7. Minnewashta Pkwy Upgrade 1 CITYOF = 7
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
� (612) 937 -1900 • FAX (612) 937 -5739
1 �
1
MEMORANDUM
1 TO: Don Ashworth, City Manager
FROM: Charles Folch, City Engineer
1
DATE: April 8, 1992
1 SUBJ: Award of Bids for Minnewashta Parkway Upgrade
Project No. 90-15
1
On Tuesday, March 31, 1992, bids were received and opened for the Minnewashta Parkway
1 Street and Storm Drainage Improvement Project No. 90-15. Nine bids were received in all
with the difference between the low bid and high bid being only 11 %. The project was bid
with one alternate for paving an 8 foot walkway /trail versus a 6 foot trail. The average
increase cost associated with the wider trail section amounted to approximately $40,000 per
bid. Additional tree loss would also be incurred with the wider trail section. The low total
base bid (6 foot trail) for the project was submitted by Imperial Developers at $1,338,534.40.
1 The engineer's estimate for the project was $1,648,178. The low bid is approximately 19%
less than the engineer's estimate.
1 Imperial Developers has performed satisfactorily on previous projects within the city. It is
therefore recommended that the Minnewashta Parkway Street and Storm Drainage
1 Improvement Project No. 90-15 base bid implementing a 6 foot wide trail be awarded to
Imperial Developers in the amount of $1,338,534.40.
1 jms
c: Dave Hempel, Sr. Engineering Technician
1 Mr. Von Bergstrom, Imperial Developers
Attachment: Bid Tabulation
1
1
Is
to PRINTED ON RECYCLED PAPER
1
W.R. ENGELHRPDT ASSOC. TEL No.612- 448 -8805 Apr 3,92 13:48 No.002 P.02
1
TABULATION OF BIDS
S.A.P. 194- 111 -01
MINNEWASHTA PARKWAY
STREET AND STORM DRAINAGE IMPROVEMENTS
CHANHASSEN, MINNESOTA
MARCH 31, 1992 - 11:00 A.M.
TOTAL BA E
BID TOTAL TOTAL BID WITH
CONTRACTOR BOND BASE BID ALT. BID ALTERNATE
Imperial Developers 5% $1,338,534.40 $42,139.00 $1,380,673.40
Brown do Chris, Inc. 5% $1,344,158.95 $35,126.10 $1,379,285.05 1
Widmer, Inc. 5% $1,348,227.25 $36,194.10 $1,384,421.35
Progressive Contractors 5% $1,416,914.80 $42,444.00 $1,459,358.80 1
Veit & Company, Inc. 5% $1,431,306.14 $35,761.20 $1,467,067.34
S. M. Hentges & Sons 5% $1,440,018.37 $43,153.80 $1,483,172.17
Ryan Contracting 5% $1,460,048.50 $42,989.00 $1,503,037.50 1
Wm. Mueller & Sons, Inc. 5% $1,472,784.60 $36,748.25 $1,509,532.85
Hardrives, Inc. 5% $1,515,582.65 $33,731.40 $1,549,314.05 1
1
Number of bidders - 9 '