Loading...
6. Receive Supplemental Report to Feasibility study for West 78th St. Detachment Improvement Project, Call for Public Hearing 1 i 6 C 1 TY O F 1 , ,, c2ANBAssEN ->° 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937 -1900 • FAX (612) 937 -5739 Actb ; by City A!.-o r?stto1 MEMORANDUM II TO: Don Ashworth, City Manager "' FROM: Charles Folch, City Engineer s 1 DATE: February 19, 1992 __ . _ 2- 2 �F�9 SUBJ: Receive Supplemental Report to Feasibility Study for West I 78th Street Detachment Improvements; Call for Public Hearing - Project No. 92 -3 (Former City Project No. 87 -2) II Attached is a Supplemental Report for the Wet 78th Street Detachment /Powers Boulevard Improvement Project No. 92 -3 (formerly Project No. 87 -2) as prepared by our consultant Strgar- Roscoe- 1 Fausch, Inc. (SRF). There are two primary reasons for performing this update to the I original feasibility study. First, a project which is proposed to be funded by special assessments must begin construction within one year of its formal ordering or an updated feasibility study and associated public hearing must be held as required by Minnesota I State Statute No. 429. Second, the Downtown Central Business District Traffic Study completed in April, 1991 by SRF raised questions about the traffic capacity on West 78th Street under the I current development proposal. Therefore, the design for the segment of West 78th Street between Kerber Boulevard and Powers Boulevard (County Road 17) has been changed from a four -lane I undivided roadway to a four -lane divided roadway with left turn lanes to provide adequate levels of service and safe traffic movements. 1 The primary elements of the previously proposed West 78th Street Detachment Project have basically remained unchanged as it relates to roadway alignment and profile, sanitary sewer, watermain, storm II sewer and drainage facilities. As I noted previously, the primary change to the roadway section itself involves the inclusion of medians with dedicated left turn lanes. In addition, the SRF 1 downtown traffic study recommended future installations of traffic signals on West 78th Street in conjunction with the development of the downtown retail center and forecasted population growth. Therefore, depending on the timing of the Market Square project, II the installation of traffic signals on West 78th Street at Powers 1 t4, PRINTED ON RECYCLED PAPER 1 Don Ashworth February 19, 1992 ' Page 2 Boulevard (County Road 17) and Kerber Boulevard may be incorporated into the project. The previous plan for the undivided roadway section included ' sidewalks on the north side of West 78th Street within the existing 80 -foot right -of -way. With the addition of a divided median and left turn lanes, additional right -of -way or trail easements will need to be secured from the abutting parcel owners. Street lighting and landscaping are also proposed as a part of this improvement project. The total project cost is estimated to be $1,920,700 with approximately 75% to be funded by the City and 25% funded by special assessments. This estimate does not include any costs for right -of -way or easement acquisition. Mr. Jim Dvorak of SRF will be at the City Council meeting to provide a presentation of this updated report and respond to questions accordingly. It is therefore recommended that the City Council receive the update to the feasibility study for the West 78th Street Detachment Project No. 92 -3 (formerly Project No. .87-2) dated February 19, ' 1992 as prepared by Strgar- Roscoe - Fausch and that a public hearing be called for Monday, March 9, 1992. jms /ktm . Attachment: Feasibility Study Update dated February 19, 1992. c: Jim Dvorak, SRF Dave Hempel, Sr. Engineering Technician Tom Chaffee, Data Processing Coordinator • 1 1 1 1 1 1 1 II ST RGAR - RO SC O E- FAUSCH, INC. S CONSULTING ENGINEERS II TRANSPORTATION ■ CIVIL ■ STRUCTUR ■PARKING ■ LAND SURVEYORS February 19, 1992 SRF No. 0921634 1 Mr. Charles Folch, P.E. CITY OF CHANHASSEN City Engineer O 0 R CITY OF CHANHASSEN I 690 Coulter Drive FEB w 01992 Chanhassen, Minnesota 55317 RE: CITY PROJECTNO. 92-3 OLDTCITYEPROJECTENO.D8 1 INEENdNG DEPT II UPDATED FEASIBILITY STUDY AND REPORT Dear Mr. Folch: II As requested, we have prepared the following update to the Feasibility Study for street and utility improvements to West 78th II Street and Powers Boulevard (C.S.A.H. 17). West 78th Street is proposed to be realigned between Powers I Boulevard and Kerber Boulevard. Powers Boulevard is proposed to be reconstructed from Mn /DOT's intersection construction associated with the T.H. 5 improvement on the south to approximately 1,500 II feet north. INTRODUCTION In July, 1987 a feasibility study was prepared addressing proposed public improvements to West 78th Street and Powers Boulevard in Chanhassen •(see Figure 1). In July 1988 a supplemental report was I prepared to summarize the changes to the project and their associated impacts. By late 1990 construction plans and specifications had been completed. II This update is in response to a traffic study done in April of 1991 for the central business district of the City of Chanhassen, which II raised questions about the traffic capacity of West 78th Street • under current development proposal. In this report, West 78th Street is now proposed to be expanded to a four -lane divided facility with left turn lanes provided to aid in traffic movement. 1 PROJECT DESCRIPTION II A. STREET IMPROVEMENTS In the original report and construction plans, West 78th Street is proposed as a four -lane undivided roadway without exclusive left or right turn lanes. The Central Business District (CBD) traffic study cited traffic forecasts sufficient to warrant a four -lane II Suite 150, One Carlson Parkway North, Minneapolis, Minnesota 55447 I 612/475 -0010 FAX 612/475 -2429 1 Mr. Charles Folch, P.E. -2- February 19, 1992 facility with turn lanes at major intersections on West 78th Street between Kerber Boulevard and Powers Boulevard. These traffic volumes are anticipated within the design life of the roadway and assume development consistent with future land use anticipated by the City. This report proposes West 78th Street between Kerber Boulevard and ' Powers Boulevard as a four -lane, divided roadway with exclusive left turn lanes at the major intersections (see Figures 2 and 3). Only two full access intersections are proposed on West 78th Street ' between Kerber Boulevard and Powers Boulevard. The location of these intersections are approximate and although can be adjusted slightly should remain in the location shown in Figure 3. Additional easements will need to be acquired if sidewalk /trail, lighting, and landscaping improvements are to be constructed as shown in Figure 4. The proposed improvements to Powers Boulevard are essentially the same as those presented in the original feasibility study and construction plans. Costs are included for the traffic signals proposed for the Powers Boulevard /West 78th Street and the Kerber Boulevard /West 78th ' Street intersections. The timing on the installation of these signals is dependent on the development of the area, and therefore, may not be installed immediately. As a minimum, the underground 1 conduit and handholes will be installed with the roadway improvements. B. DRAINAGE IMPROVEMENTS The proposed drainage design remains virtually unchanged from that proposed in the original study and indicated in the construction plans. Minor design revisions will be made to the West 78th Street storm sewer to conform to the proposed roadway geometry. 1 C. PUBLIC UTILITY IMPROVEMENTS The proposed sanitary sewer and watermain improvements will not be changed from that indicated in the original report and construction ' plans unless more up to date plans for development of the surrounding area become available during final design. D. EASEMENTS AND RIGHT -OP -WAY As mentioned previously, right -of -way for the West 78th Street realignment has already been secured at 80 feet of total width. The proposed roadway will fit within that corridor, but due to the wider section proposed in this report, additional right -of -way for trails or sidewalks, and temporary slope easements will be required 1 along West 78th Street. 1 II Mr. Charles Folch, P.E. -3- February 19, 1992 II Slope limits along Powers Boulevard also fall outside the platted 1 right -of -way. For this reason, temporary slope easements also will be required along Powers Boulevard. 1 ESTIMATED COSTS The estimated costs of the proposed improvements are summarized 1 below. Construction costs are indicated, and an allowance is possible for design, inspection, legal, administrative and fiscal expenses. A more detailed account of the preliminary construction I estimate is included in the Appendix. The costs presented below do not include any amounts for right -of -way and easement acquisition. II PROJECT ESTIMATED COSTS 1 West Powers 78th Street Boulevard , Total Project I Grading $ 101,500 $101,700 $ 203,200 Paving $ 226,200 $127,200 $ 353,400 1 Drainage $ 135,700 $ 25,000 $ 160,700 1 Detention Pond $ 189,800 $ 0 $ 189,800 Sanitary Sewer $ 22,400 $ 0 $ 22,400 1 Watermain $ 33,000 $ 0 $ 33,000 Landscaping/ 1 Miscellaneous $ 260,600 $197,600 $ 458,200 Construction II Subtotal $ 969,200 $451,500 $1,420,700 Legal, II Administration, Fiscal II ( percent) $ 340,000 $160,000 $ 500,000 TOTAL ESTIMATED 1 PROJECT COST $1,309,200 $611,500 $1,920,700 1 1 1 II Mr. Charles Folch, P.E. -4- February 19, 1992 1 PROJECT FINANCING The assessment methodology in this update is consistent with the I original design and implementation study. A preliminary assessment role is included in the Appendix. II PROJECT FINANCING TABLE 1 General II Improvement Assessable Obligation Amount Amount Total II Grading, Paving, Signals, Lighting, and Landscaping $327,200 $1,045,700 $1,372,900 1 Drainage and Storm Sewer $108,900 $ 108,900 $ 217,800 1 Detention Pond $ 0 $ 255,200 $ 255,200 Sanitary Sewer $ 30,200 $ 0 $ 30,200 1 Watermain $ 44,600 $ 0 $ 44,600 II TOTAL PROJECT $510,900 $1,409,800 $1,920,700 1 The project proposed herein is feasible from an engineering standpoint. We would be pleased to meet with the City Council, 1 staff and other interested parties to review any aspect of this report. I Respectively submitted, STRGAR - ROSCOE - FAUSCH, INC. II mes R. Dvorak, P.E. 1 ssociate JRD /mdg 1 1 : J cis ty l - '.. r _ PtEA1tn. • .1 Y F ��• W & W o e Ea �� ... .4 101 -0: 1 WHITE ()Off V o STRATTON c, 4 fox CT � a a a` z' •• 4 CIR. C'. a lid c. t f J• f v1EW 4 t '•f 4 , > a `` .' A• P LA f i � ? s W , � r Ox 11 0 pR/ N C, f LItCY LA. R0. 4 '? . Ail v , Q o !! J o t/ii 7 H 1b 0 y! / y /R vo 9-• Q Q• FM TAR �® o D1ROAOM DR( ni I v l3. NAVAJO DR, ? i P 4• J ' 14. BROKEN ARRON DR, 1AKE Ll1CT R0. <�9f 'Po � ¢ N Oq P : _ ► ., J a HARROGATE 15. RED WINO C1 5HENEN D0A11 NESIFRN OR. O = s Q y r0K 17. 16. CHAPARNAI CI Q f.I IIIANA (HA DR 4 ay e T, PLC SANT ClR NET PERCf CT ' CARYER BEACH RD • 8. 91 UE RIBBON CT, 10. PIMA DAY o W a n OYES [��!• me" y 9. HUNTERS C. ti♦ O P j \Y. Op �r 1 ®� 0 5 r NOC7AM , % u y L. An � LONE DR. CIR. i = 8 1 JAY CIR. SEH LA. ' 18011 CIR. J o a KfR liel: t EAG OR , j 1 E0 Lotus N F u °k ► le z CIR. J J HOOD NILLiDR Nt OR• la4e R0 T , LOTUS VIEN OR RIDGE CIR, L.oke Lucy 7 e ` ► i ti0 ,400* = , W L 10 F TAR RIDGE CT. �,� • 7 `� $ ft O t�" I , i MAPLE L EA • PONTIAC E'. a O ♦ a ♦ i W ` i 1 / 67 ICA ( 4. a F OR. * O tT R. , o c I 4 j ' : d A mike fROHTifq!' ' 1EN y/ c'. ONT C 1441x, y Nit. CO E - '.*b TA• Y :LIT CT CT • jy N. CONE v e1�:_130: c u RtRIDC! .LfbRO(Q c�q ,, :st. R S7EAD 'PTA C Lake Ann W 1O o t0. Cf TR. g • t �t CIR, `3 ~ EAS 2A.5ADDLEBROOR PASS P o NI yl DR. D RrTE D C 25. CHIPPEWA tr. EO Q p u ov' DR. ':::1111 CIWRRON Q g jl , t R ISTIE , �HIPPEW A t v J DR• CIR, !' , '. L a l CT. J, o t, ! 0 PROJECT LOCATION ��� zs 5 "B' Q ��`� N •. LAREDO L . L o r. 76Th c 1R. i Au' �� _ ,! a '11.1130000B F 51. E COL • ile,..1 ♦ b Lc NTA f1R N. 77th ST, 101 / 11 12. SA CHAN sr ® . <-- COUtTEq 4 r , � �EN ST, if ARBOR( T c W. TOth ST, U M r. o � 13th 0 T 11611 R73■ P ��- -� `� a \ NCH* DR. rj & (I CI � ..T E. 10111 CT ^ F .-1�� T I 1 1611 15Ii �tb z o g T9*TT ST OR. 121 T ] 1 , W . W2311 - Rt2r i I S O CN NE 1 3110 P pA 5 W. ra K L' �� `', y S � v \ a, .4 = 8 0 n, ST. A. i G f .4' , s as SINNEN -. y / e Q OIR,� 11a > 5u Q %"4 a LAKE Ci. G .0.. cc e UARp •4 W ' . `' OR. Rios } a �r ��" � � Lake Saran Month t C� r Lake g P• )... � U U r N. Kitt ST. TOLES I OIL LL ' 4 ,� i T1151IR23r g,, 1,!). 1 11 2312. su," / eAReARA 7.. S 0 s I w CT. a .. . . �0 it i ,;;., w IT LYMAN m i Rd elvo. ' (4•72' 1 t : Rqt f • • - v Sn' STRGAR- ROSCOE-FAUSCH, INC CONSULTING ENGINEERS CITE,' OF CHANHASSEN FIGURE 1 lei' 1 °r"'' °'d' 2.mi 1 ` W. 78TH STREET Suite 150, One Carlson Parkway North POWERS BLVD PROJECT LOCATION Minneapolis, MN 55447 (612) 475 -0010 QTY PROJECT NO. 92-3 SRF NO. 0921634 , 1 1 1 1 EX. R/W 40.0' 40.0' EX. R/W I 6.0 , 28.0' 9.0' 28.0' „ 8.0' ,_ WALK , 14.0' I 14 0' 14 0' 1 14.0' 1 WALK J. � ' THRU THRU 1 THRU THRU • �q B624 C&G B624 C&G 111 .04'/. , .02_,'L, .047 .02'/. w 04' /. k 1 W. 78TH ST. POWERS BLVD. 1 CENTER GRASS MEDIAN ( FOR ONLY A SHORT DISTANCE) SEE FIGURE NO.3 1 , 1 c. • EX R/W I 40.0' EX. R/W 40.0' ' 6.0' I 28.0' _ 6.0' 3.0' 37.0' 1 8.0' WALK 14.0' 14.0' '14.0' 1 12.0' 1 14.0' WALK 1 THRU THRU LT. TURN THRU THRU ' P 04'/, I B624 C&G 8624 C&G 02'/ 8624 C 04'/, �, 1 W. 04,40,4:: 4:7 , Ak. 1 1 W. 78TH ST. POWERS BLVD. LT. TURN LANES 1 1 1 SnF STRGAR - ROSCOE - FAUSCH, INC. CITY OF CHANHASSEN FIGURE 2 1 j� CONSULTING ENGINEERS Transportation III °°°'�" r. s`�.,m 1 • Land Surveyors W. 78TH STREET Suite 150, One Carlson Parkway North POWERS BLVD PROPOSED TYPICAL SECTIONS Minneapolis, MN 55447 1 (612) 475 -0010 CITY PROJECT NO. 92 -3 SRF NO. 0921634 MATCH LINE ....; ■ • • 1-1 •s.- . . ' t'"1 rxi • 1 _ 4 '4 I 1 o•-) .:1: , ..: - 1 . ' : •!* •-•-•-• - l 0 I ••': '1. .1.' . • . .': ' 1 4 8' TRAIL ...tC i - - - POWERS BLVD. • ,., .,:::1.,. . 1 > '.' . .,....:.....:, 1 LEGEND . ' . • .' ( 1 _ ____. 0 I ". ','''..;.: ', - - -- - EXISTING STREET - - -- - - - . : :. • • PROPOSED STREET r i , , 1 1 • -0-»- - EXISTING STORM SEWER --/ /I • ; -----7-T-7-.-.-7,-,=,..-,,-7,-...,.;m1,-,----77-- --.--,--- PROPOSED STORM SEWER Jr ›., • _ __ _ - -- .;:....:••:y1: ma .."t,7:-.,_ 1■I rr • • - • .:.z.7 • — ..,„ ,......._ l --0-- > — - EXISTING SANITARY SEWER AI __ __ -___ __, 4 , 12 1 1 ; ;, .„ .. .:',.:. ;. . ;..........,•.• :..J;.-1-,.. .44••:• .,, _ -,..- > — PROPOSED SANITARY WER / G WALK SE 11: .!..' .'.•' :: - — I -- - EXISTING WATERMAIN 1:0 11-1114 \- .. . — 1 — PROPOSED WATERMAIN i , , 7-, , , N "..:.•:;:,:..;.,..‘.:.;;.-.:.'‘:•.,....''..; :.,..,.. . . . ■ ) ; 1, , i • '' '...,,,,,, "<;.•' '.. ‘.. , . ' ••: .•,' • ' \.., . . TO BE CONSTRUCTED W. 78TH STREET --<-- 6' WALK L . — -- — — — ==.— ....-4 --_—__L-- .- ,_1_==-_ ,-,....t-_,• =_-: -r --r I ___ _— - - - — --- - — - - - - --- — - - - — - -- — -.“-• -..--- '-7--- •".'".' - ` ,- .7'''' 4 7 • - — , ••:. - 7. -- _ - _ - 72 _ .. _ ,.„- ---<— ---.--=-- 71- ... ---- • — ■....■••....... -'" -'<. • - • =--''''----- ' ' 77 -''.'' ._ ' . .. 1...ii • ( I ' L-- ---, / / 1 ..--- .---------- / ---"---...„_.„...... .... 7 , _...._ 1 l SRF STRGAR-ROSCOB , FAUSCH, INC CONSULTING ENGINEERS ,., CITY OF CHANHASSEN FIGURE 3 Temporiatba II 0•11 II %swim! I hribg lard %rayon PROPOSED STREET Suite 150, One Carlson Parkway North W. 78TH STREET/ POWERS BLVD. IMPROVEMENTS Minneapolis, MN 55447 (612) 475-0010 CITY PROJECT NO. 92-3 SRF NO. 0921634 .- . —. NM NM — 111111 MO — 11111 Ern =II 111111 111111 111111 ION 11111 IIIII 11111 — IIIIII -MI NMI EMI MI NM MI • IIIIIII NMI • • OM — — MO — — — MLA= • . - MATCH LINE 44 1 i — — ', II III __• _ _ __ .4 • -,--------- , ----____,-____4- .- — I) .4 ill > l■• ---- — -- ---- - - -- - - - POWERS BLVD. Iii 1-3 ral it 0- 0 1 1 I L Li C11 IP .11 At4 . 1 1 / ' 1 1-04Y • . ti• ., LIGHT STANDARD (TYR.) IA? 1 t ........._ it.... , ...., _ 02 - \ i C4 ) k i t - - .\,%, , , i co c4 Na ‘ 6 ■,, I ; / / / I No \ \ 6 * \ , ._ AI . 'cs • ' ,. -0.- W. 78TH STREET N • . :...-., to ,,.... - - - ' .,__, • _ _ .. - 3 7 3 - 0 , 300e j ----OTTeiUDIO - 7)0_• , ' _ - - - _ - - _ -- -4.4 .- --,-: -----_-:-.-. _ — . ,. ..._ ._ ,- _______- 0 _-___ _..__ _. . _ ------------ ,-- -- - . _ _ _ _ _ _ _ _ F — — - - -- . .......,_.,_... „J.... ..,- _ Afil'■,•1•ISMSRIt ••••••••111=11111•A•110111•11111 ' I – – ---- ' I – –) i – -- / / /– 1 1 — ( — - ■ -- , SRF STRGAR-ROSCOE-FAUSCH, INC CONSUMING ENGINEERS CITY OF CHANHASSEN FIGURE 4 tuiticarica • 041 • Stsuctsig S lIablas II larlSenern PROPOSED LANDSCAPING Suite 150, One Carlson Parkway North W. 78TH STREET/ POWERS BLVD. AND LIGHTING Minneapolis, MN 55447 (612) 475-0010 CITY PROJECT NO. 92-3 SRF NO. 0921634 1 1 1 1 APPENDIX 1 1 1 1 1 1 1 1 1 1 1 1 11•1111 MI r N NM = MI MI - MI = - MI • • I M r - STRGAR - ROSCOE - FAUSCH, INC. PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS W 78th ST. / POWERS BOULEVARD PROJECT. W 78th ST. SRF NO.: 0921634 W. 78th ST POWERS BLVD. TOTAL PROJECT I FILE: 1634EST1 LATEST REVISION: 2 -19 -92 UNIT ESTIMATED TOTAL ESTIMATED TOTAL ESTIMATED TOTAL NOT ITEM NO. ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 2101.511 CLEARING AND GRUBBING LUMP SUM $5,000.00 0.5 2500.00 0.5 2500.00 1 5000.00 2104.505 REMOVE BITUMINOUS PAVEMENT SQ. YD. 3.00 5800 17400.00 5200 15600.00 11000 33000,00 2105.501 COMMON EXCAVATION (EV) CU. YD. 2.00 15000 30000.00 25000 50000.00 40000 80000.00 2105.522 SELECT GRANULAR BORROW (CV) CU. YD. • 6.00 8600 51600.00 5600 33600.00 14200 85200.00 SUBTOTAL GRADING $101,500.00 $101,700.00 $203,200.00 2211.503 AGGREGATE BASE PLACED, CLASS 5 CU. YD. $13.00 3300 42900.00 2100 27300.00 5400 70200.00 2340.508 TYPE 41 WEARING COURSE MIXTURE TON 20.00 1500 30000.00 1000 20000.00 2500 50000.00 2340.514 TYPE 31 BASE COURSE MIXTURE TON 18.00 2900 52200.00 1900 34200.00 4800 86400.00 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 1.50 330 495.00 210 315.00 540 810.00 2521.501 4" CONCRETE WALK SQ. FT. 2.00 31400 62800.00 10100 20200.00 41500 83000.00 2521.511 2' BITUMINOUS WALK SQ. FT. 1.00 0 0.00 3000 3000.00 3000 3000.00 2531.501 CONCRETE CURB AND GUTTER DESIGN B624 LIN. FT. 6.00 6300 37800.00 3700 22200.00 10000 60000.00 - SUBTOTAL PAVING $226,200.00 $127,200.00 5353,400.00 2501.511 30" R. C. PIPE CULVERT CLASS V UN. FT. $50.00 0 0.00 70 3500.00 70 3500.00 2501.515 15" R. C. PIPE APRON EACH 350.00 0 0.00 1 50.00 1 50.00 2501.515 30" R. C. PIPE APRON EACH 500.00 0 0.00 2 1000.00 2 1000.00 2501.515 54" R. C. PIPE APRON EACH 1000.00 1 1000.00 0 0.00 1 1000.00 2502.541 6" PERFORATED TP PIPE DRAIN LIN. FT. 15.00 250 3750.00 150 2250.00 400 6000.00 2503.511 12" R. C. PIPE SEWER CLASS 11I LIN. FT. 22.00 0 0.00 120 2640.00 120 2640.00 2503.511 15" R. C. PIPE SEWER CLASS III LIN. FT. 25.00 50 1250.00 270 6750.00 320 8000.00 2503.511 18" R. C. PIPE SEWER CLASS 111 LIN. FT. 32.00 70 2240.00 0 0.00 70 2240.00 2503.511 24" R. C. PIPE SEWER CLASS III LIN. FT. 36.00 210 7560.00 70 2520.00 280 10080.00 2503.511 27" R. C. PIPE SEWER CLASS III UN. FT. 40.00 610 24400.00 0 0.00 610 24400.00 2503.511 36" R. C. PIPE SEWER CLASS III LIN. FT. 45.00 340 , 15300.00 0 0.00 340 15300.00 2503.511 42" R. C. PIPE SEWER CLASS III LIN. FT. 75.00 200 15000.00 0 0.00 200 15000.00 2503.511 54" R. C. PIPE SEWER CLASS III LIN. FT. 100.00 490 49000.00 0 0.00 490 49000.00 2506.509 CONSTRUCT DRAINAGE STRUCTURE EACH 1000.00 14 14000.00 6 6000.00 '20 20000.00 2511.501 RANDOM RIPRAP CLASS III CU. YD. 80.00 28 2240.00 3 240.00 31 2480.00 SUBTOTAL STORM SEWER $135,700.00 $25,000.00 5160,700.00 2105.501 POND EXCAVATION (EV) CU. YD. 2.50 50000 125000.00 0 0.00 50000 125000.00 2501.511 6(Y' R. C: PIPE CULVERT CLASS III LIN. FT. 200.00 250 50000.00 0 0.00 250 50000.00 2501.515 60" R. C. PIPE APRON EACH 1500.00 2 3000.00 0 0.00 2 3000.00 0506.602 CONSTRUCT OUTLET CONTROL STRUCTURE EACH 10000.00 1 10000.00 0 0.00 1 10000.00 2511.501 RANDOM RIPRAP CLASS III CU. YD. 80.00 23 1840.00 0 0.00 23 1840.00 SUBTOTAL POND $189,800.00 $0.00 5189,800.00 STRGAR - ROSCOE - FAUSCH, INC. PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS W 78th ST. / POWERS BOULEVARD PROJECT W. 78th ST. SRF NO.: 0921634 W 78th ST. POWERS BLVD. TOTAL PROJECT FILE: 1634EST1 LATEST REVISION: 2 -19 -92 UNIT ESTIMATED TOTAL ESTIMATED TOTAL ESTIMATED TOTAL NOT ITEM NO. ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 0451.602 TRENCH STABILIZATION MATERIAL TON $10.00 25 250.00 0 0.00 25 250.00 2503.511 6" PVC PIPE SEWER LIN. FT 10.00 275 2750.00 0 0.00 275 2750.00 2503.511 8" PVC PIPE SEWER LIN. FT. 24.00 550 13200.00 0 0.00 550 13200.00 0503.601 CONSTRUCT 6" OUTSIDE DROP LIN. FT. 200.00 10 2000.00 0 0.00 10 2000.00 0506.508 CONSTRUCT MANHOLE EACH 1100.00 3 3300.00 0 0.00 3 3300.00 2506.511 RECONSTRUCT SANITARY MANHOLE LIN. FT. 180.00 4 720.00 0 0.00 4 720.00 2506.522 ADJUST FRAME AND RING CASTING EACH 200.00 1 200.00 0 0.00 1 200.00 SUBTOTAL SANITARY SEWER $22,400.00 $0.00 522,400.00 0504.602 RELOCATE HYDRANT AND VALVE EACH $800.00 2 1600.00 0 0.00 2 1600.00 0504.602 HYDRANT EACH 1200.00 4 4800.00 0 0.00 4 4800.00 0504.602 ADJUST VALVE BOX EACH 125.00 1 125.00 0 0.00 1 125.00 0504.602 WATER MAIN PIPE FITTINGS EACH 70.00 23 1610.00 0 0.00 23 1610.00 0504.602 6" WATER GATE VALVE EACH 450.00 8 3600.00 0 0.00 8 3600.00 0504.602 8" WATER GATE VALVE EACH 550.00 3 1650.00 0 0.00 3 1650.00 0504.602 12"X8" WET TAP EACH 1000.00 1 1000.00 0 0.00 1 1000.00 0504.603 6" WATER MAIN - DUCTILE IRON LIN. FT. 14.00 300 4200.00 0 0.00 300 4200.00 0504.603 8" WATER MAIN - DUCTILE IRON LIN. FT. 16.00 900 14400.00 0 0.00 900 14400.0 SUBTOTAL WATERMAIN $33,000.00 80.00 $33,000.00 2545.501 ELECTRIC LIGHT SYSTEM LUMP SUM $100,000.00 0.5 50000.00 0.5 50000.00 1 100000.00 2554.501 TRAFFIC BARRIER DESIGN 88307 LIN. FT. 17.00 0 0.00 1000 17000.00 1000 17000.00 0564.602 SIGNING LUMP SUM 3,000.00 0.5 1500.00 0.5 1500.00 1 3000.00 0564.602 STRIPING LUMP SUM 3,000.00 0.5 1500.00 0.5 1500.00 1 3000.00 2565.511 FULL T ACTT CONTROL SIGNAL SYSTEM SIG. SYS. 80,000.00 1.5 , 120000.00 0.5 40000.00 2 160000.00 0571.501 CONIFEROUS TREES TREE 275.00 25 6875.00 25 6875.00 50 13750.00 0571.502 DECIDUOUS TREES TREE 300.00 100 30000.00 100 30000.00 200 60000:00 0571.503 ORNAMENTAL TREES TREE 200.00 25 5000.00 25 5000.00 50 10000.00 2573.501 BALE CHECKS EACH 5.00 250 1250.00 250 1250.00 500 2500.00 2573.502 SILT FENCE HEAVY DUTY LIN. FT. 3.00 2500 7500.00 2500 7500.00 5000 15000.00 0575.605 SODDING W/ 4" TOPSOIL SQ. YD. 1.80 20000 36000.00 20000 36000.00 40000 72000.00 0575.501 SEEDING W/ 4" TOPSOIL ACRE 500.00 2 1000.00 2 1000.00 4 2000.00 SUBTOTAL LANDSCAPING & MISCELLANEOUS $260,600.00 $197,600.00 $458,300.00 TOTAL PROJECT $970,000.00 $450,000.00 $1,420,000.00 NM NM MN - MI N- OM =- MN 1 1 NM NM MI M 11111 11111 INNII MO MN - - OM - OM • MN MN I MO MI i NM ME MB UN W. Nth ST. /POWERS BLVD. ESTIMATED ASSESSMENTS BY PROPERTY OWNERS COMM. NO.: 0921634 PREP: JAR DATE: 2 -19 -92 , 1 11 1 1, ,1 1 11 11 1 1 1 11 11 11 11 1 1 11 ;; 1 11 SA NITARY SEWER 11 WATER MAIM „ STORM fiRMWARE 11 ROADWAY IMPROVEMENTS „ :: 11 PROPERTY 1 :EXISTING :EXISTING 11 11 1 11 11 TOTAL 11 11 1 1 1 11 1 1 11 11 11 1 1 1 1 1 1 1 1 11 1, 11 11 TAX 1 OWNERSHIP /DESCRIPTION : FRONT 1 GROSS 11 RATE- I ! 11 RATE- 1 1 11 RATE- 1 1 11 RATE- 1 . 1 11 11 11 1 1 1 :I !ASSESS -1 LATERAL 11 !ASSESS -: LATERAL :: !ASSESS- 1 11 :ASSESS-1 11 ASSESSMENT 11 11 NUMBER I : FOOTAGE : 5Q. FT. II FRONT I ABLE 1 AMOUNT 11 FRONT I ABLE 1 AMOUNT 11SOUARE 1 ABLE : AMOUNT 11 FRONT : ABLE : AMOUNT II II :1 : 1 I 11 FOOT If R. FT. I 11 FOOT FR. ET.1 1: FOOT 150. FT. 1 1: FOOT IFR. FT.: 11 1: 11 1 / 1 11 1 1 11 I 1 11 1 1 11 1 1 11 1, 11 1 1 I 11 1 1 11 1 I , 1 /1 1 1 11 1, 1 1 1 1 1 11 1 1 11 1 1 11 1 1 11 , 1 ,1 1, 1 1 1 11 1 1 11 1 11 1 1 , 11 1, 11 11 , 1 1/ 1 1 11 1 1 11 1 i 11 11 11 , 1 1 11 1 1 11 1 1 11 1 1 11 1 1 11 11 II !VILLAGE WEST TONNHOUSES LOT 1 ! 0 I 119255 1:826.19 I 0 1 $0.00 11825.11 : 0 1 $0.00 1180.077 1 103220 I $7,947.94 1:892.00 I 0 1, $0.00 11 $7,947.94 :1 11 !VILLAGE WEST TOWNHOUSES LOT 2 I 0 1 136725 :1$26.19 ! 0 : $0.00 11$25.11 : 0 1 $0.00 11$0.077 1 136725 1 110,527.83 11192.00 1 0 1 $0.00 :1 $10,527.83 :: 11 0125000 (WEST VILLAGE HEIGHTS BL 1,101 1 I 219 I 66025 11126.19 ! 0 ! $0.00 11125.11 I 0 1 $0.00 1180.077 1 66025 1 $5,083.93 :1892.00 1 0 1 $0.00 :1 $5,083.93 11 I: 0125000 (WEST VILLAGE HEIGHTS BL 1,101 1 1 294 I 66025 11826.19: 294 : $7,699.86 11125.11: 294 1 17,382.34 1110.077 ! 0 I $0.00 11192.00 1 294 1 $27,048.00 I: 142,130.20 11 11 0125000 :WEST VILLAGE HEIGHTS 81 1,101 2 1 337 1 109300 1326.19 1 337 $8,826.03 11125.11 1 337 1 18,462.07 1110.077 1 109300 1 $8,416.10 11192.00 1 337 1 $31,004.00 :I $56,708.20 11 11 0125000 IWEST VILLAGE HEIGHTS 81 1,101 3 1 200 I 47135 11126.19 1 0 1 10.00 11125.11 1 0 1 $0.00 11$0.077 1 47135 1 13,629.40 :1192.00 I 200 I $18,400.00 1: $22,029.40 1: 1 0125000 :WEST VILLAGE HEIGHTS 111 1,LOT 4 1 866 1 533515 11126.19 I 0 1 $0.00 1325.11 1 355 1 18,914.05 130.077 1 533515 1 141,080.66 11192.00 1 866 1 179,612.00 :18129,666.71 11 11 0125000 W. VILLAGE HEIGHTS BL 1,0UTLOT BI 750 1 832530 11126.19 1 0 1 $0.00 11125.11 1 0 1 10.00 1110.077 1 275045 1 121,178.47 11192.00 1 0 1 $0.00 :1 $21,178.47 11 1: 0125000 :WEST VILLAGE HEIGHTS BL 2,101 1 1 718 I 136508 11826.19 1 522 1113,671.18 11$25.11 1 652 1$16,371.72 1180.077 1 136508 1 $10,511.12 11192.00 1 652 1 159,984.00 118100,538.02 11 11 0125000 :W. VILLAGE HEIGHTS BL 2,OUTLOT AI 138 1 6755 11826.19 1 0 1 $0.00 11125.1! 1 138 1 $3,465.18 130.077 1 6755 I $520.14 11192.00 1 138 1 $12,696.00 1: $16,681.32 11 11 :CHAPARRAL ON LK ANN DUTLOT B 1 1030 1 789694 11126.19 1 0 1 $0.00 :1825.11 1 0 1 $0.00 1110.077 1 0 : $0.00 11$92.00 1 0 1 $0.00 11 ,$0.00 11 1125-15000601BURDICK PARK 81 2, LOT 3 1 0 1 39485 11126.19 1 0 1 80.00 1325.11 1 0 1 10.00 1110.077 1 0 1 $0.00 11892.00 1 0 1 $0.00 11 $0.00 11 1125- 150007016URDICK, PARK, 81 2, LOT 4 1 0 1 32180 1326.19 1 0 1 $0.00 11125 :11 1 0 1 10.00 1110.077 1 0 1 10.00 H192.00 1 0 : $0.00 1: j10.00 11 1 125- 1500070:8URD1CK PARK 81 2, LOT 5 1 0 1 31045 11126.19 I 0 1 $0.00 11125.11 1 0 1 $0.00 1180.077 1 0 1 $0.00 1 :892.00 I 0 1 $0.00 11 10.00 11 1 125- 15000601BURDICK PARK 81 3, LOT 1 1 283 1 53300 :1826.19 1 0 1 $0.00 11325.11 1 0 1 $0.00 :110.077 1 0 I 80.00 :1892.00 1 283 1 $26,036.00 11 $26,036.00 11 :125-1500090 :BURDICK PARK BL 3, LOT 2 1 0 1 42860 11826.19 1 0 1 *0.00 11825.11 1 0 1 $0.00 130.077 1 0 1 $0.00 :1192.00 1 0 1 $0.00 11 $0.00 11 :1 0140500 :BURDICK. PARK 2ND ADD 81 1,101 1 1 230 1 70135 1326.19 1 0 1 10.00 11125.11 1 0 1 $0.00 1 130.077 1 0 I $0.00 11192.00 : 0 1 $0.00 11 1 $0.00 :1 11 0140500 :BURDICK PARK 2ND ADD BL 1,101 2 1 240 I 104430 :1826.19 1 0 1 $0.00 11125.11 1 0 1 $0.00 1110.077 1 0 1 $0.00 11$92.00 1 0 1 $0.00 :1 80.00 11 1: 0140500 1BUP.DICK. PART: 2ND ADD BL 1,101 3 1 235 1 121068 1326.19 1 0 1 $0.00 1325.11 1 0 1 $0.00 1110.077 1 0 1 $0.00 11$92.00 : 175 I $16,100.00 1: $16,100.00 11 11 0140500 :BURDICK PARK 2N0 ADD BL 1,101 4 1 245 1 167923 11126.19 1 0 1 $0.00 11125.11 1 0 1 $0.00 1180.071 1 0 1 80.00 11892.00 1 245 1 $22,540.00 11 $22,540.00 11 11 0140500 1BURDICK PARK 2140 ADD 81 1,101 5 1 367 1 319324 11126.19 1 0 1 $0.00 11825.11 1 0 I $0.00 11$0.077 1 0 1 $0.00 11192.00 1 367 1 $33,764.00 :1 $33,764.00 1: 11 1 , 1 11 1 I 1 , 1I , 11 1 I 1 1 1 1 1 1 , 1 11 I 1 11 , , 11 , : 11 1 I , 1 1153 $30,197.07 1776 144,595.36 1414228 $106,895.56 3557 $327,244.00 $510,931.99