevard to meet with the senior men's and women's clubs to discuss the project. Lastly,
Phone: 952.227.1400 with the revised schematic design submittal drawn, I had the opportunity to
Fax: 952.227.1404
review it with the Senior Commission on October 17, 2003. The Commission
Planning & approved the current plan with a unanimous vote. A separate motion was
Natural Resources entertained concerning the inclusion of the kitchen appliances. This motion
Phone: 952.227.1130 passed with one dissenting vote.
Fax: 952.227.1110
Public Works The revised prelimary construction estimate is broken down by category. The
1591 Park Road base bid amount of $175,760 includes general construction, mechanical and
Phone: 952.227,1300
Fax: 952.227.1310 electrical work. The furnishing estimate for all new spaces is $50,390. The
scope our work with KKE has changed to include additional design services to
Senior Center accommodate a competitive general construction project. Design fees are now
Phone: 952.227. t 125
Fax: 952.227.1110 proposed at $24,460, an increase of $14,160 over our original contract with
KKE. The final item accounts for the finishing of two accessible restrooms
Web Site
across the hall from the existing congregate dining kitchen. Minnesota
v^,av, ci.chanhassen.mn.us
Accessibility Code mandates that accessibility restrooms be made available
when alterations are made to an existing space. Currently, no accessible
restrooms are available in the lower level of City Hall. The space for these
restrooms had been roughed in with plumbing during an earlier City Hall
remodel project. The estimated cost to complete the restrooms is $27,950.
These items bring the total estimated project cost to $278,710.
The Ci'l¥ of Chanhassen ,~ A growing cornmunily with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Mr. Todd Gerhardt
October 21, 2003
Page 2
Two cost saving measures presented in the first proposal have been incorporated
in the updated plan. These include elimination of a divider wall, saving an
estimated $13,000, and elimination of the majority of the sheetrock in the
conference room ceiling, saving $7,500. Additional potential cost saving
measures include: eliminating the tile floor in the corridor leading to the elevator
($1,600), not replacing the existing ceiling tile and grid in the old library
($3,000), elimination of the bench seating outside the meeting room ($2,500).
RECOMMENDATION
The two options being proposed to finance these improvements are the sale of
bonds or the use of excess cash from the sale of the bowling alley, which is
estimated at approximately $300,000. The two financing options should be
considered as a part of the 2004 Capital Improvement Program approval
process. The option to bond for these improvements only became available in
the last legislative session.
It is recommended that the City Council approve the revised schematic design
submittal for the City Hall Remodel project dated October 27, 2003.
ACTION NEEDED: A simple majority vote.
c: Bruce DeJong, Finance Director
Kate Aanenson, Planning Director
Senior Commission
KKE Architects
KKE Architects, Inc.
300 first avenue north
minneapolis, mn 55401
612/339-4200
612/342-9267 fax
www. kke.com
minneapolis
newport beach
Memorandum
K K Project Name: Chanhassen City Hall
Project Number: KKE 0307.1220.01
arch itects To: Chanhassen City Council Members and Staff
From: Matt Masica KKE Architects
Date: 10/27/03
Subject: Revised Schematic Design Submittal
Dear Council Members and Staff,
KKE Architects would like to thank the City of Chanhassen for the opportunity to work
on the City Hall Remodel project. Attached is our schematic design package for your
review. If you have any questions during your review please give me a call.
Once again KKE Architects is thankful to be of service,
Sincerely,
KKE Architects Inc.
expanding the vision
KKE Architects, Inc.
300 first avenue north
minneapolis, mn 55401
612/339-4200
612/342-9267 fax
www. kke.com
minneapolis
newport beach
Meeting Minutes
K K ~i Project Name: Chanhassen City Hall Remodel
Project Number: KKE 0307.1220.01
architects To: File, All Present
From: Matt Masica
Date: 09/19/03
Subject: Schematic Design Review Meeting
Present: Todd Hoffman - City of Chanhassen
Todd Gerhardt - City of Chanhassen
Dale Geving - Senior Representative
Tom Faust - Senior Representative
Jean Mancini - Senior Representative
Roxanne Decoster - KKE Architects
Matt Masica - KKE Architects
Number Item Action
1 The following items were discussed as desirable for the kitchen
area of the new senior center space:
· A microwave
· A dishwasher
· A refrigerator
· Both upper and lower cabinetry to run the entire length
of the wall between the new senior center space and the
new conference room space.
· Tile near the countertop space is preferable for cleaning
purposes.
There was a discussion about the possibility of placing a door
between the new senior center space and the new conference
room but it was agreed that more countertop space and better
acoustical separation between these rooms would be more
desirable.
2 Senior Coordinator Office
· Shelving and file storage space is needed.
· A Iockable drawer would be desirable in the senior
coordinator's office.
3 Furniture
· A mix of round and square tables with rolling casters
expanding the vision
: : Schematic Design Review Meeting
09/19/03
KKE 0307.1220.01
Page 2
Number Item Action
would be desirable
· Tables to seat 4 people comfortably; 6 would be
preferable
· Tables need to be foldable to clear space for different
functions.
· Chairs for the new conference room to be similar to the
conference room chairs at the new library.
· Chairs for the new senior center space to be lightweight,
stackable and preferably with arms.
4 Misc. Items
· Eight copies of updated plans will be delivered to
Chanhassen City Hall C/O Sharmine to be distributed to
the senior commission for review at their Friday
meeting.
· Glenn Gauger from KKE Architects to contact Todd
Hoffman regarding potential reformatting the parameters
of the agreement and scope of the project
Please review the above for errors and omissions. Notify this office immediately with
any comments or corrections. After 10 days of receipt, these minutes will become part
of the KKE main file.
Copy to:
KKE Architects, Inc.
300 first avenue north
minneapolis, mn 55401
612/339-4200
612/342-9267 fax
www. kke.com
minneapolis
newport beach
Memorandum
K K ~i Project Name: Chanhassen City Hall Remodel
Project Number: KKE 0307.1220.01
architects To: Todd Hoffman
From: Matt Masica
Date: 10/27/03
Subject: Revised Preliminary Construction Estimate
Dear Mr. Hoffman,
Based on the attached drawings and description of the Chanhassen City Hall Project
KKE would estimate the following breakout of packages and their estimated associated
costs. These numbers have been revised to reflect changes made from a September
12, 2003 letter from Todd Gerhardt and from the September 19, 2003 schematic
design review meeting held at Chanhassen city hall.
Base Bid
General Construction $125,760
Mechanical $ 25,000
Electrical $ 25,000
Construction Total $175,760
Furnishings $ 50,390
Design Fees $ 24,460
Total project cost $250,760
Alternate #1
General Construction $15,450
Mechanical $10,000
Electrical $ 2,500
Alternate #1 Total $ 27,950
Alternate #1 reflects finishing out the restrooms located near the existing kitchen area.
expanding the visions"
KKE Architects, Inc.
300 first avenue north
minneapolis, mn 55401
612/339-4200
612/342-9267 fax
www. kke.com
minneapolis
newport beach
Memorandum
K K ~" Project Name: Chanhassen City Hall Remodel
~r~ Project Number: KKE 0307.1220.01
architects To: MJM
From: Roxanne DeCoster
Date: 14 August 03, Revised 9/24/03
Subject: Furniture Opinion of Probable Cost
This opinion is based on revised drawings and meeting 9/18/03:
Description of Product Quan Unit Price Extended
Cost
SENIOR CENTER
Stackable, upholstered, w/arms, wood legs 42 $250/ea 10,500
Table, laminate top, wood edge, casters,
flip top, 42" x 42" 4 500/ea 2,000
Table, laminate top, wood edge, casters,
42" x 42", drop leaf, opens to 60"dia 6 1,100/ea 6,600
Sign-in table, 24" x 48", casters 1 500/ea 500
COORDINATORS OFFICE
Desk 1 700/ea 700
Safe I 100/ea 100
Desk Chair I 300/ea 300
File - 2 drawer I 400/ea 400
CONFERENCE ROOM
Wood leg, stackable 12 400/ea 4,800
Caster based chair, mid back 17 500/ea 8,500
Conference Table (3 sections) 1 10,000/ea 10,000
Desk for note taking 1 800/ea 800
Poduim 1 600/ea 600
Sub total $45,800
10% contingency 4,580
expanding the vision
'. MJM
14 August 03, Revised 9/24/03
KKE 0307.1220.01
Page 2
TOTAL $50,390
Includes freight and installation.
Does not include tax.