Loading...
C2 2004-2008 CIP ReviewCITYOF C gEN /700 Market BCL~!evar,~J PO Box 147 Adminislration Ph,s'/e 952 22T 1100 Fax~ 952227 1110 Building Inspections 952227 1180 ,,,x ~b, 2z~ 190 Engineering Pr, ore: 952227 1160 F~x: 952227 1170 Finance Phone 952227 1140 Fax: 95222711!0 Park & Recreation Phone 952227.1120 Fax: 952 227 1110 R~,}c',reat ors Ce?ter 2310 Oou"er Bou evard Pr or~e: 952 2271400 Fax 952 227 !404 Planning & Natural Resources P/ole 952 227 1130 Fax 952 227 1110 Public Works 1591 Park Roaa Pl~c ~e 9522271300 Fax 952227 1310 Senior Center Phone: 952 227 1125 Fax: 952 2271110 Web Site ca, w ci charlhasser/rfc.us MEMORANDUM TO: FROM: DATE: Mayor City Council Bruce M. DeJong, Finance Directo~p/~,) November 17, 2003 SUBJECT: 2004-2008 ClPReview Our capital plan is a five-year projection of what we will need to spend to maintain our existing capital assets and add improvements or system expansions when necessary. The preliminary estimate for the next five years exceeds $45,000,000 which is more per year on average than is raised through the tax levy for operations and debt service. This is a very large amount of money, much of which has to be finance through bonding. It is incumbent on the City Council and staff to exercise prudent stewardship over these capital assets. This plan will fully fund our capital needs while maintaining existing services. The CIP has changed based on our discussion two weeks ago. The Public Works division made some large revisions to the plans. There was also one more project that was included for a filing system that the Administration Department had proposed last year, but was missed during the preliminary proposals this year. The City of Chanhassen · A ~rQ'¢,,iflq ,;Qr~Ir71LJIN~, ,~%,i[i] (aei[ ;~,kes (:il il, 'aL"2,: ~ i H~r ! ": ,' I ' ; ' Capital Improvement Program City of Chanhassen, MN DEPARTMENT SUMMARY 2004 thru 2008 Department Major Equipment Municipal Buildings Park & Trail Improvements Sanitary Sewer Improvements 2004 21}05 2006 595,400 740,500 802,300 290,000 335,000 335,000 180,000 395,000 703,000 760,000 1,126,000 2007 2008 Total 751,200 1,817,900 4,707,300 200,000 5,200,000 6,025,000 190,000 80,000 1,180,000 160,000 315,000 3,064,000 1,195,000 4,510,000 12,545,000 105,000 155,000 1,370,000 228,000 7,565,000 16,982,000 Street Improvements Surface Water Management Water System Improvements 1,730,000 2,925,000 2,185,000 735,000 190,000 185,000 6,332,000 372,000 2,485,000 Total 10,720,400 5,502,500 7,178,300 2,829,200 19,642,900 45,873,300 ['age I of I Dtesday, November 18. 2003 Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2004 thru 2008 Department Project# Priority 2004 2005 2006 2007 2008 Total Major Equipment Fire Dept.: SCBA Upgrades EQ-004 0 5.000 5,000 5,000 5,000 5,000 25,000 Fire Dept.: Thermal Rescue Device EQ-005 0 10,000 10,000 10,000 30,000 Fire Dept.: Laptop Computers EQ-009 0 50,000 50,000 Fire Dept.: PPE (Turnout/Helmets) EQ-010 0 15,000 15,000 15,000 15,000 15,000 75,000 Computer Purchases/Upgrades EQ-013 0 73,300 92,000 81,300 74,200 63,100 383,900 Telecommunication Purchases/Upgrades EQ-014 0 7,600 7,600 Community Dev.: Light Duty Trucks EQ-015 0 24,000 25,000 26,000 27,000 30,000 132,000 Dump/Plow Truck Replacements/Additions EQ-016 0 135,000 140,000 145,000 300,000 720,000 Vibratory Roll Packer EQ-019 0 50,000 50,000 Equipment Trailers EQ-021 0 25,000 25,000 Tar Kettle EQ-022 0 30,000 30,000 Ford 555C Backhoe EQ-023 0 75,000 75,000 Line Stdper EQ-025 0 9,000 9,000 Audio/Visual Equipment EQ-026 0 10,000 10,000 10,000 10,000 10,000 50,000 Copier Replacements EQ-027 0 15,000 15,000 Groundsmaster 580 Mower Replacement EQ-028 0 78,000 88,000 166,000 Public Works: Light Duty Trucks EQ-029 0 28,000 31,000 32,000 91,000 Bobcat Snow Blower EQ-030 0 5,000 7,000 12,000 Grounds Mower Replacement EQ-034 0 19,000 21,000 22,000 62,000 Tractor & Broom EQ-035 0 51,000 51,000 Tractor & Broom EQ-036 0 79,000 79,000 Upgrade 217 Grass Rig Pump/Motor/Water Tank EQ-039 0 40,000 40,000 Mailing Folder/Inserter EQ-041 0 20,000 20,000 Web-Enabled Software EQ-048 0 65,000 16,800 16,800 98,600 Computerized Records Retention System EQ-049 0 22,500 7,000 6,200 7,000 42,700 Light Duty Trucks: Parks EQ-052 2 62,000 64,000 33,000 34,000 35,000 228,000 Fire Vehicles EQ-054 1 80,000 55,000 400,000 80,000 615,000 Aerial Maps for GIS EQ-055 0 30,000 30,000 Front-End Loaders EQ-056 0 205,000 205,000 Sander EQ-058 0 5,000 5,000 Generators EQ-059 0 10,000 10,000 Bobcat Tracks EQ-060 0 6,000 6,000 Bobcat Planer EQ-061 0 15,000 15,000 Light Duty Trucks: Utilities EQ-062 0 34,000 33,000 34,000 36,000 137,000 Page I of 3 Dtesday, November 18. 2003 Department Project# Priority 2004 2005 2006 2007 2008 Total Administration Vehicle EQ-063 0 25,000 25,000 Engineering Van EQ-065 0 30,000 30,000 Fire Department Equipment EQ-066 0 10,000 10,000 Fire Station 3 Vehicles and Equipment EQ-068 3 1,000,000 1,000,000 File Storage System EQ-069 2 30,000 30,000 City Council Data Tablets EQ-070 4 21,500 21,500 Major Equipment Total 595,400 740,500 802,300 751,200 1,817,900 4,707,300 Municipal Buildings Former Library Space Remo0eling MB-001 Public Works Facility Expansion MB-003 Fire Station Capital Improvements MB-008 Fire Station 3 MB-009 Public Works Roof Repair MB-010 Municipal Buildings Total Park & Trail Improvements Improvements: Bandimere Community Park PK&T-001 Development: City Center Park PK&T-003 Playground Replacement: Curry Farms Park PK&T-004 Signage: Kerber Pond Park PK&T-005 Playground Replacements: Meadow Green Park PK&T-006 Improvements: North Lotus Lake Park PK&T-007 Bandimere Heights Park PK&T-022 Hwy 41 Trail Connector PK&T-029 Playground Improvement: Minnewashta Heights Park PK&T-031 Playground Replacement: Lake Ann Park PK&T-032 Playground Replacement: Lake Susan Park PK&T-033 Chanhassen Hills Park PK&T-035 Rice Marsh Lake Park PK&T-036 Carver Beach Park PK&T-037 Park & Trail Improvements Total Sanitary Sewer Improvements Sanitary Sewer: LC-1 SS-002 Sanitary Sewer: BC-2 SS-00S Sanitary Sewer BC-3 SS-006 Inflow and Infiltration Abatement SS-012 Lift Station SCADA Upgrades SS-013 Sanitary Sewer Replacement SS-014 Lift Station #2 Forcemain Separation SS-015 Sanitary Sewer Improvements Total Street Improvements IHS/West 78th St. ST-001 0 280,000 280,000 0 200,000 1,700,000 1,900,000 0 10,000 175,000 185,000 0 3,500,000 3,500,000 0 160,000 160,000 290,000 335,000 200,000 5,200,000 6,025,000 2 60,000 60,000 0 275,000 100,000 375,000 0 55,000 55,000 0 10,000 10,000 0 65,000 65,000 0 60,000 60,000 3 35,000 35,000 0 120,000 120,000 0 35,000 35,000 0 90,000 90,000 0 115,000 115,000 0 60,000 60,000 0 55,000 55,000 0 45,000 45,000 335,000 180,000 395,000 190,000 80,000 1,180,000 0 200,000 200,000 0 816,000 816,000 0 405,000 405,000 0 75,000 75,000 80,000 80,000 85,000 395,000 0 80,000 80,000 80,000 80,000 80,000 400,000 0 240,000 150,000 150,000 540,000 0 308,000 308,000 703,000 760,000 1,126,000 160,000 315,000 3,064,000 0 300,000 300,000 Page 2 of 3 Tuesday, November 18, 2003 Department Project# Priority 2004 2005 2006 2007 2008 Total Lyman Boulevard Improvements Annual Street Improvement Program Improvements to City Hall Parking Lots TH 212 Construction Street Improvements Total Surface Water Management SWMP ~mplementation NPDES PermitJStorm Water Management Plan Update Property Acquisition Lake Susan Shoreline Stabilization Surface Water Management Total Water System Improvements Well #9 W-001 Well #10 W-002 Well #11 W-003 Water Improvements: TH 41 W-006 Water Improvements: Minnewashta Loop W-008 Repainting: West 76th St, Water Tower W-015 Water Treatment Plant W-019 Arboretum Water Main W-020 Well #2 Inspection W-021 Well #3 Inspection W-023 Watermain Replacement W-024 Study Well #4 W-025 Pressure Reducing Station 5 W-026 Pressure Reducing Station 6 W-027 Pressure Reducing Station 7 W-028 Trunk Main Oversizing W-029 Raw Well Water Collection System W-030 Water System Improvements Total GRAND TOTAL ST-003 0 2,000,000 2,000,000 ST-012 0 1,655,000 950,000 2,140,000 1,150,000 2,500,000 8,395,000 ST-013 0 50,000 50,000 ST-014 0 75,000 1,625,000 45,000 45,000 10,000 1,800,000 1,730,000 2,925,000 2,185,000 1,195,000 4,510,000 12,545,000 SWMP-012 0 105,000 190,000 185,000 105,000 156,000 740,000 SWMP-013 1 250,000 250,000 SWMP-014 0 300,000 300,000 SWMP-015 0 80,000 80,000 735,000 190,000 185,000 105,000 155,000 1,370,000 0 900,000 900,000 0 72,000 900,000 972,000 0 75,000 900,000 975,000 0 20,000 200,000 220,000 0 600,000 600,000 0 80,000 80,000 0 4,500,000 6,000,000 10,500,000 0 20,000 200,000 220,000 0 30,000 30,000 0 35,000 35,000 0 152,000 160,000 165,000 477,000 0 50,000 50,000 0 45,000 45,000 0 45,000 45,000 0 45,000 45,000 0 1,180,000 108,000 1,288,000 0 500,000 500,000 6,332,000 372,000 2,485,000 228,000 7,565,000 16,982,000 10,720,400 5,502,500 7,178,300 2,829,200 19,642,900 15,873,300 Page 3 of 3 Dtesdr4~,, November 18, 2003 Capital Improvement Program City of Chanhassen, MN SO[IRCES OF REVENUE SUMMARY 2004 thrti 21108 Source 2004 2005 2006 2007 2008 Total Assessment Bonds 1,105,000 2,600,000 2,633,000 1,268,000 1,250,000 8,856,000 Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000 Capital Replacement Fund 230,000 375,000 16,800 16,800 638,600 Certificates of Indebtedness 766,400 782,500 861,500 795,200 871,100 4,076,700 GO Bonds 200,000 5,700,000 5,900,000 MSA 824,000 500,000 1,165,000 25,000 3,260,000 5,774,000 Park Bedication Fund 180,000 10,000 275,000 100,000 565,000 Revenue Bonds 5,400,000 72,000 900,000 75,000 6,900,000 13,347,000 Sewer Utility Fund 708,000 678,000 558,000 196,000 815,000 2,955,000 State Tumback Funds 106,000 106,000 Surface Water Utility Fund 735,000 275,000 185,000 105,000 155,000 1,455,000 Water Utility Fund 656,000 200,000 574,000 55,000 665,000 2,150,000 Total 10,720,400 5,502,500 7,178,300 2,829,200 19,642,900 45,873,300 Page I of' I Tuesday, November 18, 2003 Capital Improvement Program City of Chanhassen, MN PROJECTS BY FUNDING SOURCE 2004 thru 2008 Source Project# Priority 2004 2005 2006 2007 2008 Total Assessment Bonds Sanitary Sewer: BC-2 SS-005 Sanitary Sewer BC-3 SS-006 TH5/West 78th St. ST-001 Annual Street Improvement Program ST-012 TH 212 Construction ST-014 Water Improvements: TH 41 W-006 Water improvements: Minnewashta Loop W-008 Trunk Main Oversizin9 W-029 Assessment Bonds Total Cable TV Fund Audio/Visual Equipment EQ-026 Cable TV Fund Total Capital Replacement Fund Web-Enabled Software EQ-048 Former Library Space Remodeling MB-001 Fire Station Capital Improvements MB-00$ Public Works Roof Repair MB-010 Improvements to City Hall Parking Lots ST-013 Capital Replacement Fund Total 0 568,000 568,000 0 280,000 280,000 0 300,000 300,000 0 760,000 950,000 1,000,000 1,150,000 1,250,000 5,110,000 0 35,000 970,000 20,000 20,000 1,046,000 0 10.000 100,000 110,000 0 300,000 300,000 0 1,045,000 98,000 1,143,000 1,105,000 2,600,000 2,633,000 1,268,000 1,250,000 8,856,000 0 10,000 10,000 10,000 10,000 10,000 50,000 10,000 10,000 10,000 10,000 10,000 50,000 0 0 230,000 0 0 0 175,000 160,000 40,000 16,600 16,800 33,600 230,000 175,000 160,000 40,000 230,000 375,000 16,800 16,800 638,600 Certificates of Indebtedness Fire Dept.: SCBA Upgrades EO-004 0 5,000 Fire Dept.: Thermal Rescue Device EQ-005 0 Fire Dept.: Laptop Computers EQ-009 0 Fire Dept.: PPE (Turnout/Helmets) EQ-010 0 15,000 Computer Purchases/Upgrades EQ-013 0 73,300 Telecommunication Purchases/Upgrades EQ-014 0 7,600 Community Dev.: Light Duty Trucks EQ-015 0 24,000 Dump/Plow Truck Replacements/Additions EQ-016 0 Vibratory Roll Packer EQ-019 0 Equipment Trailers EQ-021 0 Tar Kettle EQ-022 0 Line Striper EQ-025 0 5,000 5,000 5,000 10,000 10,000 10,000 15,000 15,000 15,000 92,000 81,300 74,200 25,000 26,000 27,000 135,000 140,000 145,000 25,000 5,000 25,000 30,000 50,000 50,000 15,000 75,000 63,100 383,900 7,600 30,000 132,000 300,000 720,000 50,000 50,000 25,000 30,000 30,000 9,000 9,000 Page I of 4 Tuesday, November 18, 2003 Source Projec[# Priority 2004 2005 2006 2007 2008 Total Copier Replacements E0-027 0 Groundsmaster 580 Mower Replacement E0-028 0 78,000 Public Works: Light Duty Trucks EQ-029 0 28,000 Bobcat Snow Blower EQ-030 0 Grounds Mower Replacement EQ-034 0 Tractor & Broom EO-035 0 51,000 Tractor & Broom EQ-036 0 Upgrade 217 Grass Rig Pump/Motor/Water Tank EQ-039 0 Mailing Folder/Inserter EQ-041 0 Web-Enabled Software EQ-048 0 65,000 Computerized Records Retention System EQ-049 0 22500 Light Duty Trucks: Parks EQ-052 2 62,000 Fire Vehicles EQ-054 1 80,000 Aedal Maps for GIS EQ-055 0 Front-End Loaders EQ-056 0 Sander EQ-056 0 Bobcat Tracks EQ-060 0 Bobcat Planer EQ-061 0 Administration Vehicle EQ-063 0 Engineering Van EQ-065 0 Fire Department Equipment EQ~066 0 10,000 File Storage System EQ-069 2 30,000 City Council Data Tablets EQ-070 4 Former Library Space Remodelin9 MB-001 0 50,000 Fire Station Capital Improvements MB-008 0 10,000 Playground Replacement: Curry Farms Park PK&T-004 0 Playground Replacements: Meadow Green Park PK&T-006 0 65,000 Improvements: North Lotus Lake Park PK&T-007 0 Bandimere Heights Park PK&T-022 3 Playground Improvement: Minnewashta Heights Park PK&T-031 0 Playground Replacement: Lake Ann Park PK&T-032 0 90,000 Playground Replacement: Lake Susan Park PK&T-033 0 Chanhassen Hills Park PK&%035 0 Rice Marsh Lake Park PK&T-036 0 Carver Beach Park PK&T-037 0 Certificates of Indebtedness Total GO Bonds Fire Station 3 Vehicles and Equipment EQ-068 3 Public Works Facility Expansion MB-003 0 Fire Station 3 MB-009 0 GO Bonds Total MSA Lyman Boulevard Improvements Annual Street Improvement Program ST-003 ST-012 15,000 15,000 88,000 166,000 31,000 32,000 91,000 5,000 7,000 12,000 19,000 21,000 22,000 62,000 51,000 79,000 79,000 40,000 40,000 20,000 20,000 65,000 7,000 6,200 7,000 42,700 64,000 33,000 34,000 35,000 228,000 55,000 400,000 80,000 615,000 30,000 30,000 205,000 205,000 5,000 5,000 6,O0O 6,0O0 15,000 15,000 25,000 25,000 30,000 30,000 10,000 30,000 21,500 21,500 50,000 10,000 55,000 55,000 65,000 60,000 60,000 35,000 35,000 35,000 35,000 90,000 115,000 115,000 60,000 60,000 55,000 55,000 45,000 45,000 0 0 789,000 Page 2 of 4 766,400 782,500 861,500 795,200 871,100 4,076,700 200,000 1,000,000 1,000,000 1,200,000 1,400,000 3,500,000 3,500,000 200,000 5,700,000 5,900,000 1,140,000 2,000,000 2,000,000 1,250,000 3,179,000 7}tesd~v, November 18, 2003 Source Project# Priority 2004 2005 2006 2007 2008 Total TH 212 Construction MSA Total Park Dedication Fund Improvements: Bandimere Community Park Development: City Center Park Signage: Kerber Pond Park Hwy 41 Trail Connector Park Dedication Fund Total Revenue Bonds Well #9 W-001 Well #10 W-002 Well #11 W-003 Water Treatment Plant W-019 Revenue Bonds Total Sewer Utility Fund Generators EQ-059 Light Duty Trucks: Utilities EQ-062 Public Works Facility Expansion MB-003 Sanitary Sewer: LC-1 SS-002 Sanitary Sewer: BC-2 SS-005 Sanitary Sewer BC-3 SS~006 Inflow and Infiltration Abatement SS-012 Lift Station SCADA Upgrades SS-013 Sanitary Sewer Replacement SS-014 Lift Station #2 Forcemain Separation SS-015 TH 212 Construction ST-014 Sewer Utility Fund Total State Turnback Funds Annual Street Improvement Program State Turnback Funds Total ST-014 0 35,000 500,000 25,000 25,000 10,000 595,000 824,000 500,000 1,165,000 25,000 3,260,000 5,774,000 PK&T-001 2 60,000 PK&T-003 0 PK&T-005 0 PK&T-029 0 120,000 10,000 275,000 100,000 60,000 375,000 10,000 120,000 180,000 10,000 275,000 100,000 565,000 0 900,000 900,000 0 72,000 900,000 972,000 0 75,000 900,000 975,000 0 4,500,000 6,000,000 10,500,000 5,400,000 72,000 900,000 75,000 6,900,000 13,347,000 0 10,000 10,000 0 33,000 36,000 69,000 0 500,000 500,000 0 200,000 200,000 0 248,000 248,000 0 125,000 125,000 0 75,000 75,000 80,000 80,000 85,000 395,000 0 80,000 80,000 80,000 80,000 80,000 400,000 0 240,000 150,000 150,000 540,000 0 308,000 308,000 0 5,000 155,000 160,000 708,000 678,000 558,000 196,000 815,000 2,955,000 ST-012 0 106,000 106,000 106,000 106,000 Surface Water Utility Fund Ford 555C Backhoe EQ-023 Improvements to City Hall Parking Lots S%013 SWMP Implementation SWMP-012 NPBES PermitJStorm Water Management Plan Update SWMP-013 Property Acquisition SWMP-014 Lake Susan Shoreline Stabilization SWMP-015 Surface Water Utility Fund Total Water Utility Fund 0 0 0 105,000 1 25O,O00 0 3OO,OO0 0 80,000 75,000 10,000 190,000 185,000 105,000 155,000 75,000 10,000 740,000 250,000 300,000 80,000 735,000 275,000 185,000 105,000 155,000 1,455,000 Page 3 of 4 Tuesday, November 18, 2003 Source Project# Priority 2004 2005 2006 2007 2008 Total Light Duty Trucks: Utilities EQ-062 Water Improvements: TH 41 W-006 Water Improvements: Minnewashta Loop W-008 Repainting: West 76th St. Water Tower W-015 Arboretum Water Main W-020 Well #2 Inspection W-021 Well #3 Inspection W~023 Watermain Replacement W-024 Study Well ~ W-025 Pressure Reducing Station 5 W-026 Pressure Reducing Station 8 W-027 Pressure Reducing Station 7 W-028 Trunk Main Oversizing W-029 Raw Well Water Collection System W-030 Water Utility Fund Total 0 34,000 34,000 68,000 0 10,000 100,000 110,000 0 300,000 300,000 0 80,000 80,000 0 20,000 200,000 220,000 0 30,000 30,000 0 35,000 35,000 0 152,000 160,000 165,000 477,000 0 50,000 50,000 0 45,000 45,000 0 45,000 45,000 0 45,000 45,000 0 135,000 10,000 145,000 0 500,000 500,000 656,000 200,000 574,000 55,000 665,000 2,150,000 GRAND TOTAL 10,720,400 5,502,500 7,178,300 2,829,200 19,642,900 45,873,300 Pa~¢ 4 cF 4 Tuesdqv, November 18, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-004 Project Name Fire Dept.: SCBA Upgrades Type Equipment Priorit? Useful Life 10-15 years ('ontac( Category Fire Department Data in Year 2004 n/a Major I~quipmcnl l'otal Project $73,280 Description This program is to provide additional SCBA bottles and upgrade air packs as needed Justification Additional spare cylinders are necessary to replace empty air tanks at our emergency scenes. The spare cylinders would help build our supply of current cylinders. The additional cylinders would allow the department to work more effectively at the largcr scenes b? reducing/eliminating the need to shuttle bottles back to the fire station for re-filling or calling Bloomington Fire tbr their air truck. Prior Expenditures 2004 2005 2006 2007 2008 Total Equipment 5,000 5,000 5,000 5,000 5,000 25,000 Tota I Total 5,000 5,000 5,000 5,000 5,000 25,000 Prior Funding Sources 201}4 2005 2006 2007 2008 Total Certificates of Indebtedness 5,000 5,000 5,000 5,000 5,000 25,000 Tota I Total 5,000 5,00O 5,000 5,000 5,OOO 25,000 Operational Impact/Other This assists the department on emergency scenes and helps reduce on-scene times by eliminating thc need to shuttle bottles from the scene to the fire station for re- filling. Page 1 of 41 Wednesday, 3/ovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-010 Project Name Fire Dept.: PPE (Turnout/Helmets) Type Equipmen! Priorib Useful Life 5-7 years (iOllta('J Ca legory Fire I)e J)ll ri illellJ Data in Year 2004 n/a M~jor I!quipnlent Iotal Projec! $125,000 Description Replacement of 3-5 sets per year as a result of damage received from lirefighting actMtics and provide nc~x members with gear after they complete their probati()naD' perk)d Account #400-4105-47(15 Justification Turnout gear lasts approximately 5-7 years on average, Prior Expenditures 2004 2005 2006 2007 2008 Total  Maintenance 15,000 15,000 15,000 15,000 15,000 75,000 Total Total 15,000 15,000 15,000 15,000 15,000 75,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness ~5,000 15,000 15,000 15,000 15,000 75,000 Total Total 15,000 15,000 15,000 15,000 15,000 15,000 Operational Impact/Other There should be no operational impact from this purchasc. I'he current maintenance budget ~ill ~lCCOlBmOd;-lle ['or this addition Page 2 of 41 Wednes'da)', November 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-013 Project Name Computer Purchases/Upgrades Type Equipment Prioril.~ Useful Life Contact Category Administration Departmcn! Data in Year 2004 n/a Major I quipmem I'otal Projecl Cos! $687. 100 f Description Funds the purchase of replacement PCs. local area network equipment, network and local printers, peripheral hardware and all network and common-user software. Account # 101 - 1160-4703 Justification The replacement schedule for this equipment is based on the following useful life expectancies: 3-5 5cars -- PCs. network servers: 4-5 years -- network printers Budgeting and purchasing PCs through this pro ect allows thc City greater flexibility to direct equipmcnl to where it is needed most. rather than using individual budgets. Prior Expenditures 2004 2005 2006 2007 2008 Total 303,2001 Office Equipment 73,300 92,000 81,300 74,200 63,100 383,900 Total Total 73,300 92,000 81,300 74,200 63,100 383,900 Prior Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 73,300 92,000 81,300 74,200 63,100 383,900 Total Total 73,300 92,000 81,300 74,200 63,100 383,900 Operational Impact/Other No additional operating costs are anticipated. Page 3 of 41 I4'ednesda)'. November 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # Project Name l'ype liseflfl life Category EQ-014 Telecommunication Purchases/Upgrades Equipmem Priorib n/a (Olll3('! Administration Department Data in Year 2004 Major [!tluipn~ci~l Iolal Projecl Cos! $254.600 Description This project funds expansion of the City Hall telephone system l(~ thc new Librar5 Justification There will be a need to provide telephones to the nexx. kibrar> building. This ,alii thnd tile eqLlipmenl and connections necessary to allow phone service using the recently installed phone switch in Ci_ty Hall Prior Expenditures 2004 2005 2006 2007 2008 Total ;)47,0001 Office Equipment 7,600 7,600 Total Total 7,600 7,600 Prior Funding Sources 2004 2005 2006 2007 2008 Total 247,0001 Certificates of Indebtedness 7,600 7,600 Total Total 7,600 7,600 Operational Impact/Other Page 4 of 41 14~ednesda)', ,'¥ovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-026 Project Name Audio/Visual Equipment Type Equipmcot Useful Life Category Administratkm Data in Year 2004 Description Provides lbr the systematic maintenance and upgrading of audio/visual equipment Replacement ~,ill occur in Ibc I st Quarter of 2003 Account #210-0000-4705 Justification The original A/V equipment was purchased in 1989. with thc remainder purchased in 1094 Ibis prcticct calls for the systematic maintenance and upgrading of the A/V equipment and additional equipment as new technolog)dcxclops. Potential pro cots include: rcplaccmcn! of equipment including, but not limited to, replacing the spotlight system in the Council Chambers and stal'fnficrophoncs These replacements xxill ensure thc quality or'official City meetings and video productions. Prior Expenditures 2004 2005 2006 2007 2008 Total Maintenance 10,000 10,000 10,000 10,000 10,000 50,000 Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total 40,000] Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000 Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Operational Impact/Other This purchase will include a limited warranty. Page 6 of 41 I,l~ednesda)', Vovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # Project Name Type Useful Life Category EQ-028 Groundsmaster 580 Mower Replacement Equipment Priorit~ n/a COlli:lc! Park I)epartnlenl Data in Year 2004 M~jor t':quipmcn! l'olal Project $238,042 Description Provides for I addition to and I replacement of an existing loro 580. 15 foot. high ',(flume grounds moxxcr Account #400-0000-4705 Justification The City currently has 3 high-production grounds mowers thal cut a 15' pass. I:ach machine is used daily during thc growing season and takes the place of 2 1/2 smaller machines used by the City. Due to additional park de,,clopnlent, an additional high-capacily machine is needed The oldcst machine is scheduled to be replaced in 2002. INs is consistent with the Equiprnent Replacement Schedule Prior Expenditures 2004 2005 2006 2007 2008 Total ~ 72,042[ Equipment 76,000 88,000 166,000 Total Total 78,000 88,000 166,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total 72,0421 Certificates of Indebtedness 78,000 88,000 166,000 Total Total 78,000 88,000 166,000 Operational Impact/Other This purchase will include a limited warranty and reduce maintenance and repair expenses as compared Io the nnit replaced. Also. each of these machines takes the place of 2 1/2 smaller machines and makes the mowing opcratkm 15(t% more efficient Page 7 of 41 IFednesday. ,Vovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-029 project Name Public Works: Light Duty Trucks Type Vehicles Prim'it.x Useful Life ( ontact Category Street Equipment I)epartmeat Data in Year 2004 n/a Ma:jor 1 quipment I'otal Projccl ( Description Provides for scheduled replacement of light duty trucks in linc sired and garage departmcnts Rcplaccmcnl units are generally purchased carl.~ in thc 5ear in order to accommodate the time frames established by Hennepin ('mmtx and thc State o~' kin Cot~pcrati',c Purchasing Program. Justification These ~,ehicles are used for a variety of services throughout Ibc community. I'hc average replacement age is 13 years I'hcsc purchases arc consi~lcnl x~ ilh the Vehicle Replacement Program. 2004 - 89 Ford $28,000 * 2005 - 90 Ford $29,000 * 2¢)06 t)5 ('hex $302100 * 2017 96 ('hex $31,000 Prior Expenditures 2004 2005 2006 2007 2008 Total 113,000 1 Vehicles 28,000 31,000 32,000 91,000 Total Total 28,000 31,000 32,000 91,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total I115,000 [ Certificates of Indebtedness 28,000 31,000 32,000 91,000 Total Total 28,000 31,000 32,000 91,000 Operational Impact/Other These purchases will include a limited warranty and will reduce annual maiutcmmcc and repair costs as c(mqlarcd to tile vehicles replaced Page 8 Ill' 41 II'~,d~?etcJ(z.t'. ~ovemher 19. 2003 Capital Improvement Program City of Chanhassen, MN erojcct ~ EQ-035 Project Name Tractor & Broom Type Equipment Useful Life Category Park Priori() ('ontacl Department Description Provides tbr replacement of 3 existing tractors o~er afivc ~car period Account #400-41 I 1-4705 n/a Ma:jot liquipmcnl Data in Year 20(/4 Total Project Cos! S 124,90O Justification 2000: Unit is 27 years old with an estimated 4.500 hours of usagc. It is used for a varict.x of Park Maimcnancc activities, including fcrtilizing, spraying, grading. etc. The new onit will be used for sweeping skating rinks. 'Il lib WILl BI! I)}!l AYED UN I'11. 2001 FOR A ~,IGNIFICAN I'[ Y P, ID[:5;I(iN}:D M()I)}~I~ 2002: Unit is 52 years old. It is smaller, used for secdiug parks, raking beaches, grading and ballfi¢ld maimcnancc. 2003: Unit is 16 years old and is not dependable. Rebuilding is not cost efl'ecti~c. It is used for sx~ceping rinks and trails, grading/Icvcling parks, fertilizing and weed control. This project is consisteut with the Equipment Replacement ~;chcdulc. Prior Expenditures 2004 2005 2006 2007 2008 Total  51,000 51,000 Equipment Tolal Total 5~,000 51,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 51,000 51,000 Total Total 51,000 51,000 Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the cxisting uilil age 9 o f 41 I I'ed~zesda)', Xovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Data in Year 2004 Project # EQ-048 ~ Project Name Web-Enabled Software lype Equipment I','i,),'it5 n/a ffi Category Administration l)eparlnwut Ma or I.quipmcnt ffi 2000 $263.600 Description This project xvill fund new software for Administration. [:inancc Park 8: Recreation, aud Building Inspection The financial software is expected to be about $150.000 aud tile customer relationship softx~are x~,ill bc about $15.000 l:or 2003 For 2004. rccreation and building permits are estimated at about $100.000 Account # 400-4117-4707 Justification New software will allow web access to pay utility bills, process recreation registratkms and appl.,,, lbr building permits. The currcnl software is adequate lbr current uses but is not web-enabled. There are nagging fimclional issues fha! continue Io crop up and will probably not be lixed bt tile vendors in a timely manner. Prior Expenditures 2004 2005 2006 2007 2008 Total Office Equipment 66,000 16,800 16,800 98,600 Tot'al Total 65,000 16,800 16,800 98,600 Prior Funding Sources 2004 2005 2006 2007 2008 Total ~ Capital Replacement Fund Total Certificates of Indebtedness 16,800 16,800 33,600 65,000 65,000 Total 65,000 16,800 16,800 98,600 Operational Impact/Other Page 10 of 41 Wechwsda3', A ovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # Project Name 1 ype Useful Life Category EQ-049 Computerized Records Retention System Equipment Prim'it) n/a (olltacl Administration I)tl)}l ri n]elll Data in Year 2004 Major [ quipmcnt ! olal I)rojccl $13%700 Description This project will fund a system that will scan and store records on CD's, rathcr than rel~ing onl? on paper copies. 400-4124-4703 Justification This type of system will allow records to be retrieved much l~ster d~an the curren! method The possibilit3 ol'lost or misfiled records will be reduced. Most of these systems also have readers that allow the records to be vicx~ed o¥cr lhe internel. ~xhich will alloxx easier access Io city records for thc general public Prior Expenditures 2004 2005 2006 2007 2008 Total [ ~'5',0001 Office Equipment 22,500 7,000 6,200 7,000 42,700 Total Total 22,500 7,000 6,200 1,000 42,700 Prior Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 22,500 7,000 6,200 7,000 42,700 Total Total 22,500 7,000 6,200 7,000 42,700 Operational Impact/Other I'agc II of 41 It~d~esdrO', November 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-052 Project Name Light Duty Trucks: Parks Type Vehicles Prim'ily Useful Life Cm(t:(c! Category Park De pti rim e nt Data in Year 2004 Description Provides for scheduled replacement of light duty tracks in thc Park Mainlenancc Department Justification These vehicles are used for multiple park maintenancer operations including towing mowers, bobcat, smmplowing, sanding, etc. Thc average replacement age of these vehicles is 13.5 yrs. Vehicles proposed l~br replaccmcnl arc; 2004 - 89 Ford $28.0(10. 89 [:ord $31.0(}(L Oil Ford $31.000. 2005 - 90 I:ord $33.00(L 89 Ford $33.000. 2006 - 94 Chev $34.000.94 Chev $34.000. 2007 - 95 ('hey $36.000. t)5 Chex $36.000. 20(18 - 04 ('he~ $36.000.95 Che~ $36.000. Expenditures 2004 2005 2006 2007 2008 Total Vehicles 62,000 64,000 33,000 34,000 35,000 228,000 Total 62,000 64,000 33,000 34,000 35,000 228,000 Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 62,000 64,000 33,000 34,000 35,000 228,000 Total 62,000 64,000 33,000 34,000 35,000 228,000 Operational Impact/Other I'agc 12 of 41 14~,ch?esdc,)'. ,\~ovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-054 Project Name Fire Vehicles lype Vehicles Usefitl Life 10-15 years Category Fire Data in Year 2004 Description This item allows for the replacement of existing equipmenl. Vehicles are purchascd offci0~er thc Hcnncpin ('ounty or grate of Minnesota coopcrativc bid. Orders are typically required to be placed up to one (1) year in adx ante of deliver5 Justification As vehiucles age they become less reliable. ,Also. the> requirc more costl5 maintenance Vehicles prop~scd l'~r replacement arc: Unit 207 - 1995 Astro Van 2007 $30.000. l/nit 219 - 1088 ('hcv I ton 2007 $50.000. Unit 210 - 1981 Pumper Truck 2006 $400.000. [Init 228 - 1090 Acrial Truck 2003 $20.000. Unit 216 - 1990 Heavy Rescue 2005 $15.000. Unit 217 - 1977 Ford Pick-up 2005 $40.000 Expenditures 2004 2005 2006 2007 2008 Total Vehicles 80,000 55,000 400,000 80,000 615,000 Total 80,000 5§,000 400,000 80,000 615,000 Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 80,000 55,000 400,000 80,000 615,000 Total 80,000 55,000 400,000 80,000 615,000 Operational Impact/Other These purchases will include a limited warranty and will reduce thc annual maintenance and repair cosls. 1he electrical work on the Aerial Truck will correct an existing problem that has been a concern of the mechanics lbr ~omc tilne. I'agc 13 ol' 41 l,t'ed~zesday. November 19, 2003 Capital Improvement Program City of Chanhassen, MN Project it EQ-062 Project Name Light Duty Trucks: Utilities rl'ype Vehicles Prim'il) Useful Life ()mlatq Category Utilitics Departmeul Data in Year 2004 n/a Major [iquipn~cnt Iolal Prqjecl $167,000 Description This allows for replacement of existing vehicles in Ibc Water and ,";ewer dcpm-tmcnt Justification This replaces pickups in accordance with the vehicle replacement phm Prior Expenditures 30,0001 Vehicles 20114 2005 2006 2007 2008 Total 34,000 33,000 34,000 36,000 137,000 Total Total 34,000 33,000 34,000 36,000 137,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total I 30,000l Sewer Utility Fund Total Water Utility Fund 34,000 33,000 36,000 69,000 34,000 68,000 Total 34,000 33,000 34,000 36,000 137,000 Operational Impact/Other Page 14 of 41 II~'ch~exdq3', Xovember / 9, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-066 Project Name Fire Department Equipment Type Equipmcnl Priority [Jseful Life ( (}IlllICl Category Fire I)cpartmcn! Data ill Year 2004 Major t quipmcnl l'otal Projecl ('osl Description This equipment will be to upgrade the existing cquipmen! in thc fimess room al the fire stalion. Justification Some of the current fitness equipment at the fire station is in need of replaccmcnt We arc currently spending money on trying to maintain Iht equipmenl when replacing it can be more cost etli~ctivc. Also. some of thc equipment does nol have rcplacemcnl parts available due to its agc. Thc current users of the fitness equipment arc the Chanhasscn Fire l)cpartmenl. Carver ('ounty Shcrifl's ()It]ce and tile City of Chanhasscn employees. Prior Expenditu res ~ Equipment 2004 2005 2006 2007 2008 Total 10,000 10,000 Total Total 10,000 10,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 10,000 10,000 Total Total 10,000 10,000 Operational Impact/Other Operation impacts would be for annual preventive maintenancc inspeclions This is currcnllv being done lhrough thc training budget. l'agc 15 o1' 41 Wednerd~o'. ,\ovemher 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # EQ-069 Project Name File Storage System Type Equipment Useful Life 10-15 5,cars Category Administration Data in Year 2004 Description Administration and Planning need a lile system that is centrali/cd and easil.', accessible, l'he syslcm proposed is one where thc file racks will bc able to be moved on a track to store records more densely while still all(m4ng suflicicnt room I'or access lo each lilt Justification Space for administration files is quickly absorbing more and m{~rc space Movi;lg to a system simihlr t~ thc Fngincering and Building Inspections departments will allow for a more orgaoized tiling system a ~d reduce the clutlcrcd appearance ~flhe main administration ol'licc splices Expenditures 2004 2005 2006 2007 2008 Total Office Equipment 30000 30,000 Total 30,000 30,000 Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 30,000 30,000 Total 30,000 30,000 Operational Impact/Other This project should allow for more efficient use ofstafftimc in Iiling and rctricx ing records No additional dircd c;)sts arc anticipated its a rest[l; ol'dlis project iff 41 IU~(h~e.,:day. ,\'orember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # MB-001 Project Name Former Library Space Remodeling Type Imwovemcnt I'riori~3 Usefifl Life (ontad Category Administration Dcpartmcal Data in Year 20(}4 n/a Municipal Ituildings 'l olal Projccl ('osl $6,120.0{10 Description This project provides for the expansion of the cnrrcnt librar} ('urrcntly. tile library has q 8( 0 sq. fL ~ci~cduling to be detcrmincd as parl of Needs &nalysis. Justification The city has hired a Libra~ consultant to review the needs amflysis tbr thc l,ibrar} expansion This v, ork is consistent with thc policy of providing limcl) and cfficient prcx cntative maintenance of thc ('ity's buildings Prior Expenditures 2004 2005 2006 2007 2008 Total  Construction 230,000 230,000 Total Equipment 50,000 50,000 Total 280,000 280,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total ~ Capital Replacement Fund Total Certificates of Indebtedness 230,000 230,000 50,000 50,000 Total 200,000 280,000 Operational Impact/Other :These projects generally improve building efficiencies, l lmxcvcr, with tile expansion, lhcre will be n percentage increase based on the expanded tbotprint of the Library. I'agc 17 c,l' 41 ll~'d,e.',zhO'. \rol'elllher 19, 2003 Capital Improvement Program City of Chanhassen, MN Project it MB-008 Project Name Fire Station Capital Improvements Type lmprovemen! Prioril~ Useful Life ( onmcl Category Fire Delmrm]cnl Data in Year 2004 n/a Municipal Fhfildings Iolal [)r~[iecl $216,000 Description This program would be for the maintenance for tile stations Items like painting, worn-oul carpet, cie would be covered through this prognml. ~1 hc building was originally built in 1966 with an addition in 1989. This prqject would be to replace tile drivewa5 at Station I Justification The goal is to increase the lit~ of the building through a pl'oadix c muintenancc program The current driveway is in need of replacement at the recommendation of thc Public Works Director. The driveway would be replaced with a mo'c suitable surface for thc xxcighl of thc x cificlcs at tile lire station. Prior Expenditures 2004 2005 2006 2007 2008 Total Construction 10,000 t75,000 185,000 Total Total 10,oo0 175,000 185,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total I 31,000] Capital Replacement Fund Total Certificates of Indebtedness 10,000 175.000 175,000 10,000 Total 10,000 175,000 185,000 Operational Impact/Other There should be no operational impact to this project. I)agc 18 o1' 41 Wednexday. ,Vovember/9, 2003 Capital Improvement Program City of Chanhassen, MN Data in Year 2004 Project Name Improvements: Bandimere Community Park Type lmprovcmem Prim'iD 2 Improve I!xisting S;cr,~icc }: ' '*i. Useful Life 25 years (~Olllael Categnry Park Deparlmenl Park & trail hnprovcmcnts /olal Projecl (osl S60,000 Description Bandimere is a a 30-acre Community Park at 9405 Greal Plains Bhd - T;t 101 I'he ft4hmin~ improxcments are recommended for 2004 - Play Equipment (Phase II) - $60.000 Account #410-0000-4705 Justification This project involves the implementation of recommend~tions scl l'ortb b5 the Park & Recreation Commission. It is consistent x¥itb thc City's effbrls to maintain its natural resources and the public's investmenl in community parks Expenditures 2004 2005 2006 2007 2008 Total Equipment 60,000 60,000 Total 60,000 60,000 Funding Sources 200-~ 2005 2006 2007 2008 Total Park Dedication Fund 60,000 60,000 Total 60,000 60,000 Operational Impact/Other This project will increase annual operating costs by an estinmtcd $500. Operating Budget Impact 2004 2005 2006 2007 2008 Total Maintenance 500 500 500 500 2,000 Total S00 500 5O0 §00 2,000 Page 19 of 41 II'ednesdcty..\ovember 19. 2003 Capital Improvement Program Data in Year 2004 City of Chanhassen, MN PK&T-006 Playground Replacements: Meadow Green Park Project # Project Name Type Usefu! Life Category Improvement Prioril) n/a 25 years Colll:lcl Park l)epartmenl Park & [rail hnpr~vcments Tolal I'r([ject S71 Description Provides for replacement of the existing ~ood pla3grotmd slructttrc a! thc park Justification The existing playground was installed in 1984 and is nearing thc end of its uscfid life Prior Expenditures 2004 2005 2006 2007 2008 Total Equipment 65,000 65,000 Total Total 05,000 65,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total 6,0001 Certificates of Indebtedness 65,000 65,000 Total Total 05,000 65,000 Operational Impact/Other Negligible additional operating cosls are anticipated l'agc 20 of 41 I I'eclnexdtO', Am'ember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # PK&T-029 Project Name Hwy 41 Trail Connector Type lmprovemcn~ Useful Lift' 30 Years Category Park Data in Year 2004 Description This project constructs an 8 fi)ol x~idc bituminous trail including retaining wall in dac righl-of-x~a_x of 5qatc Ih~3 41 betwecu &rboretum Village and thc Woods at Longacres. Justification This project completes thc missing link in thc Upper Bluff'( reck Basin trail s3slcm Expenditures 2004 2005 2006 2007 2008 Total Construction 120,000 120,000 Total 120,000 120,000 Funding Sources 2004 2005 2006 2007 2008 Total Park Dedication Fund 12C,000 120,000 ~Fotal 120,000 120,000 Operational Impact/Other Negligible operating costs are anticipated Page 21 of 41 Wednesday, ,Vovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # PK&T-032 Project Name Playground Replacement: Lake Ann Park lype Equipmen! I'rioriD n/a Useful Life ( o]lmct Category Park Department Description Replacement of existing wood pla5 ground sin cturc Data in Year 2004 Park & I'rail hnprovcmcnts Iofal Pro.icc! Cos! $90,000 Justification The existing wood structure was installed over 15 years ago and does nol currcntlx meet thc lbllowing federal guidelines and/or laws fi>r safct.x and accessibility Consumer Products Safet~ Commission (CPS('). Americai~ 5;ocict5 ibr Tcsting and Materials (A%'I M). and Americans with Disabilities .Act (ADA) I'his playground poses a serious liability risk tbr the cit5 and needs to be replaced Expenditu res 2004 2005 2006 2007 2008 Total Equipment 90,000 90,000 Total 90,000 90,000 Funding Sources 2004 2005 2006 2007 2008 Total Certificates of Indebtedness 90,000 90,000 Total 90,000 90,000 Operational Impact/Other This project will increase annual opcrating costs b? a~ eslinl:llcd $500 Operating Budget Impact 2004 2005 2006 2007 2008 Total Maintenance 500 500 500 500 2,000 Total 500 50O 500 5O0 2,000 Page 22 of 41 IF~,dne.vd(O'..\ovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # Project Name Type Useful l.ife Category SS-012 Inflow and Infiltration Abatement I)ata in Year 2004 Description This annual project includes televising, repair and rchabililation of existing sanitary scx~cr to detect poinls ofcntr~ of ground ~xatcr into thc City sanilary sewer system and eliminate that flow from the sanitary system Justification The City of Chanhassen pays the Metropolitan Council ol'lllc l'win Cities for scwa~c treatment l'hcsc pa7 mcnts are based on thc ammml ol'fiox~ Ica~ing the City of Chanhassen. Groundwater that makes its way into thc sxstcm either through brcaks, displaced joints, manhole covers, or private connections to thc systcln increase the amount charged to thc City lbr sewage disposal and increasing thc load on thc City's lift slations. In addition, these same points of ground walcr cnt~ can also allow debris and tree roots to enter tile ('ltv sanitarx scucr system causing potential blockages and sanitar5 sewer back-ups. Expend itu res 2004 2005 2006 2007 2008 Tota I Maintenance 75,000 75,000 80,000 80,000 85,000 395,000 Total 75,000 75,000 80,000 80,000 85,000 395,000 Funding Sources 2004 2005 2006 2007 2008 Totttl Sewer Utility Fund 75,000 75~000 80,000 80,000 85,000 395,000 Total 75,000 75,000 80,000 80,000 85,000 395,000 Operational Impact/Other The eftbrts will decrease operational and maintenance costs. I age ~a ~ I 41 It'c&*e,s'dc(3'. Vm'ember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # SS-013 Project Name Lift Station SCADA Upgrades Type ln'Jprovcmenl I'rioril) [;sefnl Life ( Olltacl Category Utilities Dclmrm]enl Data in Year 2004 n/a Sanilar? Sc~,cr hnprovemcnl', Iotal Pr{Ljecl ( $400,000 Description This project is a phased upgrade of the City's sanilar5 scxxcr lili slalion conlrol ~td~warc and hardxxarc 15,(\I)A) Justification The City's current SCADA system is unable to handle thc current lift station already in linc s,x stem and additional lift stations are anticipalcd as lhe ('it,,, continues to develop. Lift stations are a necessary component of thc City's sanita~ scwcr syslcm dtlc to tile lopograph) ol'the City and its many lakes Thc SC'ADA system provides control of the lift stations as well as monitors their opcralion and sends an alarm alerting City Stat¥iflhe lift station needs attention. Like all SCADA systems the City's is proprietary, however, the current s.xstcm is no longer suppurtcd b5 the mamdhcturer. I'here is (inly one company that is still able to provide support to this system in the Twin Cities area. Pans for Ibc system and suppor! arc cosdy and becoming difficult to oblain Expenditures 2t}04 2005 2006 2007 2008 Total Equipment 80,000 80,000 80,000 80,000 80,000 400,000 Total 8c,000 80,000 80,000 80,000 80,000 400,000 Funding Sources 2004 2005 2006 2007 2008 Total Sewer Utility Fund 80,000 80,000 80,000 80,000 80,000 400,000 Total 80,000 80,000 80,000 80,000 80,000 400,000 Operational Impact/Other ~These upgrades will decrease operational aud mainlcnancc costs. I'ag¢ 24 of 41 It'ednexday, ,\'ol,etnber 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # SS-014 Project Name Sanitary Sewer Replacement Type Improvement PrioriI} Useful Life ('oniacl Category Utilities I)epartmcnt l)ata in Year 2004 Description Replacement of existing sanitaD scx~er lines in coordination xxith the reconstruction of thc ('it5 stl-ccl Justification While internal repairs can significantly cxtend the life of thc sanitar) sewer pipe. sometimes it is nccessarx or less costly to replace the pipe completely. Thc City considers the condition of the existing utilities in the process to select streets Ibr rehabilitation in an cflbrt Io realize cost sax ings by consolidating these pr(}iects and also to avoid potential cuts in recently improved strccts. Expenditures 2004 2005 2006 2007 2008 Total Construction 240,000 150,000 150,000 540,000 Total 240,000 150,000 150,000 540,000 Funding Sources 2004 2005 2006 2007 2008 Total Sewer Utility Fund 240,000 150,000 150,000 540,000 Total 240,000 150,000 150,000 540,000 Operational ImPact/Other This project will decrease maintenance costs. Page 25 of 41 ll2,dnesday. Vovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # SS-015 Projec! Name Lift Station #2 Forcemain Separation Type lmpro~emenl Prioril) Useful Life ( Olll;it.'l Calegory Utilities Dclmrlmcnl Data in Year 2004 n/a Sanitar) k;cx~cr hnprovemcnts Total I'rqiect (oxt S308,000 Description Construction ora force main to separate the Lift Station #2 Ihm Ii'om the lift ~tation ~- 10 llmx Justification Bonestroo did a study of lilt Stations # I. #2. and # I 0 In that sit t y they fimnd lhal thc three lili stations xxcrc not limctioning at peak cfliciency and were actually conflicting with each other inhibiting llow. Bonestroo recommended the construction of a fi~rcc main fi'om l,ili Station #1 lo l.il't Station #2 and thc installation ora standby generator at I.it't Station # I0 which was COlnplcled in 2003. Boncstroo also recommended that a second lbrc¢ main lo eliminate Iht conl]ic! between Lift Statin # 10 and Lift Station #2 would bc necessary as soon as possible. This project will complete the recommendation comaincd in thc report done in 2002 on these lift stations. Expend itu res 2004 2005 2006 2007 2008 Tota I Construction 308,000 308,000 Total 308,000 308,000 Funding Sources 2004 2005 2006 2007 2008 Total Sewer Utility Fund 30E,O00 308,000 Total 308,000 308,000 Operational Impact/Other This project will decrease maintenance costs I'agc 26 of 41 I1 ~'dnes~ta.)', ;\ ovember 19, 2003 Capital Improvement Program City of Chanhassem MN Project # Project Name 'lype Usefifl Life Category ST-012 Annual Street Improvement Program Improvement Prim'it.~ (Oil Ill (,'I Streets/Highways I)el)a rtme.t Data in Year 2004 n/a 5;trcet Jnlj31'tl¥cnlcill5, I'otal Prl[jecl Co~l $8,395J}0(} Description Annual project to rehabilitate and reconstruct streets in ll~c ('iix ('urrent 5->car plan shows the lblIox~ing neighborhood at'cas: 2o04 2005 2oo6 2007 2008 Residential pr(~ject Santa Fe Foxford/Dccrbrook areas kochnen Arca ('hah I lills Mch)d.x Hill MSA project Downtown ,\udubon Rd 5, o xk 78th SI East end Justification :The City uses a Pavement Managcment System It/monitor tile condition of thc Cily streets While proper maintenance extends tile life oflh¢ street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cosl effcclix c. Rehabilitation projects attempt to extend thc life of the street indefinitely and can do so as long as there are no utilit3 or subgrade issues In cases with utility or subgradc issues, reconstruction of thc street is necessary, An annual feasibility study is done considering the streets to bc done and advising either rchabilitalion or rcconstruclion. Expenditures 201}4 2005 2006 2007 2008 Total Construction 1,655,000 950,000 2,140,000 1,150,000 2,500,000 8,395,000 Total 1,655,000 950,000 2,140,000 1,150,000 2,500,000 8,395,000 Funding Sources 2004 2005 2006 2007 2008 Total Assessment Bonds 760,000 950,000 1,000,000 1,150,000 1,250,000 5,110,000 MSA 789,000 1,140,000 1,250,000 3,179,000 State Turnback Funds 106,000 106,000 Total 1,655,000 950,000 2,140,000 1,150,000 2,500,000 8,395,000 Operational Impact/Other This project may decrease maintenance costs I'ag¢ 27 el' 41 l,l'ednesdav. Vovemher 19. 2003 Capital Improvement Program City of Chanhassen, MN Project# ST-014 Project Name TH 212 Construction Type Improvement Usefifl Life Category Streets/Highways Description [)ara Jn Year 2004 The construction of TH 312 through lhe CiD ol'('hanhas~cn I'hc ('iix will bc rcsponsihle lhr a share of'thc costs ol'thc prqjecl Mnl)()[ has estimated the City share of the project based nn pr¢liminaD cost cslimatcs Rex isions ~o this cos~ estimate arc l ikcl5 as linc prt[icct matures Justification The City desires certain amenities that need to bc co~lstrucled at the same limc~ as TI I ~12 I'hcse amenities include but arc not limited to bikc/pedestrain crossings. storm water management, municipal services crossings, construction o~' Powers Boule~ ard. and improvcmcms to TH 101, In addition, the City does not have adequate staffto perform all ol'thc rclatcd engineering rcvicxx and approval process that xx ill bc rcquired as parl of this project. Rather than increase sial'f levels for a single project, consultant services will Dc used to ensure thc (.'il5 responsibilities and needs are mci Expenditures 20(14 2005 2006 2007 2008 Total Construction 75,000 1,625,000 45,000 45,000 10,000 1,800,000 Total 75,000 1,625,000 45,000 45,000 10,000 1,800,000 Funding Sources 2004 2005 2006 2007 2008 Total Assessment Bonds 35,000 970,000 20,000 20,000 1.045.000 MSA 35,000 500,000 25,000 25,000 10~000 595,000 Sewer Utility Fund 5,000 155,000 160,000 Total 75,000 1,625,000 45,000 45,000 10,000 1,800,000 Operational Impact/Other This prqject will increase maimenancc costs l'agc 28 of 41 Wednesday. Vovemher 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # SWMP-012 Project Name SWMP Implementation Type lmprovcmenl Useful Life Category SWMP Data in Year 2(}(}4 Description This project implements prt~jects identified as high prioril> hx Iht ('ity's Surl'acc Waler Managcmen! Pl:m. Iht National Pollutanl l)ischargc Eliminalion $;ystem (NPDES) Phase Il permit. City Council alld/ror ('it5 slaff Justification These projects are necessary, to mcct state and tbderal gm crmncnl requirements for storm drainage: address storm xxalcr issues Jo existing dcvclopmcnts: maintain existing infrastructure: and construct Ibc Jnl?astructure recommended b5 thc City's gurlhcc %aler Mamlgcnlcnt Plan Prior Expenditures 2004 2005 2006 2007 2008 Total Construction 105,000 190,000 185,000 105,000 155,000 740,000 Total Total 105,000 190,000 185,000 105,000 155,000 740,000 Prior Funding Sources 26'04 2005 2006 2007 2008 Total Surface Water Utility Fund ~05,000 190,000 185,000 105,000 155,000 740,000 Total Total 105,000 190,000 185,000 105,000 155,000 740,000 Operational Impact/Other Citywide. No map. I'agc 2o of 41 Il ~,dttesc/c0', ,\'ovember l 9, 2003 Capital Improvement Program City of Chanhassen, MN Project # Project Name Type Maintenance Useful Life 5-10 years Category SWMP Data jn Year 2004 SWMP-013 NPDES Permit/Storm Water Management Plan Update Priori(~ I MaintaiT~ I"xisting 'qcr~ icc ( OIIlaCl I)('jlarllllelll '~tlrJ'~lCC ~, aLcr ~'Jalla~,._'lllcll! IolaJ Projecl $275,(}(HI Description This prqject will update thc City's 5;udhcc Watcr Manat~cmcn! Plan Pollutant Discharge Elimination %stem (Nlq)ES) Phase It permit In so doing, it x~il] ensure compliance with a number ol'requircmcnts for thc ('il,x's National Justification The City's Surface Water Management Plan has not been updated since thc inception o['lhc surface walcr management program in 1994. Since thc City has experienced a large amount ofgro~qia in thc 10 years since thc dcvclopmcm of Ibc phm. il is IlCCCssary lo rccvalualc storm xvater ncccls in the community. In addition, the NPDES Phase 11 permit imposcs stringent storm walcr inl'rastrucV~trc mapping, inspection and maintcnance requirements I'he proposed plan update will enable the City to comply with these requirements. Prior Expenditures 2(t(14 2005 2006 2007 2008 Total Planning/Design 250,000 250,000 Total Total 250,000 250,000 Prior Funding Sources 200; 2005 2006 2007 2008 Total Surface Water Utility Fund 250,000 250,000 Total Total 250,000 250,000 Operational Impact/Other Citywide. No map. Inspections. maintenance and recordkccping arc the primary requirements of thc ('itx's NPI)ES Phase II permit, While thc Cit3 has done some of these things in the past, this permit requires a much more organi/cd and docttmented appn)ach that xdll affect operations in all (_;it5' departmenls, chiefly by way of increased documentation. Pagc 30 of 41 ll'udnesday, ,Vovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # SWMP-014 Project Name Property Acquisition Type Improvcmen! Useful I,ife Category SWMP Data in Yea!' 2004 Description The City will acquire property in accordance with its ('omprchcnsi',e and ~qurlhc¢ Water Managcmcn! Plans Justification Properties within the City must be acquired in order to achicxc Ibc goals scl I'orlh in thc ('omprchcnsix c and 'qurI'acc Water Managemen! Plans Expenditures 2004 2005 2006 2007 2008 Total Land Acquisition 300,000 300,000 Total 3o~,ooo 300,000 Funding Sources 20(~4 2005 2006 2007 2008 Total Surface Water Utility Fund 300,000 300,000 Total 300,000 300,000 Operational Impact/Other Citywide. No map. Page 31 o1' 41 IFe~mesday. Aovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project ti SWMP-015 Project Name Lake Susan Shoreline Stabilization '[ype Improvement Prim'it) Useful Lift' ( OIl{~ltq Category SWMP Department Data m Year 2004 Surlhce Water Management Iolal Projee! ('osl $80,000 Description The City will work with thc Rile?PurgaloD' -Bluff('reck ~,\ alcrshed Dislrict 1o ,;tabilizc the shoreline ofl akc %usan on Cil5 propcrt5 Justification The erosion of the shoreline is a threat to public health and salizt5 dt~e to ils close proximit) to a public frail and sanitar3 scxxcr main Expenditu res 2004 2005 2006 2007 2008 Total Construction 80,000 80,000 Total 80,000 80,ooo Funding Sources 2004 2005 2t}06 2007 2008 Total Surface Water Utility Fund 80.000 80,000 Total 80,000 80,000 Operational Impact/Other I'agc 32 of 41 It ~*d~exdr0,, ,\ ovemher 19, 2003 Capital Improvement Program City of Chanhassen, MN I'roject # W-001 Project Name Well #9 Type Improvement Useful Life ( ategory Utilities I:'rioril~ (onl}i{'l Dt'parlmt'nl Data in Year 2004 ll/a ~'alci' '<,\ StCIll [IDl~r{iVClllCllls lot}il Pri)jeel (()si $9711,110(I Description Construction cfa municipal ~vater suppl5 well. Well siting and design was begun in 2003 Justification Needed to provide for increased demand in the system duc lo dcvclopmenl 2003 Master Water Stud5. Identified in both thc 1098 ('omprchensivc Walcr Supply and l)istribulion Plan and the Prior Expenditures [ 70,0001 Construction 2004 2005 2006 2007 2008 Total 900,000 900,000 Total Tolal 900,000 900,000 Prior Funding Sources 2004 2005 2006 2007 2008 Total 70,000 [ Revenue Bonds 900,000 900,000 Total Total 900,000 900,000 Operational Impact/Other ]'his project will increase maintenance costs. Page 33 ol 41 IIbdnesdav, ,\ ovemher 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # W-006 Project Name Water Improvements: TH 41 Type hnprovcmcnl Prioril~ Useful Life f:onmcl Category Utilities I)cpa ri lll~"llt Data in Year 2004 Description Installation ora missing piece ot'watcr main to provide bctlcr h*oping bctx\ccn I ongacrc,, l)rixc and Vv'cll v-8 adjaccnl lo TIt 41 Justification Completing this section of'water main ,Mil complete a missing loop in the sSstcm pro,,iding impro\ cd xxatcr qualit5 and pressure as well as increasing operational reliability. Expenditu res 2004 2005 2006 2007 2008 Total Planning/Design 20,000 20,000 Construction 200,000 200,000 q'otal 20,000 200,000 220,000 Funding Sources 2004 2005 2006 2007 2008 Total Assessment Bonds 10000 100,000 110,000 Water Utility Fund 10,000 100,000 110,000 Total 20,000 200,000 220,000 Operational Impact/Other This project will increase maintenance costs Pagc 34 of 41 I, ltqd. esdrz),. Vovemher 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # Project name l'ype IJselul Life Category W-O08 Water Improvements: Minnewashta Loop lmprovcmenl I'rim'it.~ Utilities Data in Year 201)4 Description Construction of the missing section el'water main between ~,~.' 78th Street at 'I'll 4} and I (mc ('cdar l,anc Io complete the loop around I~ak¢ Mimlcxxashta Justification This section ot~x,*,rater main will impr()ve ~xalcr qualily and :dso rcliahilit3 el'thc xxatcr suppl3 ar(mhd I.al, c 'Xlinncx~ashta Expenditures 2004 201)5 2006 2007 2008 Total Construction 600,000 600,000 Total 600,000 600,000 Funding Sources 200~. 2005 2006 2007 201}8 Total Assessment Bonds 300,000 300,000 Water Utitity Fund 300,000 300,000 Total 600,000 600,000 Operational Impact/Other This project will increase maintenance costs. I'agc 35 of 41 IFed~exdc(¥, .'xovcmber 19, 2003 Capital Improvement Program City of Chanhassem MN Project # Project Name Type Useful Life Category W-015 Repainting: West 76th St. Water Tower Improvement PrioriD n/a (()IH;lC! Utilities i)cparlmen! Data in Year 2004 wt tcr 5;~,slcm ] npro'~,cmcnts l olal Prl~jecl Description Provides lbr the recoating oflhc interior and cxtcrior surfilcc, of thc W 76t1~ 5;I 9. atcr Foxxcr Justification This type of'infrastructure requires recoating eyed 10 .~cars to protcc! the lili: of Thc metal structure Expend itu res 2004 2005 2006 21}07 2008 Total Construction 80,000 80,000 Total 80,000 80,000 Funding Sources 201;4 2005 2006 2007 2008 Total Water Utility Fund 80,000 80,000 Total 80,000 80,000 Operational Impact/Other This project does not increase operational costs. I"age 36 o1' 41 ID.,d¢~e.v&~),..\rol'elllbet' ]9. 2003 Capital Improvement Program City of Chanhassen, MN project # W-019 Project Name Water Treatment Plant Type Improvcmcnl Useful Life Category Ulilities Data in Year 2004 Description The form of water treatment in thc Cit.~ of Chanhasscn is still under discussion &n updated item xxill be suhmined to the City Council xd~en a decision is made. however, it is known that some form of treatment eiti~cr in thc shapc ofa trcatmcm plan! or other operational changes and impro,~cmcms will be done. Justification Water treatment is recommcndcd b) boti~ thc 1998 and 20(}3 Water Plans. Thc form of Ibis trcatmcnl ts ~till in discussion. Expenditures 2004 2005 2006 2007 2008 Total Planning/Design 500,000 500,000 1,000,000 Construction 4,000,000 5,500,000 9,500,000 Total 4,500,000 6,000,000 10,500,000 Funding Sources 2004 2005 2006 2007 2008 Total Revenue Bonds 4,500,000 6,000,000 10,500,000 Total 4,500,000 6,000,000 10,500,000 Operational Impact/Other Project will increase maintenance costs. Page 37 of 4I 142)dnesdc(v..\'ovember 19, 2003 Capital Improvement Program City of Chanhassen, MN Project # W-021 Project Name Well//2 Inspection Type Improvement Useful Life Category t ;ti lities Data in Year 2004 I'rim'it) ('onlacl I)cpartmenl Waler "4) slcm hnl)rovenlenls I'.lal I'J'ojeel S30.000 Description Removal of[he well pump and inspection and maintenance al Well #2 Justification To extend the life and ensure reliabilib of thc Cib's x~,ells, periodic inspection and maimcnancc is rcquircd l)oing this work can idcntil3 and con'ccl issues in a timely and cost efl'cctNc rammer Expenditures 2004 2005 2006 2007 2008 Total Maintenance 30~000 30,000 Total 30,000 30,000 Funding Sources 2004 2005 2006 21)07 201)8 Total Water Utility Fund 30,000 30,000 Total 30,000 30,000 Operational Impact/Other This project will decrease maintenance costs and exlcnd thc lili.- of Iht well primp Page 38 o f 4 ! tl 'ednesday. g~r()~,ember / 9. 2003 Capital Improvement Program City of Chanhassen, MN Project # W-024 Project Name Watermain Replacement Type hnprovcmcnt Useful Lift. Category Utilities Data in Year 2004 Description Replacement or'existing water ~llain lincs in coordination xxilh Ibc reconstruction ol'lhc ('it} street Justification The City considers the condition ol'thc existing utilities in thc process to select streets tbr rchabilifation in an cl'lbrl to realize cos! savings b5 consolidating these projects and also to avoid potential cuts ill recently improved strccts. If signil'ican! repairs arc ncccssaD to the cxisting watcr main. rcplaccment max bc thc most cost effective option. Given thc highl5 corrosive soils ill the ('it). xxatcr main replacement is an ongoing project in tile (-'it5 Expenditures 2004 2005 2006 2007 2008 Tutal Construction 152,000 160,000 165,000 477,000 Total 152,000 160,000 165,000 477,000 Funding Sources 2004. 2005 2006 2007 2008 Total Water Utility Fund 152,000 160,000 165,000 477,000 Total 152,000 160,000 165,000 477,000 Operational Impact/Other These projects will decrease maintcnancc costs. Page 3q of 41 I,IS, dnexd, O'. ,\'ovcm/~er 19. 2003 Capital Improvement Program City of Chanhassen, MN Project # Project Name Type ITseful Life Category W-025 Study Well #4 Impro~,¢ment Data in Year 2004 I) rioril) n/a ('()iii:icl [}12pltl*lliltqlt Walcr 5;xMcnl hllprovcII1Cll[h I olal I)r~[ject ( Description Engineering review and analysis of thc grounduater aquilbrs xxhich Well #4 dra~xs water from Justification Well #4 has previously tested high fi)r RAI')IUM. This anal5 sis ,Mil determine ii' il is possible to lind thc aquifer which conribulcs to the high RADII rM concentration and screen or block olTthis aquifer from thc xxcll's intakc Expenditures 2004 2005 2006 2007 2008 Total Construction 50,000 50,000 Total S0,000 S0,000 Funding Sources 2004 2005 2006 2007 2008 Total Water Utility Fund 50,000 50,000 Total 50,000 50,000 Operational Impact/Other This project will not increase ,~pcration:. cost Pagc 40 of 41 Werh~exdco'. Vm.ember 19, 2003