Loading...
6. Americana Bank, Site Plan Review, Preliminary Plat, Public Hearing Vacating Underlying Plat and Easements of crossroad Plaza Addition C 1 TY 0 F PC DATE: 2/19/92 6 C 1A 11A E N CC DATE: 3/9/92 1 vy CASE #: 92 -1 SITE 90 -2 VAC 89 -19 SUB STAFF REPORT ' PROPOSAL: 1) Site Plan Review for an 11,468 Square Foot Bank and Office Building - Americana Community Bank 2) Replat Lots 1 and 2, Block 1, Crossroads Plaza, into two parcels IZ with areas of 70,000 Square Feet and 164,762 Square Feet 3) Vacation of a cross access easement and an underlying utility I Q and drainage easement located on Lot 2, Block 1, Crossroads V Plaza 2nd Addition e LOCATION: North of Highway 5, east of Market Boulevard, south of Q. Chicago, Milwaukee, St. Paul, and Pacific Railroad I APPLICANT: KRJ Associates City of Chanhassen POBox635 L,t1 MN :,336 PRESENT ZONING: BH, Highway and Business Services District g Y 1 ACREAGE: 234,762 Sq Ft (Plat) 70,000 Sq Ft (Site Plan) ' DENSITY: ADJACENT ZONING AND LAND USE: N - BG and CBD, Filly's and Country Suites S - BH, Vacant E - BH, Vacant 11 W - BG, Vacant (Future Market Square) and Fountain - 1 (, WATER AND SEWER: Available to the site. w PHYSICAL CHARACTER.: The site has been extensively altered due to the . construction of Market Boulevard and West 79th Street. The site is flat and devoid of tree cover. 1 2000 LAND USE PLAN: Commercial 1 1 ' ' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Americana Community Bank February 19, 1992 Page 2 PROPOSAL /SUMMARY 1 At the time staff submitted their February 19, 1992, report to the Planning Commission, the site plan for the Americana Bank was for a smaller building than what is being proposed Staff was informed of the revisions two days prior to the Planning Commission meeting date. The ' additional building area will be used to expand office space. The expansion illustrated but not proposed in the original plan. Since the change was minor and staff wished to expedite the review, we kept the site plan on the agenda with amended conditions. 1 A second change in the site plan was the preparation of a traffic study investigating the safety of allowing full access (left /right in and out) curb cut on Market Boulevard Staff was initially ' hesitant in recommending approval of such access, but the traffic study concluded that it could be accommodated. Rather than writing an update to the staff report containing all the changes, staff rewrote the report The original report submitted to the Planning Commission is attached 1 (Attachment #1). This request is for the construction of an 11,468 square foot bank building on the westerly 1 70,000 square feet of Lot 1, Block 1, Crossroads Plaza. This parcel is currently owned by the Chanhassen Housing and Redevelopment Authority. The applicant is negotiating with the HRA to purchase the property. Approval of the purchase was scheduled to take place 1 on February 20, 1992. As part of the agreement, the city is replatting the subject property and adjacent property (Lot 2, Block 1) which is also under the ownership of the HRA. 1 The site plan is well developed. The architecture of the bank building attempts to reflect the nearby Market Square Shopping Center through the use of stucco accent tiles, columns ' and accentuated gabled entries, as well as the roof line of the Country Suites Hotel. Staff is proposing that the type of shingle which resemble wood shakes from a distance be used similar to the Country Suites Hotel. One highly attractive feature of the site is the inclusion of a pedestrian plaza at the intersection of West 79th Street and Market Boulevard. A four ' lane drive -thru is provided to the north of the building. The stacking area for the drive -thru will be on the northeast portion of the site. The location for the drive -thru is appropriate ' as it places car stacking away from Market Boulevard and West 79th street. The drive -thru is screened by the bank building and landscaping from West 79th Street and Market Boulevard. The site landscaping is generally of high quality. Landscaping materials along the railroad tracks may be restricted due to sight distance limitations as it may obstruct visibility of oncoming trains to traffic on Market Boulevard. The Twin Cities and Western Railroad has been sent a copy of the plans for review and comments and staff has made several attempts to contact them by telephone. As of today, no comments have been received. Site access is of concern in this proposal. Several years ago, a subdivision and site plan for the Crossroads National Bank was approved for this site with two access points on West 1 1 Americana Community Bank r February 19, 1992 Page 3 79th Street. The most easterly access was to be shared by the adjoining That lan Y Y J g P also had an access point on Market Boulevard with a right -in /left -in only. All of the above mentioned access points have been installed by the city. The applicant for Americana Community Bank requested two full access points. One via Market Boulevard (right /left in and out), and the second via West 79th Street. Staff had some concerns regarding the Market Boulevard island cut and allowing a left turn in and out due to traffic safety concerns. A traffic study was preformed by Strgar, Roscoe and Fausch, the city's traffic consultant, prior to the February 19, 1992, Planning Commission meeting. This study concluded that full access could be accommodated. The second access point is through West 79th Street. The access via West 79th street will be exclusively used by the applicant which in turn reduces one access drive. In an accompanying subdivision request, Lots 1 and 2, Block 1, Crossroads Plaza are being replatted into two lots, one of which will contain the bank building and the second will be reserved for future development. The subdivision request is a relatively straight forward action. A simple utility and cross access easements vacation are being requested as well. These 1 easements were part of a previous plat and are no longer needed. Based upon the foregoing, staff is recommending that the City Council approve the site plan, subdivision, and vacation requests for this proposal without variances and subject to appropriate conditions. 1 BACKGROUND On February 12, 1989, the City Council approved the preliminary and final plat for ' Crossroads Plaza Addition. The plat consisted of two lots and four outlots. Lot 1 consists of 2.47 acres and Lot 2 is 3.02 acres. Two of the outlots were utilized for Highway 5 right- of-way dedication. The other two outlots were used for drainage and retention ponds. Lot 1 was to become the future site for the Crossroads National Bank. On October 23, 1989, the City Council approved the site plan for the bank. The site plan consisted of a bank and office building with a total area of 14,000 square feet. Operation of the bank was proposed to begin out of a modular banking facility while the permanent facility was being built. The city constructed a parking lot, three access points to the site, and installed light fixtures to prepare the site for the Crossroads National Bank's temporary facility. The site plan proposed an entrance only along Market Boulevard with an exit only at the southwesterly portion of West 79th Street to accommodate a drive -thru teller. Another full access was provided at the southeast corner of the site to be shared with the adjacent property to the east (Lot 2) in the future. The plans never matured beyond the site plan and subdivision approvals (Attachment #9). 1 1 Americana Community Bank February 19, 1992 Page 4 1 The application in front of the City Council today will change the approved proposal for the Crossroads National Bank Site Plan. The proposed Americana Community Bank will ' invalidate the Crossroads National Bank Site Plan. Therefore, considering action of approval of the Americana Community Bank is contingent upon the withdrawal of Crossroads National Bank Building site plan approval. ' On August 7, 1991, the Planning Commission approved an application for Site Plan #91 -3 for the Americana Community Bank Building to be located at the southwest corner of 1 Market Boulevard and West 78th Street (Market Square Development). A planned unit development amendment and a subdivision proposal were reviewed concurrently. The proposal was approved by the City Council on August 12, 1991. The applicant elected not to proceed with construction on this site due to delays with Market Square Shopping Center and a design for increased visibility from Highway 5. SITE PLAN REVIEW 1 - General Site Plan /Architecture ' The building is proposed at the northeast corner of West 79th Street and Market Boulevard. Site access is proposed from both West 79th Street and Market Boulevard. The parking is located to the north and east of the proposed building. Vehicle stacking is provided ' northeast of the building so that direct distant views from West 79th Street, to the south of the site, will be minimized. Direct views of the stacking lanes will be screened by the building and landscaping from the west of the site. The architecture of the bank building reflects the shopping center's use of stucco accent tiles, columns, and gabled entries. Colors and material types need to be specified for staff approval. Low gabled roofs and a strong masonry base complete the bank's image for the prominent corner site. The applicant does ' not intend to have any rooftop HVAC equipment. All equipment will be placed on the ground. The applicant is showing the trash enclosure screened by a masonry wall using the same materials as the building and an air conditioning unit located on the northwest corner ' of the building. These units are screened by a berm and landscaping to the north, west, and south. The architect's intent to combine the style of the shopping center building, along with other 1 downtown buildings such as the Country Hospitality Suites, is a sound one. Parking /Interior Circulation ' The City's parking ordinance requires one parking space per 250 square feet of gross floor area. The number of parking spaces required is 46 and the applicant is providing 52 parking ' spaces and 1 handicap space which satisfies the requirements of the ordinance. Traffic will be directed via West 79th Street miming parallel to the easterly edge of the site then head 1 1 1 Americana Community Bank February 19, 1992 Page 5 west into the bank site or via Market Boulevard, parallel to the northerly property line. Traffic exiting the site would utilize the same entrance points located to the northwest and southeast of the site. A stop sign is recommended at both locations to regulate traffic 1 exiting the site. The Planning Commission recommended that the parking spaces located to the northeast 1 of the site be designated as employee parking to minimize traffic conflict of cars continuously backing up an disturbing the flow of traffic headed to the drive -thru. Appropriate signage should be required. 1 In general, the interior circulation and entrances are fairly reasonable in our view. There is one minor change to the set up of the parking lot. One turnaround area to the east of the proposed building must be provided to allow vehicles adequate space to back out of the stalls located at the east side of the building. Access There are three existing driveway access points (curb cuts) to the site. One along Market 1 Boulevard and two along West 79th Street. The applicant is proposing to eliminate the most westerly access, and abandoning the existing easterly access on West 79th Street which was to be shared by the adjoining property, and building a new curb cut for the banks exclusive use. The existing curb cuts will have to be eliminated and restored as boulevard. The new entrance on West 79th Street will serve the parking lot and the drive -thru facilities as proposed. This entrance will provide a reasonably safe access to this site since it provides adequate offset separation between this site entrance and Market Boulevard. We believe the current proposal along West 79th Street is acceptable. 1 The second access point would expand the existing curb cut on Market Boulevard located on the northwest corner of the site. As proposed, this would serve as the entrance /exit to the drive -thru lanes and the bank building. The plans propose to expand the existing curb cut and reduce the island on Market Boulevard which was originally constructed for . Crossroads National Bank. The Market Boulevard access was reviewed by the City's traffic engineering consultant, Strgar, Roscoe, Fausch (SRF), who also prepared the downtown traffic study. Based on their calculations, there appears to be sufficient gaps in traffic movements on Market Boulevard during the peak periods to accommodate left - turning movements into and out of the site. Their study is based upon full development of the CBD. 1 Although SRF's calculations are assumed on future land uses, should the land uses intensify, traffic counts may increase beyond what is being anticipated. This could occur if the CBD contains several major retailers. Staff believes it would be appropriate to place in the 1 1 1 Americana Community Bank February 19, 1992 Page 6 ' conditions of approval if two or more traffic accidents occurred over a 12 -month period involving right -angle collisions on Market Boulevard, the City reserves the right to close off the median access and restrict the access along Market Boulevard to a right -in /out only. Staff also believes the Market Boulevard access could be left as is and effectively provide full access to and from the site. The only modification would be striping of a left turn on ' southbound Market. Signalization of the intersection of West 78th Street and Market Boulevard, which is currently under consideration by the HRA and City Council, will help traffic flow on Market Boulevard, although not reduce conflicts at this intersection dramatically. The bank's request calls for cutting back a median so that southbound traffic exiting the bank site could make a left turn onto Market Boulevard. Market Boulevard was widened ' south of the railroad tracks to accommodate right and left turn lanes into the site. The center median length and pavement markings have been reduced to below suggested standards to accommodate the left turn lane into the site. Further expansion of the curb ' cut would require reducing the median further. Both medians and pavement markings have a unique function in the proper control and regulation of traffic into the proper lanes in the roadways. By shortening the median areas further we may be creating confusion or delay in reaction by the driver for smooth and safe lane transition. Therefore, we are recommending that the curb cut of off Market Boulevard remain as is (26 feet), and not be widened to a three lane (36 feet). This access point is further complicated with the ' relationship of the railroad crossing approximately 80 feet to the north. Although the crossing is equipped with flashing light signals and automatic gate arms, it still creates an additional distraction for motorists. Occasional use of the railroad tracks will create temporary stacking of vehicles back into.the site. Layout of the parking lot gives motorists an option to loop back to the east to exit via West 79th Street rather than waiting to turn onto Market Boulevard. Staff is recommending that the bank provide the city with financial ' security in the form of a Letter of Credit to guarantee installation of the required improvements on Market Boulevard and West 79th Street. The applicant shall also be liable for all costs associated with the traffic study and construction of the curb cut. ' Landscaping The landscaping plan is well developed. Trees and hedges are proposed along the north, south, and east portions of the site. Staff is recommending that the applicant comply with any railroad guidelines for maintaining sight lines at the railroad crossing which may limit landscaping along the northerly portion of the west half of the site (See attachment #4). • 1 Americana Community Bank 1 February 19, 1992 Page 7 Lighting Lighting locations are illustrated on the plans. Two light poles are proposed. Only shielded g g P fixtures are allowed and the applicant shall demonstrate that there is no more than .5' candles of light at the property line. Plans should be provided to staff for approval. 1 Signage li has submitted a si na a plan. One monument identification sign is proposed The applicant b g g p g p p at the westerly edge of the site. The area of the monument sign is 70 square feet. The ordinance permits up to 80 square feet. The applicant is also showing two 3 -foot high wall mounted signs on each building elevation with a street frontage. We find the sign package to be reasonable and consistent with the ordinance. Sign permits are required prior to sign installation. Grading /Drainage 1 Specific grading and drainage plans were not prepared for this submittal. Given current conditions on the site and the proposed site plan, grading activity is expected to be minimal. The site plan proposes parking lot drainage divided with half the site draining to Market Boulevard and the remaining half to West 79th Street. Storm sewers should be extended from Market Boulevard and /or West 79th Street to convey runoff generated from the site prior to discharging into the City street. Final grading and drainage plans should be prepared for approval by the city, in addition to submitting storm water calculations for 10 year storm events. All plans shall be prepared by a professional engineer and submitted to the City's Engineering office for review and approval. The site plan does not propose any erosion control measures at this time. Erosion control measures (Type I - silt fence) should be incorporated on the plans along with 79th Street and Market Boulevard. Temporary gravel construction entrances should be employed until the permanent access points have been constructed. 1 Upon receipt of an acceptable grading and drainage plan, staff will be able to recommend appropriate erosion control measures. District approval of this is required. Watershed st app va o t s1 pan s requ ed. The applicant shall receive a Watershed District permit and comply with their conditions. Utilities Municipal sanitary sewer and water service is available to the site from West 79th Street. 1 A previous site plan proposal for this lot extended the water and sewer service into the lot 1 1 Americana Community Bank February 19, 1992 Page 8 to accommodate a temporary building facility; however, the temporary building facility was never constructed. Therefore, the utility services will have to be disconnected by the applicant at the property line and redirected to the proposed facility. Final plans for utility connection should be prepared for approval by staff. ' The Fire Marshal is requesting that utilities coming into the building as well as other fire hydrants in the vicinity be shown on the site plan. ' Park and Trail Dedication The Park and Recreation Commission acted to recommend that the city accept full park and ' trail dedication fees as part of this development. Fees are paid at the time the building permits are requested. The applicant shall also construct a concrete sidewalk, 6 feet wide, to be located south of the site and connecting with the sidewalk located to the west of the ' site. 1 1 1 1 1 1 1 1 1 1 1 Americana Community Bank February 19, 1992 Page 9 1 COMPLIANCE TABLE WITH HIGHWAY & BUSINESS DISTRICT ORDINANCE 1 Required Proposed 1 Building Front Yard Setback 25' 35' Building Side Yard Setback 10' N 100' /E 130' Lot Area 20,000 S.F. 70,000 S.F. 1 Parking Setback from Railroad 0 12' Hard Surface Coverage 65% 65% g , Parking Stalls 46 52 1 SUBDIVISION • The metes and bounds subdivision proposal is a relatively simple request that will serve to realign the easterly property line of Lot 1, 40 feet to the west. Lot 1, Block 1, is proposed to have an area of 70,000 square feet and will be occupied by the bank building. Lot 2, Block 1, is vacant and there is no development proposed on the site at this time. This is a meets and bounds subdivision, therefore no action was required by the Planning Commission. The following easements are illustrated on the plat: 1. Standard drainage and utility easements around the perimeter of both lots (5 feet to the side, 10 feet to the front). 2. A utility and drainage easement over the northerly 20 feet of Lot 1 and 2, Block 1, Crossroads Plaza 2nd Addition. 3. The final plat must be submitted to staff for approval and recording with Carver 1 County. VACATION OF A CROSS ACCESS EASEMENT AND UTILITY EASEMENT ON THE UNDERLYING PLAT The Planning Commission did not need to take action on this item as vacation require City Council approval only. As part of the plat and site plan approval for Crossroads National 1 1 • Americana Community Bank 1 February 19, 1992 Page 10 Bank, a cross access easement was required to allow the occupants of both Lots 1 and 2, to share a driveway. With the new proposed site plan for Americana Community Bank, this cross access easement will no longer be needed and will need to be vacated. Also, due to shifting the westerly property line of Lot 2, the drainage and utility easement along the previous lot line will need to be vacated. Staff is recommending approval of the cross access ' easement and utility and drainage easement vacation. PLANNING COMMISSION UPDATE: A number of revisions took place between the time period when staff submitted their staff report and the day the Planning Commission met. These revisions include: 1 1. The applicants had originally planned on building the bank in two phases. Two days prior to the Planning Commission meeting date, the applicant decided to construct ' phase II of the plan now rather than wait for a future date. The proposed revisions to the site plan met all the requirements of the Zoning Ordinance. Those requirements included setbacks, hard surface coverage, and parking. The roof line ' on the building, including the addition was revised. Additional gables had been introduced and the overall concept was well developed. ' 2. The Market Boulevard access was reviewed by the traffic engineering firm of Strgar, Roscoe, Fausch, who prepared the Downtown Traffic Study. It was concluded that • left turning movements into and out of the site on Market Boulevard can be accommodated. At full development, they found that during the peak P.M. hours, there is capacity 1 for 68 left turns exiting the site onto Market Boulevard. They calculated that there would be 50 movements out of the site during the same time per; - .! Additionally, the site allows for exiting out onto West 79th Street if the wait te it onto Market Boulevard becomes too long. ' Engineering staff still had safety concerns regarding left turns into and out of the site on Market Boulevard. They recommended that if there is more than two traffic accidents involving right angle collisions on Market Boulevard, the access will be limited to right ' in /out only. The Planning Commission was satisfied with the changes, and recommended approval of the application. They commented that the design had been refined further from what was proposed on the corner of West 78th Street and Market Boulevard (the Market Square site). r 1 1 Americana Community Bank February 19, 1992 Page 11 • 1 STAFF RECOMMENDATION Site Plan Review , Staff recommends that the City Council adopt the following motions: ' 'The City Council approves Site Plan Review #92 -1 as shown on the site plan dated February 27, 1992, subject to the following conditions: 1. The applicant must obtain a sign permit prior to erecting any signage on site. Stop signs shall be installed at both exit points located on Market Boulevard and West 79th Street. 2. Landscaping along the north edge of the site must be modified to meet all 1 requirements of the railroad. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building permit issuance. Provide a plant schedule indicating the size and type of all plant materials for staff approval. 3. The applicant shall provide the city with the necessary financial securities to guarantee installation of the required public improvements and costs associated with • the traffic study. 4. Revise architectural P lans as follows: • Incorporate the use of Timberline or similar quality shingles that provide an image of a cedar shake roof. • Provide details of building exterior treatment for staff approval. ' 5. A grading and drainage plan, including storm sewer calculations for a 10 year storm event prepared by a professional engineer, be submitted to the City Engineer for review and approval. 6. The applicant shall indicate on the site plan utilities coming into the building and addition and fire hydrants in the vicinity. 7. The applicant shall include construction of the driveway aprons, any median improvements, sidewalk and boulevard restoration in the site improvements. All boulevard restoration, sidewalk, driveways, and median improvements shall be constructed in accordance with the latest edition of the City's Standard Specifications 1 Americana Community Bank February 19, 1992 Page 12 and Detail Plates (1992). Detailed plans and specifications shall be prepared by a professional engineer and submitted for approval by the City Engineer. 8. The applicant shall be responsible for all damage to the City's existing public improvements (i.e. streets, sidewalk, utilities). 9. The applicant shall provide a turnaround area at the east side of the proposed building. 1 10. The northerly 16 parking stalls shall be labeled "Employee and Tenant Parking Only ". 1 11. The width of the easterly curb cut of off Market Boulevard shall not exceed 26 feet. 12. Plans for the plaza shall be submitted to city staff for approval. 1 13. Type I erosion control fence shall be installed along West 79th Street and Market Boulevard. 1 14. The City reserves the right to limit access to right -in /out only should two or more traffic accidents involving right -angle collisions on Market Boulevard occur within a 12 -month period. 15. The applicant shall utilize the existing Market Boulevard access and provide a 1 striping and signing plan for a left turn lane on southbound Market Boulevard. Subdivision ' Staff is recommending the ::; Council adopt the following motion: g "}' P g 1 '"The City Council approves the subdivision proposal with the following conditions: 1. Park and trail dedication fees shall be paid at time of building permits are requested. 2. Provide the following easements: a. standard drainage and utility easements around the perimeter of all lots. b. The final plat for Crossroads Plaza 2nd Addition must be submitted to staff for approval and filed with Carver County. 1 1 1 Americana Community Bank February 19, 1992 Page 13 1 Withdrawal of originally approved site plan 'The City Council withdraws approval of Site Plan 89 -6 for the Crossroads National Bank 1 building, concurrently with the approval of Site Plan #92 -1 for Americana Bank. The applicant should file the notice of withdrawal against the property at Carver County." 1 Vacation Staff recommends that the City Council adopt the following motion: "The City Council approves the vacation of the following easements: 1. The easterly 5 feet of Lot 1, and the westerly 5 feet of Lot 2, Block 1, Crossroads Plaza Addition. 1 2. The cross access easement located along the common lot line of Lots 1 and 2, Block 1, Crossroads Plaza Addition." ATTACHMENTS 1. Staff report and Planning Commission minutes dated February 19, 1992. g ry , 2. Memo dated February 19, 1992. 3. Memo from Engineering Department dated February 19, 1992. 4. Attachment showing railroad track sight restrictions. 5. Memo from Fire Marshall dated February 12, 1992. 6. Memo from Building Official dated February 6, 1992. 7. Memo from Senior Engineering Technician dated February 12, 1992. 8. Staff report dated August 12, 1991, Americana Community Bank. 9. Staff report dated October 23, 1989, Crossroads National Bank. 10. Plans dated February 27, 1992. 1 1 1 1 1 1 s CITY 0 ' PC DATE: 2/19/92 v ,,\ CHATHAET CC DATE: 3/9/92 11 Jy CASE #: 92 -1 SITE 89 -19 SUB B : A1- Jaff•v II . 1 STAFF REPORT . , 1 PROPOSAL: 1) Site Plan Review for an 7,268 Square Foot Bank and Office Building - Americana Community Bank 2) Replat Lots 1 and 2, Block 1, Crossroads Plaza, II into two parcels with areas of 70,000 Square Feet and 164,762 Square Feet Z 3) Vacation of a cross access easement and an I underlying utility and drainage easement located on r , Lot 2, Block 1, Crossroads Plaza 2nd Addition. LOCATION: North of Highway. 5, east of Market Boulevard, south of 1 O Chicago, Milwaukee, St. Paul, and Pacific Railroad Q APPLICANT: KRJ Associates City of Chanhassen I P 0 Box 635 690 Coulter Drive Long Lake, MN 55356 Chanhassen, MN 55317 II , 1 PRESENT ZONING: BH, Highway and Business Services District ACREAGE: 234,762 Sq Ft (Plat) 70,000 Sq Ft (Site Plan) 1 DENSITY: 1 ADJACENT ZONING AND LAND USE: N - BG and CBD, Filly's and Country Suites S - BH, Vacant E - BH, Vacant I W - BG, Vacant (Future Market Square) and 0 II Fountain WATER AND SEWER: Available to the site. 1 W PHYSICAL CHARACTER.: The site has been extensively altered due to I.. the construction of Market Boulevard and West "=10 79th Street. The site is flat and devoid of tree cover. II 1 2000 LAND USE PLAN: Commercial II 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 Americana Community Bank August 7, 1991 Page 2 ' PROPOSAL /SUMMARY ' This request is for the construction of a 7,268 square foot bank building on the westerly 70,000 square feet of Lot 1, Block 1, Crossroads Plaza. This parcel is currently owned by the Chanhassen Housing and Redevelopment Authority. The applicant is negotiating with the HRA to purchase the property. Approval of the purchase is scheduled to take place on February 20, 1992. As part of the agreement, the city is replatting the subject property and adjacent ' property (Lot 2, Block 1) which is also under the ownership of the HRA. The site plan is fairly well developed. The architecture of the ' bank building attempts to reflect the nearby Market Square Shopping Center through the use of stucco accent tiles, columns and accentuated gabled entries, as well as the roof line of the Country ' Suites Hotel. Staff is proposing that the type of shingle which resemble wood shakes from a distance be used similar to the Country Suites Hotel. One highly attractive feature of•the site is the ' inclusion of a pedestrian plaza at the intersection of West 79th Street and Market Boulevard. A four lane drive -thru is provided to the north of the building. The stacking area for the drive -thru will be on the northeast portion of the site. The location for the ' drive -thru is appropriate as it places car stacking away from Market Boulevard and West 79th street. The drive -thru is screened by the bank building and landscaping from West 79th Street and Market Boulevard. The site landscaping is generally of high quality. Landscaping materials along the railroad tracks may be restricted.due to sight distance limitations as it may obstruct ' visibility of oncoming trains to traffic on Market Boulevard. The Twin Cities and Western Railroad has been sent a copy of the plans for review and comments. As of today, no comments have been received. Site access is of concern in this proposal. A previous subdivision and site plan for the Crossroads National Bank was approved with two access points via West 79th, the most easterly access was to be shared by the adjoining property. The site also had an access point on Market Boulevard with a right -in /left -in only. All of the ' above mentioned access points have been installed by the city. The applicant for Americana Community Bank requested two full access points. One via Market Boulevard (right /left in and out), which will require cutting back the existing island on Market Boulevard and widening the existing driveway apron. Staff has some concerns regarding the Market Boulevard island cut and allowing a left turn in and out due to traffic safety concerns. Staff recommends that a traffic study be preformed prior to the city granting full access drive. According to the Eastern Carver County Transportation study there is a potential for 7,400 trips per day on Market Boulevard by the year 2010. The second access point is through West 79th If Americana Community Bank If August 7, 1991 Page 3 Street. The access via West 79th street will be exclusively used by the applicant which in turn reduces one access drive. The bank representatives believe that the southbound left turn from the site on to Market Boulevard is critical to their operation. From a design standpoint, we believe this change is not likely to undermine the effectiveness of traffic flow on Market Boulevard. However, it is necessary to note that the City Engineering Department continues to have safety concerns with the left turn from the site to southbound Market Boulevard. If the applicant still desires to have a full access approved, they should pay for all associated costs related to preparation of a traffic study. The results of that study shall determine the feasibility of granting a full access. , In an accompanying subdivision request, Lots 1 and 2, Block 1, Crossroads Plaza are being replatted into two lots, one of which will contain the bank building and the second will be reserved for future development. The subdivision request is a relatively straight forward action. Based upon the foregoing, staff is recommending that the Planning Commission approve the site plan, and subdivision requests for this proposal without variances and subject to appropriate conditions. 1 BACKGROUND On February 12, 1989, the City Council approved the preliminary and final plat for Crossroads Plaza Addition. The plat consisted of two lots and four outlots. Lot 1, 2.47 Acres, and Lot 2, 3.02 Acres. Two of the outlots were utilized for Highway 5 right -of -way dedication. The other two outlots were used for drainage and retention ponds. Lot 1 was to become the future site for the Crossroads National Bank. On October 23, 1989, the City Council approved the site plan for the bank. The site plan consisted of a bank and office building with a total area of 14,000 square feet. Operation of the bank was proposed to begin out of a modular banking facility while the permanent facility was being built. The city constructed a parking lot, three access points to the site, and installed light fixtures to prepare the site for the Crossroads National Bank's temporary facility. The site plan proposed an entrance only along Market Boulevard with an exit only at the southwesterly portion of West 79th Street to accommodate a drive - thru teller. Another full access was provided at the southeast corner of the site to be shared with the adjacent property to the east (Lot 2) in the future. The plans never matured beyond the site plan and subdivision approvals (Attachment #2). The application in front of the Planning Commission today will change the approved proposal for the Crossroads National Bank Site 1 11 Americana Community Bank August 7, 1991 Page 4 1 Plan. The proposed Americana Community Bank will invalidate the Crossroads National Bank Site Plan. Therefore, considering action of approval of the Americana Community Bank is contingent upon the 1 withdrawal of Crossroads National Bank Building Site Plan approval. On August 7, 1991, the Planning Commission approved an application ' for Site Plan #91 -3 for the Americana Community Bank Building to be located at the southwest corner of Market Boulevard and West 78th Street (Market Square Development). A Planned Unit Development ' Amendment and a subdivision proposal were reviewed concurrently. The proposal was approved by the City Council on August 12, 1991. The applicant elected not to proceed with construction on this site due to delays with Market Square Shopping Center and a design for ' increased visibility from Highway 5. ' SITE PLAN REVIEW General Site Plan /Architecture ' The building is proposed at the northeast corner of West 79th Street and Market Boulevard. Site access is proposed from both West 79th Street and Market Boulevard. The majority of the parking is located to the east of the proposed building. Future parking is proposed to be added to the north of the site with phase II. Vehicle stacking is provided northeast of the building so that direct distant views from West 79th Street, to the south of the site, will be minimized. Direct views of the stacking lanes will be screened by the building and landscaping from the west of the site. The architecture of the bank building reflects the shopping center's use of stucco accent tiles, columns and gabled entries. Colors and material types need to be specified for staff approval. Low gabled roofs and a strong masonry base complete the bank's image for the prominent corner site. The applicant does not intend to have any roof top equipment. All equipment will be placed on ' the ground. The applicant is showing the trash enclosure screened by a masonry wall using the same materials as the building and an air conditioning unit located on the northwest corner of the building. These units are screened by a berm and landscaping to the north, west and south. The applicant has illustrated a building addition on the south side of the building, paralleling West 79th Street, which represents potential future expansion of the bank facility. This addition will overlook the plaza area. Upon review of the plans, staff ' concluded that additional parking will be needed to support a building addition on this site. The applicant has illustrated 16 additional future spaces. This building addition is supported by staff but the applicant will have to reappear in front of the r Americana Community Bank August 7, 1991 Page 5 Planning Commission and City Council for a Site Plan amendment at the time when the addition is to be built. Staff is recommending that the applicant illustrate how the roof line will be extended at the time the addition is built. The architect's intent to combine the style of the shopping center building, along with other downtown buildings such as the Country Hospitality Suites, is a sound one. Parking /Interior Circulation The City's parking ordinance requires one parking space per 250 square feet of gross floor area. The number of parking spaces required is 30 and the applicant is providing 36 parking spaces and 1 handicap space which satisfies the requirements of the ordinance. Traffic will be directed via West 79th Street running parallel to the easterly edge of the site then head west into the bank site or via Market Boulevard, parallel to the northerly property line. Traffic exiting the site would utilize the same entrance points located to the northwest and southeast of the site. A stop sign is recommended at both locations to regi} late traffic exiting the site. In general, the interior circulation and entrances are fairly reasonable in our view. 1 Access There are three existing driveway access points (curb cuts) to the site. One along Market Boulevard and two along West 79th Street. The applicant is proposing to eliminate the most westerly access, 11 and abandoning the existing easterly access on West 79th Street which was to be shared by the adjoining property, and building a new curb cut for the banks exclusive use. The existing curb cuts will have to be eliminated and restored as boulevard. The new entrance on West 79th Street will serve the parking lot and the drive -thru facilities as proposed. This entrance will provide a reasonably safe access to this site since it provides adequate offset separation between this site entrance and Market Boulevard. We believe the current proposal along West 79th Street is acceptable. The second access point would expand the existing curb cut on Market Boulevard located on the northwest corner of the site. As proposed, this would serve as the entrance /exit to the drive -thru lanes and the bank building. The plans propose to expand the existing curb cut and reducing the island on Market Boulevard which was originally constructed for Crossroads National Bank. 1 The applicant's position is that they want full access to the bank from both West 79th Street and from Market Boulevard. Staff 1 11 11 Americana Community Bank August 7, 1991 Page 6 ' recommends that the applicant provide the City with a cash escrow to have a traffic engineering consultant, prepare a traffic analysis of the turning movements onto Market Boulevard with ' recommendations for improvements, i.e. turn lanes, medians, driveway location, etc. ' Staff believes there ultimately will be too many traffic movements occurring on Market Boulevard to safely exit this site onto southbound Market Boulevard. Signalization of the intersection of ' West 78th Street and Market Boulevard, which is currently under consideration by the HRA and City Council, will help traffic flow on Market Boulevard, although not reduce conflicts at this intersection dramatically. A right -in /right -out only entrance via Market Boulevard has always been the plan for this access. The bank's request calls for cutting back a median so that southbound traffic exiting the bank site could make a left turn onto Market Boulevard. Market Boulevard was widened south of the railroad tracks to accommodate right and left turn lanes into the site. The center median length I r and pavement markings have been reduced to below suggested standards to accommodate the left turn lane into the site. Further expansion of the curb cut would require reducing the median further. Both medians and pavement markings have a unique function in the proper control and regulation of traffic into the proper lanes in the roadways. By shortening the median areas further we ' may be creating confusion or delay in reaction by the driver for smooth and safe lane transition. This access point is further complicated with the relationship of the railroad crossing approximately 80 feet to the north. Although the crossing is ' equipped with flashing light signals and automatic gate arms, it still creates an additional distraction for motorists. Occasional use of the railroad tracks will create temporary stacking of ' vehicles back into the site. Layout of the parking lot gives motorists an option to loop back to the east to exit via West 79th Street rather than waiting to turn onto Market Boulevard. Representatives from the bank believe that the, Market Boulevard access point is vital to their operation. Final designs for this curb cut have not been developed. Staff recommends that the access point along Market Boulevard be restricted to a right in /out and left turn in from Market Boulevard. If the applicant wishes to maintain the current proposed plan of full access by expanding the access point with a left turn lane from the site onto southbound Market Boulevard, a traffic study should be prepared. Staff is also recommending that the bank provide the city with financial security in the form of a Letter of Credit to guarantee installation of the required improvements on Market Boulevard and West 79th Street. The applicant shall also be liable for all costs associated with the 1 Americana Community Bank August 7, 1991 Page 7 traffic study and construction of the curb cut. The traffic study ' would specifically address vehicle stacking needs, turning movements and related safety concerns at both the driveway intersection and railroad track intersection. Landscaping The landscaping plan is acceptable. Trees and hedges are proposed ' along the north, south, and east portions of the site. Staff is recommending that the applicant comply with any railroad guidelines for maintaining sight lines at the railroad crossing which may limit landscaping along the northerly portion of the west half of the site (See attachment #1). Although the landscaping plan appears to be generally reasonable, we do have several revisions to request. The first is that the plan does not specify type or size of all materials. Final plans should be developed that incorporate this and the size of all materials must meet or exceed normal city standards. Secondly, the applicant has failed to show any grades on the site. We are requesting that grading details of the site be provided for staff review. Lighting ' Lightipg locations are illustrated on the plans. Two light poles are proposed. Only shielded fixtures are allowed and the applicant shall demonstrate that there is no more than .5' candles of light at the property line. Plans should be provided to staff for approval. S ignacce The applicant has submitted a signage plan. One monument identification sign is proposed at the westerly edge of the site. The area of the monument sign is 70 square feet. The ordinance permits up to 80, square feet. The applicant is also showing two 3- foot high wall mounted signs on each building elevation with a street frontage. We find the sign package to be reasonable and consistent with the ordinance. Sign permits are required prior to sign installation. ' Grading /Drainage Specific grading and drainage plans were not prepared for this , submittal. Given current conditions on the site and the proposed site plan, grading activity is expected to be minimal. The site plan proposes parking lot drainage divided with half the site draining to Market Boulevard and the remaining half to West 79th Street. Storm sewers should be extended from Market Boulevard 1 1 11 Americana Community Bank August 7, 1991 Page 8 1 and /or West 79th Street to convey runoff generated from the site prior to discharging into the City street. Final grading and drainage plans should be prepared for approval by the city, in 1 addition to submitting storm water calculations for 10 year storm events. All plans shall be prepared by a professional engineer and submitted to the City's Engineering office for review and approval. 1 The site plan does not propose any erosion control measures at this time. Upon receipt of an acceptable grading and drainage plan, staff will be able to recommend appropriate erosion control ' measures. Watershed District approval of this plan is required. The applicant shall receive a Watershed District permit and comply with their conditions. Utilities Municipal sanitary sewer and water service is available to the site from West 79th Street. A previous site plan proposal for this lot extended the water and sewer service into the lotto accommodate a temporary building facility; however, the temporary building facility was never constructed. Therefore, the utility services will have to be disconnected by the applicant at the property line and redirected to the proposed facility. Final plans for utility connection should be prepared for approval by staff. ' The Fire Marshal is requesting that utilities coming into the building as well as other fire hydrants in the vicinity be shown on the site plan. 1 Park and Trail Dedication The Park and Recreation Commission acted to recommend that the city ' accept full park and trail dedication fees as part of this development. Fees are paid at the time the building permits are requested. ' The applicant shall also construct a concrete sidewalk, 6 feet • wide, to be located south of the site and connecting with the sidewalk located to the west of the site. • • 1 1 1 1 1 1 Americana Community Bank August 7, 1991 Page 9 COMPLIANCE TABLE WITH HIGHWAY & BUSINESS DISTRICT ORDINANCE Required Proposed Building Front Yard Setback 25' 50' Building Side Yard Setback 10' N 80' /E 130' • Lot Area 20,000 S.F. 70,000 S.F. Parking Setback from Railroad 0 12' Hard Surface Coverage 65% 62% Parking Stalls 30 36 1 STAFF RECOMMENDATION Staff recommends the Planning Commission adopt the following motion: Site Plan Review "The Planning Commission recommends approval of Site Plan Review #92 -1 as shown on the site plan dated 1992, subject to the following conditions: 1. The applicant must obtain a sign permit prior to erecting any signage on site. Stop signs shall be installed at both exit points located on Market Boulevard and West 79th Street. 2. Landscaping along the north edge of the site must be modified 1 to meet all requirements of the railroad. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building permit issuance. Provide a plant schedule indicating the size and type of all plant materials for staff approval. 1 3. The applicant shall provide the city with the necessary financial securities to guarantee installation of the required public improvements and costs associated with the traffic study. 1 1 1 1 11 Americana Community Bank August 7, 1991 Page 10 4. Revise architectural e a hitec Ural plans as follows: • Provide a concept of what the roof line would look like when phase II is added. ' • Incorporate the use of Timberline or similar quality shingles that provide an image of a cedar shake roof. • Provide details of building exterior treatment." 5. A grading and drainage plan including storm sewer calculations for a 10 year storm event prepared by a professional engineer ' and submitted to the City Engineer for review and approval. 6. The applicant shall indicate on the site plan utilities coming ' into the building and addition fire hydrants in the vicinity. 7. The applicant shall include construction of the driveway ' aprons, median improvements, sidewalk and boulevard restoration in the site plan improvements. 8. The applicant shall be responsible for any damage to the ' City's existing sidewalk along Market Boulevard. SUBDIVISION The subdivision proposal is a relatively simple request that will serve to realign the easterly property line of Lot 1, 40 feet to ' the west. Lot 1, Block 1, is proposed to have an area of 70,000 square feet and will be occupied by the bank building. Lot 2, Block 1, is vacant and there is no development proposed on the site • at this time. This is a meets and bounds subdivision, therefore no ' action is required by the Planning Commission. The following easements are illustrated on the plat: 1. Standard drainage and utility easements around the perimeter of both lots (5 feet to the side, 10 feet to the front) ' 2. A utility and drainage easement over the northerly 20 feet of Lot 1 and 2, Block 1, Crossroads Plaza 2nd Addition. 3. The final plat must be submitted to staff for approval and recording with Carver County. 11 11 1 Americana Community Bank August 7, 1991 Page 11 Staff is recommending approval g appr al of the subdivision proposal with the following conditions: 1. Park and trail dedication fees shall be paid at time of building permits are requested. 2. Provide the following easements: a. standard drainage and utility easements around the perimeter of all lots. b. The final plat for Crossroads Plaza 2nd Addition must be submitted to staff for approval and filed with Carver , County. WITHDRAWAL OF ORIGINALLY APPROVED SITE PLAN ' "The Planning Commission recommends the withdraw of approval of Site Plan 89 -6 for the Crossroads National Bank building, concurrently with the approval of site plan #92 -1. The applicant should file the notice of withdrawal against the property at Carver County." VACATION OF A CROSS ACCESS EASEMENT AND UTILITY EASEMENT ON THE UNDERLYING PLAT The Planning Commission does not need to take action on this item but we are including it as an informational item. As part of the plat and site plan approval for Crossroads National Bank, a cross access easement was required to allow the occupants of both Lots 1 and 2, to share a driveway. With the new proposed site plan for Americana Community Bank, this cross access easement will no longer be needed and will need to be vacated. Also, due to shifting the westerly property line of Lot 2, the drainage and utility easement along the previous lot line will need to be vacated. Staff is recommending approval of the cross access easement and utility and drainage easement vacation. ATTACHMENTS 1. Attachment showing railroad track sight restrictions. 2. Memo from Fire Marshall dated February 12, 1992. 3. Memo from Building Official dated February 6, 1992. 4. Memo from Senior Engineering Technician dated February 12, 1992. 5. Staff report dated August 12, 1991, Americana Community Bank. 6. Staff report dated October 23, 1989, Crossroads National Bank. 7. Plans dated January 31, 1992. 1 , • . -''' ''' ' ''''- t --It .4.' ', E'X ST T lif.-ES r ,,,,,,3„, _ _... .....„...„..,...„,.:,f...,.‘t,T,O,'"t Eft ;IRE MO ` \:\4..\ �� .r te RIN , . ' CONSI \ , 1 -. 1<.• - - - - - G— --,. ---....... ,- _ . , \ \ 4: M 1 S /GH R _ = —_ -- — . J .. / , \ \ —\• , 7- 44 N ` ,. \ A p _ — - Alb �- ,� �.� (111 _____„7 / ' i \ \ °‘.:S. - N---/ -- ) ( ----- : -------2- IIII.1- - - '- %� �� -ice a�J ��-r� \ �, t ` A% • 955 -Or S� g5± �- a 10 ‘ 0 ••• % ' ' ' %. 0 1 likkalr"-- " _ _��— /' - _ e �..�:.,�\ \ T c P 0 F R 0.1„,`,101110 , ', F k /r. • 1 A, _______ ...... __--,..____-________------- 44%,,,„„„ _____ __________-_________ _____ .,„.__,------__---=:__= *,,,,, . 0, .001 (...............--- 1 9 . c j t g ----___:---- i .......,-------- \\ \.‘.. \..\\ ' lb ... \ elf:1114- ........../... / /\ 4 . \ • iljfr VI) .1 ; \ I .—,, ,,: dIr n _ —'. \ \ ,1 \ \\ \ 95• _ 1 Ai., r� ; ' r r ,I , SI GHT ! ./\ \ 1 \ Soft, s s ` r; , V \A ' �wr , / : r \ \ \ ..s • i rttr .i•^:, � t,1 +ti? ✓� It Grimm 0 -0,0001.--- " eil 0 A i l k \ • )ETENTION ,:P /(Z- 3 /!7'' i. \ \\ \`� 1 •;;+,��: � ', ! c V 11 �� :� 1 r . _� Ay • - e.,e+t/.0__Ii4k. 4, 2. N N - t 9 /* •:. . ,.....--- X -.....6.." \ ' 3 u .4: . . _ BEE - N. ,- \ ., \\ \ \\\\ 4 _. _. \ . . . , CITYOF 1 � II CHANHASSEN : '- °' 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 II II MEMORANDUM 1 TO: Sharmin Al -Jaff, Planner I FROM: Mark Littfin, Fire Marshal 1 DATE: February 12, 1992 SUBJ: #89 -19 SUB and #92 -1 Site Plan 1 Please indicate the following on site plan: 1 1. Other additional fire hydrants in vicini 2. Utilities coming into building, i.e, water, gas, II electricity 1 1 1 1 1 • 1 • If 1 t lt PRINTED ON RECYCLED PAPER 1 .. , ,. 1 . ., CITYOF i 4 CHANHASSEN 1 .,..„.. O. , 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 1 MEMO DATE (mm/dd /yy): 02/06/92 II TO: Sharmin Al --Jaff TITLE /T0: Planner I THROUGH: TITLE /THROUGH: "FROM: vteve A. Kivchmank� TITLE /FROM: Building Official SUBJECT: Planning Case: 89 -19 SUB & 92 -1 Site Plan '1 _: Site play: review has been completed for the Americana Community Bank. I have the following comments. 1. Construction of the "16 future stalls" will trigger the requirement for an 1 additional handicap parking space. Tha applicant may wish to design the II parking spaces near the building entrance to accomadate the future handicap stall. 2. The Americans with Disabilities Act became effective on 1/26/92. The designers are responsible for compiiance the ADA. II 3. B -2 office occupancies of 8500 or more gross feet of floor area are II required to be fire sprinklered. Gross feet of floor area includes the basement. 1 . 1 1 1 1 1 If tli PRINTED ON RECYCLED PAPER . . , , CITYOF li i 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 II (612) 937 -1900 • FAX (612) 937 5739 CHANHASSEN II MEMORANDUM II TO: Sharmin Al -Jaff, Planner I r FROM: Dave Hempel, Sr. Engineering Technician ;�j - ' DATE: February 12, 1992 SUBJ: Site Plan Review - Americana Bank, Northwest Corner of 1 West 79th Street and Market Boulevard Lot 1, Block 1, Crossroads Plaza II LUR 91 -11 Utilities 1 Municipal sanitary sewer and water service is available to the site from West 79th Street. A previous site plan proposal for this lot ' extended the water and sewer service into the lot to accommodate a temporary building facility; howevdr, the temporary building facility was never constructed. Therefore, the utility services will have to be disconnected by the applicant at the property line II and redirected to the proposed facility. Grading, Drainage & Erosion Control 11 No actual grading and drainage plan was submitted with this II proposal. The site plan proposes parking lot drainage divided with half the site draining to Market Boulevard and the remaining half to West 79th Street. Storm sewers should be extended from Market II Boulevard and /or West 79th Street to convey runoff generated from the site prior to discharging into the City street. A grading and drainage plan including storm sewer calculations for a 10 -year storm event should be prepared by a professional engineer and II submitted to the City's Engineering office for review and approval. The site plan does not propose any erosion control measures at this II time. Upon receipt of an acceptable grading and drainage plan, staff will be able to recommend appropriate erosion control measures. 11 . 1 II Sharmin Al -Jaff February 12, 1992 Page 2 11 Site Access Three driveway access points (curb cuts) along Market Boulevard and West 79th Street have been designed and constructed in accordance with a previous bank facility in mind (Crossroads National Bank). That site plan proposed an entrance only along Market Boulevard with an exit only at the southwesterly portion of West 79th Street to accommodate a drive through teller. Another full access was provided at the southeast corner of the site to be shared with the adjacent property to the east (Lot 2) in the future. The new plans propose to expand the existing curb cut on Market Boulevard and replace the two curb cuts along West 79th Street with one new one. Staff is comfortable with the full access being proposed along West 79th Street but has safety concerns with the expansion and proposed usage of the Market Boulevard curb cut. ' Market Boulevard was widened south of the railroad tracks to accommodate right and left turn lanes into the site.. The center median length and pavement markings have been reduced below suggested standards to accommodate the left turn lane into the site. Further expansion of the curb cut will require reducing the 1 median further. Both medians and pavement markings have a unique . function in the proper control and regulation of traffic into the proper lanes in the roadways. By shortening the median areas further we may be creating confusion or delay in reaction by the driver for smooth and safe lane transition. According to the Eastern Carver County Transportation Study, Market Boulevard is classified as a Class I Collector. Market Boulevard is predicted by the year 2010 to accommodate 7,400 ADT. It is the City's intent to limit the amount of curb cuts /turning movements on ' Market Boulevard due to the anticipated high volume of traffic. Staff feels the expansion of the access point on Market Boulevard to be unduly hazardous and not totally necessary for this site to effectively function. This access point is further complicated with the relationship of the railroad crossing approximately 80 feet to the north. Although the crossing is equipped with flashing light signals and automatic gate arms, it still creates an additional distraction for motorists. Occasional use of the railroad tracks will create temporary stacking of vehicles back into the site. Layout of the parking lot gives motorists an option to loop back to the east to exit via West 79th Street rather than waiting to turn onto Market Boulevard. Staff recommends that the access point along Market Boulevard be restricted to a right in /out and left turn in from Market Boulevard. If the applicant wishes to maintain the current proposed plan of full access by expanding the access point with a t 1 1 Sharmin Al -Jaff February 12, 1992 Page 3 left turn lane from the site onto southbound Market Boulevard, a 1 traffic study should be prepared. The applicant should provide the City with a cash escrow to have a traffic study prepared. The traffic study would specifically address vehicle stacking needs, turning movements and related safety concerns at both the driveway intersection and railroad track intersection. Site access from West 79th Street appears acceptable. The existing 1 curb cuts will have to be eliminated and restored as boulevard. The applicant should include the boulevard restoration, sidewalk, driveway and median construction and access removal into their site plan improvements. Final detailed plans and specifications shall be submitted to the City Engineer for approval. All boulevard restoration, sidewalks and driveway aprons (public improvements) shall be constructed in accordance with the latest edition of the City's Standard Specifications. The project specification documents should incorporate the City's standard specifications. All work performed within the City's right -of -way shall be inspected and approved by the City's Engineering Department prior to releasing any financial security or issuance of Certificate of = Occupancy. Recommended Conditions of Approval 1. A grading and drainage plan including storm sewer calculations for a 10 -year storm event prepared by a professional engineer and submitted to the City Engineer for review and approval. 2. The applicant shall include construction of the driveway aprons, median improvements, sidewalk and boulevard restoration in the site plan improvements. 3. The applicant shall provide the City with a financial security (letter of credit or cash escrow) to guarantee construction of the driveway aprons, center median improvements and boulevard restoration and all other proposed public improvements. The applicant shall furnish the City with a letter of credit from a bank, cash escrow or equivalent for $10,000. The security shall be for a term ending December 31, 1992. Once the required improvements have been inspected and approved by the City and a two -year maintenance bond received for the public improvements, the letter of credit shall be released. 4. The applicant shall work with staff to develop an erosion 1 control plan. 5. The applicant shall be responsible for any damage to the 1 City's existing sidewalk along Market Boulevard. • 1 1 I Sharmin Al -Jaff February 12, 1992 Page 4 6. The applicant shall receive a Watershed District permit and comply with conditions stipulated. 7. If the applicant wishes to expand the existing curb cut along Market Boulevard with a left -turn lane from the site onto southbound Market Boulevard, a traffic study shall be prepared ' to determine if warranted. The City shall retain a consultant and all costs associated with the Study shall be borne by the applicant. 1 jmslktm 11 1 c: Charles Folch, City Engineer 1 1 1 1 1 1 1 1 1 r 1 ITY OF? CC , .SATE: 8/7/91' C H A DATE : 8/12/91 ----1/ • �-. CASE #: 91 -3 SITE 89 -2 PUD, 91 -8 SUB STAFF REPORT PROPOSAL: 1) Site Plan Review for an 8,365 Square Foot Bank • Building, 2) Replat a Portion of Outlot A, Market Square into a 40,000 Square Foot Lot and a 39,600 Square. Z Foot Lot V 3) PUD Amendment to Add a Bank Building to Market Square Shopping Center a LOCATION: Southwest corner of the intersection of Market Boulevard and West 78th Street • Q APPLICANT: KRJ Associates P O Box 635 Long Lake,' MN 55356 PRESENT ZONING: PUD, Planned Unit Development ACREAGE: • 40,000 square feet DENSITY: ADJACENT ZONING AND LAND USE: N - OI and CBD S - BG, vacant Q E - CBD, Filly's and•Hotel �- W - BG Kx.+r "'' • WATER AND SEWER: Available to the site. R W = yi : 12 PHYSICAL CHARACTER.: A level parcel. �, t�dt< — — 2000 LAND USE PLAN: Commercial '-_ J. • 1 Americana Community Bank August 7, 1991 Page 2 PROPOSAL /SUMMARY On October 8, 1990, the City Council approved the final PUD plan for a shopping center subject to conditions described in the attached report. The site included 3 outlots containing a proposed veterinary clinic and a cleaners and one vacant outlot ( Outlot A) with an area of 79,946 square feet. The shopping center remains undeveloped due to financing difficulties, however, these are in the process of being resolved and construction is likely to start in September. The current request is for the construction of a ' 8,365 square foot bank building on the north half of Outlot A. The site plan is well developed. The architecture of the bank building attempts to reflect the shopping center's use of stucco 1 accent tiles, columns and gabled entries as well as the roof line of the Country Suites Hotel. This type of architecture is consistent with the rest of the shopping center. Staff is proposing that the roof line of the bank be revised to accentuate the gables and to ensure that the shingles are of,the type used on the Country Suites Hotel which resemble wood shakes from a distance. One highly attractive feature of the site is the inclusion of a pedestrian plaza at the intersection of West 78th Street and Market Boulevard. A four lane drive -thru is provided to the south of the building. Car stacking for vehicles waiting to go 1 through the drive -thru will be on the south portion of the site away from West 78th Street. The location for the drive -thru is appropriate as it places car stacking away from West 78th Street. The drive -thru is screened by the bank building from West 78th Street. Upon review of the drive -thru by the Engineering Department, it was found that the proposed turn radius for the drive -thru exit was inadequately sized. Alternatives to address I the problem and acquisition of additional land to the south or reversing the turn lane direction of flow should be submitted. The site landscaping is generally of high quality due to the attention 11 that was paid to this issue by staff and the applicant. Additional landscaping is being requested north and west of the site across from the parking area. II Site access has been a major concern of staff through the design of this proposal. The applicant originally requested two access points, one via Market Boulevard and the second through West 78th Street. Staff strongly opposed the Market Boulevard curb cut noting traffic safety concerns and the fact that this entrance was specifically prohibited by the PUD agreement. After a number of meetings with the applicant, the Market Boulevard curb cut was eliminated and the curb cut on West 78th Street was refined to allow a right turn lane only for traffic eastbound and a median cut allowing left turns for traffic westbound. A traffic study conducted by Strgar, Roscoe and Fausch, Inc. has been submitted to 1 1 Americana Community Bank August 7, 1991 1 Page 3 the City in support of this curb cut and new median cut on West 78th Street. The bank representatives believe that the West 78th Street curb cut is critical to their operation. From a design standpoint, we believe this change is not likely to undermine the effectiveness of traffic flow on West 78th Street. However, it is necessary to note that the City Engineering Department continues to have some reservations with the median cut. Staff notes that the West 78th Street curb cut does not specifically serve the bank but rather would connect to the main driveway for the shopping center. We would strongly recommend against any median breaks serving individual sites. Ultimately, the Planning Commission, City Council and HRA will need to make a determination if it is acceptable on aesthetic grounds. Since at least part of the landscaped median would be lost if the median cut is approved. If it is approved, the bank should pay for all associated costs related to studying, designing and constructing this curb cut. 1 In an accompanying subdivision request, the outlotis being divided into two lots, one of which will contain the bank building and the second of which will be reserved for future development. The subdivision request is a relatively straight forward action. The plat should be corrected as required to reflect an additional 10 feet of right -of -way along West 78th Street that has been required 1 by the City under the Development Agreement. Based upon the foregoing, staff is recommending that the Planning Commission approve the site plan, subdivision and planned unit development amendment requests for this proposal with appropriate conditions. SITE PLAN REVIEW General Site Plan / Ardhitecture 1 The building is situated at the southwest corner of West 78th Street and Market Boulevard. Access is.gained off of a proposed curb cut on West 78th Street. Staff will discuss in detail the access aspect later in the report. Parking is located to the west of the proposed building. Vehicle stacking is located south of the site and the building so that direct distant views from West 78th Street, to the north of the site will be minimized. Direct views of the stacking lanes will be screened by the building and landscaping from the north of the site. The architecture of the bank building reflects the shopping center's use of stucco accent tiles, columns and gabled entries. Colors and material types need to be specified for staff approval. Low gabled roofs and a strong masonry base complete the bank's image for the prominent corner site. The applicant has failed to show a roof top equipment 1 1 Americana Community Bank August 7, 1991 Page 4 screening plan. Such should be submitted prior to the City Council meeting. The applicant is showing the trash enclosure screened by a masonry wall using the same materials as the building and located on the southeast corner of the building. Two electric boxes operated and maintained by NSP, as well as an air conditioning unit, are located to the southeast corner of the site. These units are screened by a berm and landscaping to the north, east and ' south. While we are generally satisfied with the building architecture and note that the applicant has worked extensively on this project, we do have several main concerns. These include the illustrated building addition on the north side of the building paralleling West 78th Street, the incorporation of what appears to be an extended canopied entrance into the plaza area, and the building roof line. As to the first issue, a building addition has been illustrated on the north side of the structure. This had been incorporated into earlier plans and was intended to represent 1 potential future expansions of the bank facility. Upon review of the plans, staff concluded that there was insuff}cient parking to support a building addition on this site and believed we had come to an understanding wherein the addition was to be deleted from the plans. We wish to make it clear that this building addition is not supported by staff and we do not believe we will be in a position to recommend approval of it in the future. We are therefore recommending that it be deleted from final plans for the project. The site on which this bank is situated is a highly visible one at what is highly likely to become one of the most important intersection in the Chanhassen CBD. Setting an architectural standard for this bank is difficult in part due to its location. The PUD approval requires architectural consistency with the main shopping center building. However, at the same time, this site is essentially the transition point from the shopping center site into architectural styles found elsewhere in the CBD. Therefore, we believe that the architect's intent to combine the style of the shopping center building, along with other downtown buildings such as the Country Hospitality Suites, is a sound one. We continue to have some concerns over the visual massiveness of this building and its proximity to the street. In part, these concerns will be addressed by ensuring that the building maintains a 25 foot setback 1 from the public right -of -way required elsewhere in the shopping center as well as by the taking of an additional 10 feet along West 78th Street which will be reserved for the inclusion of a second thru -lane when it is needed in the future. However, we continue to be concerned about the massiveness of the roof line and the inclusion of relatively diminutive dormers to break this up. We would propose that the dormers be increased in size to break up the roof line or that some other structural design for the roof be considered. We believe a peaked roof is essential on this 1 1 Americana Community Bank August 7, 1991 Page 5 structure but are requesting that the applicant's architect be somewhat more creative in addressing this concern. How this concern is addressed will also have some bearing on our issue concerning the HVAC screening mentioned above as well. 1 The third concern pertains to the plans for a canopied entrance on the northwest corner of the building. Staff supports the inclusion of a highly accentuated main entrance but wants to ensure a 25 foot setback from the right -of -way is maintained from all structures and we define the canopy as part of the structure. The plans are somewhat misleading on this point since it appears as though the canopy would extend out over a portion of the patio area. Due to the lack of time, we have not had an opportunity to explore this more fully with the project architect but are certain that this matter could be resolved in the final plans. Parkins /Interior Circulation The City's parking ordinance requires one parking space per 200 square feet of gross floor area. The number of parking spaces required is 34 and the applicant is providing 35 parking spaces which satisfies the requirements of the ordinance. Traffic will be directed via West 78th Street running parallel to the westerly edge of the site then headed east into the bank site. Traffic exiting the site would either use an exit located at the southeast corner of the site or utilize the same entrance located to the east of the - site. A stop sign is proposed at that location to regulate traffic. 1 In general, the interior circulation and entrances are reasonable in our view. The proposed exit along the south property line is ' intended to become part of the entrance /exit to whatever develops on the southern portion of Outlot A. The remaining area of Outlot A is unlikely to be able to support any other entrances and exits apart from this one. A cross access easement running in favor of both lots being created from Outlot A, over this driveway and over the northern 30 feet of the lot to be created south of the bank, will be required to ensure that this element can be incorporated. However, during review of the access proposal by the Engineering Department, a problem has surfaced. When turning templates were put on the drive -thru lanes, it became clear that cars exiting the • site would be unable to complete the turn required to transition into the exit lane. Again, this problem surfaced too late to be able to discuss it more fully with the project designer. There are several possible ways of addressing this issue. The first would be to incorporate a larger radius turn which would require the taking of additional land off of the southeast corner of the site or the reversal of traffic flow through the facility. There may in fact be other alternatives and we would be open to suggestions from the project designer as to how to resolve this issue. 1 1 • Americana Community Bank August 7, 1991 Page 6 Access There are two sets of access points requiring discussion. The first is the internal access onto the shopping center driveway system. The second concerns proposed revisions to the shopping center access from West 78th Street. As to the first question, there are two access points being proposed off the internal driveway system. The northern most access is the major site entrance which will serve the parking lot and the drive -thru facilities as proposed. In discussions with staff, we found some difficulty in providing safe access to this site since we wanted to provide the maximum offset separation between this site entrance and the major shopping center entry point on West 78th Street. We believe the current proposal is acceptable and resolves this concern. The second entrance point is, the proposed exit lying adjacent to the south edge of the site. As proposed, this will serve as the exit to the drive -thru lanes. In the future, this exit would be shared with a new entrance to serve whatever is•to be located on II the remaining undeveloped area on Outlot A to the south. Staff supports this option noting that, due to the relative limited size of the newly created lot on the south portion of Outlot A and its location adjacent to the main entrance to the shopping center from Market Boulevard, this future common entrance point, shared with the bank, is likely to be the only means of entering and exiting this site that can be allowed. Staff is recommending that cross access easements be established in favor of both the bank parcel and the future lot to the south to guarantee that the shared access arrangement can work in the future. One of the major points of discussion between staff and the applicant on this proposal concerned external entrances into the site. The applicant's original position was that they wanted entrances to the bank from both West 78th Street and from Market Boulevard. Staff noted that any additional curb cuts into the Market Square site are specifically prohibited by the approved PUD plan, however, at the applicant's request we did have the city's traffic consultant, Strgar, Roscoe and Fausch prepare an analysis of both proposed curb cuts. Their report is attached to the staff report. Essentially, they agreed with the city's original position that a Market Boulevard curb cut into this site is unacceptable from a traffic safety standpoint. There are simply too many traffic movements occurring with southbound cars on Market Boulevard attempting to decelerate and move to the right to turn into the main shopping center entrance and cars from making a left turn to Market from West 78th Street accelerating. A final problem occurs with the proposed signalization of the intersection West 78th Street and Market Boulevard that is currently under consideration by the HRA and City Council. The SRF study concludes 1 •1 • Americana Community Bank August 7, 1991 Page 7 that the stacking of vehicles waiting for the light to turn green would extend beyond the point at which the curb cut had been proposed. Discussion then focused on the proposed north median cut into the shopping center from West 78th Street. A right -in /right -out only entrance to the main shopping center drive had always been incorporated into plans at this point. The bank's request called ' for the inclusion of a median cut so that westbound West 78th Street traffic could turn into the shopping center site. Representatives from the bank believe that this entrance is vital to their operation. The SRF study indicated that this could be incorporated from a traffic safety standpoint. It became clear to staff that the only way we could support this was that the shopping center entrance continue to be structured as a right -in /right -out only, thus traffic would be unable to exit the shopping center site at this point crossing 78th Street median to make a left turn onto westbound West 78th Street. Westbound traffic on West 78th Street would, however, be able to turn into the Market Square site. Staff would never want to be in a position of recommending a median cut to serve a specific site. We believe it would be highly inappropriate to do so since this would in essence establish a new turning movement to the benefit of a single property to the detriment of all traffic flowing through the downtown. However, we believe this request is somewhat different. This median cut would not specifically serve the bank but would directly serve the main shopping center driveway system. From the studies that have been done, we believe that it could probably be incorporated in an acceptable . manner from a traffic safety standpoint. We must point out though that in spite of the SRF study, the City Engineering Department continues to have some reservations with this request. The ultimate decision as to whether or not this should be included truly rests in the hands of the Commission, City Council and the HRA. Much of this decision will rest on an aesthetic determination as to whether or not the city wishes to see landscaping in the center median island and be compromised to some degree to support the turning movement. Final designs of this curb cut have not been developed and there is some expectation on the part of staff that we would be able to salvage much of the landscaping that occurs in this area. We are currently in the process of asking SRF to look at possible designs for this curb cut in conjunction with their 1 work on signalization of the downtown intersections which is currently in process. Should this curb cut be approved, as called for on this site plan, staff is recommending that the bank be liable for all costs associated with the traffic study and construction of the curb cut. 1 1 1 Americana Community Bank August 7, 1991 Page 8 Landscaping Staff worked closely with the applicant to design the landscaping plan. Berming is proposed along the northeast and westerly portion of the site. Staff is recommending additional screening along the northerly edge of the site to block the parking lot area from views from West 78th Street. 1 Although the landscaping plan appears to be generally reasonable, we do have several revisions to request. The first is that the plan does not specify type or size of all materials. Final plans should be developed that incorporate this and the size of all materials must meet or exceed normal city,standards. Secondly, a hedge and berm is illustrated along the West 78th Street exposure west of the building. Grading details do not show a berm in this area and staff does not believe a significant berm can be incorporated, given the limited size of this area. We are requesting that details of this area be provided for staff review. In addition, two additional over -story trees should be incorporated in this area. • 11 Lighting Lighting locations are illustrated on the plans. Two light poles are proposed. Only shielded fixtures are allowed and the applicant shall demonstrate that there is no more than .5' candles of light at the property line. Plans should be provided to staff for approval. Fixtures should match those being used elsewhere in the shopping center. Signaae The applicant has submitted a signage plan. ' One monument identification sign is proposed at the westerly entrance to the site. The area of the monument sign is 70 square feet. The applicant is also showing three 4 -foot high wall mounted signs on each building elevation. • II Staff has some concerns over the signage proposal. Although it is attractive, we believe that the number and size of the signs are excessive relative to other buildings in the shopping center as well as other buildings in the CBD. The normal provisions of the sign ordinance are not applicable within the PUD and all development within it are subject to covenants approved by the city. We note that the 3 wall mounted signs appear appropriate given the multiple exposure this building has but note that the Chanhassen Bank has one major wall mounted sign even though it • occupies the entire south end of a city block. Having said that, we are not sure which sign to recommend be deleted since they each appear to be appropriate given the design and location of the 1 Americana Community Bank August 7, 1991 Page 9 building. We are, however, going to recommend that the size of I/ these signs be reduced to a maximum height of 3 feet which is consistent with approvals granted for the Medical Arts Building, which was recently considered by the Planning Commission and City Council. Given the number of signs on the building, we cannot support the currently proposed 4 foot height. There is an additional 70 square foot monument sign proposed at the , southeast corner of the site adjacent to the internal shopping center driveway. We find no justification for this sign since the bank building and all wall mounted signage will be highly visible from this location. We are recommending that this sign be deleted. In its place, there should be directional signage clearly illustrating the appropriate bank entrance and drive -thru exit lanes. Grading /Drainage Specific grading and drainage plans were not prepared for this submittal. Given current conditions on the site•`and the proposed site plan, grading activity is expected to be minimal. Storm sewer connections into the shopping center system are illustrated in concept, but plans have not been developed. We do not anticipate any significant problems in this regard but final grading and drainage plans should be prepared for approval by the city, in , addition to submitting storm water calculations for 10 and 100 year storm events. Watershed District approval of this plan may be required, although they have already reviewed the shopping center plans. Utilities 1 City utilities are available to the site. Final plans for utility is connection should be prepared for approval by staff. Park and Trail Dedication The Park and Recreation Commission acted to recommend that the city accept full park and trail dedication fees as part of this development. Fees are paid at the time of the building permits are requested. i 1 • • - r 1 1 1 II Americana Community Bank August 7, 1991 Page 10 1 COMPLIANCE TABLE WITH PUD ORDINANCE As a PUD, most of the usual ordinance provisions pertaining to II ' dimensional criteria are waived. Required Proposed "' Building Setback 25' 25' II Hard Surface Coverage N/A 73% Parking Stalls 34 35 II SUBDIVISION I The subdivision proposal is a relatively simple request that will serve to split the 1.6 acre outlot into two lots. The northerly lot will have an area of 40,000 square feet and will be occupied by I the bank building. The southerly lot is vacant and there is no development proposed on the site at this time. The final plat needs to be revised to provide the additional 10 feet of right -of- 1 way along West 78th Street that is being required by the City. The following easements are either illustrated on the plat or should be required: II 1. Standard drainage and utility easements around the perimeter of both lots. II 2. A utility easement running in favor of NSP, located to the southeast corner of the building, 10' x 30'. 3. The final plat for the entire Market Square shopping center 1 must be submitted to staff for approval and filed with Carver County. The plat needs to be revised, as does this requested lot division to accommodate the additional 10 feet of right - II of -way along West 78th Street that is being required by the city. 11 4. Cross access easements need to be provided over the south driveway and northern 30 feet of the newly created parcel located south of the bank on Outlot A. 1 PLANNED UNIT DEVELOPMENT AMENDMENT This application is consistent with the overall planned unit II development concept for Market Square. The only change is the curb cut and median cut access point off of West 78th Street. As stated II . II Americana Community Bank August 7, 1991 Page 11 before, a study was conducted by Strgar, Roscoe and Fausch 1 supporting this amendment. While we believe that this proposal is consistent with the PUD guidelines established, we note that at the time of writing the PUD agreement, development contract and final plat for Market Square, they have not yet been finalized or recorded. A condition should be added that no construction is to occur on the bank property until this documentation has been completed to the satisfaction of the city and a construction time table has been established for interior streets and utilities on the Market Square site that will be necessary to support the bank. STAFF RECOMMENDATION Staff recommends the Planning Commission adopt the following motion: Site Plan Review "The Planning Commission recommends approval of Site Plan Review #91 -3 as shown on the site plan dated July 29, 1991, subject to the following conditions: 1. The applicant must obtain a sign permit prior to erecting any signage on site. Sign plans should be revised to eliminate the monument sign, reduce the wall sign height to .3 feet and incorporate requested directional signage. 1 2. Additional landscaping shall be provided along the north edge of the site as proposed in the staff report. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building permit issuance. Provide a plant schedule indicating the size and type of all plant materials for staff approval. 3. The applicant shall enter into a development contract with the city and provide the necessary financial securities as required. If the West 78th Street curb cut is approved, the applicant shall be required to compensate the City for all costs related to its design and construction. 4. Revise architectural plans as follows: • Incorporate dormers of increased size or other acceptable measures to enhance the design of the roof line. • Provide details of HVAC screening. 1 1 1 Americana Community Bank 0 August 7, 1991 Page 12 • Incorporate the use of Timberline or similar quality shingles that provide an image of a cedar shake roof. • Provide details of building exterior treatment indicating consistency with shopping center construction. • Eliminate the proposed building addition from the plans since adequate parking cannot be provided on site. • Revise plans as necessary to ensure that a 25 foot setback is provided to all portions of the building, including the entrance canopy. 5. Revise the plans as required to ensure that room is provided for safe turning movements for cars exiting the drive -thru lanes." • Subdivision "The Planning Commission recommends approval of Subdivision #91 -8 1 J as shown on the plat dated July 29, 1991, with the following conditions: 1. Park and trail dedication fees shall be paid at time of building permits are requested. 2. Provide the following easements: a. •Standard drainage and utility easements around the perimeter of all lots. b. A 10' x 30' utility easement located to the southeast corner of the bank building running in favor of NSP. c. The final plat for the entire Market Square shopping center must be submitted to staff for approval and filed with Carver County. The plat needs to be revised, as 11 does this requested lot division to accommodate the additional 10 feet of right -of -way along West 78th Street that is being required by the city. d. Cross access easements need to be provided over the south driveway and northern 30 feet of the newly created parcel located south of the bank on Outlot A." Planned Unit Development Amendment "The Planning Commission recommends approval of an amendment to PUD #89 -2 as shown on plans dated July 29 1991." 1 1 Americana Community Bank August 7, 1991 Page 13 PLANNING COMMISSION UPDATE 1 The Planning Commission reviewed this item on their August 7, 1991 agenda. The applicants indicated that they were comfortable with the recommendations in the staff report. Most of the Planning Commission comments focused on two issues, including building architecture and the inclusion of a median break in West 78th Street. 1 On the first issue, the Planning Commission addressed architectural concerns in detail. Staff had worked with the applicant extensively to revise architectural plans and a number of changes had been incorporated; however, we continued to be of the opinion that the roof line as presented gave a somewhat massive appearance. We noted to the Planning Commission that as an outlot on the Market Square site, a PUD condition for the Market Square development comes into play. This condition requires that buildings constructed on outlots be architecturally consistent with Market Square. The bank attempted to achieve this goal while at the same time recognizing that it is across the street from other buildings such as the Hospitality Suites. 1 The Commission's comments on the building were rather severe. They believed that the appearance was not generally one of "an inviting" type of structure and that there was a massive feel to it. Some suggestions included modifying roof lines, enlarging windows and altering color schemes. On the matter of the median break that is called for in the plans, 1 staff indicated that in all honesty that there was some difference of opinion at a staff level as to whether or not this was 1/ reasonable. The City Engineer continues to have reservations with this proposal that are fully understood by Planning staff; however, at the same time we believe it is not unreasonable to think that there should be a northern entrance into the shopping center including a median break. As we indicated in the staff report, there is also a design issue in that median breaks such as this should be limited only to major site entrances for uses such as the shopping center and not individual buildings. The Planning Commission strongly agreed with us on this point. The current proposal complies with this standard since the median break serves the main shopping center driveway and not the bank site. The other design issue is that a median of this type is likely to compromise the landscaping theme on West 78th Street, and this is something that the City Council and HRA may want to evaluate this. However, the Planning Commission discussion regarding the median break was extremely favorable. Each of the members of the Commission voted to support it. 1 1 1 Americana Community Bank August 7, 1991 Page 14 The Commission ultimately recommended that the plans be approved and sent to the City Council. The applicant was strongly encouraged to rework architectural plans to accommodate the concerns and issues that have been raised. This matter would normally have come before the City Council on August 26, 1991. However, staff is attempting to work with the time demands of the bank, who are under regulatory requirement to open before the end of the year. We spoke with them on the morning after the Planning Commission meeting and indicated a reluctance to take a plan containing unresolved architectural issues to the City Council. The bank's representative indicated a strong desire to work with the city to resolve these architectural issues. They believe that a plan could be presented to the City Council that would accommodate most of these concerns and if approved, final details could be worked out with staff after the fact. We agreed that if an acceptable plan could not be developed prior to the City ' Council meeting that this item would be deleted at the applicant's request and held over to August 26th. We regret that this puts us in a somewhat uncomfortable position of bringing -to you a set of plans that have yet to be refined. However, we are trying to balance this by attempting to meet the bank's time constraints if this is at all feasible. The Planning Commission revised conditions pertaining to the architectural design of the building. These changes have been reflected below. However, pending submission of final architectural plans by the bank, staff believes that we may recommend further changes in these conditions based upon final plat. • 11 PLANNING COMMISSION RECOMMENDATION Site Plan The Planning Commission recommends that the City Council approve Site Plan Review #91 -3 as shown on the site plan dated July 29, 1991, subject to the following conditions: 1. The applicant must obtain a sign permit prior to erecting any signage on site. Sign plans should be revised to eliminate the monument sign, reduce the wall sign height to 3 feet and incorporate requested directional signage. 2. Additional landscaping shall be provided along the north edge of the site as proposed in the staff report. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building 1 Americana Community Bank 11 August 7, 1991 Page 15 permit issuance. Provide a plant schedule indicating the size and type of all plant materials for staff approval. 3. The applicant shall enter into a development contract with the city and provide the necessary financial securities as required. If the West 78th Street curb cut is approved, the applicant shall be required to compensate the City for all costs related to its design and construction. 1 4. Revise architectural plans as follows: • Incorporate dormers of increased size or other acceptable 11 measures to enhance the design of the roof line. • Provide details of HVAC screening. 1 • Incorporate the use of Timberline or similar quality shingles that provide an image of a cedar shake roof. 1 • Provide details of building exterior treatment indicating consistency with shopping center construction. 1 • Eliminate the proposed building addition from the plans in part because we would never be necessarily approving the proposed addition. 1 • Revise plans as necessary to ensure that a 25 foot setback is provided to all portions of the building, including the entrance canopy. 5. Revise the plans as required to ensure that room is provided for safe turning movements for cars exiting the drive -thru lanes and submit the same for staff approval. 6. Parking stalls located to the south of the site shall be 1 designated for employees only." Subdivision The Planning Commission recommends that the City Council approve Subdivision #91 -8 as shown on the plat dated July 29, 1991, with ' the following conditions: I/ 1. Park and trail dedication fees shall be paid at time of building permits are requested. 1 2. Provide the following easements: a. Standard drainage and utility easements around the 11 perimeter of all lots. i I Americana Community Bank August 7, 1991 Page 16 b. A 10' x 30' utility easement located to the southeast corner of the bank building running in favor of NSP. c. The final plat for the entire Market Square shopping II center must be submitted to staff for approval and filed with Carver County. The plat needs to be revised, as does this requested lot division to accommodate tie additional 10 feet of right -of -way along West 78th Street that is being required by the city. d. Cross access easements need to be provided over the south driveway and northern 30 feet of the newly created parcel located south of the bank on Outlot A." Planned Unit Development Amendment The Planning Commission recommends approval of an amendment to PUD 89 -2 as shown on the plans dated July 29, 1991. ATTACHMENTS 1. Staff report dated 10/8/90. 2. Memo from Park and Recreation Coordinator dated July 29, 1991. 3. Americana Community Bank Traffic Study dated June 5, 1991. 1 4. Project statement. 5. Plans dated July 29, 1991. 6. Minutes of the August 7, 1991 Planning Commission Meeting. 1 1 1 1 11 1 1 1 1 riii v I TY O F C DATE: Oct. 4, 19 • I fl A A C.C. DATE: Oct. 23, 1 1 3 1 Y . HS I NO: .89 -6 Site Plan • Prepared by: Olsen /v 7i a.......maumm.....mmmi....m.:=i..........m.m.i.m..m....m........... STAFF REPORT 1 PROPOSAL: • Site Plan Review for 14,000 Sq. Ft. Bank and Offill Building - Crossroads National Bank 1- Q LOCATION: Northeast Corner of Market Boulevard and West 79ill Street Parts of Lots 5 -7, Block 1, Frontier th U Development Park APPLICANT: TCNB Incorporated Tom Mork II 10201 Wayzata Blvd. .Jim Ruckle Minnetonka, MN 55343 Shea Architects Q Butler Square, Suite Iii 100 North 6th Street Minneapolis, MN 5540 II PRESENT ZONING: BH, Highway Bdsines BG, General Business District and ACREAGE: 2.4 acres DENSITY: ADJACENT ZONING II AND LAND USE: N- BH; railroad tracks & Chan Bowl Q II S- BH; vacant 1 I/ 0 E- BB; vacant W W- BG; vacant - ponding area II WATER AND SEWER: Available to the site. PHYSICAL CHARAC.: The site is fairly level unimproved II property. 2000 LAND USE PLAN: Commercial I‘ II • - - .- E.P. Al: skiyavt__ &iv wiwr i II et* V - an. :',..,'= _ Y ., ''' ' RD k' WA li NM um e . l a-0 nm; 1-,:: .. 1 ONIP im s` ., . ; Via . •� , oa `, L 0 rvs x (firt* •.07 .. W tt •• t....:E: :4, Or 411: rote -....... ; • . ' ' + : ti mis ow state � /�� �1:- 'al 11 Nat is � � • .: . � `�' oo � � ■■■�� • \ ;,'tip A • try -Ag W. 117 1 k Vi 1 �� r; - ; ' , O . ""� kiana SHAOOwMER 1 -�,r, cc vaunt% S �� W- , e t • '-x'11 / _ :.. 441 Ja. �: e L ADE \Vsaf 1 / el 1 , cQ . a 5 v , a Inuit •�; \ � � ; .� �,, , Villa . . 1 413 Whit" IP .� v `4 = i r` Saw .aCrr.e. al 11 144 w -c as �� - gi 0 �i� 0 .■:.� S i 60 .),-.4 0 ilt JVAV i ;- 0,74-._:ftsyt:•0010. ki#4,44.1 1. , a .-- mismat eitz f r i ary _ i Iii. _ 1 . R 1 tr pl , 12 01 a is Wit;�^ r • " , ter_ ��, �iw _�r� �w,� �,� � 3 ' �j� ♦IS: ~ 1111 e ` •73_1/5 1 ..111 b .. 4 - 1 cwt « l at '� r 'y!- 1c�f1'11 I„J G �� ; : � � sue _ : 1":> ll f a .. a 1 r. lbw, r :: –.so —wit ...dal , rawg6L-1.::--' .."---. , ----- khz /t ow — ... I: t • PA ____�_. m...-,.... i Alt " Ail � ��I �� T :7....: ■ --- WAY : � • ma v .1 , 0 55:0 . u . _ a al 4, gb t a r t eal =1_ p V4111 ��ce it %iri : g :IS'' A INNEN LIPPOINIV NOP% i e RSF `1 ` grea - LAKE - L A SUS` Crossroads National Bank ; - , �_.r October 4, 1989 ��.. Page 2 x,. APPLICABLE REGULATIONS ' Financial institutions are a permitted use in the BH and BG - .. -A Districts. `= Section 20 - 715 and 20 - 755 requires in the BH District a miniMum $ - r lot area of 20,000 square feet, lot frontage of 100 feet, lot depth of 150 feet and a maximum lot coverage 65% (70% in BG District). _ The setbacks for the BH District are 25 feet front, 20 feet for _ I . rear yard and 10 feet for the side yard setbacks. The setback" for BG District is 25 feet front and rear and 10 feet on the side yards. The maximum height for a structure is two stories for the principle structure and one story for the accessory structure in BH and 3 stories (40') in BG District. There is no minimum setback for off - street parking areas when it abuts a railroad right -of -way except as provided in Sections 20 -1191 and 20 -1192 pertaining to landscaping requirements. Section 20 -1191 requires a 10 foot strip of land between abutting right -of -way and vehicular use areas including one tree per 40 feet and a hedge wall or berm of at least two feet. 1 Section 20 -1192 requires interior property lines to be landscaped with one tree per 40 feet. 1 Section 20 -1211 requires interior landscaping for vehicular use areas. Section 20 -1125 requires for office three parking spaces for each 1,000 square feet of gross floor area and one parking space every 250 square feet of floor space for a financial institute. 1 REFERRAL AGENCIES Building Inspector ,Attachment #1 1 Fire Inspector Attachment #2 City Engineer Attachment #3 ANALYSIS 1 The applicant is proposing to develop a bank and office building with a total square footage of 14,000 square feet (including a future 4,000 sq. ft. addition). The building is located at the northeast corner of Market Boulevard and West 79th Street. The proposed site is part of Lots 5 -7, Block 1, Frontier Development 1 1 yk:$ Crossroads National Bank October 4, 1989 Page 3 Park which is owned by the Chanhassen Housing and Redevelopment Authority. The applicant is currently negotiating with the HRA to purchase the property. As part of the agreement, the City is platting the subject property and adjacent property also under the ownership of the HRA. A condition of site plan approval will be for the preliminary and final plat to be approved and recorded with Carver County. The site is in both the BG and BH District. This is due to the fact that the old district boundaries do not conform to the pre- sent Market Boulevard alignment. The site plan meets conditions of either district but a rezoning of the property should occur during the plat procedure to provide consistency. The City will initiate the request. Site Plan Circulation The bank is oriented towards West 79th Street with a drive -thru area located adjacent to Market Boulevard. The design of the site plan allows easy flow for the drive -thru tellers and allows separate access for parking and entering the bank and office areas. Market Boulevard, once connected to Hwy. 5, will become a major roadway entering downtown Chanhassen. The Market Boulevard curb cut will be an entrance only. A left turn lane will be provided into the site from southbound Market Boulezard. Due to the high traffic levels that are expected, staff is recommending that a right turn deceleration lane should be provided to accommodate traffic entering the site from Market Boulevard. In addition, a bituminous sidewalk is located on the east side of Market Boulevard from West 78th Street to "Bowling Alley Lane" and con - tinues east on "Bowling Alley Lane ". Staff is recommending - a 6' concrete sidewalk be located south from "Bowling Alley Lane" to West 79th Street on the east side of Market Boulevard. To accommodate the right turn lane on Market Boulevard and the 6 foot concrete side sidewalk, the 44' right -of -way will have to be expanded. At the most, an additional 20 feet of right -of -way would be required. Staff is recommending that the applicant work with staff to design the deceleration lane and sidewalk to deter- mine the exact amount of additional right -of -way which is required. Once the amount of additional right -of -way is deter- mined, the site plan will have to be revised to reflect the new westerly lot line (to maintain proper setbacks). This revision can be easily accommodated by shifting the entire site plan to the east. .The most easterly curb cut on West 79th Street is approximately 75 feet from the West 79th Street - Market Boulevard intersection. • Crossroads National Bank October 4, 1989 Page 4 Staff would prefer the exit be further separated from theinta section (100' - 150'). Shifting the site plan to the easto:r_`•_;.: accommodate the additional right -of -way on Market Boulevardwl',: provide additional separation between the exit and the inteisec,_; tion (approximately 100'). r ,:•. The east access on West 79th Street is located on the east 'lot r`. °.. line and the adjacent lot. In the future the easterly access on ,. ` West 79th Street will also act as an access to the adjacent lot when it is developed. Since the access is crossing property lines, cross easements must be provided. Parking, Landscaping and Elevation • 11 Using the calculation for parking for financial institutions at one parking space per 250 square feet of building area, a total of 56 parking spaces would be required. The applicant is pro- viding 67 parking spaces which includes 2 handicapped parking spaces. The 67 spaces exceeds the requirements for financial institutions and offices. The area for cars using the drive -thru II provides adequate stacking distance. • Page L -1 of the plans provides proposed landscaping for the site. II The applicant is providing the required landscaping except for hedges required on the berm located between the south - parking area and West 710th Street. The landscaping plan shall be revised to provide the necessary landscaping on the berm between the parking area and West 79th Street. Staff is not requiring internal landscaping along the most easterly lot line since the parking area and access will be expanded into the lot. The building is one story with a tower at the southwest corner. The building is brick with bronze metal roof with HVAC enclosed internally. There are 6 covered drive -thru tellers connecting the building with a tower made of similar materials which features a time and date sign. Signage • The applicant is proposing one pylon sign, several•Oirectional 1 signs and a time and temperature sign above the drive -thru. The pylon sign is located at the entrance from Market Boulevard and is 45 square feet in size. The BB and BG District permits one pylon sign /lot not to exceed 64 square feet and the height of the I/ pylon sign is limited to 20 feet. A detail on the pylon sign providing the height of the sign shall be provided prior to City Council approval. The time and temperature sign is located on the north and west side of the tower and is 42 square feet (3' x 14'). Sign permits are required for the pylon and directional signs. 11 The time and temperature sign are permitted without a permit. Any additional signage will require a permit. 1 1 Crossroads National Bank October 4, 1989 Page 5 Grading, Drainage & Utilities Please refer to the Senior Engineering Technician's memorandum. Temporary Facility Page 1B of the site plan illustrates a modular banking facility and a phasing plan for the construction of a permanent facility. The applicant is proposing to utilize the temporary facility in order to open up the bank prior to the permanent building being completed. The temporary building is a 24' x 74' modular constructed building. The temporary building is a fully self contained building with all necessary eqiupment including two drive up lanes. Crossroads National Bank will be prepared to • open their bank for business in the near future and the permanent building will not be completed until the end of 1990 or early 1991. The temporary bank facility will be located within the easterly parking lot. All of the parking areas used for the temporary banking facility will be paved with the curb and gutter and landscaped as proposed on the overall site plan. The building will have footings, will be hooked up to sewer and water and will be handicapped accessible. The temporary facility will utilize the easterly full access on West 79th Street. A condition of site plan approval will be that the temporary facility will have to be removed within one week of the permanent facility receiving a certificate of occupancy. RECOMMENDATION Planning staff recommends the Planning Commission adopt the following motion: "The Planning Commission recommends approval of Site Plan Review #89 -6 for Crossroads National Bank as shown on the plan dated September 22, 1989 and subject to the following conditions: 1. The property shall be platted and recorded with - Carver County. 2. The City shall process a rezoning of the property as part of the platting procedure. 3. The site plan shall be revised to include a right turn dece- leration lane on Market Boulevard and a 6 foot wide concrete sidewalk on the east side of Market Boulevard. The site plan shall be revised to reflect additional right -of -way necessary for the deceleration lane and sidewalk and to maintain required setbacks. • Crossroads National Bank 1989 11''' 3 i. , , October 4, , ` . * �� .4 � : Page 6 r 4. The applicant shall provide cross easements for the joint access on West 79th Street. *:`' 3` ` .., 5 . The applicant shall provide revised landscaping plan p r o - : . - . viding necessary landscaping on the berm between the parking ; : ;;;,..‘-=;;;,..‘-=. = area and West 79th Street. ,Y t' ` - t 6. The applicant shall provide a detail on the pylon sign pro viding the height of the sign prior to City Council approval. IF 7. The temporary facility will have to be removed within one week of the permanent bank facility receiving a certificate I/ of occupancy. 8. The applicant shall comply with any and all Watershed 1 • District requirements. 9. The city will monitor the site for erosion control problems and if deemed necessary additional erosion control may be II required in the future. r 10. Exact storm sewer connections and design shall be verified in II the field and approved by the City's Engineering Department prior to construction. ' • . 11. The exit on West 79th Street shall be moved a minimum of 100 1 feet from the West 79th Street /Market Boulevard intersection. 12. The applicant shall illustrate how the easterly parking lot II will be modified in the future when the adjacent parcel is developed." PLANNING COMMISSION ACTION The Planning Commission recommended approval of the site plan with staff's conditions with the following changes: II 6. The temporary facility will have to be removed within. one week of the permanent bank facility receiving a•.certi•ficate II of occupancy, notwithstanding the foregoing, such temporary facility shall be removed within 9 months of the issuance of the building permit for the permanent bank facility. 1 11. Future addition designated on the plans are not part of the site plan approval. II In addition, the Planning Commission wanted staff to provide the City Council with the details for the lighting of the site. The applicant has provided the details showing the type of light fix- tures used on the site and where they are located. 11 II ^ t' _ ; . - - Crossroads National Bank , October 4, 1989 ,• Page 7 STAFF UPDATE The applicant has provided a revised site plan which provides the additional right -of -way required for the right turn lane on Market Boulevard and sidewalk. The site plan shifts the entire ' project to the east and provides a connection between the drive - thru and bank parking area. The amended plan was submitted on October 18, 1989, and staff has not had time to completely review the site plan. Staff is providing the Council with a copy of the amended site plan for their review. Staff will be performing a complete review of the site plan and believes the changes are minimal and the site plan still meets the requirements of the zoning ordinance. Unless directed otherwise, staff will admi- nistratively approve the amended site plan. St ti ti CITY COUNCIL RECOMMENDATION #89 -6 for Crossroads National Bank as shown on the plan dated September 22, 1989 and subject to the following conditions: 1. The property shall be platted and recorded with Carver • County. 2. The City shall process a rezoning of the property at part of the platting procedure. 3. The site plan shall be revised to include a right turn dece- leration lane on Market Boulevard and a 6 foot wide concrete sidewalk on the east side of Market Boulevard. The site plan shall be revised to reflect additional right -of -way necessary for the deceleration lane and sidewalk and to:maintain required setbacks. 4. The applicant shall provide cross easements for the joint II access on West 79th Street. "' 5. The applicant shall provide revised landscaping plan pro - viding necessary landscaping on the berm between the parking area and West 79th Street. 6. The temporary facility will have to be removed "within one week of the permanent bank facility receiving a certificate of occupancy, notwithstanding the foregoing, such temporary facility shall be removed within 9 months of the issuance of the building permit for the permanent bank facility. 7. The applicant shall comply with any and all Watershed District requirements. 8. The city will monitor the site for erosion control problems and if deemed necessary additional erosion control may be required in the future. 1 y y = < Crossroads National Bank October 4, 1989 ''` Page 8 4 9. Exact storm s � " ewer connections and design shall be verifi ;' the field and approved by the City's Engineerin ,ri-. . prior to construction. 9 Departineiit" . - . 10. The exit on West 79th Street shall be moved a minimum of 100 feet from the West 79th Street /Market Boulevard intersection. , ' 11. Future addition designated on the plans are not part of the site plan approval. II 12. Lighting to be consistent with Market /West 79th Street lighting. II ATTACHMENTS 1. Memo from Ron Julkowski dated September 27, 1989. 2. Memo from Mark Littfin dated September 27, 1989. 3. Memo from Dave Hempel dated September 27, 1989. II 4. Letter from Crossroads National Bank dated September 12, 1989. 5. Letter from Crossroads National Bank dated 6. Memo from Jo Ann Olsen dated September 20, 1989ember 11, 1989. 7. Planning Commission minutes dated October 4, 1989. II 8. Site plan dated September 22, 1989. 9. Site plan dated October 18, 1989. il II 11 II • II II II 11 II II } fifty (,Unman Meeting - ix 23, 1989 {r _ whole thing and you were suggesting that we go ahead with that company to do the whole thing. That was my misunderstanding. If Gary Warren: ND, it would just be for the feasibility study and then after that • we would have a handle on the plans and specifications which would take a separate authorization. HI Councilman Workman: I'd move approval. Mawr Qimiel: I had one other question on that. Can that be done in that one day rather than incorporating another $800.80 charge? (lry Warren: It's a matter of hydraulics. The Murray Hill tower being in a high pressure zone doesn't always drain out in one day. It will depend on the system pressures at the time. He'll do it as fast as we can but it may take 2 days at the maximum. Cauncilimian Workman moved, Councilwoman Dimler seconded to authorize inspection r study for rehabilitation of Murray Hill water tower. All voted in favor and the ration carried. cn --(0 J. SITE PLAN REVIFIJ FOR A BANK AND OFFICE BUILDING, NORTHEAST CORNER D MARKET ' r, BOULEVARD AND WEST 79TH STREET, CROSSROADS NATIMAL BANK. Councilman Hoyt: I will start this by apologizing to the group that brought it in. They asked me to call if I had questions and I just got so busy I didn't have time to get back to theme Reading through, this is the Crossroads National Bank. My problems here is understanding the nature of the temporary building. I think that it's one thing to have a temporary building while they're building the permanent building but as I read through the Minutes of the Planning Commission, the impression I got was a temporary building was going in and then they were going to begin pursuing the permanent structure. I'm uncanfortable with that arrangement. Maybe they can clear sane things up about it. Are yon open to hearing from them? Mawr Chmiel: Sure. Ton Mork: Good evening Mr. Hoyt. I'm Tam Mork and we visited over the phone briefly. In actual fact, as I understand it, we are here tonight to gain a building permit approval for both our permanent building and our nodular building inasmuch as we are well underway in terms of getting our bank organized. We have received charter approval from the office of the ca+ptroller of currency. kb are currently awaiting approval of our holding company frail the Federal Reserve Bank. Our strategy in beginning in a modular building was to essentially give ourselves some time to establish ourselves as a business entity. To establish systems. To get our staff up and naming. TO get a marketing presence in the community and it is our intent to begin construction on the permanent building just as soon as we possibly can. Hopefully in 1990 but in reviewing the process and in getting to this point, we spent a lot of time talking to a lot of bankers, both in this metropolitan area and even as far south as St. Zonis where there has been a lot of denoteable bank charter activity in the past 24 months approximately. To rake a determination for 4 . . • CIty Council Meetir :tober 23; 1989 •, encounter. However, to this, point we have been unable to close on the property for any number of'reasons and what we have requested is an amendment to the _ purchase agreement that would essentially allow us access to the site, completely at our risk, to enable us to go on and rake whatever physical improvements we need to make in order to accommodate our modular building. Principally that would involve some grading according to an approved grading plan. The installation of utilities to the modular bank site. The installation of lighting in the parking lot. Paving the parking lot and the construction of a foundation for the modular building and ultimately the installation of the modular building when it's delivered, hopefully as of now in the middle of January or early January. Our sense is that if we're not able to complete the improvements, particularly the paving, within approximately the next 30 days or I at least no later than the end of November, then we will be forced to open the bank sometime after the frost is out in 1990. Keep in mind that we have been undertaking our capitalization efforts now for approximately 60 days. We have a number of people who have paid in considerably sums. I think the paper quoted about a million and a half dollars and that's what we have paid in so far. That potential delay presents same significant difficulties as far as we're concerned in dealing with our potential investor base so that's the reason for the amendment is to accommodate those site improvements. Mayor Qumiel: Any other questions Tot? Councilman Workman: No, I don't. Councilman Boyt: How would this be different than saying to some other business 1 in town you can open up a Quonset hut and run your business out of it until you've got everything in place to build the permanent structure that we've approved? Is this somehow different than that? 1 Ttm Mork: Well I guess I come at it from a biased viewpoint but I believe it is. I believe for one thing the opportunity to have a new business in to with II the level of capital that we intend to.bring, thatjwe will b ing, is in itself screwhat unique. I furthermore believe that the addition of a commercial bank to this marketplace is an enhancement to the constrhers in this area. I note II with interest that already prior to our even opening the doors, the other bank in Chanhassen has expanded it's hours from 3:00 lobby hours to 4:30 and introduced full service Saturday morning banking. Wa expect that the addition of ourselves in the marketplace will just do nothing pore but further enhance 1 the banking climate for consumers in the Chanhassen area. Yurthermore, this is not a Quonset hut. This is a building that is built by the Sun Corporation which for the last 18 years has done nothing but construct permanent.modular II banking facilities. Currently for example Norwest Corporation has installed a building for one of their branch facilities on a permanent basis up in Anoka. While the renderings that you may have seen I don't think do justice to the building, when we're talking about total cost of improvements of an excess of $200,000.00, I don't think that that represents an insignificant level of investment on our part to satisfy our needs on an interim basis. Councilman Hoyt: Everything's relative and I didn't mean to imply that your 11 building was going to be a Quonset hut. You're talking about building a permanent structure that's around 2 pollicn dollars so a considerably greater investment than what you're going to have in the temporary sturcture, which I 4, .'. .guess is pretty natural. I think. the Ocwncil, hopefully the other people on the • • 't 4se V ' : �> : _ :. . .. '_ ...city Council Meeting - C-- er 23, 1989 , ) Council are going to be convinced that we're not sitting in a situation in which this group of investors is tryingiout Chanhassen to see if a bank will work 11 because we're now, shortly later in this meeting we're going to be looking at a shopping center which is talking about a significantly greater investment than the bank is and I guess without having them here, I'm just curious as to how 1 they feel about having a temporary bank structure just down the block and across - the street. I don't know. I'm rambling so I guess I'm done. ii lhyor Ctmiel: There were some concerns I had too Bill about that modular building. My train concern was whether or not it was in compliance with the State of Minnesota requirements for a temporary structure and whether it did have the state of approval by the State and it does so that made me feel a 11 little more canfortable with it. I also feel that some of the concerns that Bill has had has been same of my concerns. one basically is to the construction start and they're saying it's being just a little bit of an open period of time, as we discussed the situation. I feel that the bank, with all intent, plans on starting construction I would just as soon see that construction start as early as possible. I'm sure you'd welcome that as well. ' II Tom Mork: Absolutely. I think all of us involved in the bank are very reasonable people and certainly recognize the impact of competition. It would not be to our favor when our principle competition in the community is the II resident of approximately a 2 million dollar facility, for us to remain in this modular facility for any longer than we absolutely need to until we have our permanent hone built for us. I guess if I could just'camment'on the impact of I . the neighborhood and some of the concerns that Mr. Hoyt, you voiced. I think one of the things that has to be considered is that it would be incredibly difficult for a supermarket to operate out of a modular building jest because their spacial needs are considerably greater. We can as a result of a growing and initially a zero customer base and a growing customer base, begin in a modular building because we don't have those kinds of space needs. But hopefully our growth will be a level that all of us expect it to and we'll be 11 forced to start construction as soon as the frost is out I guess if I can give you my cannitment that it is not in our intent to be in this building any longer than we absolutely need to. II Cow cidman Hoyt: What would happen if your customer base didn't build? Then are you still going to go ahead and build the permanent structure? II Tbm Mork: Well, I would say that certainly we can't expect to be at home in a temporary building or modular building forever. In actual fact, we have to construct our permanent building within I believe it's a 2 year timieframe with II our agreement with the } A or we forfeit the land. Someone else Can came in and develop a bank on that site so we absolutely grill construct the permanent building under the conditions of the purchase agreement. I don't think there's any question about that. Cburcilworen Dimler: Tom, I have a question. It was re understand that you . were going to build around the modular facility? II Tam Mork: Correct. - II Councilwoman Dimler: Could you explain that? It doesn't look like it bone. II 8 1 _ • _ • City Council Meeting - =tober 23; 1989 ,c Tam Pbrk: We're intending to locate the modular building on the eastern portion 11 of the site. The bulk of the construction activity will be in the central and western portion of the site and that we have attempted to do is locate the modular building in a fashion such that we can acco modate continuing drive up traffic through our nodular building at the same time that we're building. ' Councilwoman Dimler: iahile you're constructing but after your construction, what are you going to do with your modular? 1 Tom Mork: It will be down within a week after we receive our certificate of occupancy. I believe the Planning Commission further put in the condition that it would be no later than 9 months after the issuance of the building permit for the permanent building and that's a time table that we can certainly live with. Councilwoman Dimler: I misunderstood you then because when I asked that 1 question to you the other day, I thought that you were going to incorporate it into your... Tan Mork: No. Absolutely not. That will. be green space when it's all done. 1 Mayor Qriel: Any other questions? Councilman Hoyt: Can anybody think of a way to add anymore assurance to this list of conditions? Ard' you going to have, if worse goes 'to worse and you do in fact not build, how much money do you have in this piece of property 2 years fram now? You've got the $200,000.00 for improvements.' Co you have anything else in it? Tom Mork: We11 at that point we would have closed on the property and I believe II that the aggregate purchase price is $4.50 times whatever the amount of land is. It's approximately 110,000 square feet. Todd Gerhardt: $470,000.00. Councilman Hoyt: So your expenses and liability then would be somewhere around $700,000.00 total? , Todd Gerhardt: tie's incurred architectural. fees and rendering, a site plan so. Councilman Hoyt: Well that's a ballpark figure Todd? $700,800.00? 11 Todd Gerhardt: Minimum. .' 1 Councilman Hoyt: I guess I can live with that sort of risk. I would approval of item 1(j) with the conditions noted in the staff report. Councilwoman Dirtier: I'll second that. Councilman Boyt roved, Councilwoman Dimler seconded to approve Site Plan #89-5 for Crossroads National Bank as shown on the plan dated September 22, 1989 pursuant to the City Manager's reca►Randations. All voted in favor and the motion carried. 9 1 CHANHASSEN PLANNING COMMISSION REGULAR MEETING DECEMBER 6, 1989 Chairman Conrad called the meeting to order at 7:45 p.m.. MEMBERS PRESENT: Tim Erhart, Steve Emmings, Annette Ellson, Ladd Conrad ' and Brian Batzli MEMBERS ABSENT: Jim Wildermuth 1 STAFF PRESENT: Paul Krauss, Director of Planning; Jo Ann Olsen, Senior Planner and Sharmin Al -Jaff, Planning Intern PUBLIC HEARING: I PRELIMINARY PLAT TO REPLAT LOTS 5 -9, BLOCK 1, FRONTIER DEVELOPMEMNT PARK (16.77 ACRES) INTO TWO LOTS AND FOUR OUTLOTS ON PROPERTY ZONED BH, HIGHWAY BUSINESS DISTRICT AND LOCATED ON THE EAST AND WEST SIDES OF MARKET BOULEVARD, NORTH OF HWY. 5 AND SOUTH OF THE SOO LINE RAILROAD, CROSSROADS 1 PLAZA ADDITION, CITY OF CHANHASSEN. Sharmin Al -Jaff presented the staff report. Chairman Conrad called the 1 public hearing to order. II Krauss: We should add that that last condition is a new one. Emmings: Yeah, would you say it again? 1 Krauss: What we're proposing is that, there's a problem in there that the underlying zoning does not conform to the new location of Market Blvd.. We have the BH and the BG districts which will be split partially by the new alignment. There's a corner of the BG commercia1, area that extends over onto the bank property. I think this pretty much outlines it right there. What we want to. do is rake our zoning map look a little more reasonable by extending the BH district, which is over here, up to the street. So what 1 we're asking is that the future purchaser of Lot 1, the bank, not contest, be required to not contest a city sponsored rezoning. 1 Emmings: So what do you want that last condition to say? Krauss: That the owner of Lot 1, Block 1 agree not to contest the City I sponsored rezoning of the entire site to the BH district. Emmings: Are we still in a position with that purchase that we can impose a condition on him at this point in time? 1 Krauss: They haven't closed on the property. 1 Emmings: Okay. Conrad: Okay. It is a public hearing. Are there any comments? Erhart moved, Emmings seconded to close the public hearing. All voted in favor and the motion carried. The public hearing was closed. 1 Planning Commission Me S. 171 December 6, 1989 - Page 2 1 Batzli: Why again do you want to make Outlot A into Lot 2, Block 1 at this 1 Krauss: The purpose for that is that what we'd like to call Lot 2 is a buildable lot. That the HRA intends at some point to sell to another purchaser. Conveying it with outlot status means it would have to be replatted to remove that status in the future. It would seem to be a lot cleaner for all concerned if the HRA just had a simple Lot 2 to deal with than to sell. Batzli: What's the down side of doing it now and not leaving it an outlot? Krauss: I don't think there is any since the City owns it. It's not as 1 though it's an independent owner who can come in and just say, I have a site plan. You have to approve it. It is an HRA controlled parcel. 1 Ellson: When I first read this I got really confused reading the map but can you point out C again? Just that whole strip. Even though that one kind of crosses it. Krauss: Well it's called D on the other. side I think. Ellson: And like this one crosses over. Emmings: No, this whole thing is C all the way down to here. Ellson: That's what I was thinking that B maybe crossed it. I don't ' have anything else to add. Emmings: I don't have any other questions. Erhart: I wish I had some questions but I just can't think of any. 1 Conrad: I can't think of any either. Emmings moved, Batzli seconded that the Planning g Cormm�.ssion recommend approval of Subdivision Request 489 -19 as shown on the preliminary plat dated October 27, 1989 and subject to the following conditions: 1. The following easements shall be provided: a. A 20 foot wide utility and drainage easement will be required 1 on Lot 2, Block 1. b. The final plat should include the typical utility and drainage 1 easements over each lot; 5 feet on side lot lines and 10 feet over the front and rear lot lines. c. An additional utility easement should be shown on the plat .for the 1 existing gas line across the northerly lot lines of Outlot E and Lots 1 and 2, Block 1. 1 ' ' Planning Commission Me J.ng ��, I December 6, 1989 - Page 3 • II d. Cross access easement over the southern 50 feet of the common lot I line between Lots 1 and 2. The easement shall be 20 feet wide on each lot. 2. The final plat should show Outlot A as Lot 2, Block 1. II 3. The Lot 1 park dedication fee should be paid as outlined in the HRA's purchase agreement at the time of sale. The City reserves the right to I acquire park dedication fees on Lot 2 at such time as it is proposed for development. 4. The owner of Lot 1, Block 1 agree not to contest the City sponsored II rezoning of the entire site to the BH district. All voted in favor and the motion carried. II PUBLIC HEARING: I ZONING ORDINANCE AMENDMENT TO AMEND THE CITY CODE, DIVISION 6, SITE PLAN - REVIEW TO REVISE THE PROCEDURE, EXPAND ON DEVELOPMENT STANDARDS AND REQUIRE FINANCIAL GUARANTEES FOR LANDSCAPING AND OTHER SITE IMPROVEMENTS. II Paul Krauss presented the staff report. Chairman Conrad called the public hearing to order. I Emmings moved, Ellson seconded to close the public hearing. All voted in favor and the motion carried. The public hearing was closed. 1 Erhart: I don't really have anything right now Ladd. Maybe after some discussion. I Emmings: I've just got a couple things. On page 6 on item C at the top. Where it says, in the second sentence, low profile, self contained mechanical units which blend in with the building, architecture are exempt• I from the screening requirement. I wonder if we should add onto that, that unless topography makes them visible to other properties or something like that so that we have an out there to require screening in some odd circumstance. I think the general idea is fine. I Krauss: Should we say then may be exempt instead of are? I Emmings: Yeah. Or may be exempt. That's right. That would be fine. I'd agree with that change rather than the language I had. That's even broader and I like it better because it gives them the idea that we might accept II something other than the screening which I think is fine but it doesn't make it automatic. If they buy a low profile unit because there might be one that's obnoxious. Alright. The other thing is, I'rt just glad that Howard wasn't here to hear you say plain concrete block.- '" Conrad: Yeah, Howard would not go along with that. 1 11 fl ITY O F ';2. DATE: Dec. 6, r CllANllAE C.C. DATE: Dec. 18, 1989 N CASE NO: 89 -19 SUB Prepared by: Al- Jaff /v STAFF REPORT PROPOSAL: Preliminary Plat to Subdivide 16.77 Acres into Two Lots and Four Outlots 1- Z Q LOCATION: North of Highway 5, west of Great Plains Boulevard and south of Chicago, Milwaukee, St. Paul �2ailroad tin 9 - ?y Adminis;atar Endorse � � ,0A- Cl. APPLICANT: City of Chanhassen e`iR; 690 Coulter Drive Q Chanhassen, MN 55317 12e, i Date :uultti:E:{ C: .S ✓_'!l Date Sutmitte. •o cop;.it PRESENT ZONING: BG, General Business Dist Highway and Business Services District ACREAGE: 16.7 acres, 730,327 square feet ADJACENT ZONING AND LAND USE: N - CBD; Central Business District and BG, General Business District S - Highway 5 E - BH; Highway and Business Services District W - Highway 5 WATER AND SEWER: Available to the site. W PHYSICAL CHARAC.: The site has been extensively altered by the recent completion of Market Blvd. and 79th Street. With exception of two retention ponds, the larger of which is located west of Market Blvd., the site is flat and devoid of tree cover. 2000 LAND USE PLAN: General Business and Highway Business 1 6 . 4 --toll, f'f X 1`4: '+. - 4 ` -1-- ,--.1.:/,;) 1 464% Iv ` i ✓ ii f • , � _ .. L. Ir. RSF = - -. �� �' . .91. , il O •� ;. t � ' l 11,,� ' tis I ��•� • i _. o r 4.1 dt1141 el) at 1 It R4 (k)Fli ! • ,4 iv= 1p . ..-r . t___ rs : A Id N • 1 v • . ■ e 4, PTA r .a,a.u.eD.Ko., E ■�• •- LLD s R�2- - .. Ion= rr r fel n Inn MS . P& r ' R12 r � � � _ � v'' `V ■ 1 r�r� " Y`, trill - ! � i 1 1111111111� L SG P ,l /1 II- • ilivill 1 _ - � J L IF : 61 4 441 0 IR adi_::... '....-- 4------ IIIT 1 al . no% 1 - - ti-----___:----- iv v, 14 2.1 6,-,-4111 mi .1 1011.: illio - i .41114:ifp 0 4; ir &t . 41 :; Ad olf 1 O' „� e;clo �I • GP/ f so il �.�, -'_ / 4. e•, rte .. + . - a �' ���1 vs ' � t Location f � Via : A ► A - ro os ed i di ' � ge l. p p - to , �N . �i • �, .► 6 • 4 RSF 4 111 . 1.3 011040 INNEN CIXCLV II ., j 7 ! LANCE SUSAN r ` :� RD );Ilv , ' 111Pr Ric ;%----•.._:___--.-, - 0 Ij PUD-R t i 96 TM ST • • 0 2 Crossroads Plaza Subdivision December 6, 1989 Page 2 1 BACKGROUND ; In October, 1989, plans were submitted for the Crossroads National Bank and development started on the site. Plans were approved on October 23, 1989. The subdivision is being requested 1 primarily so that the City can convey the bank site to the developers, create a second lot for future development and create necessary easements and roads. 1 On December 6, 1989, the Planning Commission reviewed and recom- mended approval of the subdivision. Just prior to the meeting with the Planning Commission, staff added Condition #4 which states that the applicant agrees to support a rezoning request of the westerly portion of the site from BG, General Business to BH, Highway and Business District. Staff anticipates the City requesting the rezoning to eliminate the current situation where the bank property is split between the BG and BH districts. Rezoning it to BH will provide continuity with parcels located to the east. ANALYSIS The City, which currently owns the site, is proposing to„sub- divide 16.77 acres into two lots and four outlots as follows: • Lot 1, Block 1 contains 2.47 acres and will be the site of the 1 future Crossroads National Bank. Lot 2, Block 1 contains 3.02 acres and will 4e reserved for 1 future development. Lot 2 is labeled as Outlot A on the current survey. Staff is recommending that the final plat be revised to plat it as Lot 2, Block 1 since it will eventually be sold for future development. Outlot B, 1.74 acres, contains a drainage pond and may ultimately contain streetscape improvements as it is an entrance into the CBD. . Outlot C, 0.33 acres, and Outlot D, 0.55 acres have been 1 established for the future expansion of Highway 5 for ultimate right -of -way negotiations with MnDOT. Outlot E, 6.14 acres, contains a drainage pond and will be pre- served as such. STREETS 1 In the attached memo, the Senior Engineering Technician addresses the utilization of the existing West 79th Street for access. He is requesting that Lot 2 share a common access driveway with Lot 1 to eliminate traffic congestion on West 79th Street. Provision 1 1 • s*!. Crossroads Plaza Subdivision December 6, 1989 1 Page 3 of a shared curb cut between Lots 1 and 2 was a condition of ' approval for the bank. A 20 -foot wide cross access easement should be provided over each side of the south 50 feet of the common lot line between Lots 1 and 2 (see attached copy of bank staff report and City Council minutes). ' Market Boulevard is located on the extreme westerly edge of Outlot E connecting West 78th Street with Highway 5. Acceptable right -of -way for the final design of both streets has been pro- vided. UTILITY EASEMENTS In the attached memo, the Senior Engineering Technician addresses the utility easements. He is requesting the typical utility and ' drainage easements over each lot; five feet on side lot lines and 10 feet over the front and rear lot lines. A 20 -foot wide utility and drainage easement on the southern border of Lot 2, Block 1 is required as storm sewer was extended through Lot 2, Block 1 into Lot 1, BLock 1. An additional utility easement for existing gas lines is requested across the northerly lot lines of ' Outlot E and Lots 1 and 2, Block 1. PARK DEDICATION • A park dedication fee for the bank site has been negotiated under the purchase agreement from the City's Housing and Redevelopment Authority. The City reserves the right to open park dedication fees on Lot 2 at such time as it is proposed for development. PLANNING COMMISSION UPDATE The Planning Commission recommended approval of Subdivision Request #89 -19 as shown on the preliminary plat dated October 27, 1989 and subject to the following conditions: _ 1 1. The following easements shall be provided: 1 - A 20 -foot wide utility and drainage easement will be required on Lot 2, Block 1. - The final plat should include the typical utility and drainage easements over each lot; 5 feet on side lot lines and 10 feet over the front and rear lot lines. - An additional utility easement should be shown on the plat for the existing gas line across the northerly lot lines of Outlot E and Lots 1 and 2, Block 1. 1 - Cross access easement over the southern 50 feet of the common lot line between Lots 1 and 2. The easement shall be 20 -feet wide on each lot. 1 1 Crossroads Plaza Subdivision December 6, 1989 Page 4 1 2. The final plat should show Outlot A as Lot 2, Block 1. 3. The Lot 1 park dedication fee should be paid as outlined in the HRA's purchase agreement at the time of sale. The City reserves the right to acquire park dedication fees on Lot 2 at such time as it is proposed for development. 4. The applicant and purchaser of Lot 1, Block 1 agrees to sup- port a rezoning request of the westerly portion of the site from BG, General Business and BH, Highway and Business District. CITY COUNCIL RECOMMENDATION Staff recommends the City Council adopt the following motion: 1 "The City Council approves Subdivision Request #89 -19 as shown on the preliminary plat dated October 27, 1989 and subject to the following conditions: 1. The following easements shall be provided: - A 20 -foot wide utility and drainage easement will be„ required on Lot 2, Block 1. • - The final plat should include the typical utility and 1 { drainage easements over each lot; 5 feet on side lot lines and 10 feet over the front and rear lot lines. - An additional utility easement should be shown on the plat for the existing gas line across the northerly lot lines of Outlot E and Lots 1 and 2, Block 1. 1 - Cross access easement over the southern 50 feet of the common- lot line between Lots 1 and 2. The easement shall be 20 -feet wide on each lot. 2. The final plat should show Outlot A as Lot 2, Block 1. 3. The Lot 1 ark dedication fee should be P paid as outlined in the HRA's purchase agreement at the time of sale. The City reserves the right to acquire park dedication fees on Lot 2 at such time as it is proposed for development. 4. The applicant and purchaser of Lot 1, Block 1, agrees to sup- port a rezoning request of the westerly portion of the site from BG, General Business and BH, Highway and Business District." 1 1• Crossroads Plaza Subdivision December 6, 1989 Page 5 ' ATTACHMENTS 1. Senior Engineering Technician report dated November 29, 1989. 2. Preliminary plat of Crossroads Plaza Addition dated October ' 27, 1989. 3. Existing features map. 4. Staff report and minutes for the Crossroads Bank dated 1 October 23, 1989. 5. Planning Commission minutes date December 6, 1989. 1 1 1 1 1 . 1 - • 1 1 1 1 1 1 1 . 1 • . . • . ‘ CI tV'OF . . .cHANH 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM 1 TO: Sharmin Al -Jaff, Planning Intern FROM: Dave Hempel, Sr. Engineering Technician � DATE: November 29, 1989 1 SUBJ: Preliminary Plat Review for Crossroads Plaza File No. 89 -18 Land Use Review Upon review of the preliminary plat of Crossroads Plaza dated October 27, 1989, prepared by BRW, Inc., I find the overall plan is generally acceptable with the following conditions: 1. The final plat should include the typical utility and drainage easements over each lot, i. . 5 feet on side lot lines and 10 feet over the front and rear lot lines. 2. With recent development on Lot 1, Block 1, storm sewer was 1 extended through Lot 2, Block 1. Therefore, a 20 -foot wide utility and drainage easement will be required on Lot 2, Block 1 (see attached). _ 1 3. Across the northerly lot lines of Outlot E and Lots 1 and 2, Block 1, an additional utility easement should be shown on the plat for the existing gas line. Attachment: Easement map = ' - c: Gary Warren, City Engineer • �� I p} Pn k. 1 vo 6 t .... si, A VI I % ... 41%. I. • ,t 1 z CIL . . / , ' 0 - / i , � • 1 ci. \ )". frs „... 1 , _ . ,, -_,.__:.• ,\ , • I . _ • ,-..„. it,, it 1 y � 1111): 4 :,.„. ‘ ti / . No . 1 _... • ., , . . • I i l. .,/ 1 t • t , 3 / f / 4 1 1 4 \ 1 k / / . . • 1 • pAt 1 I , 1 ,. ,.� ...... ._ . 1 . . . • • . 1 1 1 _ 1 ....." . _ �/ iii I - r._ NM = •— MI • — MI • MI • MI • NM — i = MI MI • -c- 1 CROSSROADS PLAZA $ CHANHASSEN, MN s Ili . o II i l ji 4 • -_ - �; ' w ?rai � A, y M1r 1 x a ]r: - �w • \ 3 • �...o`e... p..i '� p +A�!;M1'1 \ 1 �� .11.10 r+. '� C I �. in i8 Jt V=. r" sip i 1:4 Aw e 09.1 ,Ra ;' /;:_ ..) M nth 4 . 141, ....r 1 ../ ...• 7 -- w r ■T - -- - •..-- ,,� 4;�a11a, Odel' gat _ + ;Rl _ w - .1.....le. G fa ady v Rumors e r r ' ::•.°'°.."" p" ` KN I �.... • t i 1 .6 4 i ►_ c � " � " f : ( ?ate Q m ei, • • . ..0,.`1°' •rw'�a • .1.1.1.1 ••• n m. F SS • ..-:. 'v. 10 in mot.a•.°•'°.. moon .. Towle . :'°"'" ;� �'l f ,: �� l��� •: / Q MINSUICKWIta m l� i° I G ° x�C � Y C " I , kite • o0 V/ '.4 a— 1111 1 rr s • 1 Planning Commission Meeting February 19, 1992 - Page 9 Conrad: Second. ' Erhart moved, Conrad seconded that the Planning Commission recommend approval of Subdivision #92 -2 as shown on the plans dated January 21, 1992 with the following conditions: •1 1. The proposed property line for the lot split be moved a minimum of 10 feet to the south so that the existing Lot 1 meets the setback standards of the RSF zone. 2. Lot 2 gain access by receiving a right to use Outlot B to Nez Perce from the city. 1 3. A landscaping, tree preservation and home placement plan be submitted at the time of the building permit for staff review and approval. 4. At the time of building permit issuance of Lot 2, Block 1, a connection charge in the amount of $7,732.68 (1992 balance) should be collected. ' 5. The City will provide and install sanitary sewer and water to the property, at the developer's expense, at the time the building permit is issued for Lot 2. 1 6. The applicant shall dedicate to the City by final plat an additional 7 feet of right -of -way along Pleasant View Road. 1 All voted in favor and the motion carried. ' PUBLIC HEARING: AMERICANA COMMUNITY BANK LOCATED AT THE NORTHEAST CORNER OF WEST 79TH STREET AND MARKET BOULEVARD: A. PRELIMINARY PLAT TO REPLAT LOT 7, BLOCK 1, CROSSROADS PLAZA INTO ONE LOT. ' B. SITE PLAN REVIEW FOR A 7,268 SQUARE FOOT (2 STORY) BUILDING FOR PHASE I AND PHASE II CONSISTING OF 4,200 SQUARE FEET. Sharmin Al -Jaff presented the staff report on this item. Batzli: Engineering, do you want to comment at this time before we hear ' from the applicant or about the traffic study or anything? Hempel: As Sharmin had pointed out Mr. Chairman, kind of a last minute traffic study by the City's traffic engineer consultants, Strgar Roscoe- Fausch, they had prepared the downtown traffic study so they're quite familiar with our future land use and potential number of cars using Market Blvd.. We also have the Eastern Carver County Transportation study that was prepared, in the year 2010 and full development, they estimated 7,400 trips per day on the street. That had engineering somewhat concerned with a full access onto Market Blvd.. Based on their calculations that Strgar- Roscoe performed, if future land uses intensify in the downtown area, we may have to relook at this intersection. If the number of accidents become 1 • Planning Commission Meeting 1 February 19, 1992 - Page 10 excessive, the City would like to reserve a condition that if there are excessive accidents, that we have a right to limit or restrict that access to a right -in /right -out only and reconstruct the center median area. 1 Batzli: Would you like to give a presentation now? Randy Schultz: Good evening. My name is Randy Schultz. I'm President of 1 the Americana Community Bank. We're here tonight to show you a design for a site plan of a building project that we'd like to put down on West 79th 1 and Market Blvd.. We have an artist drawing here of what we think the building will look like. Would be pretty close to. We also have a board II on the floor here that would show you some of the materials that we'd expect the building to be made out of. Just like to say that we think it' be a very attractive building. We think it'd be the kind of building the City of Chanhassen would be proud of to have right there on that main intersection coming into the community and we look forward to constructing" the building and doing business in Chanhassen. As far as any questions, I'll turn it over to our architect Kim Jacobsen to tell you more about the building. Thank you. Kim. Kim Jacobsen: As you remember we came in before you last time with a gray 1 building I think when we were here. It was redone. •'!t came back to being a building that was technically Phase I. It was on a different site. Opportunity came about and we said we'd like to add Phase II. It was always planned but this was what developed in Phase II. We're still trying to keep some of the downtown character. I think that was one of the goals 1 we tried to feel and wanted to have a building we'd feel comfortable in town. So we kept a roof...we have the Timberline shingles, we're feeling comfortable with it. We've got an exterior material that is a masonary .material. It's stucco type of material. It has a color to it. We've got" a rock faced block that goes down...to tie the building down. Overall we received fairly favorable comments. Put awnings on it to kind of keep the sum shade out and give it some color and feel. That in a nutshell is our 1 building. We did a plaza out in front. Put flagpole there. There is a big fountain across the street and our earlier proposal had a fountain in it but we felt it would not really fit with the large spray across the street to have something that was fairly small. And we developed our parking and everything predicated on the parking movements and movements o the site. If there's questions, I'll sure... There's some tiles for color. There's some inserts of tiles that are going to...building to just" kind of break it up a little bit. We do have some signage that...over the entranceway. Erhart: When will you see completion? 1 Kim Jacobsen: We would like to get started, you know if everything goes well, middle of April through the end of April at the latest.' I figure 4 II or 5 months until completion so August. July or August.... Batzli: Does anyone else have any questions right now? Some might come ull I guess. I guess no one else is here for the public hearing. If someone would like to. 1 1 ' Planning Commission Meeting February 19, 1992 - Page 11 Erhart moved, Conrad seconded to close the public hearing. All voted in favor and the motion carried. The public hearing was closed. Batzli: Jeff, what do you think? I Farmakes: The building I guess it's an improvement over the original building. I guess I appreciate the fact that they made an effort to not be the same as some of the other development buildings in the interpretation I think I talked about that before. Basically being a carry on an identical building because I think the city loses out with that. Particularly with an opportunity to have an upper end building in an important location in the city. I always have been uncomfortable with reading that it should be compatible with retail development that's going on. It seems to me we're limited ourselves. I see the definition of compatible as being, doesn't clash with. Not the same as. And it's a far ' friendlier building than the original that I've seen. I guess I would have liked to have seen maybe a bit more of the detailing of the plaza. It seems like it can be again a nice feature and a key corner. I have not had the opportunity to look at some of your drawings a little closer. But it ' looks like a major improvement. The signage area, I think for the size of the building, that the signage is appropriate. I do have a question in regards to the, who is the other tenant in the building? Does the tenant want that too? Kim Jacobsen: There is leaseable space right now. 1, 2 or 3 tenants. The bank will have about 2/3 of the main floor. The upper floor and the last 1/3 of the south side facing 79th Street would be leaseable space. Farmakes: Right now it shows that the Americana Community Bank on the monument sign is very, very small. Is tenant 1 you and then tenant 2 another leasee or would.it be two other tenants? ' Kim Jacobsen: It would be Joe Smoe's whatever and somebody else's whatever. Farmakes: Okay. So the monument sign would primarily then be for your tenant? Kim Jacobsen: For tenant only... .Batzli: Does that fit in with what the sign task force is looking at? Farmakes: Well, that's still pretty fluid. Real fluid as a matter of ' fact. We've just begun that but I don't want to hedge on that because I'm one member out of many that my preference would be that the monument sign reflect the major tenant of the building. But I don't believe our present ordinance is that. Batzli: What do you think about the turn in, turn out? Did you take a look at that? Do you have a feeling about that? Farmakes: I would leave that up to the engineers. I can see that that may be a problem when the area's entirely developed. That's a difficult read ' for me considering that basically right now a large extent of that area is 1 Planning Commission Meeting II February 19, 1992 - Page 12 1 II empty. And I don't think that that street is very heavily used right now. But I think once that development is in place, it will see far more traffic. That will be main street. I have no further comments. 1 Emmings: All and all, we've seen most of this before and we're just moving it to a different site and it looks fine to me. I wondered if the parking" - information that's in here, they're required to have 30 and they're providing 36. It says in this report. Now is that based on just Phase I or is that both? - A1 -Jaff: With Phase II, they would need 47 spaces. They will be providinj 52. So they're fine. Emmings: Okay. So that's fine. Alright. I think that's all I've got. 1 It is. Oh, and the hard surface coverage also, it says 62% and there's a 65% requirement. The 62% is both phases? Al -Jaff: I think it's Phase I only. They will be very close to 65 %. DavJ tried to calculate the hard surface coverage and he was very close to 65 %. Emmings: So it looks like it's alright? II - A1 -Jaff: Yes. They're still fine. We did a very quick check -up with II , Phaes II before we came down here. Not all the information is in the report that we gave you but they are fine. Emmings: Okay. That's it. 1 Ledvina: I had a question regarding the engineering staff and their _ recommendation regarding two traffic accidents. It doesn't state the time period. Eventually two traffic accidents are going to occur. So is this year or? Hempel: That's correct. That was an oversight on our part. We're lookini at a 12 month period. • Ledvina: Okay. I'm a little bit confused about the number of tenants thall would be in this building. Would there just be Americana and then one other tenant or Americana and potentially a group of other businesses? Randy Schultz: ...we're not sure at this point. We have lease space and II of course we're going to obviously try to find good, suitable tenants and we'd like to have as few tenants as possible., The building will be designed, it will be able to accommodate a large tenant or another smaller!' tenant. How that will shake out I don't know. Ledvina: No other comments. 1 Conrad: It looks good. The impervious surface or the hard surface, as I look at the map it doesn't look. It looks like there's a lot of hard surface on the diagram so I just want to make sure. We did the calculatio today or when did we do the calculation for everything including Phase II? Hempel: Approximately 2 weeks ago. , 1 • Planning Commission Meeting February 19, 1992 - Page 13 Conrad: But you're pretty confident we're close? 1 Hempel: Very close. Conrad: Okay. The question on future parking. The site north of the drive thru. Is that a bermed area? That's grassy and we'll convert it to ' parking? • Kim Jacobsen: Right now in order to Phase II in, that already will be ' bermed. Conrad: Is there grass there at all or is that just parking? Is that just ' hard surface parking then? Batzli: Are you looking at the new set of plans? Conrad: I'm looking at whatever Tim has here. That is grass, okay. Kim Jacobsen: In the plaza design, the amount of hard surface in the plaza has been cut down. There is a design...landscaped and it comes back in and it's full of plantings. has a seating area to it. That was done as representation of the plaza... We've actually cut down on the hard surface area or soften it a lot. I've got it along if you'd like to. II } Conrad: Well yeah. Is it easy to? As they're doing that, our left in off of Market Blvd., if we were to, what do we do? Do we create a left turn ' lane then or is that just a left turn from, as we're going south, is that just a left turn from one of the two lanes that are there or how do we handle that traffic? II Hempel: Prior to this bank proposal there was another one, Crossroads Bank. They had at originally a full access also I believe. The original Market Blvd. construction plans showed a median going all the way ' up to the railroad tracks and a standard width of the road. Since that bank proposal they looked at cutting back the center median and also putting a tapered end on the west side of Market Blvd. to expand the lane . width. This taper here was expanded to allow for left turns into here. Into the bank site and also to swing traffic around the median. Actually there are two lanes capable up here. A 12 foot lane... What happens with the expanded driveway, if we allow the wider cut. We are cutting back the II median and it's kind of a short taper zone then. When you're driving south on Market. It's actually below design standards right now. Staff looked at, originally sat down and looked at this and on a quick note, we thought well if we're going to have a left turn lane or allow a left turn onto southbound Market, it might be a good idea to provide an extra lane width in the access. So we have a right out, a left turn and one lane in. After ' rethinking that, we believe the site will function properly with just a two lane entrance. One lane in, one lane out. If stacking becomes a problem • on left turn lane, they can loop back through the site and exit out to 79th Street which is the desired out anyway. Conrad: So we don't end up with a left turn lane coming in? 1 11 • Planning Commission Meeting , February 19, 1992 - Page 14 Hempel: Yes we would. That can be striped. Right now it is a painted median out there. That would have to be revised. Conrad: Did you find the? 1 Batzli: Yeah. It's still at this end. It's coming around. Farmake s: I have just a quick question. Is this relatable in size to the site plan that we have on page 1? Kim Jacobsen: Pardon me? Farmakes: How does this relate in size? I notice a difference in what seeing here. Kim Jacobsen: It's a 1 to 30 and the other one is 1 to 40 so you're at different scales there. That's a working drawing. 1 Batzli: Do you want to take about a 2 minute recess while you get a chance to look at this and look at what we're doing here? I think there's been all lot of changes and I wouldn't mind taking a short break just to try and figure out what changes this is. • (The Planning Commission took a short recess at this point in the meeting." Batzli: Ladd, we were right in the middle of you and your discussion. Conrad: I'm done. I think I feel comfortable with what I see. I do. Noll more questions. Erhart: Where's, the bank customer, where's the predominant parking when II you want to go in and make a large withdrawal? Who parks in the north parking lot? Where the 16 stalls are. That's employees? Kim Jacobsen: Employees and some leased major tenant that would come in. Same thing with the far easterly stalis...most of those are again for employees or tenants of the building parking. , Randy Schultz: Employees will be asked to park as far from the building as possible. 1 Erhart: Right, okay. Batzli: Is there a rear entrance to the building? ' Kim Jacobsen: It's not a public rear entrance. It would be a person would walk into the lockable entrance. , Randy Schultz: You can enter off of the plaza. That would be an entrance. Erhart: But that's the only entrance so if you're parking on the east end," you have to walk around the front? Randy Schultz: No, no. That's the main entrance to the building. 1 Planning Commission Meeting February 19, 1992 Page 15 Erhart: Oh, it's not from the plaza? Krauss: It's got two entrances. - Kim Jacobsen: The main entrance to the building would be right off this parking lot into that entrance there. ' Erhart: Into the bank? ' Kim Jacobsen: Into the bank or actually into a leased space. Erhart: What about into the bank? • Kim Jacobsen: Into the bank, this direction also. Erhart: So you can get into the bank from both directions? Kim Jacobsen: You can get into the bank from both directions. You can get into the leased space from... Batzli: So are people from the parking lot then cutting through the drive thru traffic if they're parking in the north stalls ?:' Kim Jacobsen: They shouldn't be. It's two way traffic on that northern route. Krauss: No, but I see what you're saying and yes, that's a possibility but what we're talking about doing is probably an oversight on our part but we have typically labeled more inappropriate stalls as employee parking only forcing those folks to park in places that might be a little more hazardous. Like the ones just to the outside of the drive up should definitely be employee parking only. You want to free up the best spaces in front of the door. ' Kim Jacobsen: That parking up there has actually been created. They have a room which may operate as a community room or as a service room for the ' bank and that appears off the plaza and that would be open late hours.. In other words it might be open until 9:00 or 10:00. The drive thru would traditionally close at 5:00 or 6:00. 7:00, whatever. It's really to serve late night if someone comes into that room and uses it. Conrad: Sidewalk on both those streets? • 1 Kim Jacobsen: There's an existing sidewalk on Market and yeah, we're being asked and we will put in a sidewalk on 79th. Erhart: On the parking lot adjacent to the bank but on the east side, is that for people who are going to be coming and going frequently? Kim Jacobsen: Yes. It would be customers that either bank or the lease... 11 Erhart: That's a lot of turning in there isn't it? Dave do you see that as well designed? Or acceptable. i Planning Commission Meeting ' February 19, 1992 - Page 16 Hempel: It appears acceptable. Any kind of banking facility like that I you're going to have a lot of vehicles moving. Pedestrian traffic is always a concern. ' Erhart: I understand the movement. It just seems you've got to turn in and all of a sudden you've almost got to turn like it's almost another entrance"' onto another street to turn into that parking lot. I see a lot of potential for conflict there. Almost create a lot. Kim Jacobsen: It's not a major street. It's a parking lot. Traffic's moving at 5 to 10 mph. I don't see internal problems... A lot cleaner than the last one we brought to you. Erhart: Well yeah. A lot of turns but I'll leave that up to Dave. What II are the awnings, that's awnings I think on there. I'm getting old. I can't see so good. Is it awnings right? Kim Jacobsen: Yes. Erhart: What's the material? What's the life of the material? Color or"' durability? Kim Jacobsen: 3 to 5 years on an awning. ••. Erhart: Really? Kim Jacobsen: A commercial awning. It should be 10 years but I would never tell anybody that. They'll tell you 10 years. Erhart: When it fades and starts looking ratty, who's responsible to get II it changed? • Kim Jacobsen: The bank. It's got an image. You're not going to stick dollars into a bank without an awning. I mean I think that's the biggest II thing you've got. You've got tenants... - Erhart: You're not a savings and loan right? ' Randy Schultz: No, it's not a savings and loan. We're a bank. A year or two from now you may not think... 1 Erhart: Is staff satisfied with the awnings issue? Non - issue? Krauss: It really is a self controlling problem. If it got notoriously II bad and we had to interact, I mean the property owner has an obligation to maintain the property in the condition you approved it. So theoretically we could go after somebody if it became a problem. • 1 Emmings: Are we approving it with awnings? I mean we've got a drawing out here. An artist rendering. • Krauss: Yeah. It's part of the architectural elevations. 1 Planning Commission Meeting • February 19, 1992 - Page 17 Emmings: Okay. Does it appear in the plans too? The plans that we're approving? Kim Jacobsen: Yes, definitely. The elevations...face south and leave those windows exposed, we're going to have a real heat problem. Farmakes: There are no graphics on those? • Krauss: I think one important thing that you need to recognize on this site is that it's a corner site. It's a little more difficult to develop but I think there's a real advantage with this site plan over the Crossroads. I don't know if the Crossroads appeared in your packet but Crossroads had all the drive thru was on the corner and the building was further back. It had less conflict in terms of the parking lot but your main view of the place was a drive up window which really was not all that appealing and I think this with the plaza and the building and everything ' behind it is a lot more attractive. Emmings: It also made you feel a little insecure to have a bank with ' wheels underneath it. Erhart: Okay, I've just one last question. Maybe sdmebody asked this. I The plaza, the material itself, is that a non -slip? Kim Jacobsen: Yeah, we're going to use a crushed concrete and exposed aggregate mix. Erhart: Oh, so it's not tile? Kim Jacobsen: No tile...so we're keeping it so it will be non -slip. Erhart: Okay. Looks good to me. Conrad: 90% of your business would be drive thru traffic probably? Randy Schultz: Usually 60% to 80 %. i Conrad: 60% to 80%, okay. The only thing that really bothers me about the plan is that little bit of a cross street. You know most of the folks will be going through your 3 drive thru stalls and our engineer has looked at it and he's comfortable with the taffic alignment on the north side of the property. Just, and you've probably thought about it. You've got cars backing up into the inbound lanes and I know why you've got those parking stalls with the berm on the south. However, would it make any sense to put the berm on the north of those parking stalls so you don't.have folks backing up into the inbound? Krauss: But then you would have them trying to back out into what may be standing traffic in front of. Conrad: The drive thru. Maybe. There looks to be space there. Batzli: Isn't that the truck lane? 1 Planning Commission Meeting February 19, 1992 - Page 18 Kim Jacobsen: ...I think that northern road really is for employee parking. If I went into the bank I would probably come back out of that parking lot and exit back onto 79th Street... Conrad: Most of the traffic is drive thru and most of the traffic will be coming from Market Blvd., that's why you want to be on that left end I assume. , Kim Jacobsen: I think that most your traffic's going to come from going home. It's going to be a normal drive thru i.s 3:00 to 6:00 peak time. They're going to be coming off of TH 5. They're going to be right turning" in. My guess is once you do i. once, you're going to turn in on 79th and drive thru. It's going to take one time and you're going to find people g to the easiest way. Conrad: Yeah. So your premise is, most will be coming from TH 5 and then you're right. They will go to 79th. If they come in from downtown, they're going to be coming in, they're going to take your northerly access' off of Market Blvd.. Kim Jacobsen: And I really think that if you think about your normal ' traffic pattern when you go to your bank, it is normally on your way home. At least for me it always is. Batzli: You get a lot of traffic Saturday mornings though and that will II probably be the other way. Conrad: Well you've thought it through. Batzli: Tim, did you have anything else? Erhart: No. Batzli: Okay. We were given a look at the new plaza but it's nowhere on II our plans. How do we make sure that that gets into what we approve tonight, if that's what the applicants are going to do and we all like that new concept? Krauss: I don't know if that sheet was dated or anything but you can reference it in your recommendation to make sure it gets approved. Maybe I should explain why, I mean we don't usually like to bring these things that" are, have loose ends dangling but we've worked with this group for quite a while to get them into the city. We've got a good working relationship with them. Because only due.to some unfortunate delays with Market Square 11 they would be open already and we've really been trying to work with them on their schedule as much as we can to facilitate this thing moving through. So we apologize for some of the loose ends but that's the reason!' for it. Batzli: Okay. On a technical matter here, we simultaneously I assume are withdrawing approval of the site plan for the Crossroads Bank? ' Al -Jaff: True. i Planning Commission Meeting February 19, 1992 - Page 19 } Batzli: And since we've given them approval, we're taking something away from them. Does the City have it in writing that they are not planning on proceeding or something so we're not? Krauss: Todd Gerhardt is here and can explain the status of it but the HRA ' controls the property. Crossroads has no interest in it any longer. Their option agreement lapsed and the sole control is vested in the HRA. Batzli: Okay. So we don't have a problem with withdrawing their approval? Okay. I guess I'd like to see the 16 stalls to the north labeled employee parking only, just so that we don't have people traffic through the drive thru. Krauss: Would it be acceptable to label it employee and tenant parking? Batzli: Yeah. Just so we don't have people going into the building through that traffic there I think makes sense. People are filling out their check stubs or what have you in their car waiting in line and sometimes they're not paying a lot of attention to people darting between the cars if they're trying to get that front door. I didn't have any other comments that haven't already been discussed. I'd entertain a motion. And I assume when, whoever does make the motion, that we'll be going off the II February 19th revised application? Emmings: That's what they've given us. We're talking here about the, ' we're not doing anything on the subdivision? I'd move that the Planning Commission recommend approval of Site Plan #92 -1 as shown on the site plan dated February 19, 1992 and subject to the conditions in the updated staff report that is also dated February 19, 1992 with the addition that II , additional condition that Brian mentioned. That the north 16 parking stalls be labeled for employee or tenant parking only. ' Batzli: Did you want to include anything about the modified plaza? Emmings: I don't know how to reference it I guess. It doesn't have a date. I guess let's do this. As an additional condition I will say that . 11 the plans for the plaza ought to be submitted to the staff for approval. I don't know what else to do. Batzli: Sounds good to me. Is there a second? • Erhart: Before that I've got a question here. Item 9. Applicant receive a Watershed District permit. Why is that required? Krauss: That's a normal requirement for any development that disturbs more than one acre of ground. In this case the Watershed District may well tell them a permit is not required because it fits into our overall downtown drainage system. • Erhart: Okay, with that I'll second it. Emmings moved, Erhart seconded that the Planning Commission recommend approval of Site Plan Review #92 -1 as shown on the site plan dated February 19, 1992, subject to the following conditions: Planning ''ommission Meecing 1 February 19, 1992 - Page 20 1. The applicant must obtain a sign permit prior to erecting any signage II on site. Stop signs shall be installed at both exit points located on Market Boulevard and West 79th Street. 2. Landscaping along the north edge of the site must be modified to meet all requirements of the railroad. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating' the required financial guarantees. These guarantees must be posted prior to building permit issuance. Provide a plant schedule indicating the size and type of all plant materials for staff approval. 1 3. The applicant shall enter into a Site Development Contract with the city and provide the necessary financial securities to guarantee 11 installation of the required public improvements and costs associated with the traffic study. 4. Revise architectural plans as follows: , a. Incorporate the use of Timberline or similar quality shingles that provide an image of a cedar shake roof. 1 b. Provide details of building exterior treatment. S. A grading and drainage plan including storm sewer calculations for a 1 year storm event prepared by a professional engineer shall be submitte to the City Engineer for review and approval. 6. The applicant shall indicate on the site plan utilities proposed for II the building and additional fire hydrants in the vicinity. 7. The applicant shall include construction of the driveway aprons, medial' improvements, sidewalk and boulevard restoration in the site plan improvements. All boulevard restoration, sidewalks, driveway aprons and median improvement shall be constructed in accordance with the I latest edition of the City's Standard Specifications. Detailed plans and specifications shall be prepared by a Professional Engineer and submitted for approval by the City Engineer. 1 8. The applicant shall be responsible for any damage to the City's existing sidewalk along Market Boulevard. 9. The applicant shall receive a Watershed District permit and comply wit all conditions of the permit. 10. The northerly 16 parking stalls shall be labeled "Employee and Tenant II Parking Only ". 11. Plans for the plaza shall be submitted to city staff for approval. 1 All voted in favor and the motion carried. Batzli: I think we need a motion,on the withdrawal of the Crossroads. 1 Planning Commission Meeting February 19, 1992 - Page 21 Emmings: I will move the Planning Commission recommend the withdrawal of approval of Site Plan #89 -6 for the Crossroads National Bank building. The 11 applicant should file the notice of withdrawal against the property at Carver County. I'm not sure I understand that; Batzli: Which applicant needs to file that? Emmings: Yeah. 11 Al -Jaff: The Americana Bank would. Batzli: Should we put that in our other motion? That probably should have gone in our earlier motion that they need to file that notice but. Emmings: Well we've got it here. 1 Batzli: Okay. Is there a second? Conrad: I second. ' Emmings moved, Conrad seconded that the Planning Commission recommend the withdrawal of approval of Site Plan #89 -6 for the Crossroads National Bank _building. The applicant, Americana Community Bank, should file the notice of withdrawal against the property at Carver County. All voted in favor and the motion carried. - Krauss: Could I propose another agenda change? We have Todd Gerhardt waiting for an item. I think it's an item you may find a little bit interesting anyway. It will get Todd home at a reasonable time. 1 Erhart: Can we vote on that? Batzli: Okay, we can vote. All in favor of moving up to new business to previous to the PUD stuff signify by saying aye. Ledvina voted in favor, the rest opposed. II Batzli: Why don't we do that first. So Todd, why don't you go ahead with your modified tax increment financing district. 11 ADOPT RESOLUTION STATING THAT MODIFICATION PROGRAM FOR DEVELOPMENT DISTRICT NO. 2, MODIFICATION OF PLAN FOR TAX INCREMENT FINANCING DISTRICT NO. 2 -1; AND ADOPTION OF PLAN FOR TAX INCREMENT FINANCING DISTRICT NO. 2 -2, IS II CONSISTENT WITH THE CITY'S COMPREHENSIVE PLAN. Gerhardt: The first item I have in front of you is a modification to development district No. 2 and modification to tax increment plan No. 2 -1 and creating a new district called 2 -2. And you're saying, what is all this? In the past the City Council who is acting as the Economic Development agency for the city of Chanhassen, created a district is what we call the McGlynn District which is 2 -1, highlighted in the blue. Approximately 2 -3 months ago the Planning Commission approved an expansion to the industrial park called Chanhassen Business Center, which is ' highlighted in the red called 2 -2. To get businesses like McGlynn, i CITYOF CHANHASSEN . 1 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612)937-1900* FAX(612)937-5739 To: Planning Commission ' From: Sharmin Al -Jaff, Planner I Date: February 19, 1992 ' Subject: Revised Site Plan application No.92 -1 and Conditions of approval 1 A number of revisions took place over the past week, after the Americana Community Bank Site Plan report was sent out to the Planning Commission. These revisions include: 1. The applicants decided to construct phase II of the plan now rather than wait for a future date. The proposed revisions to ' the Site Plan meet all 'the requirements of the Zoning Ordinance. Those requirements include Setbacks, Hard surface coverage, and Parking. _ The ',roof line on the building, including the addition has been revised. Additional gables have been introduced and the over all concept is well developed. 2. The Market Boulevard Access was reviewed by the traffic engineering firm of Strgar - Roscoe - Fausch who prepared the Downtown traffic study. It was concluded that left turning movements into and out of the site on Market Boulevard can be accommodated. At full development they found that during the peak P.M. hour, there is capacity for 68,left turns exiting the site onto Market Boulevard. =They calculated "that there would be 50 movements out of the site during the - same time period. Additionally, the site allows for exiting out onto West 79th Street if the wait to exit onto Market Boulevard becomes too long. . Engineering staff still has'safety concerns regarding left turns into and out of the site on Market Boulevard. They recommended that if there' Is more than two traffic accidents involving right angle collisions on Market Boulevard, the access will be limited to right in /out only. • Staff also believes that the Market Boulevard access could be left as is, and effectively provide access from the site. This in turn will help reduce cost in driveway construction, I! 11 N PRINTED ON RECYCLED PAPER ° 11 boulevard restoration, and median reconstruction. STAFF RECOMMENDATION Staff recommends the Planning Commission adopt the following motion: ' Site Plan Review "The Planning Commission recommends approval of Site Plan Review 11 #92 -1 as shown on the site plan dated February 19, 1992, subject to the following conditions: ' 1. The applicant must obtain a sign permit prior to erecting any signage on site. Stop signs shall be installed at both exit points located on Market Boulevard and West 79th Street. 2. Landscaping along the north edge of the site must be modified to meet all requirements of the railroad. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building permit issuance. Provide a plant schedule indicating the size and type of all plant materials for staff approval. 3. The applicant shall enter into a Site Development Contract with the city and provide the necessary financial securities to guarantee installation of the required public improvements and costs associated with the traffic study. ' 4. Revise architectural plans as follows: • Incorporate the use of Timberline or similar quality shingles that provide an image of a cedar shake roof. ' • Provide details of building exterior treatment. 5. A grading and drainage plan including storm sewer calculations for a 10 year storm event prepared by a professional engineer shall be submitted to the City Engineer for review and approval. 6. The applicant shall indicate on the site plan utilities proposed for the building and addition fire hydrants in the vicinity. 7. The applicant shall include construction of the driveway aprons, median improvements, sidewalk and boulevard restoration in the site plan improvements. All boulevard restoration, sidewalks, driveway aprons, and median improvements shall be constructed in accordance with the latest edition of the City's Standard Specifications. Detailed plans and specifications shall be prepared by a Professional Engineer and submitted for approval by the City t • 1 - Engineer. ' 1 8. The applicant shall be responsible for any damage to the City's existing sidewalk along Market Boulevard. 1 9. The applicant shall receive a Watershed District permit and comply with all conditions of the permit. 11 1 1 1 1 1 h 1 1 1 . • 1 1 1 1 1 1 f 1 .. CITY T ii Ili, CHANHASSEN II . 6 9 LTER DRIVE • P.O. BOX 147 • CHANHASSEN MINNESOTA 55317 (612) 937 -1900 • FAX(612)937-5739 - II MEMORANDUM 1 TO: Sharmin Al -Jaff, Planner I FROM: Dave Hempel, Sr. Engineering Technician/1251i I DATE: March 2, 1992 II SUBJ: Update of Revised Site Plan for Americana Community Bank File No. 91 -11 LUR II Upon review of the revised site plan for Americana Community Bank dated 1/31/92 revised 2/27/92, ItOffer the following comments and recommendations: I ' TRAFFIC CIRCULATION II The Market Boulevard access was reviewed by the City's traffic engineering consultant, Strgar - Roscoe - Fausch (SRF), who also II prepared the downtown traffic study. Lased on their calculations, - there appears to be sufficient gaps in=xtraffic movements on Market Boulevard during the peak periods to accommodate left- turning movements into and out of the site. Although SRF's calculations are assumed on future land uses, should the land uses intensify, traffic counts may dramatically increase I traffic projections in this location. Staff believes it would be appropriate to place in the conditions of ' approval if two or more traffic accidents occurred over a 12 -month period involving right - angle collisions on Market Boulevard, the - City reserves the right 1 to close off the median access and restrict the access :along Market Boulevard to a right -in /out only. Staff also believes the Market Boulevard access could be left as is and effectively provide full I access to and from the site. 1. The only modification would be striping of a left turn on southbound Market. 1 GRADING AND DRAINAGE Staff still has not received storm sewer calculations or detailed I storm sewer plans for the site. This information should be submitted and approved by the City prior to issuance of building permits. 1 T4: PRINTED ON RECYCLED PAPER 1 Sharmin Al -Jaff March 2,. 1992 Page 2 • Erosion and - control measures (Type I silt fence) should be incorporated on the plans along with 79th Street and Market Boulevard. Temporary gravel construction entrances should be employed until the permanent access points have been constructed. RECOMMENDED CONDITIONS OF APPROVAL 1 1. The applicant shall enter into a site development contract with the City and provide the necessary financial securities ' to guarantee installation of the public improvements and costs associated with the traffic study. 2. A grading and drainage plan including storm sewer calculations 1 for a 10 -year storm event prepared by a professional engineer should be submitted to the City Engineer for review and approval. 3. Type I erosion control fence shall be installed along West 79th Street and Market Boulevard. 1 4. The applicant shall include construction of the driveway aprons, any median improvements, sidewalk and boulevard restoration in the site improvements. All boulevard restoration, sidewalk, driveways and median improvements shall be constructed in accordance with the latest edition of the City's Standard Specifications and Detail Plates (1992). Detailed plans and specifications shall be prepared by a professional engineer submitted for approval by the City Engineer. . 5. The applicant shall be responsible for all damage to the City's existing public improvements (i.e. streets, sidewalk, utilities). 6. The applicant shall receive a watershed district permit and comply with all conditions of the permit. 1 7. The City reserves the right to limit access to right -in /out only should two or more traffic accidents involving right- angle collisions on Market Boulevard occur within a 12 -month period. 8. The applicant shall utilize the existing Market Boulevard 1 access and provide a striping and signing plan for a left turn lane on southbound Market Boulevard. c: Charles Folch, City Engineer