Loading...
2. Lake Ann Irrigation System 1 , CITYOF Q... .........._._._ I totio, CHANHASSEN 1 ___‘ 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 *Mil 159 MEMORANDUM Yom► 1 TO: Don Ashworth, City Manager atdorso %/ (k eod's`d Reiser' Date —71: 1111 FROM: Todd Hoffman, Park and Recreation Coordinator Dets Submitted is CammissioW DATE: October 8, 1992 Dats SC' ^.its to cot Ti SUBJ: Lake Ann Park Irrigation System, City Project RA -350 1 As you are aware, sealed bids for the above mentioned project were opened this morning, I October 8, 1992, in the City Council Chambers. Seven bids were received, as summarized in the attached tabulation of bids prepared by Mr. Mark Koegler of Hoisington - Koegler Group, a consulting firm employed for this project. 1 The targeted budget for this project was $60,000 with a cap of $65,000. The plans and specifications were prepared to include a base bid and two alternates. Alternate A was the I inclusion of irrigation for the shelter and spectator seating areas. Alternate B was the inclusion of irrigation for the ballfield infield areas. The low bid, including both alternates, was $45,497 from Innovative Irrigation from Coon Rapids. In reviewing the bid tabulation, it can be seen that I this bid is a competitive and favorable one for the city. Preliminary reference inquiries of Innovative Irrigation indicate that they are a reputable company. They are currently under contact with the City of Waconia. 1 Recommendation I It is recommended that the Lake Ann Park Irrigation Project, including the base bid and both Alternates A and B, be awarded to Innovative Irrigation of Coon Rapids, Minnesota in the amount of $45,597. I Attachments I 1. Letter from Bill Engelhardt dated October 8, 1992 2. Bid Tabulation 1 pc: Dale Gregory, Park Foreman Mark Koegler, Hoisington - Koegler Group Charles Folch, City Engineer Bill Engelhardt, Engelhardt and Associates Is zit PRINTED ON RECYCLED PAPER W.F. ENGELHARDT ASSOC. TEL No.612- 448 -8805 Oct 8, 92 15:09 Nr.004 F.02 1 WILLIAM R. ENGELHARDT ASSOCIATES, INC. cc.C.3r3I* liar efYsrineei4 1107 HAZELTINE BOULEVARD CHASKA, MINNESOTA 55318 (6121 448 -8838 1 1 October 8, 1992 City of Chanhassen c/o Todd Hoffman 1 690 Coulter Drive Chanhassen, MN. 55317 RE: Lake Ann Park - Irrigation System - 1 Honorable Mayor and City Council Members: Enclosed is a tabulation of bids received October 8, 1992 for the above project. Seven (7) bids were received ranging from a high bid of $84,587.0 to a low bid of $45,497.00, including all alternates. The low bid was submitted by Innovative Irrigation of Coon Rapids. This contractor was the low bidder on a similar ' project of ours for eight ballfields and was thoroughly checked out We found this contractor's work to be ofr high standard. Although he is a small company, he has performed very 1 well. The bid had a base bid and two alternates for additional work, if of budget the Bae allowed. Based on the both Alternates A and 13 for a total contract 1 of Base of $45,497.00. 1 Very truly yours, WILLIAM R. ENGELHARDT ASSOCIATES, INC. 1 William K. Engelhardt 1 WRE /las encl. (1) 1 1 W.R. ENGELHARDT HSSOC. TEL No.612 -448 -8805 Oct 8,92 15 :09 No.004 P.03 1 1 TABULATION OF BIDS 1 LAKE ANN PARK - IRRIGATION SYSTEM CITY OF CHANHASSEN, MINNESOTA C.P. NO. R.A. 350 OCTOBER 8, 1992 - 11:30 A.M. 1 TOTAL ESTIMATED BIT) BID BASE BID do BASE BID dt BASE BID CONTRACTOR BONSS T. BID A ALT. BID B ALT. BID A be B Innovative Irrigation 5% $41,342.00 $41,503.00 $45,497.00 1 Albrecht Company Check $50,197.00 $50,022.00 $54,140.00 g Aqua Engineering Check $53,735.00 $54,412.00 $59,176.00 1 q � Green Acres Sprinkler Check $54,686.00 $54,452.00 $59,527.00 Mickman Brother's 5% $57,475.00 $57,832.00 $62,932.00 Arteka Natural Green 5% $64,095.00 $64,775.00 $70,495.00 1 Irrigation Engineering 5% $76,460.00 $77,638.00 $84,587.00 1 Number of Bidders - 7 1 1 1 1 1 1 1 1