Loading...
1g. Change order No 1. Upper Bluff creek Truank utility project i CITYOF i ilot, 0 IIANHASSEN' 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 Act by City AM'mimstntor I MEMORANDUM Er!)' Ian 1 TO Don Ashworth, City Manager n . -_� a L- 9 ?=— FROM: Charles Folch, City Engineer - - -- DATE: December 7, 1992 / a 144 --y 1 SUBJ: Approve Change Order No. 1 for Upper Bluff Creek Trunk Utility Project No. 91 -17 I Attached to this staff report is supplementary information related to Change Order N P PP �'Y g o. 1 for the Upper Bluff Creek Trunk Utility Improvement Project No. 91 -17. The good news 1 is that Chanhassen will not be responsible for the costs associated with this change order. The primary purpose for this change order is to facilitate the installation of additional trunk I sanitary sewer which will ultimately convey flow from Chaska as specified in the Joint Powers Agreement between Chanhassen, Chaska and the Metropolitan Waste Control Commission for interim flow diversion to the Lake Ann Interceptor. 1 The work involves the extension of trunk sanitary sewer from the Upper Bluff Creek sewer west along Lyman Boulevard and across Audubon Road to its temporary terminus. The City I of Chaska proposes to extend their trunk line north along the west side of Audubon Road and connect into this facility in 1993. One of the advantages in constructing the sewer along Lyman Boulevard this fall is to minimize the impact and crop loss on the adjacent farm i property. The amount of the change order is estimated to be $41,300 construction cost plus an I additional 15% to 18% for indirect costs. The City of Chaska has submitted a letter agreeing to paying all the costs associated with this change order. It is therefore recommended that Change Order No. 1 for the Upper Bluff Creek Trunk Utility I Improvement Project No. 91 -17 in the amount of approximately $41,300 plus indirect costs be approved with the understanding that said costs shall be paid by the City of Chaska. 1 ktm 1 fir I t0, PRINTED ON RECYCLED PAPER 1 1 Don Ashworth December 7, 1992 Page 2 I Attachments: 1. Location map. 1 2. Letter from the City of Chaska dated November 18, 1992. 3. Letter from MWCC dated November 19, 1992. 4. Letter from Phil Gravel of BRA dated November 13, 1992. 1 5. Change Order No. 1. c: Dave Hempel, Sr. Engineering Technician I Jerry Boucher, Utility Superintendent Phil Gravel, BRA I Dave Pokorny, City of Chaska Robert E. Isakson, MWCC 1 1 1 1 1 1 1 1 1 1 1 1 0 . i 1 1 I , : _ t 9 1 ...L. i___ I 0 J A4H 1 ! 1- l- 0 Cie • ' 0 1 1 1 •■•1---- ............ PE fitanh ' PE 0 t - 1 140'-1 RCP 2" 1 0 PRO E5c BITUMINOUS. , u, 0 REPtA0EDISTURBED .... '- 1 GRAVEL SHOULDERING. fir sti - fit I tE 0 -- —_ — — ___ um ,.. _ t., 0 ..., ., ._:,....,, 1 i I • ,nal ... _. C.S.A.H. — 1 ----- — _ _ — — --------- _ k -- - - - - - 1: ------------------ --- - ------------ 1 --------- 1 i W --1 , - ____ ____ ____ ___ - - - 1 ! SOIL BORING # 8 - 1 \ ti - ....._ - ... 3:1 % .,, ,,,,;:' Men NUMOSSIMMA:46::«4. .:::::1 Cfp:Wk ...::- v , :::,,,•::::::, -> ; . ;::,:.' $v; ,,'; ..m •-% i .45e::::*: ,,,&:•': *. ,..,<, ...,..„...,...:..:....,.,,...... ..; :. ' :.: ----------------------- .a‹<. ... --- — FUTUR 8" g„.0:: : f. : : tt, - : :' .,i0,:,:o „'z''',3ftr „. ;;;;.:g . t.t;'.Zer' : :::::::. , r * It:;? : .erF .:;: .. ;.:: 1?,, i , f .s:',.IrY :i ..:*:' . :V.04FOrM.:':i......- .:0,...$ .„... .... wo.. , , . - , - ,.: 5 ::: 474{'M , , .. :4: :.:4: " .: M . i'i , i ,....... :;: .. .:: , : , *: ,. .:.:..,,0,,,.:,::: . .0::, PE SEWER PLUG 7 MANN 4 LE WEST I --- -4. 1 i , 1 9 OPENI G 1 I !' 2 Tilledio 9 ,., ._ 1 s: I: N 44936.959 1 E 25240 059 N 44918.768 I . 1 DEAN & LOIS DEGLER BOOK 53. PAGE 284 CHANGE ORDER NO.1 E 24886.851 i I 1 PA I WORK SCOPE 7-- • 1 FUTURE 12" SEWER JACK OR AUGER BY OTHERS . it I ! 1 00 2" DIP T CL. 52 W/ CASING. CM OF CHANUASSEN i .t • . 1 ci cr I . ..., a) iii LOCATION MAP . Ns ii. .." No .1. No ow 1.1 ... ... ill. 1.• ... E. ER ow MI MU -1111111 t 1 0 .., - 1 '= -" 2 T H L' 1 4 4 4. F• . ►• 1 Vty G1/ ' , ' fiT Ch aska -- 1 . ,. . " .,?:. I 1 - . November 18, 1992 1, ' Mr. Phil Gravel Bonestroo, Rosene, Anderlik & Associates I' 2335 West T.H. 36 St. Paul, MN 55113 i ! Dear Phil: Recently 1 received the Change Order and plan sheet relative to construction of a portion of the Chaska -Chan Interceptor in conjunction with Chanhassen Lift Station Project. As the agency responsible for constructing the Chaska -Chan Interceptor, the City of Chaska would agree to be responsible for the entire plus amount of the Change Order which is estimated to be $.1, i indirect costs. The City of Chaska looks forward to continued cooperation in expediting this project. If mit ment, have any your convenience. co convenience. commitment, please Sincerely, i ) 4 Dav _ cd6rney y Administrator 1 i DP:jai ' � c: Charles Folch, City of Chanhassen I 1 II\ 11 I City or Chaska Minnesota I One City Hall Plaza 55318-1962 ; Phone 612f448-2851 I NOV -19 -92 THU 12 25 MCC CO FAX NO. 6122292138 P. 02 Metropolitan Waste Control Commission McarsPark Centre, 230 East Fifth Street, Si Paul, Minnesota 55101 -1633 612 222 -8423 November 19, 1992 • Mr. Dave Pokorney City Administrator One City Hall Plaza Chaska, MN 55318 -1962 RE: Chaska WWTP Study MWCC Project Number 920600 Interim Forcemain /Lift Station Dear Mr. Pokorney: The Commission has reviewed the change order to the Chanhassen lift station project and it is acceptable. The Commission would like to have the following questions answered by Chanhassen and BRA Inc.: 11 1. Establish a fixed indirect cost, not a range or a changing cost, The Commission believes this should be at 15 percent. ' 2. The Commission would like to have a copy of the bid form for the Chanhassen project to confirm that the unit prices for the change order are consistent with the bid. The Commission agrees that this change order work should proceed as soon as practical, and the Commission will reimburse the City of Chaska for the actual cost of the change order, not to exceed $50,000. Thank you for your assistance. Sincerely, Robert E. Isakson Manager WWTP Engineering Division REI:AED:bw chaschas.aed cc: Allen Dye Don Aiuhn Charles Folch - Chanhassen Robert Schunicht - BRA 1 E uat Oppoilumov/A!lirmaliv"" Ai_l'on Cumpinyer i Otto G. Bonesuoo, P.E. Howard A. Sanford. P.E. Michael P Rau. P.E. Miles B. Jensen. P.E. Bonestroo Robert W Rosene, P.E' Keith A. Gordon. P.E. Agnes M. Ring, A.I.C.P L. Phillip Gravel III. P.E. Joseph C. Ander11k, P.E. Robert R. Pfefferle. P.E. Thomas W. Peterson, P.E. Karen L. Wiemeri. P.E. I is Marvin L. Sorvala. P.E. Richard W. Foster. P.E. Michael C. Lynch, P.E. Gary D. Kristoftz. P.E. Rosene Richard E. Turner. P.E. David O. Loskota, P.E. James R. Ma land. P.E. F Todd Foster, P.E. A nderlik & Thomas E. Noyes.EP.E. Robert A. Bourdon, P.E. Kenneth P Anderson. P.E. Shawn D. Gustafson. P.E. VI Robert G. SchunichL P.E. Mark A. Hanson, P.E. Mark R. Rolfs, P.E. Cecilio Olivier, P.E. A ssociates Susan M. Eberlin, C.P.A. Michael T. Rautmann, P.E. Mark A. Seip. P.E. Charles A. Erickson ' •Senior Consultant Ted K. Field. P.E. Gary W. Morien, P.E. Leo M. Pawelsky Thomas R. Anderson. A.I.A. Daniel J. Edgerton. P.E. Harlan M. Olson Engineers & Architects Donald C. Burgardt P.E. Daryl K. Kirschenman, P.E. James F Engelhardt Thomas E. Angus. P.E. Philip J. Caswell, P.E. Ismael Martinez, P.E. Mark D. Wallis, P.E. 1 November 13, 1992 COP‘tf 1 Mr.Dave Pokorney 1 City of Chaska #1 City Hall Plaza Chaska, MN 55318 I Re: Chas /Chan Interconnection Change Order to Chanhassen Proj 91 -17 I Our File Nos. 39305 and 92151 I Dear Dave: Attached is a Change Order and Plan Sheet for your review. The Change Order is for a I portion of the Chas /Chan sanitary sewer that is to be constructed this fall under City of Chanhassen Project 91 -17. The purpose of the change order is to have the construction completed this fall to minimize the impact on the adjacent farm property. 1 Permanent easement for the construction was acquired under Chanhassen's project. However, approximately 0.2 acres of temporary easement must still be obtained. 1 It is proposed that the entire Change Order amount of approximately $41,300 plus 15 -18 percent in indirect costs will be the responsibility of Chaska. 1 Please review the attached documents and advise me of any comments you may have by November 20. Also, please send either Charles Folch or me a letter indicating that Chaska 1 agrees with the Change Order and agrees to reimburse Chanhassen for the costs. Feel free to contact me if you have any questions or require any additional information. I Sincerely, 1 BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. 1 Phil Gravel 1 cc: Mr. Charles Folch, City of Chanhassen MWCC 1 2335 West Highway 36 • St. Paul, Minnesota 55113 • 612- 6364600 J r1 Bones troo Owner City of Chanhassen, 690 Coulter Drive, Chanhassen, MN 55317 Date November 23, 1992 t� Rosen 11 As sociat A'xt� es Contractor Progressive Contractors, Inc., 8736 Zachary Lane, Osseo, MN 55369 Change Order No. 1 a ,:: —' I3ond Co. 7284386 Cobb- Strecker- Dunphy, John Martinsen, 150 S 5th St, #2000, Mpls., MN 55402 CHANGE ORDER NO. 1 I Upper Bluff Creek District Sanitary Sewer & Water Main Improvements 1 Project No. 91 -17 File No. 39305 1 Description of Work This change order consists of the construction of a portion of the planned Chas /Chan Interconnection Sanitary Sewer. remainder of the Chas /Chan project will he completed by the City of Chaska next spring. The work under this change ordc's to he completed at this time in order to minimize the impact of the construction on the adjacent property owner. The change order amount is based on the bid unit prices and estimated quantities shown below. The final amount will he hal on the actual quantities installed. The total amount of the change order should be the responsibility of the City of Chaska. order does not include any contract completion date extensions. I This change r y p Contract Unit Total' No. Item Unit Quantity Price Amount Change Order No. 1 - Sanitary Sewer 1 12" RCP Class 5, 0'- 8' deep in place LF 60 21.75 1,305. 2 12" RCP Class 5, 8'- 10' deep in place LF 90 21.75 1,957 3 12" RCP Class 5, 10'- 12' deep in place LF 40 22.00 880 4 12" RCP Class 5, 12'- 14' deep in place LF 60 23.00 1,380 0 5 12" RCP Class 5, 14'- 16' deep in place LF 65 24.75 1,60 ' 6 12" RCP Class 5, 16'- 18' deep in place LF 35 26.35 922.25 7 12" RCP Class 5, 18'- 20' deep in place LF 35 2825 981 8 Class 13 bedding for 12" pipe LF 25 3.10 77.50 9 12" DIP outside drop on manhole LF 10.7 200.00 2,14 10 12" DIP Class 52 sewer LF 28 40.25 1,12. 0 1 I Standard 4' diameter manhole w /casting EA 3 1,500.00 4,509t 12 4' diameter depth greater than 8 feet LF 21.1 90.00 1,80 13 Structure marker sign with post EA 3 10.00 31i0 1 39305.CI IA CO - 1 1 II Contract Unit Total No Item Unit Ouaotity Price Amount ' 14 Remove and replace field d p farm fiel tarn I tile (variable diameter) LF 790 10.00 7,900.00 15 Class 5 100% crushed aggregate for I patching and shouldering TN 20 9.50 190.00 16 Topsoil borrow (CV) CY 100 5.00 500.00 17 Seed with mulch, fertilizer and 3" 1 existing topsoil AC 0.2 780.00 156.00 18 Wood fiber blanket with seed and 3" 1 existing topsoil SY 200 1.10 220.00 19 Jack or auger 12" RCP CI 5 w /casing LF 100 155.00 15,500.00 1 Total Change Order No. 1 $43,281.75 1 Original Contract Amount $ 2,352,258.00 Previous Change Orders 0.00 This Change Order No. 1 - ADD 43,281.75 I Revised Contract Amount (including this Change Order) $ 2,395,539.75 1 1 1 1 1 1 I 39305.CHA CO -2 1. Recommended for Approval by: 1 BONESTROO, ROSLNE, ANDERLIK & ASSOCIATE'S, INC. Approved h Contractor: 1 pp y Approved by Owner: PROGRESSIVE CONTRACTORS INC. CITY OF CHANHASSEN, MN 1 1 1 Date: 1 Distribution 1 - Owner I 1 - Contractor 1 - Engineer 1 - Bond Co. i 1 1 1 1 1 1 1 1 39305.CHA CO -3 1 o Oh /- I 1 ; 1 , . ,, i___ __, __ __ __ VP 4 ,- r , 1 43 e / 4- ;- • MN Mr ! •, _, 1 ___ 1 --,.._._. — _ — pE Brush , PC 1 ", I Z ' 0 0 PRO ECT .0C. BITUMINOUS. ' 140 -21 RCP 0 REF S TU RBED ... 7 i _ GRAVEL SHOULDERING. 5% ,rf 0 % L TE PI — — -- — — — , al filf Al3 .6( a t' jilL - - - - - - - - I "1 r -- -- — — C.S.A.H. TS T -- - -- - - , I - - - 1; ----- - - ------ _ II _ _ _ _ _ __ ------- _ il ,■ SOIL BORING #8 1 \ L' - :----- i lbliWISINNIZENNEMENNIAMIN:.:?..tangr _ FU TUR 8" [ — SEWER PLUG 0 _„._,,,o,ft, 4C14itegre.=;.:ne,,Ittlgtr.netg!.ei::.::!:::::::::_3.r',1;:eirgrWORVIAITAz*tt; ,...- PE 7 N 44938.516 : r'''' s - I - 1 r , e __ -- MANH•LE ,, If E 24995 064 Tille OPEN I G WEST i; , ,d F N 44936.959 E 25240.059 N 44918.768 I i I 1 I DEAN & LOIS DEGLER BOOK 53. PAGE 284 CHANGE ORDER NO.1 E 24886.851 • I 1 01 WORK SCOPE FUTURE 12" SEWER JACK OR AUGER rE --- - BY OTHERS I 100 DIP a TY OF I Y CL. 52 W/ CASING. CHANHASSEN I -i CS Ct g ) Z • 0 CO ,of LOCATION MAP OW NM MI NM MI I= NM I= • MI MI — • I•111 OM NMI OM MN MI