Loading...
1e. TH 101 Project 12-06 Underground Agreement, MVEC0 CITY OF CgANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 MEMORANDUM TO: Todd Gerhardt, City Manager /� FROM: Paul Oehme, Dir. of Public Works /City Engineer IV' DATE: May 13, 2013 Eke 6166 SUBJ: TH 101 (Lyman Boulevard to Pioneer Trail) Improvements Project 12 -06: Approve Electrical Undergrounding Work with Minnesota Valley Electric Cooperative PROPOSED MOTION "The City Council approves funding for Underground Electrical Utility along the TH 101 corridor in the 12 -06 City Project area in the amount of $108,713.25." City Council approval requires a simple majority vote of the City Council present. BACKGROUND Currently, the TH 101 corridor between Lyman Boulevard and Pioneer Trail has a high- voltage (7,200 -volt) overhead electrical utility line that is located mainly on the west side of the highway. However, this electrical line crosses TH 101 several times. The electrical line is owned and operated by Minnesota Valley Electrical Cooperative (MVEC). The poles for the electric utility are currently planned to be moved back out of the way to the new edge of right -of -way; however, the electrical line will still need to cross TH 101 several times to connect to all the feeder locations. The poles would be right next to the trail and the trail underpass box culvert on the west side of TH 101, and be in conflict with the existing trees and reforesting plan as well as in the wetlands in the area. All other private utilities are currently underground and will be buried on the east side of TH 101. S.P. 1009 -22 W Lake U Riley I! I• CHANHASSEN BEGIN S.P. 010- 614 -008 STA. 57 +40.00 G.S.M. 14 ENO S.P. 010- 614 -008 STA. 62 +66.00 T.H. 101 - BEGIN S.P. 194- 010 -011, S.P. 1009 -22 Web Site The City requires new developments to have all utilities undergrounded; however, in www.ci.chanhassen.mn.us this situation the City does not have the authority to require the existing electric infrastructure to be undergrounded unless someone pays for the work. g:\eng \pub1ic \_2012 projects \12 -06th 101 (lyman blvd to pioneer trl) improvements \0050813 bkgd th 101 appv mvec elc undergrounding work.doc Chanhassen is a Community for Life - Providing for Today and Planning far Tomorrow Todd Gerhardt TH 101 Improvements Project 12 -06 May 13, 2013 Page 2 When Lyman Boulevard from TH 101 to the east City limits was reconstructed in 1993, the city paid for undergrounding the electrical line. TH 101 north of Lyman Boulevard to TH 5 is all undergrounded. The electrical service on TH 101 north of Lyman Boulevard was undergrounded with the TH 212 project. MnDOT paid for this undergrounding work crossing TH 212. The benefits for undergrounding the electrical utility are as follows: ✓ Maintain underground electrical cable consistency with the TH 101 corridor and Lyman Boulevard to the east of TH 101. ✓ The electric cable will not have to cross TH 101 several times as in the current situation. ✓ The electric poles will not be inclose proximity to the trail on the west side of TH 101 or in conflict with the trail underpass box culvert. ✓ The overhead electrical cable will not be in conflict with existing trees or the current landscape /reforesting plan for TH 101. ✓ Improved Reliability: • Increased reliability during severe weather (wind and ice). • Less damage during severe weather. o Fewer momentary interruptions. ✓ Improved Public Safety: • Less potential for motor vehicle accidents with poles. • Less potential for live -wire contact injuries. ✓ Improved aesthetics. FUNDING The electrical poles will be moved and the existing cable replaced if the City does not choose to underground the electrical line. The cost for moving the poles and replacing the overhead cable would be deducted from the cost to underground the cable. The amount MVEC would charge the City is $108,713.25. The total cost to underground the electrical utility is $187,200. Funding for this work is proposed to come from the revolving assessment fund. The budget for the TH 101 project included $75,000 for turn lane improvements to Wilson's Nursery; however, it has since been determined these improvements are eligible for federal and state funding. Staff is requesting these funds be re- allocated for electrical undergrounding. Additional revolving assessment funds will also be needed to pay for the work. ATTACHMENTS 1. Resolution. 2. CIP sheet. gAeng \pub1ic \_2012 projects \12 -06 th 101 (lyman blvd to pioneer tri) improvements \0050813 bkgd th 101 appv mvec elc undergrounding work.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: May 13, 2013 RESOLUTION NO: 2013- MOTION BY: SECONDED BY: A RESOLUTION APPROVING FUNDING FOR THE UNDERGROUND ELECTRICAL UTILITY FOR TH 101 IMPROVEMENT PROJECT NO. 12-06 WHEREAS, the TH 101 corridor between Lyman Boulevard and Pioneer Trail has a high - voltage (7,200 -volt) overhead electrical utility line located mainly on the west side of the highway; and WHEREAS, there are numerous benefits to undergrounding this electrical utility line. NOW THEREFORE, BE IT RESOLVED by the City Council of Chanhassen, Minnesota, that funding be approved for the underground electrical utility along the TH 101 corridor within the 12 -06 city project area in the amount of $108,713.25. Passed and adopted by the Chanhassen City Council this 13 day of May, 2013. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT gAadmin\resol\2013 \12 -06 undergrounding electrical utility funding.doc Capital Improvement program City of Chanhassen, MN 2013 thru 2017 Project # ST-028 Project Name TH 101 Improvem - Lyman Blvd to Pioneer Trait Account #1 Account #2 Account #3 Account #4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: 511,950,000 This project is proposed to make improvements on TH 101 from Lyman Blvd to Pioneer Trail. The mobility and to plan for future growth in the improvements are proposed to improve safety, regron. The Project is consistent with the 2007101 corridor scoping study. Federal and state funds are proposed to be used to pay for most of the improvements. The City will need to pay for extension of watermain consistent with the 2030 comprehensive plan, some storm sewer improvements, a portion of the corridor landscaping and sanitary sewer extension stub. Justification —� ro improve safety and mobility on TH 101. The project also plans for growth of the community south of Lyman Blvd. Expenditures 2013 2014 2015 2016 2017 Total Construction 11,950,000 11,950,000 Total 1t,950A00 11,950,000 Funding Sources 2013 2014 2015 2016 2017 Total Assessment/Revomng Assess 75,1100 MSA 250,000 75,000 Other Agency Contribution 10,800,000 250,000 Park Dedication Fund 25,000. 10,800,000 Sewer Utility Fund 75,000 25,000 Surface Water Utility Fund 25,000 75,000 Water Utility Fund 700,000 25,000 700,000 Total 11,950,000 11,950,000 &pact(Other 101