2. Assessment Hearing for 79th St. Imp Project 1 , CITYOF 02.. 1 1 01:11111141 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 I I MEMORANDUM TO: Don Ashworth, City Manager 1 FROM: Charles Folch, City Engineer I DATE: September 8, 1992 SUBJ: Assessment Hearing for 79th Street Improvement Project No. 91 -8 1 This is the public hearing for the 79th Street Improvement Project No. 91 -8. The project I was completed earlier this summer with improvements consisting of westbound right turn lane, concrete curb and gutter, storm sewer, street lighting, landscaping and a bituminous overlay. The feasibility study identified those properties benefitting from this improvement I project as being Lot 2 and portions of Lots 1 and 3 of the proposed Gateway First Addition. The method of assessment is based on a front -foot cost consistent with the feasibility study for the street improvements and related appurtenances, this amounts to a cost of $209.19 I per front foot. The storm sewer improvements have been determined to benefit Lot 2 and Lot 3 only at a ration of 80% for Lot 2 and 20% for Lot 3 based on contributing runoff. The corresponding front -foot rates consistent with the 80/20 split are $120.18 per front foot 1 for Lot 2 and $41.90 per front foot for Lot 3. The proposed project assessments are as follows: I LOT NUMBER ROADWAY STORM SEWER TOTAL ASSESSMENT ASSESSMENT ASSESSMENT 1 1 $16,402.31 $0.00 $16,402.31 I 2 $29,44927 $16,918.47 $46,367.74 • 3 $21,117.37 $4,229.60 $25 346.99 1 These assessments are somewhat higher than that predicted in the feasibility study due to an underestimate of the required engineering costs, winter carryover of a nearly completed I project, and the relatively small construction cost. Nevertheless, staff believes that these 1 is t41, PRINTED ON RECYCLED PAPER 1 1 1 Don Ashworth September 8, 1992 1 Page 2 I proposed assessments represent legitimate necessary project costs associated to complete the improvement project. It is therefore recommended that the assessment schedule for the 79th Street Improvement Project No. 91 -8 be approved. 1 ktm I Attachments: 1. Assessment report dated August, 1992. 2. Area map. PC: Dave Hempel, Sr. Engineering Technician Brad Johnson, Lotus Realty Max Daubenberger, Van Doren - Hazard- Stallings, Inc. 1 1 1 1 1 1 1 1 • 1 1 1 1 . II II 1. PROJECT COSTS Construction Cost $58,153.19 1 Printing and Publishing 162.22 Consulting Services 17,124.09 Administration 2,703.04 II Const. /Development 3,533.46 Interest Expense 1,499.15 Capitalized Interest 4,971.89 147.04 Revenue (Collins Electric) $88,-30.00 11 $88,117.04 1 2. ROADWAY - STORM SEWER SPLIT Total Construction Cost $58,153.19 II Roadway Cost = $42,201.29 - 76% Storm Sewer Cost = $13,951.90 - 24% $58,153.19 100% II Total Roadway Cost $88,117.04 x 0.76 = $66,968.95 Total Storm Sewer Cost $88,117.04 x 0.24 = $21,148.09 $88,117.04 1 3. ROADWAY Total Cost = $66,968.95 I Benefitting length = 320.14 feet Assessment Rate = $ 209.19/FF 4. STORM SEWER 1 Total Cost = $21,148.09 Lot 2; 80% Benefitting length = 140.78 feet I Assessment Rate = $ 120.18 /FF Lot 3; 20% Benefitting length = 100.95 feet II Assessment Rate = $ 41.90 /FF FINAL ASSESSMENT SUMMARY II Storm 1 Lot Front Roadway .Sewer Total No. Footage Cost Cost Assessment 1 78.41 $16,402.31 $ 0.00 $16,402.31 1 2 140.78 29,449.27 16,918.47 46,367.74 3 100.95 21,117.37 '4,229.62 25,346.99 II TOTALS $66,968.95 $21,148.09 $88,117.04 1 1 I i" 1 II . i 0 ------ ------, 0 ...... - -- - - : : - - --'----- - - - - '------ _.,------- -- . ,----_ ---- _ ---- -- .7 - _---- - 1 ( / •••., , - — — c I.% i 1 I r , A „... 1 L f aZiNI=Erfielm; ' am ...... •A' nik.,-At...70 ------ - — ____ ,,„,.,, • • •••• --- -- -_..., ----.-__ i - ___J 1,_____J__-_ J. 2 _-,...r. :I__ __, r 4, • C - . - - - , - L „TZT :- L -c416. 26 TO* :ms..iolif ‘ 1 M ' - 1 3° 5 4"- _ -- = ----- _ _ ---- . IR 5 7 73. 15 - ---- -- k414 • " ‘ kx 1/4,,,..... ' , - -.. , , ,.... Et.Ec. . ost.„.i.,.. ,, L 46 84 ,N. 4• i6 I I (Ma •,..,c) N 70 c8 11111 All• it vi i • ..‘ -9 64_ - . . 1 4 . •Z. _. .... - -_ -- - .-...._ , _ _ _ , , ,..,. .1,\ .., . , • ' 1--. - / ol. ...? -- ..— - - L. - - - •___ _, tr,,,z: • 4 . / ,,,-- N ./ • t....4 . ---- - - -- - / — ...' .. ■ . ' / 1 / I l l i t lf Cf1 q ' , , I us, :30_64:71s1:"1 - ,. .0 4 :' , 10/1 ...._,,,,,,„",....._ ,_•_ i b 6 80 , , Vigo ••••4111 1 Wife • . !.. Ca. , =_- - _1-- 0) . / Z / / \ 44 1 / - ' \ ivC _ „ i l9 ■ - ' V _... _ :s. 38 26 26 L - • i L t..' # CA R i 1 (T 0 GAT AY FIRST AD• TION / IC / 1,965 fr) „ / Cr I V4 s I '.. -'-- s / 1 / il . 1 # *.-- - ' 1 ' ' f , - ___ " , T 8 , ..... uCk, _ / 4, i / - BLOCK 1 , , ( , , 6t' O i i 2 , p4 ' ` Di NG L e _7 ,,_..• • • \ \ ry `-- .49- . \ ■ o , 44i, ''C''c. , • \ 1 - , • -- ■ ' -' -, - ,r) ' ' • S' - _ .--., \ 159 . 0 /7 / .-- —. "s -- / HYDRANT LEGEND (4s D.-,,, - -- . - • MH ,... - - 0, - ,.... • ..,,- -,. - _ . 8 32- e;,.. .,,, • e",-...... ,.. , ,,... _ek 3 - _966- -- CB _ , - - - ' ,-., s ' '' -....,....... ,_ __.--------:---- ----- -... .,_ "--- 2---( - -* - - - - - - r-i-- ---------- • Street Light ' -- - te. .L3.... Pavement WIdenlhe \ SAN AIR 1 \ \ - - 05 V .1 Concrete Drtveway Aprtxt "7\ . .. . , \ \ . ......_ , -....._:„..-. c _____ --- - _ , .,,,,/, , ' ' - ., _ 3/ , .A■cx,„,, , . _ __ . ._ .,. _ , __ _ .. / .SAN MH t Date 4-2-91 _ / Job No. 91-307 _ W. 79th Street Feasibility Study DRAWING NO 1 !:,.• .. . ,,! '-:!. ' ' • . , 4, . " MEI 111111 • • • NM • IMO NM III•1 NM MI MI MO NMI • • • MIN