Loading...
1d. Street & Utility Plans & Specs and Amended Dev Contract for Ithilien Addition /cc_ l C ITYOF .......___. CHANHASSEN ' -rt , 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 5 (612) 937 -1900 • FAX (612) 937 -5739 Action by City Administrator T End =d Ili) "I°. MEMORANDUM • Mott;.io., II Rejectci _ TO: Charles Folch City Engineer Deje � 22 -g Date Samitted to Commission FROM: Dave Hempel, Sr. Engineering Technician l Date Submitted to Council /a - Zb 42-- DATE: October 21, 1992 1 SUBJ: Approve Street and Utility Plans and Specifications and Amended PP P Development Contract for Ithilien Addition - Project No. 92 -13 I ` �Y: I On July 23, 1992, the City Council approved -development contract for site grading on Ithilien Addition in an effort to expedite the project. The applicant has entered into the development contract and provided th , ,; nec" :ssary security deposit and paid the administration fees for the overall project. Howe g er, the development contract was never recorded. Since then the applicant has re*:ived final plat approval and has submitted final plans and specifications for approval. Tie attached development contract incorporates the I conditions of approval from the runt plat, wetland alteration permit and plan and specification approval process. As you may recall, his project has experienced several delays as a result of the Teton /Lila+cLane project Since these issues have been resolved, I the project is proceeding accordingly. It is therefore recommended that the City. Council approve the amended development contract for Ithilien- ddition dated July 27, 1992. I The developer's engineer, Mr. Mark Gronberg of Coffin & Gronberg, Inc., has submitted final construction plans and specifications for_ Ithilien Addition. Staff has reviewed the plans and specifications and f.>;nds them in n f o cue -:L s ke_ ity's,constrction standards. It is therefore recommended that the construction plans and specifications dated July 21, 1992, revised September 18, 1992 and the amended development contract dated July 27, I 1992 for Ithilien Addition, Project No. 92 -13, be'.upproved. jam. =: 1 Attachments: 1. Construction t lans (Specifications are available for review in the P 1 Engineering department). 2. Development Contract. c: Jim Fenning, Hilloway Corporation I t PRINTED ON RECYCLED PAPER 1 I/ CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) 1 ITHILIEN SPECIAL PROVISIONS AGREEMENT dated July 27 , 1992, by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City "), and HILLOWAY CORPORATION (the "Developer "). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for ITHILIEN (referred to in this Contract as the "plat "). The land is legally described on the attached Exhibit "A". 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract and furnish the security required by it. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat except for site grading as defined herein. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A - -Plat prepared by Coffin & Gronberg, Inc. Engineers, Land Surveyors, Planners, approved by ' the City Council on July 27, 1992. Plan B -- Grading, Drainage and Erosion Control Plan dated 1 March 2, 1992, revised September 25, 1992, prepared by Coffin & Gronberg Plan C- -Plans and Specifications for Public Improvements dated July 21, 1992, revised September 25, 1992, prepared by Coffin & Gronberg 1 1 1 ' SP -1 ATTACHMENT 2 1 4. Improvements. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Signs G. Street Lights H. Site Grading 1 I. Underground Utilities (e.g. gas, electric, telephone, CATV) J. Setting of Lot and Block Monuments K. Surveying and Staking 5. Time of Performance. The Developer shall install all required improvements by November 15, 1993. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6. Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit from a bank, cash escrow, or equivalent ( "security ") for $ 317,149.00 . The amount of the security was calculated as 110% of the following: Lilac Lane Assessments $ 15,000.00 ' Site Grading $ 72.200.00 Sanitary sewer $ 31 914.00 Watermain $ 33,880.70 On -site storm sewer $ 25,769.50 Streets $ 71,697.50 Street lights and signs $ 1,100.00 Erosion control $ 1.000.00 Engineering, surveying, and inspection $ 23.756.00 Landscaping $ 12,000.00 1 TOTAL COST OF PUBLIC IMPROVEMENTS . . . $ This breakdown is for historical reference; it is not a restriction 1 on the use of the security. The security shall be subject to the approval of the City. The security shall be for a term ending December 31, 1993. The City may draw down the security, without notice, for any violation of the terms of this Contract. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of SP -2 1 1 11 the original amount until all improvements are complete and accepted by the City. 7. Notice. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: ' Mr. Jim Fenning Hilloway Corporation 16455 Ringer Road Wayzata, MN 55391 Telephone: (612) 473 -1999 Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by registered mail in care of the City Manager at the following address: Chanhassen City Hall 690 Coulter Drive ' P.O. Box 147 Chanhassen, Minnesota 55317 Telephone: (612) 937 -1900 ' 8. Other Special Conditions. A. Ponding calculations should be revised to account ' for Teton Lane storm sewer contribution. B. The Developer shall take cross sections of Teton Lane to determine the full impact on the adjacent properties and ' adjust the construction plans accordingly. C. The Developer shall notify the watershed district of ' the additional area (Teton Lane) to be included in the overall project to see if additional permits are required. ' D. The following easements shall be added to the plat: 1. A drainage easement for the wetland pond for the boundary at the 100 -year flood elevation. ' 2. A conservation easement for the wetland over the 1001' contour. 3. The existing drainage easement over the wetland must be vacated. 1 E. A 12 -inch storm sewer with a 4 -inch orifice plate shall be constructed as the outlet structure for the wetland pond. The wetland pond bottom shall be lined with clay and top- dressed ' with 4 to 6 inches of topsoil. F. Lots 1 through 5 shall take driveway access from the ' proposed new street (Ithilien). SP-3 1 1 G. The Developer shall enter into a development contract with the City and provide the necessary securities associated with the development. The developer shall construct the street, sanitary sewer, and storm sewer improvements within Teton Lane at his expense and shall waive all rights to a public hearing or assessment appeal for 20 percent of the cost to the Lilac Lane improvements, City Project No. 91 -4. H. Park and trail fees shall be paid in lieu of land dedication. I. The Developer shall retain a qualified soils 1 engineer to evaluate the sub- surface soil conditions on the proposed subdivision and recommend corrections at proposed house pads if necessary. J. The wetland alteration shall be completed exactly as proposed in the Barr Engineering memo dated March 9, 1992 including the two -pond system, interspersed with open water and submergent plant species, and landscaping of a mixture of emergent plant species and wetland shrubs. ' K. Disposal of dredged material is prohibited within the wetland area. L. The Developer shall notify staff within 48 hours prior to commencing the alteration to the wetland and shall again notify staff within 48 hours after completion of the wetland alteration for staff review and approval. M. The letter of credit, as part of the development contract, shall include financial sureties to guarantee proper mitigation of the wetland, including landscaping and as -built plans. N. Minimum lowest floor elevation on Lots 12, 13, 14, 15, 16 and 17, Block 1 shall be 2 feet above the 100 -year flood elevation. , 9. General Conditions. The general conditions of this Contract, approved by the _City Council on February 22, 1988, are attached as Exhibit "B" and incorporated herein. 1 1 SP -4 1 II 11 CITY OF CHANHASSEN / , BY: ..C_ 1 (SEAL) D.nald J. i , Mayor II AND: Don Ashworth, City Manager II DEVELOPER: HILLOWAY CORPORATION II 11111k BY: , 4: IPre.s,de+Jr II STATE OF MINNESOTA ) ( ss. I I COUNTY OF CARVER ) toi The foregoing instrument was acknowledged before me this 30 1 day of s r , 19 �i-; by Donald J. Chmiel, Mayor, and by Don Ashwo h, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to II the authority granted by its City Council. g / O L TARI PUBLIC 1 STATE OF MINNESOTA ) j± KAREN J. ENuELHARDT t + NOTARY PUBLIC - MINNESOTA 1 1 v ( ss . CARVER COUNTY 1 COUNTY OF ) , ' " My Commission Expires OCT 16.1997 I 1 + + The foregoing instrument was acknowledged before me this ZS_- day of Se-v - r e - b�. , 199;- , by .slues s� es b Feib srde. r 1 i-4 1 1.1 o0 4.i c o R p o e-nhi ,v f - bl o -Ye,s o rn- Q oa.Qo w9?7 °A) 003 .e_.64-e(- r 0C Ca oRpo mfg ar✓ I • VICTORIA E. CHURCHILL NOTARY PUBLIC - - NOTARY PUBLIC - MINNESOTA " CARVER COUNTY : - = Illy oommIsion wpm 9440 II I DRAFTED BY: Campbell, Knutson, Scott & Fuchs, P.A. 317 Eagandale Office Center II 1380 Corporate Center Curve Eagan, Minnesota 55121 (612) 452 -5000 1 SP -5 II 1THILIEN KNOW AIJ. PERSONS BY THESE PRESENTS:That Hil loway poration, • Minnesota oorpordtion, tee owner of the CHANHASSEN, MINNESOTA following described property nituated In the Count of Carver, State of MInnseotd t wit: That part of The North 40 rods .. the Nest 40 rods of the 'Northeast Quarter of the Thie plat of ITH1LIEM we approved and accepted by the City Council of the City of Northwest Quarter off 1+ection 2, Townsh 118 North, Range 23 Nsst of the 5th Prinoipel nenota, at a regular nee ing thereof held this 2 7 44 day of Z , 1992. Naridian,which lice North of the North line,.f Tract A, Registered Land S1 ervey No. 27. files of once with the provisions :.f Minnesota Statutes, Section 506.03, Snbd. 2. the Registrar of Titles, County of Carver, .■ M..• NO therefrom the followi described property: That pert of said North 40 rods of the Nest 0 rods deooribed as follow: Commencing at the CITY COIAICIL 01 THE CITY OF CIANHASSEII, MIN northwest corner of sold Northeast Quarter •' the Northwest Quarter; then*, easterly along the AI i / North line m of id Northeast Quarter of tine' •rthwemt garter • distance bf 478.89 feet to LM My , �� point of beginning of the land to be donor!. .; thence southerly defleotlhg to the right 90 de- B s•L • • green 44 minutes 10 'seconds • distance of 2' feet; thence easterly deflecting to the left 90 +} degrees 44 minutes 10 seconds • distance of 03.12 feet to the East line of said west 40 rods of COUNTY SURVEYOR. CARVER .. , MtNNR1,i0'PA 4 the Northeast Quartos of the Northwest Quer ;.r; thence northerly along amid gent line to the Pursuant to Chapter 305,; inneeota Laws of 1971. this plat has been approved this __ North line of sap Northeast Quarter of the orthwest Quarter: thence westerly along said North , 199 _. . - lins to the point of beginning. Ill Has caused the saes to he surveyed and platted as i ILIEN. and does nereby donate and dedicate to the R public for public us* forever the thoroughfares • cal -de -saes. and the drainag end utility easements John E.Preasyer. Carver County Surveyor and drainage easements es shown on the plat. 1 COUNTY AUDITOR, CARVER . • MINNRHO1* In witness whereof said Hilloway Corporation, a M1. soots corporation. has caused these preeente to be 1 hereby certify that t - are no delinquent texen for ell years prior to 199 .• W signed by its proper officer this ‘7 day of i , 199.2: Dated this day -f . 199_. H /LIOWAY CORPOR a Minnesota corporation IN OMNI 9y </� '" . I to NES ' . •")r I MARK IDUIRAI, CARVER COUNTY AUDITOR 9Y STAIR O1 NIN882507*) COIETT Of P _ The foregoing instrument was • lodged Wore me this _, r day of are r^•'p COUNTY TREASURER. CARVER COUNTY. MINNESOTA t99_ , by .lama., D. Penning, its President, of Hill. 'y Corporation, a Minnesota corporation on behalf I hereby certify that t taxes payable for the year 199_ for the land described of said corporation. + , ITHILII44 have es bn paid this day of • 199_,... ,� ,, . PADIICK F. MIFORp - L.• • • -L.- _ � � m Notary Pub • a, W!'r'h( County, Ninnewo to O. 1. DAHLKE, CARVER COUNT TREASURER My oommime expires Z'•4-98 A 1 hereby certify that I have surveyed and platted propsrtlr dsoorib•d on this plat as ITHILIEN; that thin plat is • correct representation of maid su ; that all dl•tances are rrectly shorn in feet COUNTY RECORDER. CARVER •. . MINNESOTA • C end hundredths of • toot; that all monuments have • n correctly placed in the fgrou d as shown; and I hereby certify that th plat of 'TRIM= wee filed this day of that the outside boundary lines are oorrectly dsml' -. tad on mild plat; and then a ere no wetlands as de- _ n'olook _.N. a Document No. fined on Minnesota Statute, Section 50$.02. Subdiv ion 1 or publio highways to he designated other than se 'shown on this Plat. CARL N. RANSON. JR.. CARVER mum REODRIIa u_. M Mark N. H • berg. Land Surveyor and Eng ins*r Minnesota . eons* Number 12755 STATE Of MINNESOTA) COUNTY 01 ,1(; S/MAL) The foregoing instrument wan •knowledged before me thin .1 (iW VC. day of #O , f 199. by Mark R. Oronberg. load Surveyor and + r. _ ',� � NM MO " 1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) EXHIBIT "B" ' GENERAL CONDITIONS 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has ' been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office of the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 1 2. Phased Development. If the plat is a phase of a multi - phased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. ' 3. Effect of Subdivision Approval. For two (2) years from the date of this Contract, no amendments to the City's ' Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or ' federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may ' require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. ' 4. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have ' been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits from the ' Metropolitan Waste Control Commission and other agencies before proceeding with construction. The City will, at the Developer's expense, have one or more construction inspectors and a soil engineer inspect the work on a full or part -time basis. The Developer shall instruct its engineer to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of ' quality in accordance with the engineer's design. The Developer or GC -1 1 his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review the program for the construction work. Within sixty (60) days after the completion of the improvements and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as -built plans, (2) two complete sets of blue line as -built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs, (6) bench mark network, and (7) a 200 scale and a 500 scale reproducible Mylar copy of the plat. 5. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 1 6. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 7. Bite Erosion Control. Before the site is rough graded, , and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion control requirements. Erosion control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion control, the City will authorize the removal of the erosion control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion control measures. 8. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and 1 GC -2 1 II debris, including biowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. II 9. Acceptance and Ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public I easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final I inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his I engineer shall submit a written statement attesting to same with appropriate contractor waivers. Final acceptance of the public improvements shall be by City Council resolution. II 10. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this I Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security II required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District II Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the 1 letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. II 11. Park and Trail Dedication. Prior to the issuance of building permits for residential construction within the plat, the Developer, its successors or assigns, shall pay to the City the I park and trail dedication fees then in force pursuant to Chanhassen City Ordinances and City Council resolutions. 12. Landscaping. Unless the lot already has one tree in the I front yard of suitable species, the Developer or lot purchaser shall plant a tree in the front yard of every lot in the plat. Suitable trees include: II Maples Ash Linden Basswood I Green Ash Birch Honey Locust Ginko (male only) Hackberry Kentucky Coffee Tree Oak II Other species of trees may be approved by the building inspector. Trees which can cause a public nuisance, such as cotton producing 1 trees, or can be a public hazard, such as bug infestation or weak GC -3 II 11 bark, are prohibited. The minimum tree size shall be two and one -half (21) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee in the form of cash or letter of credit shall be provided to the City. Improvements are to be completed during the first growing season after issuance of the certificate of occupancy. After satisfactory inspection, the financial guarantee shall be returned. The City has established the financial guarantee at $1,000.00; however, this may be increased annually based upon cost. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 13. Warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the City. All trees, grass, and sod shall be warranted to be alive, of good quality, and disease free at the time of planting. All trees shall be warranted for twelve (12) months from the time of planting. The Developer or his contractor(s) shall post a letter of credit or other security acceptable to the City to secure the warranties at the time of final acceptance. 14. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control, and Tree Removal Plan shall be submitted for each lot as required in the Special Provisions, for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with City Ordinance. 15. Existing Assessments. Any existing assessments against 1 the plat will be re- spread against the plat in accordance with City standards. 16. Street Lighting. The Developer shall have installed and 1 pay for street lights in accordance with City standards. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $200.00 for each street light installed in the plat. The fee shall be used by the City for furnishing electricity for each light for twenty (20) months. 1 17. Street Signs. All street name and traffic signs required by the City as a part of the public improvements shall be furnished and installed by the City at the sole expense of the Developer. 1 GC -4 1 18. House Pads. The Developer shall promptly furnish the City "as- built" plans indicating the amount, type and limits of fill on any house pad location. 19. Responsibility for Costs. ' A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the ' Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for resident construction inspections. The fee shall be shall be calculated as follows: i) if the cost of the construction of public ' improvements is less than $500,000, three percent (3 %) of construction costs; ' ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3 %) of construction II costs for the first $500,000 and two percent (2 %) of construction costs over $500,000; iii) if the cost of the construction of public ' improvements is over $1,000,000, two and one -half percent (21/2%) of construction costs for the first $1,000,000 and one and one -half percent (11/2%) of construction costs over $1,000,000. 1 Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be determined based upon actual construction costs. The cost of public improvements is 1 defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer ' shall reimburse the City for all out -of- pocket costs incurred by the City for providing resident construction inspections. This cost will be periodically billed directly to the Developer based on 1 the actual progress of the construction. Payment shall be due in accordance with Article 17E of this Agreement. C. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City ' and its officers and employees for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. GC -5 1 D. In addition to the administrative fee, the Developer 1 shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. E. The Developer shall pay in full all bills submitted 1 to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty ' (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ( "SAC "), City water connection charges, City sewer connection 1 charges, and building permit fees. 20. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 21. Miscellaneous. A. Construction Trailers. Placement of on -site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre- construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance with the local Postmaster's request. C. Third Parties. Third parties shall have no recourse 1 against the City under this Contract. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. E. Severability. If any portion, section, subsection, , sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. 1 GC -6 1 F. Building Permits. Building permits will not be issued for constructing homes in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface. G. Waivers /Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution ' of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. ' H. Release. This Contract shall run with the land and may be recorded against the title to the property . After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a ' Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. I. Insurance. Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate ' evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The ' certificate may not contain any disclaimer for failure to give the required notice. ' J. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient ' by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assignability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. GC -7 1 L. Construction Hours. Construction equipment may only be operated in the plat between 7:00 a.m. and 6:00 p.m., Monday through Saturday. Operation of construction equipment is also prohibited on the following holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Eve Day, and Christmas Day. M. Access. All access to the plat prior to the City 1 accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. 1 N. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the subdivision are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the request., The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing operations. The provision of City snow plowing service does not constitute final acceptance of the streets by the City. 0. Soil Treatment Systems. If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation /disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building permit. P. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. Q. Compliance with Laws. Ordinances. and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; 4. Watershed District(s); 5. Metropolitan Government, its agencies, departments and commissions. 1 GC -8 • 1 R. Proof of Title. Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers too enter into this Development Contract. S. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on ' the property, unless hazardous wastes or pollutants were caused to be there by the City. T. Soil Correction. The Developer shall be responsible ' for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. 1 1 1 1 1 1 1 1 1 1 GC -9 1