7. Minnewashta Pkwy Upgrade 1 CITYOF = 7 CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 � (612) 937 -1900 • FAX (612) 937 -5739 1 � 1 MEMORANDUM 1 TO: Don Ashworth, City Manager FROM: Charles Folch, City Engineer 1 DATE: April 8, 1992 1 SUBJ: Award of Bids for Minnewashta Parkway Upgrade Project No. 90-15 1 On Tuesday, March 31, 1992, bids were received and opened for the Minnewashta Parkway 1 Street and Storm Drainage Improvement Project No. 90-15. Nine bids were received in all with the difference between the low bid and high bid being only 11 %. The project was bid with one alternate for paving an 8 foot walkway /trail versus a 6 foot trail. The average increase cost associated with the wider trail section amounted to approximately $40,000 per bid. Additional tree loss would also be incurred with the wider trail section. The low total base bid (6 foot trail) for the project was submitted by Imperial Developers at $1,338,534.40. 1 The engineer's estimate for the project was $1,648,178. The low bid is approximately 19% less than the engineer's estimate. 1 Imperial Developers has performed satisfactorily on previous projects within the city. It is therefore recommended that the Minnewashta Parkway Street and Storm Drainage 1 Improvement Project No. 90-15 base bid implementing a 6 foot wide trail be awarded to Imperial Developers in the amount of $1,338,534.40. 1 jms c: Dave Hempel, Sr. Engineering Technician 1 Mr. Von Bergstrom, Imperial Developers Attachment: Bid Tabulation 1 1 Is to PRINTED ON RECYCLED PAPER 1 W.R. ENGELHRPDT ASSOC. TEL No.612- 448 -8805 Apr 3,92 13:48 No.002 P.02 1 TABULATION OF BIDS S.A.P. 194- 111 -01 MINNEWASHTA PARKWAY STREET AND STORM DRAINAGE IMPROVEMENTS CHANHASSEN, MINNESOTA MARCH 31, 1992 - 11:00 A.M. TOTAL BA E BID TOTAL TOTAL BID WITH CONTRACTOR BOND BASE BID ALT. BID ALTERNATE Imperial Developers 5% $1,338,534.40 $42,139.00 $1,380,673.40 Brown do Chris, Inc. 5% $1,344,158.95 $35,126.10 $1,379,285.05 1 Widmer, Inc. 5% $1,348,227.25 $36,194.10 $1,384,421.35 Progressive Contractors 5% $1,416,914.80 $42,444.00 $1,459,358.80 1 Veit & Company, Inc. 5% $1,431,306.14 $35,761.20 $1,467,067.34 S. M. Hentges & Sons 5% $1,440,018.37 $43,153.80 $1,483,172.17 Ryan Contracting 5% $1,460,048.50 $42,989.00 $1,503,037.50 1 Wm. Mueller & Sons, Inc. 5% $1,472,784.60 $36,748.25 $1,509,532.85 Hardrives, Inc. 5% $1,515,582.65 $33,731.40 $1,549,314.05 1 1 Number of bidders - 9 ' 1 1 • 1 1 1 1