Loading...
2b. Change order Lake Ann Park Utilities ..)._b • . CITYOF I si CHANHASSEN 1 Not,441,„.,, .4„, 0 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 I Apron by City Administrator I MEMORANDUM briorsed ✓ ]:W PI `codified TO: Don Ashworth, City Engineer wed " Det 4 - Z'1 7 1 FROM: Charles Folch, City Engineer Cc Cate Submitted to Commission DATE: April 17, 1992 Date Submitted to Council SUBJ: Approve Change Order No. 1 to Lake Ann Park Utilities q—,.'7 2 ' Project No. 91 -15 I The attached Change Order No.1 for the Lake Ann Park Utilities Project No. 91 -15 contains a few adjustments g Project 7 to the contract scope for the project. The significant adjustment involves the addition of the remote transmission I unit (RTU) to the lift station which will be tied into the City's telemetry system at a cost of $12,580.04. This work would be completed by the City's telemetry contractor, Bentec Engineering Corporation. This cost proposal appears to be comparable to the City's system -wide proposal for the telemetry system. I Change Order No. 1 also includes the deletion of the emergency power generator connection plug which will, in effect, yield a deduct of $364 from the contract. The other notable changes relate to the water system where I a Woodford Model MK6B yard hydrant will be abed at no additional charge; however, it is proposed to add one more yard hydrant to the project at an additional cost of $912. The original contract amount was $108,057.64. With the addition on Change Order No. 1, the revised contract 1 amount would be $121,185.68. Again, the primary cost element to this change order involves the additional remote transmission unit (RTU) which staff believes is a necessity to integrate with the system's overall telemetric system and serve the needs of the park. It is therefore recommended that contract Change Order No. I 1 in the amount of $13,128.04 be approved for the Lake Ann Park Utilities Project No. 91 -15 to establish a revised contract amount of $121,185.68. I jms c: Dave Hempel Sr. Engineering Technician Jerry Boucher, Utility Superintendent I Bob Sellers, Van Doren Hazard Stallings Max Danhenberger, B & D Underground I Attachments: 1. 2. Letter from Bob Sellers, Van Doren Hazard Stallings dated April 9, 1992. Change Order No. 1. 1 1 t4, PRINTED ON RECYCLED PAPER 1 VanDoren Hazard Stallings, Inc. Architects • Engineers • Planners 1 April 9, 1992 Mr. Todd Hoffman • Park & Recreation Director ' City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 Re: Lake Ann Park Utilities VHS Project No. 91 -319 1 Dear Todd: Enclosed are three (3) copies of the change order for Lake Ann Park ' to add the RTU to the lift station and other minor changes. If you would please sign these copies and send them back to us we will forward them to B & D Underground for their signature. ' I talked with Jerry Boucher and he seemed satisfied and indicated he just wants the work done. If you have any questions please call me. Sincerely, VAN DOREN - HAZARD - STALLINGS, INC. /c,-4 5?-40- ' Robert L. Sellers RLS /ev 1 1 1 I r, 1 ROFFMAN.L05 APR 1 0 1992 1 ¥ OF CHANHASSEN 1 1 DATE: April 7,1992 1 CHANGE ORDER PROJECT: Lake Ann Park PROJECT NO.: 91 -319 1 Utilities CONTRACTOR: B &D Underground, Inc. CHANGE-ORDER NO. ONE 1 The following changes are hereby made to the Contract Documents: Add remote transmission unit (RTU) to lift station. Delete emergency power generator plug and circuit. Change yard hydrants to Woodford Model MK6B from Woodford Model W34 1 CHANGES TO THE CONTRACT PRICE: (See Attached Contractor Proposal) Original Contract Price: $ 108,057.64 Total Previous Change Orders: $ 0.00 1 Contract Price as Adjusted by Previous Change Orders $ 108,057.64 1 Amount This Change Order: $ 13,128.04 Revised Contract Amount: $ 121,185.68 CHANGES TO THE CONTRACT TIME: The Contract Time will not change. 1 The Completion Date for all work under this Contract will be ENDORSEMENT: Project Manager: � �1 DATE: ?A Z i APPROVALS REOUIRED: +' Contractor: DATE: 1 Owner: DATE: 1 • CHORDER.FRM 11 LAKE ANN PARK UTILITIES CHANGE ORDER NO. ONE Add Deduct 1. Add remote transmission unit (RTU) - to lift station controls 12,580.04 1 2. Delete emergency power generator connection plug and circuit from ' lift station controls 364.00 3. Substitute a Woodford Model MK6B yard hydrant for Woodford Model W34 No Change 4. Add one additional yard hydrant Woodford Model MK6B at bid unit price 912.00 $13.492.04 $364.00 NET CHANGE IN CONTRACT PRICE - INCREASE $13,128.04 1 1 1 1 1 1 1 1 1