1g. Lake Susan Hills Drainage Imp Proj: Award Contract00 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 MEMORANDUM TO: Paul Oehme, Director of Public Works/City Engineer FROM: Terry Jeffery, Water Resources Coordinator — DATE: DATE: Feb ataxy 25 2013 , SUBJ: Lake Susan Hills Drainage Improvement Project: Award Contract SWMP -12: 10 -02 PROPOSED MOTION "The City Council approves a contract in the amount of $30,045 with Parrott Contracting, Inc. and authorizes construction of the Lake Susan Hills Drainage Improvement Project, S WMP -12: 10 -01." City Council approval requires a simple majority vote of the City Council present. In the fall of 2009, staff was contacted by members of the Lake Susan Hills Townhome Association with concerns about back yard flooding and very poor drainage. After visiting the site and modeling the drainage it was determined that there was some reason for concern. WSB and Associates, Inc were retained to perform a feasibility study and present possible solutions to the issue. Further, this pond is twenty years old and should be schedule for a dredging. Four possible improvements were suggested as shown Planning & in the attached Figure 2. It was determined that of the Natural Resources Phone: 952.227.1130 proposed improvements, "Improvement 3" and Fax: 952.227.1110 "Improvement 4" were the most cost effective solutions with the greatest impact on drainage conditions. Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us A n Figure 1. Site Location In August of 2012, the City was again contacted by Mr. Rod Nelson and others representing the HOA. The Council was copied on that email correspondence. Since this time, staff has completed plans and specifications for Improvement Options 3 and 4, had the pond sediment tested for contaminants, and has solicited bids from three qualified grading contractors. Their bids are as follows: Bidder Bid Price Parrott Contracting, Inc. $30,045.00 Min er Construction $34,741.00 Kusske Construction $37,476.75 Engineer's Opinion of Cost $32,085.00 Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme Lake Susan Hills Drainage Improvement Project February 25, 2013 Page 2 Parrott Contracting, Inc. has performed numerous projects for the City and has met or exceeded expectations in all cases. Staff is recommending that Parrott Contracting be awarded the contract for the Lake Susan Hills Drainage Improvement Project, SWMP -12: 10 -02 and is authorized to proceed immediately. The work should be performed before the weather warms so that a frozen condition can be maintained on the pond bottom. To this end, pond draw down would begin on or around February 26, 2013 with pond excavation taking place soon thereafter. It is anticipated that pond excavation would take three days or less depending upon weather. The structure will then be constructed with substantial completion anticipated to occur no later than March 15, 2013. Final restoration will take place in late April or early May contingent upon the weather. Attachments: Figure 2: Possible Improvements CIP Page g: \eng \swmp projects \swmp 12 10 -02 lake susan hills drainage improvement \memo_cc_02252013.docx Capital Improvement Program 2013 thru 2017 City of Chanhassen, MN Project # SWW -032 Project Name Stormwater Pond Improvements Department Surface Water Management Contact Paul Oehme Type Improvement Useful D.ife Total Category SWMP Account #1 720 - 70254751 Account #3 Priority n/a Account #2 Account #4 Description I Total Project Cost: $360,000 this project will provide inspection and cleaning if required of all City stormwater ponds on a rotating four (4) year schedule, to identify any nanagement needs and perform needed repairs and improvements. This may include sediment removal, placement of blanket, rip -rap or other 'rosion control B Ws, vegetation management and assessment, repair and replacement of inlet and outlet structures. Justification Chere are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban 2unoff Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal >eparate Storm Sewer System permit. Prior Expenditures 2013 2014 2015 2016 2017 Total 1501000 Maintenance 50,000 20,000 60,000 20,000 60,000 210,000 Total Prior Total Funding Sources 50,000 2013 20,000 2014 60,000 2015 20,000 2016 60,000 2017 210,000 Total 150,000 Surface Water Utility Fund 50,000 20,000 60,000 20,000 60,000 210,000 Total Total 50,000 20,000 60,000 20,000 60,000 210,000 will require an input of other public works staff hours. i01.]