Loading...
8. Authorize Feasibility Study for Street & Utility Improvements C ITYOF g 1 ,.k • _l CHANHASSEN , 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 N 1 MEMORANDUM . 1 TO: Don Ashworth, City Manager FROM: Charles Folch, City Engineer I DATE: April 9, 1992 SUBJ: Authorize Preparation of Feasibility Study for Street I and Utility Improvements to NW ' Section 10 and NE ' Section 9 (Lundgren Bros.) - Project No. 92 -5 1 Over the past nine months City staff has had a number of meetings with Lundgren Bros. Construction, Inc. to discuss their intentions to acquire property for development located in the northern I portions of Sections 9 and 10. It has recently come to City staff's attention that Lundgren Bros. has secured purchase options for a large area encompassing portions of three parcels known as I the Johnson, Turner and northern portion of the Dolejsi property. Lundgren Bros. has since presented to the City a formal petition for the construction of trunk utilities and an east -west roadway I between TH 41 and CR 117 (Gaipin Boulevard). This east -west road connection was previously defined as a needed transportation element of the Comprehensive Plan. These improvements are needed in order to develop the described properties. 1 I have contacted Mr. Bob Schunicht of Bonestroo, Rosene, Anderlik & Associates to acquire an estimate as to the approximate cost to I conduct such a feasibility study. I have been informed that this study is estimated to cost $11,200. Lundgren Bros. is familiar with the City's policy to acquire financial sureties from the II petitioners of an improvement project to guarantee payment for the study should the project not proceed. It is therefore recommended that a feasibility study on trunk II sanitary sewer and watermain facilities and an east -west roadway connection between TH 41 and CR 117 (Gaipin Boulevard) in the north half of Section 9 and the northwest quarter of Section 10 be I authorized to be conducted by Bonestroo, Rosene, Anderlik & Associates conditioned upon the City receiving a cash escrow or letter of credit from Lundgren Bros. to insure payment for the II site. II V S II r PRINTED ON RECYCLED PAPER 1 1 Don Ashworth April 9, 1992 ' Page 2 Attachments: 1. Letter from Lundgren Bros. dated 3/25/92. 1 2. Letter from Bob Schunicht dated 4/8/92. c: Dave Hempel, Engineering Technician Terry Forbord, Lundgren Bros. Manager's Comments (4- 8 -92): Over the past five years, the city ' has sold bonds at a level of approximately $5 million per year. Maintaining a position at or below the $5 million figure can reasonably assure that our current bond rating can be maintained. All forms of bonds compete with each other in arriving at the $5 million total. Each year the city must anticipate the amount of general obligation bonds which may be sold (fire station bonding, ' Lake Ann Park addition, Bandimere Park, etc.); equipment certificates (current year vehicle purchases); revenue bond needs (water tower construction, major additions to the sewer system, etc.); and finally, special assessment bonding (public improvement ' projects for streets, sewer and water extension for development purposes, etc.). Although I agree with the City Engineer's position that we should move forward with the feasibility study, I ' should also note that we are in the process of attempting to prioritize 1992 bonding and we may be forced to bring this item back to the City Council if it is determined that our overall bonding ability cannot be met given the total number of projects on ' the table. No work would be completed on the feasibility study until after this determination was made. 1 DWA 1 11 • 1 1 1 1 1 LUF1DGREn BROS. CONSTRUCTION March 25, 1992 INC Mayor Don Chmiel Members of the City Council II Don Ashworth, City Manager Charles Folch, City Engineer City of Chanhassen 690 Coulter Drive 935E Wayzata Blvd.. Chanhassen, MN 55317 Wayzata , Dear Ladies and Gentlemen: Mlnnesola 55391 Lundgren Bros. Construction is proposing to develop the land known (612)473 -1231 as the Johnson, Turner and the northern portion of the Dolejsi property (depicted on Exhibit A) within the City of Chanhassen. At this time we control all of this land with an option to purchase. We hereby formally petition the City of Chanhassen for the construction of public facilities. Namely trunk sanitary sewer and water and the East/West roadway between Highway 41 and County Road 117 as depicted on the transportation element of the Comprehensive Plan. Each of these facilities is necessary for development of our property. At this time we have completed conceptual plans and have had • preliminary meetings with staff to receive their initial comments. This meeting took place on March 24, 1992. Please contact me if you require any additional material and /or 1 information. Please advise me of the date this petition will be going to the City Council and of the estimated cost of the feasibility study and its scheduling. 1 Very truly yours • . Forbord ' Vice President 117.- TMF : bw 411 n 1; +, Attachment MAR 26 1992 1 1 • .r. ;" . It I C . o *s ) 1 — I f . • • t ii., ....v, � �I �.. . .rim V, II: .•., t.e ..1�.. � ll lit! 'if a 112: , 171-. .alliva.. -- . - nori.ir.. - • '0 a il : i I Pl_ / W Mr 0 "\') _ - - g ag mac; ` ., . . - ` i -..- —E Aii -1 .:g ; 171 Avi '�CZZII I 0 r• r 1 _.);.„., -----\:_____- . 7.- - y it 4 ... -k ---L‘ ` V V ��' I v : r a' 1. p • C1 ®1� 1 _ •� • 1 =..s nil= ` w.ww/sow .. -� '. LAKE LUC1' � # _i 111 . % : __ I T 1 ■ J. 1 r . Ai . ( J.-, Th- go • • .. r - JOH , • � /�) I - r" ' _ ,DOLE SI LAKE ANN I r � - = � / 1 1::i t in t , ... _... 1 =- r :�mr4�,,, I i 11.M..... hir al"Nitailagileal II y r I n1- % VIIIIIINVAI ,11111100.1111111 ; :/ 1 /.NN i i.\ ,,, Nri I IIP 4 Min ,■ ' t 4 ...... „....01% , V der 0 I L __:____IN _ ___ 7! NO rit 4 40.. : ..; .; pm , i., 1 , 4tp ".,.. 1 1 Exhibit A 1 ( 12-- --e :-) 6Q.1 ki Otto G. Bonestroo, PE- Keith A Gordon. P.E. James R- Maland. PE Rene C Plumart. A.I.A. Bonestroo Marvin L Sorvala. P EE Richard W Foster. P.E A. Bourdon. PE Mark Rois. PE P.E Agnes Peru P.E. p Rosene Richard E Turner, PE. Mark A Hanson. PE Thomas E. Angus. P.E. Cealio Olivier, PE Glenn R Cook. P.E. David O. Loskota. PE- Daniel J Edgerton. P.E. Gary W Morien. PE. Anderiik & Thomas E Noyes. P.E. Robert C. Russek. A.IA. Mark A Sep. PE. Karen L- Wiemen. PE ri Robert G Schunicht. PE Howard A. Sanford. PE. Philip J Caswell. PE. Keith R. Tapp. P.E. Susan M Eberlin. C PA Donald C. Burgardt. PE Ismael Martinez. P.E. Michael P Rau. P.E. I A ssociates Ted K Field. P.E. Mark D. Wallis. PE. Charles A Erickson Michael T. Rautmann. PE Thomas R Anderson. A IA Leo M. Pawelsky Robert R Pfefferle. PE- Gary F Rylander. PE Harlan M. Olson Engineers & Architects Thomas W Peterson. PE Miles 8 Jensen. PE Michael C. Lynch. P.E L Phillip Gravel III, PE April 8, 1992 I City of Chanhassen 1 690 Coulter Drive Chanhassen, MN 55317 Attn: Mr. Charles Folch, P.E. I City Engineer Re: Johnson and Dolejsi Pro e rtS' I P City Project No. 92 -5 I Our File No. 39308 Dear Charles: I As requested, we have prepared a mini -scope of study and determined an estimated cost for preparing a Feasibility Report for Project 92 -5. The basis for this estimate includes information I from the Comprehensive Sanitary Sewer and Water Plans, and a conceptual site sketch from the developer. The proposed Feasibility Study will define the east -west through street and trunk sanitary sewer 1- and water main improvements necessary to serve the portion of the project area. It would involve the following specific items: 1 PROJECT NO. 92 -5 FEASIBILITY STUDY 1 1) General description of project area, owners, development activities and past activities. 2) Summary of the improvements and studies that affect the study area. , 3) Preliminary design of the proposed east -west collector street from Galpin Blvd. to T.H. No. 41. 4) Preliminary design of the trunk sanitary sewage system including: I a. Lift station location, sizing and phasing b. Trunk sewer location c. Force main sizing including economical velocity analysis. 1 5) Preliminary design of trunk water distribution mains. 6) Cost estimate of proposed improvements. 7) Cost recovery (assessment) system. I 8) Preliminary assessment role. Page 1. 1 39308.cor 2335 West Highway 36 • St. Paul, Minnesota 55113 • 612- 636 -4600 I 1 1 ' Our proposed method of compensation for the feasibility study and subsequent design and construction engineering is presented in the following table: ' PROJECT 92 -5 COMPENSATION SUMMARY 1) Feasibility Study: Lump Sum of $11.,200 to be credited against future design fees. 2) Design: 85% of attached fee table. Credit to be given for cost of feasibility study in 1 proportion to the facilities actually designed. 3) Construction Engineering: a. Contract administration - 15% of attached fee ' curve. b. Surveying and inspection - per diem, based on ' current approved rates. We understand that the developer is proposing an accelerated schedule. We would be able to ' proceed with the preparation of the feasibility immediately in anticipation of a public hearing in June. ' If you have any questions or would like any additional information, please contact Bob Schunicht or me. Sincerely, ' BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. iti 1 ji L. Phillip Gravel III, P.E. ' LPG:Ii Attachment: Fee Table • ' Page 2. 39308.cor 5 1 Fee Table Construction Fee Cost Percentage $ 50,000 11.64% 1 100,000 10.32 250,000 8.78 500,000 7.76 • 750,000 7.26 1,000,000 6.88 2,000,000 6.28 4,000,000 5.83 6,000,000 5.65 8,000,000 5.58 10,000,000 5.50 ' Design Fee: 85 percent of the indicated fee percentage. Credit is given for cost of feasibility study in proportion to the facilities actually designed. For construction costs between those listed, the fee is interpolated. 1 • 1 1