Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2e. Signal report for signals on West 78th St. at Great Plains & Market Blvd.
1 fie. 1 rt , CITY OF CHANHASSEN ‘t 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX {612) 937 -5739 Ammon by City Admint ✓ �w� MEMORANDUM Modii;e� ItsJACted TO: Don Ashworth, City Manager n Dee Submitted to Commiesiorf FROM: Charles Folch, City Engineer Dete Submitted to Council DATE: April 22, 1992 SUBJ: Approve Signal Justification Report for Traffic Signals on West 78th Street at Great Plains Boulevard and Market Boulevard; Authorize Preparation of Plans and Specifications Project No. 92 -7 The Downtown Traffic Study completed by Strgar- Roscoe - Fausch in October of 1990 identified existing traffic capacity problem areas on West 78th Street and also provided a schedule of recommended roadway improvements to meet the forecasted capacity needs 1 based on retail growth in the Central Business District and growth in the overall community population. One of the locations identified as needing immediate improvements was the intersection of West 78th Street and Great Plains Boulevard. The recommended improvements involved reconstruction of the median on the east leg of West 78th Street to provide two full lanes of approach, revising the free right island to improve truck turning movements, and the installation of a traffic control signal system. ' Strgar- Roscoe - Fausch (SRF) has completed a signal justification report for the intersection of West 78th Street and Great Plains Boulevard (see attached). Based on the traffic counts ' obtained for the previous study in 1990, it was found that this intersection meets the typical peak hour volume and 4 -hour volume warrant criteria. The analysis also shows that during the afternoon peak hour, westbound left -turn movement will operate at a level exceeding capacity without this signal system. The test for benefit also shows that during this PM peak hour the intersection, with the installation of a traffic signal, would improve to operate at a level of service of C or better. ' I think it is important to again emphasize that the most recent available counts were p g p is used e e ' from 1990 and the warrants are being met. One would anticipate that with each passing year the increase in retail development in the downtown business district and growth in community population will increase the traffic volumes in the area. It should also be mentioned that West 78th Street /Great Plains Boulevard will be designated as the detour to PRINTED ON RECYCLED PAPER ° 1 Don Ashworth April 22, 1992 1 Page 2 1 route while the TH 101 North Leg improvement project is under construction. The TH 101 North Leg project could start as early as the fall of 1992 and extend through the summer of 1993. Having a traffic signal system installed at Great Plains Boulevard and West 78th 1 Street prior to the start of construction would be of great benefit. The estimated cost for the geometric improvements at the intersection of West 78th Street and Great Plains Boulevard is $40,000, with the signal system costing approximately $80,000. These improvements are proposed to be funded via Tax Increment financing. As I have mentioned previously, the Central Business District Traffic Study completed by SRF in 1990 also provided an improvement schedule for future traffic improvements that would be needed corresponding to retail and population growth. One of the intersections identified for near term traffic control is West 78th Street at Market Boulevard. Phase I of the Market Square retail center is now under construction which will consist of 1 approximately 85,000 square feet of gross retail area. In addition, there is a great deal of discussion concerning the potential for a major high- density retail development on the property immediately west of the Market Square development. Therefore, SRF has also ' prepared an analysis and signal justification report for the intersection of West 78th Street at Market Boulevard. It was found that, from a systems standpoint, the intersection did warrant installation of a traffic control signal. Basically, the application of the systems 1 warrant is appropriate where the major street for the intersection is a collector or principal network for through traffic for traffic through an area such as West 78th Street serves for the Chanhassen Central Business District. In addition, Market Boulevard serves as the 1 principal network for through traffic to and from TH 5 from the Chanhassen Central Business District. The total volume of traffic entering the intersection exceeds the minimum requirements for the system's warrant. Therefore, traffic signal control is justified at the 1 intersection of West 78th Street and Market Boulevard also. This signal system is also estimated to cost approximately $80,000 and is also proposed to be paid via Tax Increment fnancing. ' In summary, analysis the of both the Great Plains Boulevard and Market Boulevard ' intersections with West 78th Street have met warrant tests to justify installation of a traffic control signal system. As mentioned previously, the intersection at Great Plains Boulevard is currently operating at below the acceptable level of service and, in its present condition, will continue to worsen with time. A traffic control signal at this intersection will improve traffic flow capacity and also assist in functioning as the detour route for the TH 101 North Leg improvement project. The intersection at Market Boulevard currently meets the system 1 warrants. Completion of the Market Square development and further retail development which appears to be imminent will significantly increase traffic flow at this intersection and reduce its level of service. 1 1 1 Don Ashworth 1. April 22, 1992 Page 3 It is therefore recommended that City Council approve the signal justification reports for the intersections of West 78th Street at Great Plains Boulevard and at Market Boulevard and that authorization be given to prepare plans and specifications. ktm 1 Attachments: 1. Signal Justification Report dated April, 1992. c: Dv Hempel, e empel, Sr. Engineering Technician Jim Hanson, SRF Dennis Eyler, SRF 1 1 1 1 1 . 1 1 1 • 1 1 1 1 t . 1 SIGNAL JUSTIFICATION REPORT FOR WEST 78TH STREET ' AT ITS INTERSECTIONS WITH GREAT PLAINS BOULEVARD, MARKET BOULEVARD IN CHANHASSEN, MINNESOTA 1 April 1992 I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. 1 Name Reg. No. Date 1 APPROVED: City of Chanhassen Date APPROVED: ' District State Aid Engineer Date 1 I CONCUR with your determination that a traffic signal is justified at • this location based on this Signal Justification Report. CITY OF CHANHASSEN State Aid Engineer DiU111.�► ' SRF No. 0911634 APR 211992 ENGINEERING DEPT. 1 1 INTRODUCTION This Signal Justification Report has been prepared for the installation of traffic signal control at the intersection of West 78th Street and Great Plains Boulevard and West 78th Street and Market Boulevard in the City of Chanhassen. Justification has taken form of applying the applicable warrant(s) for signal installation as outlined in the Minnesota Manual on Uniform Traffic Control Devices (MMUTCD), using "TAU 390" and applying sound engineering practice. 1 The intersections are located on West 78th Street north of State Highway 5 (see Figure 1, Project Location). West 78th Street is an east -west, two -lane divided roadway with left turn lanes at major intersections. West 78th Street has a posted speed of 30 ' miles per hour. Great Plains Boulevard is a north- south, two lane roadway with a posted speed of 30 miles per hour. The south and east legs of the intersection at Great Plains Boulevard are also marked as Trunk Highway 101. The existing intersection is designed so that the movement from northbound Great Plains to westbound West 78th Street is a through movement. Each approach to the intersection currently operates with two unmarked lanes. Market Boulevard is a north - south, two lane roadway with a posted speed of 30 miles per hour. SURROUNDING LAND USE Land use in the immediate vicinity is mostly mixed commercial 1 with some residential. This mixed commercial consists of service, retail and office. 1 1 1 1 1 1 1 o" v, 1.'" \L" - 7 R i . CAsili 1D F A•'K'•;t v • m 1 W 8 • 21 w l '�' S ' A . 90 .1/4'r ,I = • RD. ,.. I L .Stn ST .� 2.� iO� WWI PLEASAH\ < w i a< , r fii C � i : 1.,,,.... a 101 It Ti DR. 1J. . 71111 CIR ,fi o STRAi1pN fr ,,, �yy 0, : g f FO Ct. � : .¢ i s c . i CRESTVIEI 4 4F Q � v FOX P t A h� �" , � rok Np O R Cm. L UC, LA, RD. WV � C t/42 / G a- „in TOK TAIL oBR • 13. NAVAJO DR. lA1tE ! OR a' Z C; _ ® `• ^ at al `r lA. BROKEN ARR01 DR. LUCT RD. 'Eb gNApA I," N = � a N i 1 • 1' TIRED WING C1. SHENEN DOA H WESTERN DR. C o � ' o' / W 1OX 3� ��' ` 1 & CHAPARRAI Cl. �n • CIR. HIAWATHA A DR. 2 f ; �4 a ' 7. PE C ASANI CIR. r �* O LAKE Ct 17.11E7 PERCE CT. W .- t 1 ' 6. BLUE RIBBON CT. It. MA RAY $ g CARVER BEACH RD o y O s . J % "'PRI PL .NOit W 9. HUNTERS C 5 CRE CAM %.0.. `�h 4t O CIR. 4 19. BLUE JAY.CIR. /� LOW DR. 4 ,ASEN LA. RE 20. AUDUBON CIR. `J R EAGLE DR. 121111 Lotus ' / 21. iF.AI CIR. ti 1 4 WOOD wit OR, ` � OR• ( ake RD. OTUs 22. PARTRIDGE CIR. �• AO- �� H , VW DR 23. WN1TE iAtl RIDGE CT. \ b7 $ v C }£{, J PONTIAC. t1•• ' Of t� ' ^ A �� pc b t, ()R. p .: I �1CA LA. Tt0" a C4 O . TR. a S 1 BMW' ► FRON TI S Y1E Vr a d 11°14 NI u B � C, p M1 '� • TE ). C T Ct. $r u : r •r o` s " EB 4 < Cr G F � R• "F Lake Ann tr � C�9 J o to g TR. • (4 N s PNEAS 2A.SAOOLEBROOX PASS y s • oe H1 I7NLANO DR. _ r--.... 2S. CHIPPEWA TR. . A00.E ' r ' r e � ' ` APEg 1 COMMON N 01 ' A. 4. CNIPPEWA a ? ! DR. CIR. �/ �i ad V SARI- e g DEL ~ ~ W . , �y 7 111.10 CHANHASSEN Io. IAREDO Lk. ` � " 76 ' ^ g TR � I 1980 POP. 6 i59 d u. moOUoIS sT. • y . 12. SANTA EC CIR. CNAN INEIllE; 1 7Tm 51. 101 / IT -• CdATE2/ DR '��� E1 S1. I 04804E TUN W. 78Th ST. W. T8m 1116,4 17 /ARK 11111111.7 PI CNA DR a 101 W E D 1 1 [T. F • • T 1 151 �� i DR. 1 '�j vi W231 - i q VE11NE 1 I 1� (... l' J 1E a i `�C1R. \ tn. rJ �' s PO m S T. G A. ROJECT • I P V C IR. N p d' Y 4 P IEHA tS1A►10E l ! C7 . ! �D AROt 4 2 4, S Ws. W S. r 5 g Rio< 4 v~ Marsh 1 ,13). > OW 4.",../ I / C.." ., C p L W. Km ST. / J • T1161 2/239 /! • 411* T. ' CT. � �% r�r U .1 x R u MAR (1.) aw. r ■ `+s V __ _ t 1 C.ONSU - ROSCOE- FAUSCH, INC. CITY OF CHANHASSEN PROJECT LOCATION FIGURE SRF coNSULTwc ENGINEERS CITY 1 SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 1 SIGNAL WARRANT ANALYSIS 1 GREAT PLAINS BOULEVARD AND WEST 78th STREET Proposed Work ' This report documents the justification for installing traffic signal control at the intersection of West 78th Street and Great Plains Boulevard. This proposed signal system will be a permanent full traffic actuated signal system with four phases. The southbound through, eastbound left and westbound right, northbound through and westbound left will each have their own phase. The intersection of West 78th Street and Great Plains Boulevard is currently planned for geometric improvements (see Figure 2, Intersection Layout). The improvements include reconstructing the median on the east leg of West 78th Street to provide two full lanes of approach and revising the free -right island to improve mobility for trucks. The estimated cost of these improvements to the intersection is $40,000. , The estimated cost to construct the proposed signal system is $80,000. The proposed signal system will be funded by the City of Chanhassen. Traffic Volumes • 1 The signal warrant analysis is based on October 1990 traffic counts completed by Strgar- Roscoe - Fausch, Inc (see Appendix A for count data). Signal Justification 1 Traffic signal control is justified at this intersection by meeting the following signal warrants of the MMUTCD : Warrant 9 for at least four hours and Warrant 11 for at least one hour (See Figure 3, Warrant 9 - Four Hour Volume, Figure 4, Warrant 11 - Peak Hour Volume and Traffic Signal Warrant Analysis Table in the Appendix A). I/ Warrant Analysis Assumptions 1 Geometry: Mainline - 2 approach lanes Minor Street - 2 approach lanes 1 Approach Speeds : Mainline - 30 miles per hour Minor Street - 30 miles per hour 3 1 ow am r um EN ow AIN am umi ma am am r ma am no um Nis min 1 _ - - --- --- --- -- - 41. WEST 78TH STREET O r----- i � 2 o ), )\ Z,z '.)] 4: 50 0 50 100 o ` '9 scale feet y tSt SRF STRCAR- ROSCOE- FAUSCH, INC. CITY OF CHANHASSEN CONSULTING ENGINEERS FIGURE INTERSECTION LAYOUT 2 SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 ,. IN r- C) i+7 + • - w 1 N +''d - i- W I ir ' L I CC J 1 13 1 i a u . i a 111 1 t +;l 1 I . I 1 r i / . I 04 I I �- I / r a L e i / *4.4 ._:.• i 1 D 1 co 1 w + a a 2 I I•- i U:1 + Cr .4 CI 1 w 1 w I wl:tw � D + LT: LL' + !— i_11 F- LL f CO 1 i i � co r rL I 1- CC + t- J t- r` 0 I CO 1. 1.1 o • 1 t -- t-- o 1 0) w� 0 LL LL. I wtYw a , 1 1 rz L� / G cr 1 1 .• •• H 1 t * • Le •. +� I CP 1 a F 1 LL- 11_ L1 LL S 1 I— 2 1 LL LL LL CL m z Z 1 ,S ?..t .L • a t- i I 1 Lt LY iZ L 4- t' w LLI I Cie IX 1 0 0 I,1 1_I r C.L. I 1-, 170 .e_. 2 w Ci a LL- 1 ,s {L ..-, r-• - �- 'S i L G L CO i ff Z 1 al 1 +_L+ r '11 w 1 a a a w 1 t +J t+ i te. rs L O. . 1 L l co 1 Th 1 1 fil ir F a ti L a d =m Li) lu r r.) - m , 0 G a . ••••I o a CU m — st a- L ' CL 1 II1 • 11 H H m • • C rs f II 0:1 I=1 LL M CI a a a G in `r t Cad • , H8n - H3 Oddti 314n1on HO I H 1336LS }JONIW 1 I r CO 1 a 0.1 W J W I CJ t'J 1�J .-, LL t CC tt et t -.I 1 `7 = t Is I - t O t- • co 1 G 1 _ 1 GI 1 III 1 r, W 1 J 1 1-• ' 1 LL t I ID S 'Z i •--• LL H 1 {r illg t I G 1 1 G 1 t 1_Il, J 1 1 1 1 0 G eZ t G 0 tF' IX LL 1 CL E I F- ':.r I- I W 0 W I W CE W Q = I W IX 1 t' i_I ± 1 .-4 0 1 1.I) ^ i_l i 1 I 1 1.4 al 1 -J 1 1 .t f 0 LL Uri 1 1 1 1 LL CO I Q .-1 O- 1 t t .-+ J 1 F- c I f-- tit t-- f- 1 LI) W 0) G 0 I W Cif W G f- �-a I 0 Q G. �...a 1 111 ,4 1 L . •-+ ti., 1 J � • I 1 ® W 1 11 11 CL ° .: S I CL !L 11 la.. r - ITi L'i 6 (t 1 0-.1 0 1 Q: L.C. it Lt I t 1 1=1 1_I 11 0 G 11 1 I- r- Z LL 1 .T , ,� ••-1 1 =1 a ° := I �iXi ,t I t I 1=a I m G W I G G 0 W I MI t +1 t *7 q— - LL I 10)1 GI 1 G �.a Q WW 01 0 -N \ -4 ' o 5 j G IN ^ o 0 G - -r ep . - - LCI • fit -u .1 0 . CO a LL 111 G G G G G G IS '1' U V t co I HdA - HOtiOddti 3Wl1On H9' I H 133d1S ONIW 1 1 Intersection Operation 1 To determine how well this intersection will operate during the p.m. peak hour if traffic signal control is not provided, a capacity analysis was preformed assuming the existing side street stop control. The capacity analysis was based on 1990 peak hour traffic counts (see Appendix for 1990 Peak Hour Volumes Counts). The capacity analysis was performed using the methodology in the 1 1985 Highway Capacity Analysis Worksheets for Unsignalized Intersections. The analysis shows that during the P.M. Peak Hour the westbound left -turn will operate at or over capacity. 1 The intersection operation was also performed assuming traffic signal control. The analysis shows that during the P.M. Peak Hour the intersection would operate at Level of Service C or better . This confirms that delays to traffic will be excessive without traffic signal control, and further justifies installation of traffic signal control (see Appendix B for Capacity Analysis Worksheets). Dakota Avenue Reconstruction , Traffic signal control at the intersection of West 78th Street and Great Plains Boulevard is further justified by the increase 1 in traffic at the intersection due to planned reconstruction of Dakota Avenue between T.H. 101 and State Highway 5. Traffic from Dakota Avenue will be detoured to Great Plains Boulevard and West 78th Street during construction, which will increase the traffic volume at the intersection of West 78th Street and Great Plains Boulevard (see Figure 5, Dakota Avenue Construction Detour Routes) . , 1 r 1 1 f 7 1 1 7 � ; v ��� \\......n1 �hOC w r I 2 °". t4 ,b• i I ONE OR. .. CIR. i. = 1 `J oSf. H LA. a s K fR e ! EAGLE D . coy. lat CT;4,2or i u � . �P w00D Nu t pR H ,� ► O l R0, to y -� 14004:1/Pi , VIEW ON. W $ J PONTIAC t- + • � AMPLE l E r^ _ d IC * o,, QTR. I 'll CA L A. • P u p c ■ or' TR. g u 5 A ONT AG 81CH `' f RONI IE q� willow WV .4 z t o A LE Y COVE ,4' 7 cr. 2,. coNE � co � `• � o R tRIDI r9, ' Q I ! i f � , S TEAD 4R T, • 1 �� o g rR. Y < N CM. '- s PNEAS N.SADOLEBR001c PASS `• `3' W. HI CAL AND DR. DEE RFIE 0 t I 25. CHIPPEWA TR. 431). ° u * DR. " �O A `A E C CIIMRRON 101 �f KR 1STIE i, • CHIPPEwA `a CIR. p CT A+ g v J D �, � � ‘-1'. 1 405, SARI• '1 0. 'P Q N a V• . h • L g DEL _4qF� rrluG i 10. LAREDO LA. o W. 76Th c TR' g 41 0' 0 r A? y l .e s I d 11. IROQUOIS ST. a 12. SANTA FE CIR. W. • 7 7th STS ICI • 17 CHAN C W. K COOL TER OR. . Vl EM ST ARBOR(T 2: W. CT. • PICHA DR. a & 101 ' � /1",• k� i g DR. 1tl � 1 1 • vi R23� R22/ I - - © M. re, S i n *Etat 13114 1 7 r 1 W ' *I,. SO h1 ST. ♦ Y ,,,l if 'f' � • e g 1 l e us SINNEN F A. V CIR. n4e �Y ir if La 0 cl Y f, ° E w i ce. 4 ' Rice t' T„ L ,J Marsh CA .1D/ 101 • 51. O �` P ��`G V /U d' 116th 1 1 IaLS ORK M. T � a 0► - - - DETOUR ROUTE g 1:4, gi,i 4 ( BARBARA o PRIMARY ROUTE XXXX ROADWAY TO BE CLOSED STRGAR -ROSCO ENGINEERS .INC. CITY OF CHANHASSEN FIGURE SRF CONSULTING ENGWEERS i DAKOTA AVENUE DETOUR ROUTE 5 SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 MARKET BOULEVARD AND WEST 78th STREET 1 Proposed Work 1 This report documents the justification for installing traffic signal control at the intersection of West 78th Street and Market Boulevard. This proposed signal system will be a permanent full traffic actuated signal system with six phases. The eastbound and westbound left -turn movements will have protected /permissive left turn phasing. The northbound and southbound approaches will share the same phase. Ultimate improvements on West 78th Street near Market Boulevard 1 may include the construction of a four lane divided roadway. Left and right turn lanes would be provided at major intersections. Figure 6 shows the existing conditions as well as the ultimate design. The proposed traffic signal system will be designed for the ultimate condition but will also accommodate the existing geometry. The estimated cost to construct the proposed signal system is $80,000. The proposed signal system will be funded by the City of Chanhassen. 1 Traffic Volumes The base traffic volumes used for the traffic signal warrant analysis were completed by Strgar- Roscoe - Fausch, Inc. in October of 1990 (see Appendix A for Count Data). 1 Market Square Shopping Center Study 1 A study of the Market Square Shopping Center and its impacts on the intersection of West 78th Street and Market Boulevard was completed in November 1990 and is included in the Appendix. This study was revised in March of 1992 to reflect Phase 1 construction of the development. Phase 1 construction of the shopping center will consist of 85,000 sq. ft. gross leasable area. Using trip generation rates from the 5th edition of the Institute of Transportation Engineers, Trip Generation, the site is expected to generate approximately 6,000 daily trips and 560 ' p.m. peak hour trips. The revised traffic study is included in Appendix C. 1 1 9 1 • 1 NM all MI — • all — NS En NM E am r as r am me no mu ci >> J m 1- I W cc . )1 - I WEST 78TH STREET 1 R. • 1i. al■ . - r a., - -- - - -- -- --- -- _ 4.0..... C - - -- - - - - - --- ■ ....1�MM. • -MONNIMr ! am■ - _ - ,l•L■ ai ll el% A 1 i r i I - - EXISTING GEOMETRY 1 • ULTIMATE 4 LANE DIVIDED 50 0 50 100 scale feet CONSULTING - ROSCOE- FAUSCH, INC. CITY OF CHANHASSEN FIGURE S RI CONSU ENGINEERS INTERSECTION LAYOUT 6 SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 Sianal Justification 1 Warrant 7, Systems Warrant, in the Minnesota Manual on Uniform Traffic Control Devices states " A traffic signal installation at some intersections may be warranted to encourage concentration and organization of traffic flow networks." This warrant is applicable when the common intersection of two or more major routes has a total existing, or immediately projected, entering volume of 800 vehicles during the peak hour of a typical weekday. A major route as used in the Systems Warrant has one or more of the following characteristics: 1. It is part of the street or highway system that serves as the principal network for through traffic flow; 1 2. It connects areas of principal traffic generation; 3. It includes rural or suburban highways outside, entering or ' traversing a city; 4. It has surface street freeway or expressway ramp terminals; 1 5. It appears as a major route on an official plan such as a major street plan in an urban area traffic and transportation study. West 78th Street is a major collector street through the City of Chanhassen Central Business District. It connects areas of principal traffic generation and includes part of a rural highway traversing a city. Market Boulevard is part of the street system that serves as the principal network for through traffic with the intersection at T.H. 5 to the south. Both West.78th Street and Market Boulevard would appear as major routes in a transportation or urban area traffic study. 1 Figure 7 shows the immediately projected traffic volumes for the p.m. peak hour of a typical weekday at the intersection of West 78th Street and Market Boulevard. The total entering volume is 1,385 which satisfies the volume requirements for the Systems Warrant. Therefore, traffic signal control is justified at the intersection of West 78th Street and Market Boulevard. ' Future Development 1 This area of the City of Chanhassen is expecting further commercial development in the near future. In addition to the completion of the Market Square Shopping Center development 1/ adjacent to Market Boulevard, an area on West 78th Street west of Market Boulevard is planning a development that may include a major retailer. Both developments will generate significant levels of traffic volumes that will increase the need for a traffic signal system at the intersection of West 78th Street and Market Boulevard. 1 11 1 1' 1 1 J III m W . Q Q O < to t. 3 . }J 1 L 1 r 1 22 (22) F— 680 (680) 141 (84) (5) 5 --)4 . ( ( 388) 406 —0.. 1 \ W. 78TH STREET ri ..1 NNN O I ,- �O v .�- 1 1 1 1 XXX = P.M. PEAK PROJECTED VOLUMES (ONLY MARKET SQUARE SHOPPING CENTER GENERATED TRIPS) 1 (XXX) = 1990 ESTIMATED TURNING MOVEMENT VOLUMES • 1 SRF1 CITY OF CHANHASSEN FIGURE STGAR- ROSCOE-FAUSCH,INC CONSULTING ENGINEERS PROJECTED TRAFFIC VOLUMES 7 SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 1 SUMMARY AND CONCLUSIONS This report has documented the justification for installing traffic signal control along West 78th Street at the intersections of Great Plains Boulevard and Market Boulevard in the City of Chanhassen. The signal justification has taken the form of applying the applicable warrant(s) for signal installation as outlined in the MMUTDC and using sound engineering practice. Based on the 1990 traffic counts for West 78th Street and Great 1 Plains Boulevard, Warrant 9 (Four Hour Volume) will be met for four hours and Warrant 11 (Peak Hour Volume) will be met for two hours during the p.m. peak hour. Traffic signal control will also improve the operation of this intersection compared to the .alternative of side street stop control in terms of the delay and level of service for traffic on West 78th Street and Great Plains Boulevard. A traffic signal is needed at this location to manage the capacity of the intersection and to reduce the delays experienced by side street traffic due to the stop control at this intersection. The intersection of West 78th Street and Market Boulevard based on the 1990 traffic counts and forecasted volumes for Market Square Shopping Center, does not meet the typical Peak Hour Volume or Four Hour Volume Warrant at this time. However traffic signal control is justified at this intersection by meeting the requirements of Warrant 7, Systems Warrant. The traffic volume portion of the warrant is easily met with existing traffic counts. The subjective portion of whether or not West 78th Street and Market Boulevard are major routes has been justified. This intersection is vital to the central business district transportation network in that Market Boulevard intersects Trunk Highway 5 just south of the subject intersection. The City also expects future development that will increase the traffic levels in this area. Therefore, traffic signal control is justified at the intersection of West 78th Street and Market Boulevard. 1 1 1 1 i 13 1 1 1 1 APPENDIX A 1 1 1 1 1 1 1 1 1 1 1 1 1 t4INNESOTA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING 1 SIGNAL WARRANT ANALYSIS Location :CHANHASSEN Date :02/19/92 SPEED APPROACH LANES I Factor :1.000 30 Major App. 1 :NEST 78TH STREET 2 30 Major App. 3 :GREAT PLAINS ROOD 2 I 30 Minor App. 2 :WEST 78TH STREET 2 POPULATION LESS THAN 10,000 : NO Minor App. 4 : SEVENTY PERCENT FACTOR USED : NO 600/900 200 /100 200/100 1/2 1 MAJOR MAJOR TOTAL WARRANT MINOR MINOR WARRANT WARRANT MET SAME HOUR -APP.! APP.3 1 +3 MET APP.2 APP.4 MET APP.2 MET APP.4 HOURS I 6 -7 A.N. 177 90 267 / 222 0 X / X / / 7 -8 A.M. 306 179 485 / 374 0 X / X / / 1 8 -9 A.M. 279 152 431 / 305 0 X / X / / 1 9 -10 A.M. 244 130 374 / 247 0 X / X / / 10 -11 A.M. 231 138 369 / 246 0 X / X / / 1 11-12 P.M. 320 151 471 / 306 0 X / X / / 1 12 -1 P.M. 361 168 529 / 397 0 X / X / / 1 -2 P.M. 314 140 454 / 320 0 X / X / I /, 2 -3 P.M. 353 174 527 / 379 0 X / X / / 1 3 -4 P.M. 488 222 710 X / 506 0 X / X / X / 4 -5 P.M. 584 292 876 X / 615 0 X / X / X / 5 -6 P.M. 675 296 971 X / X 699 0 X / X / X / X I 6 -7 P.M. - 421 221 642 X / 427 0 X / X / X / 1 7 -8 P.M. 295 160 455 / 303 0 X / X / / 8 -9 P.M. 209 109 318 / 192 0 / X / / 1 9 -10 P.M. 192 97 289 / 184 0 / X / / 1 10 -11 P.M. 131 87 218 / 114 0 / X / / 1 WARRANT 1 WAS NOT MET : 4 HOURS SATISFIED REQUIREMENTS WARRANT 2 WAS NOT MET : 1 HOUR SATISFIED REQUIREMENTS WARRANT 6 VOLUME REQUIREMENTS WERE NOT MET 1 WARRANT 8 WAS NOT MET : 7 HOURS NET / 2 HOURS MET WARRANT 9 WAS MET : 4 HOURS SATISFIED REQUIREMENTS WARRANT 11 WAS MET : AT LEAST 2 HOURS SATISFIED REQUIREMENTS DATA FILE --> 78THSRPL 1 1 MINNESOTA DEPARTMENT OF TRANSPORTATION TRAFFIC ENSINEERING I TRAFFIC COUNT DATA 1 I • LOCATION :WEST 78TH STREET II FOR COUNTS BEGINNING : October 16, 1990 DATE 15 16 17 18 19 AVE. 20 21 AVERAGE DAY MON. TUE. WED. THU. FRI. WK.DAY SAT. SUN. WEEFEND II HOURS 12M -1 38 53 45 II 1-2 20 22 21 2 -3 7 9 � 3 - 4 8 '9 8 4-5 16 15 15 II 5 -6 58 51 54 6-7 183 171 177 7 -8 309 303 306 I 8 -9 317 242 279 9 -10 268 221 244 10 -11 226 236 231 1 11 -12N 358 282 320 12N -1 361 361 1 -2 314 314 II 3 -4 507 469 488 4 -5 625 544 584 5 -6 698 653 675 II 6 -7 436 407 321 421 7 -8 270 295 8 -9 205 214 209 9 -10 190 195 192 I 10 -11 119 144 131 11 -12M 71 79 75 II TOTALS 3474 5863 1614 5813 24 HOUR FACTOR :1.000 AADT : 5813 1 REMARKS : II II DATA FILE - -::> 78THGRPL . DA1 II . 1 MINNESOTA DEPARTMENT OF TRANSPORTATION . TRAFFIC ENGINEERING TRAFFIC COUNT DATA 1 II LOCATION :WEST 78TH STREET FOR COUNTS BEGINNING : October 16, 1990 I DATE 15 16 17 18 19 AVE. 20 21 AVERAGII DAY MON. TUE. WED. THU. FRI. WK. DAY SAT. SUN. WEEKEN HOURS 12M -1 37 43 40 II 1 -2 22 17 19 2-ti 10 9 9 3 -4 10 12 11 II 4 -5 18 18 18 5 -6 78 61 69 6 -7 226 218 222 7 -8 399 350 374 II 8 -9 336 274 305 9 -10 278 216 247 10 -11 240 252 246 II 11 -12N 360 253 306 12N -1 397 397 1 -2 320 II �c 320 379 379 3 -4 519 494 506 4 -5 620 610 615 II 5-6 689 710 699 6-7 433 421 427 7 -8 276 331 303 8 -9 188 196 i92 II 9 -10 187 181 184 10 -11 109 120 . 114 11 -12M 60 68 64 II TOTALS 3081 6241 1723 6070 • 24 HOUR FACTOR :1.000 AADT : 60711 REMARKS : II II DATA FILE - -> 78THGRPL.DAI . 1 I MINNESOTA DEPARTMENT OF TRANSPORTATION I TRAFFIC ENGINEERING TRAFFIC COUNT DATA 1 I LOCATION :GREAT PLAINS ROAD �� �� FOR COUNTS BEGINNING : October 16, 1990 DATE 15 16 17 is 19 AVE. 20 21 AVERAGE �� DAY MON. TUE. WED. THU. FRI. WK.DAY SAT. SUN. WEEKEND I HOURS 12M-1 19 39 29 1-2 19 18 18 2-3 12 12 12 N� 3-4 3 4 3 4-5 7 6 6 5-6 15 17 16 I 6-7 97 83 90 7-8 197 161 179 8-9 158 146 152 9-10 120 141 130 I 10-11 138 139 138 11-12N 157 146 151 12N-1 168 168 I 1-2 140 140 2-3 174 174 3-4 212 233 ''22 I 4-5 299 286 292 5-6 294 299 Z96 6-7 202 241 221 7-8 131 189 160 II 8-9 103 116 109 9-10 96 99 97 10-11 79 95 87 II 11-12M 44 44 44 TOTALS 1460 3026 912 2940 NI 24 HOUR FACTOR :1.000 AADT : 2940 REMARKS : �� II II DATA FILE --> 78THGRPL.DA3 II SRFJ c STRGAR- ROSCOE- FAUSCH, INC CONSULTING ENGINEERS twsrocaaot II CM II STIVCIVIAL 1 FIU321C iWA wnct= TRAFFIC TURNING MOVEMENTS COUNTS epArktAlsr l 4. 1391 ty of Prolectf irissachen et J PLAids p , and 78.71( ST. PPS i Cate, /(-29- q0 Day of Week `T`liKS. heather 35 °F) CL•vOf Raw. 2).4. 1 6 6cAYS IP .. 7 VI ST (t tT Ek�rwl .k0. (Street •.Feetj"" '(3`treetT" " from the �ScuTk • - ..e EAit f the -� frti :h - Ti:rse = - Lt. St. Rt. Lt. I Ss. Rt. Lt. St. Rt. Lt. St. Rt. Period d C D F G H 1 1 - 4 /7 2 3 7q , B3 /8 26 4:45 - of 36 ¢ 44- /2S i PA 4/ I S,o. 5t15 25 4? S/ 1/O -8 /R 6: 16' - 5 t3o , 47 set its 7/ 3e ?b, ,Sits • fo 2 B i 7o Tk1,-- , /15 ZZ-3 L79 1168 , 493 152- _ I i -..------. , + 4 Hr. iota* , 4 t. . 6RCA 1 GF (,4c /b._ f. lam,. ?6,41:: l!° "? - 1 Street Marie 112-327 ¢: 5 ;4-S 1 as F 48 3 1 _ * (indicate mirth) 1 • .- • _ 1 • 8 C - 78r0 ST ,7f €r WI=S Street Name 1 17c I(o7 . 1 Eite reference : 13910000 - 1 Site identifier : CHANHASSEN 78TH ST WEST OF MARKET BLVD 1 EASTBOUND AXLES/2 I Week beginning Mon 05 Nov 1990 TIME Monday Tuesday Wednesday Y Friday Wednesda Thursda Frida Saturday Sunday Weekday Week .EIN 5 6 7 8 9 10 11 Average Averaoe 1 t' 00:00 --- - - ---- - - 40 - - - - 40 - 01:00 - - 18 - - - - 18 - 1 02:00 - - 6 - - - - 6 - - 03:00 9 9 04 :00 - - 11 - - - - 11 - ' 05:00 - - 22 - - - - 22 Gc:00 - - 90 - - - - 90 - 07: 00 - - 450 - - - - 450 - 08:00 - - 572 - - - - 572 - 1 OP:00 - - - 361 - - - - 361 - - 10:00 195 195 11:00 - - 185 - - - - 185 - ' 1::00 - - 259 - - 259 `3: 00 258 - - 258 - 14:00 - - 203 - - - - 203 111!5:?? - - 224 - - - - 224 I 100 - 345 - - - - - 345 - 17:00 - 403 - - - - - 403 - 1E:00 - 392 - - - - - 392 - ' : , ':00 _ 339 - - - - - 339 - - GG 190 190 :.:00 - 94 - - - - - 94 - 1::. - 55 - - - - - 62 62 62 - 1 1- 18 24 HOUR, TOTALS - - - - - - - - ::jr. :G. -24:00 - - - - - - - - - I : ( :: 24:00 - - - - - - X 1;- - FEAR• -HOUR 8:00 Ir k VOLUME - - 572 - - - - 572 - DEPt. HOUK I I =EA. VOLUME - - - - - - - - - 1 1 1 1 j _aoer kocoe Fauch Printed at 18:33:53 on 07 Nov 1490 Site reference : 13910000 - 2 - Site identifier : CHANHASSEN 78TH ST WEST OF MARKET BLVD 1 WESTBOUND AXLES /2 Week beginning Mon 05 Nov 1990 1 TIME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Weekday Week 8EEIN 5 6 7 8 9 10 11 -- N Average M +- Average 1 00:00 - - 51 - - - - 51 - 01:00 - - - - 49 - - - - 49 - I 02:00 - - 10 - - , - - 10 - 03:00 - - 14 - - - - 14 - 04:00 - - 6 - - - - 6 - I 05:00 - ' - 12 - - - - 12 - Oc :00 - - 41 - - - - 41 - 07:00 - - - 161 - - - - 161 - 111 08:00 - - 318 - - - - 318 - 09:00 - - 211 - - - - 211 - 10:00 - - 168 - - - - 168 - 11:00 • - - 168 - - - - 168 - I 12 :00 - - 209 - - - - 209 - 13 :00 - - 301 - - - - 301 - 14:00 - - 239 - - - - 239 - :5:00 - - 285 - - - - 285 - 1c :00 - 506 - - - - - 506 - 17:00 - 545 - - - - - 545 - 1E:00 - 710 - - - - - 710 - 1 'c:00 - 410 - - - - - 410 - 20:00 - 316 - - - - - 316 - ..: 00 - 195 - - - - - 195 - I : - :0(- - 158 - - - - - 158 - 0 • - 127 - - - - - 127 - I:. 16. 18 t 24 HOUR TOTALS I 7: -1:00 - - - - - - - - - : r: - :. :Oi! - - - - - - - - - ::0C - - - - - - - - -, '.:0 - - - - - - - - A'' PEAT: HOUR 8:00 S 2fo _Pt. VOLUME - - 318 - - - - 318 - 1 F14 HOUR ;: VOLUME - - - - - - - - - I 1 1 1 1 S:racer Roscoe Fausch Printed at 18:35:00 on 07 Nov 1990 I i 03 �c arc..•..... ....... .. ...... .t• reference : 13910080 _ 1 78TH ST WEST OF MARKET BLVD III TBOUND AXLES /2 _ Week beginning Mon 03 Dec 1998 Monday Tuesday Wediesday Thursday Friday Saturday Sunday Weekday Week lir 4 :!1E 5 6 7 8 9 Average Average 0:00 11( - - 11 - 00 - - C8 - - 9 _ - 9 - _ 9 - - - 9 - .00 _ 16 - - 16 - 4:80 _ - 00 - - 71 - 08 _ _ _ 400 77 _ - _ 554 488 _ 1:88 - - - - 554 _ - 39b - 11 :88 - - - 396 - - - 184 :80 :08 - - - 184 - - - - L(. - +:88 - - 247 - 247 - - - 210 - 11:00 :0 - - 278 - - - - - �n t33 `''' 226 .4:30 - - 226 - _ - 31 - 311 ':?3 _ _ _ _ _ _ 317 _ 146 346 .:28 - - 352 ✓ - - _ - 352 _ :00 175 - 175 _ - - 142 - - - 142 - - - 72 - - - - 1 111:2° - - 68 - - - 68 _ :00 - - 48 - - - - 48 15, 18 b 24 HOUR TOTALS :C0-19:88 - - _ - 0 - 22:8 - - - - - - 1:00-24:83 - _ - - - - - - _ - _ _ �- - - - AM PEAK HOUR _ _ _ - - II[AK VOLUME - - PM PEAK HOUR 18:50 - 352 'AK VOLUME - - 352 .- - 1 1 1 1 it reference : 13918/08 - 2 - Site identifier ; CHANHASSEN 78TH ST BEST OF MARKET BLVD I EETBOUND AXLES /2 Week beginning Non 83 Dec 1998 1 - ii'E Monday Tuesday Wednesday Thursday Friday Saturday* Sunday Weekday Week :EEIN - - - -M - -M 3 4 5 6 7 8 9 Average Average 1 30:08 - - - 49 - - - 49 - 31:80 - - - 37 - - - 37 - '3:28 - - - 11 - - - 11 - 4 :08 - - - 6 - - - 6 - '5:08 - - - 43 - - - 43 - I .0:38 - - - 133 - - - 133 - '7:08 - - - 294 - - - 294 - '0:83 - - - 246 - - - ' 246 - - - - 1 9:08 - - - II 135 135 - - Ili 1:00 - - 212 - - - - 212 - 3:20 - - 267 28 - - - - 267 - I 4:00 - - 263 - - - - 263 - 3:38 - - 489 - - - - 489 - . ;20 - - cto - - - - 524 - ":08 - - 625 - - - - 625 - :80 - - 375 - - - - 375 - ;;80 - - 269 - - - - 269 - '::00 - - 269 - - - - 269 - 1:00 - - 224 - - - - 224 - 2:00 - - 162 - - - - 162 - ::00 - - 88 - - - - 88 - 1, 16, 18 6 24 HOUR TOTALS 111 ":00 -19 ;88 - - - - - - - - - ::03 -22:00 - - - - - - - - - 5:80 -24:88 - - - - - - - - - 2:00 -24:80 - - - - - - - -S I ccf - 1 0 PEAT; HOUR ZAK VOLUME - - - - - - - - - I • i PEAK HOUR 17:11 =;;t: VOLUME - - 625 - - - - 625 - I 1 • 1 1 1 1 Fite reference MAREET BLVD NORTH OF 78TH ST 1 FOUTHBOUND AXLES /2 I Week beginning Mon 05 Nov 1490 TIME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Weekday Week t:=EIN 5 6 7 8 9 10 11 Average Average -- ~----- ------ O -- - ----- I 00:00 0 3 - - - - -- 1 ---- _____ ---- 01:00 0 0 0 - - - - 0 - ' 02:00 0 0 0 ,d 03i00 0 0 1 - - - - (0 - 04:00 0 0 0 - - - - 4 - 1 05:00 0 0 3 - - - - F - 06:00 0 0 6 - - - - , 1 2 - 07:00 0 0 13 - - - ' ("4 - 08:00 0 0 36 - - - - - ' 0:00 0 0 28 - - - - 1 - - 10:00 0 3 :00 0 4 �'9 11:00 0 0 34 - - (47_ - - ' 1_:00 0 0 36 - - - - 12, - - 13:00 0 0 27 /Ai 14:00 0 0 28 - - - - `'9 ; - 15 :00 0 54 - - - - - 27 - I 16:00 0 114 - - - - - /57 17 :00 0 93 ��17 - 18:00 0 79 - - - - - 40 - ' 19:00 0 78 - - _ - _ •39 = 20:00 0 18 9 2 : :0() 0 1 - - - - - 1 - 12::00 0 0 2 - - - - �1 - 1" 16. 1S 8 24 HOUR TOTALS I 7 _19:00 1 340 - - - - - 171 - ...- -_ :0!_ 1 437 219' ... r.- 24:00: 1 439 - - - - - 228 - 1 -43r - _ - - _ ` - Ilr:OI-24:00 L Ar. :EAi HOUR 10:00 11:00 8:00 ' cA: VOLUME 1 0 36 - - - - 12 - Pr . r.;, . HOUR r; Zs: UO 16:00 FEr;i. VOLUME 0 114 - - - - - 57 - 1 1 1 S :racer Roscoe Fausch Printed at 18:49 :30 on 07 Nov 1990 MARKET BLVD NORTH OF 78TH ST NORTHBOUND AXLES /2 1 Week beginning Mon 05 Nov 1990 TIME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Weekday Week SEEN 5 6 7 8 9 10 11 Average Average 00:00 0 0 0 - - - - 0 - 1 01 :00 0 0 0 - - - - 0 - 02:00 0 0 0 - - - - 0 - I 03:00 0 0 0 - - - - 04:00 0 0 0 - - - - 05:00 0 0 1 - - - - 0 - 06:00 0 0 0 - - - - 0 - 07:00 $ 0 0 - - - - 0 - OS :00 0 0 11 - - - - 4 - 09:00 0 0 20 - - - - I 10:00 1 0 36 - - - - r - 11:00 0 0 55 - - - - 8 - 12:00 0 0 74 - - - - - 13:00 0 0 59 - - - - •0 - 14:00 0 0 68 - - - - ,, II 15:00 0 38 - - - - - ,9 - 1:00 0 68 - - - - • - 34 - ' 17:00 1 39 - - - - - :1 - 1:00 0 29 - - - - - _ 1 0 15 - - - - - 9 - I 21:00 0 1 - - - - - ' - 0 .:. lc, IS A 24 HOUR TOTALS :0 2 174 - - - - - - - 0 2 1 - - - - - 97 - ` ' y ::�: - _.:00 _ S ,-L - - - - - 7 - PEA! HOUR 10:00 11 :00 11 :00 EA1. Y0 UME 1 0 55 - - - - 19 - FEA: HOUR 17:00 16:00 1 FEAR. Y 1 68 - - - - - 35 - 1 1 1 1 1 E :racer Roscoe Fausch Printed at 18:51:44 on 07 Nov 1990 1 Site reference : 13910003 - 1 - Site identifier : CHANHASSEN • MARKET BLVD SOUTH OF 78TH ST IIISOUTHBOUND AXLES /2 I Week beginning Man 05 Nov 1990 TIME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Weekday Week BEGIN 5 6 7 8 9 10 11 Average Average 00:00 - - 5 - - - - 5 - 01:00 - - 0 - - - - 0 - I 03:00 - - 0 - - - - 0 - 03:00 0 0 04 :00 - - 2 - - - - 2 '105:00 3 3 06:00 - - 27 - - - - 27 - 07:00 - - 27 - • - - - 27 - 08:00 - - 49 - - - - 49 - 1 09:00 - - - 73 - - - - 73 - 10 :00 20 20 . - 11:00 - - 53 - - " - - 53 - 1 - - 44 - - - - 44 - - '3:U0 47 47 14:00 - - 31 - - - - 31 - _ 15:00 - VS 1 16:00 - 99 - - - - - 99 - 17:00 - 85 - - - - - 85 - 18:00 - BO - - - - - 80 - 'I.00 - 27 - - - - - 27 - .::00 - 20 - - - - - • 20 - 21 :00 - 18 - - - - - 18 - 11. :00 _ 7 10 - - - - - 7 10 - i� 1 IE 24 HOUR TOIALS I :7:0; -19:00 - - - .:AOC -2:00 - - - -- - - - - - - - :: :::;0 -24 :00 - - - - - - - - - :::0!'-24:0; - - - - - - - 7i' - A! PEAR. HOUR 9:00 �= _A VOLUME - - 73 - - - - 73 - 4q a PEAK HOUR 1 L'E4 VOLUME - - - - - - - - - - • • 1 1 1 1 i aeer Roscoe Fausch Printed at 18:45:16 on 07 Nov 1990 Site reference : 13910003 - 2 - Site identifier : CHANHASSEN MARKET BLVD SOUTH OF 78TH ST 1 NORTHBOUND AXLES/2 Week beginning Moo 05 Nov 1990 1 TIME Monday Tuesday + Wednesday Thursday Friday Saturday Sunday , eekday - Week BEGIN _ -_—w- 5 6 7 8 9 10 11 Average Average 00:00 - - 8 - - - - 8 - 01:00 - - 10 - - - - 10 - I 02:00 - - 2 - - - - 2 - 03:00 - - 1 - - - - 1 - 04:00 - - - 0 - - - - 0 - 05:00 - - 1 - - - - 1 - 06:00 - - 11 - - - - 11 - 07:00 2 14 - ' - 32 - - - - 08:00 - - 32 - - - - 32 - 09:00 - 27 27 10:00 _ - - 18 - - - - 18 - 11:00 - - 93 - - - - 93 - I 12:00 - - 41 - - - - 41 - 13:00 - - 41 - - - - 41 - 14:00 - - 33 - - - - 33 - 15:00 - - - - - - - -61 - 16:00 - 88 - - - - - 8B - 17:00 - 75 - - - - - 75 - 1E:00 - 54 - - - - - 54 - 19 00 • - 39 - - - - - 39 - ::0i - 30 - - - - - 30 - :=.0:: - 27 - - - - - 27 - 1 2: :00 - 18 - - - - - 1B - 12. 16. 18 r 24 HOUR TOTALS I . (i!' -1 - - - - - - - - - 0 :. - ='2:00 - - - ' - - - - - - :0t :0: -24:00 - - - - - - - - - 0 &:0 .-24:00 - - - - - - - - 7 A'' FEk HOUR 11:00 EA: VOLUME - - 93 - - - - 93 - yr PEAL HOUR PEAL VOLUME - - - - - - - - - I 1 1 1 . • Strayer Roscoe Fausch Printed at 18:46:22 on 07 Nov 1990 1 78TH ST EAST OF MARKET BLVD Ill EAETBOUND AXLES /2 Week beginning on 05 Nov 1990 111 i1HE Monday Tuesday Wednesday Thursday Friday Saturday Sunday Weekday Week HE7f1 5 6 7 8 9 10 11 Average Average 01:00 - - 15 - - 15 02:00 - - 10 - - - - 10 - ' U3:GU - - i1 - - _ 11 04:00 22 - 22 - 05 : 00 - - 64 - - - - 64 - I Uo:00 - - 384 - - - - 384 = C7:O0 53 537 02:00 - - 371 - - - - 371 - - - 186 - - - - 186 - I C:0(l 10:00 - - 173 - - - - 173 11:00 - - 269 - - 269 2 :00 - - 265 - - - - 265 - . ' 13 :00 - - 190 - - - - 190 - !4:00 - - 211 - - - - 211 - 15:00 - 300 - - - - - 300 - :7 :0 0 - 442 455 _ - - - - 442 - �0 :8:00 - 371 - - - - - 371 - ro - ?46 - - - - - 246 0 - 116 - - - - - 116 - - 106 - - - - - 106 - II:::00 - 46 - - :. 16. 18 t 24 HOUR TOTALS lir:6-1C':(1° :0- - - - _ _ - - - - .. :00 -24:00 - - - - - - 9 ses Ar PEAK HOUR 7:00 _;;,• VOLUME - - 537 - - - - 537 - 371 IlLt FEAI. HOUR 'En-: VOLUME - - - - - - - - - 1 1 1 • 1 1 -goer Roscoe Fausch Printed at 18:30:37 on 07 Nov 1990 1 Site reference : 13910001 - 2 - Site identifier : CHANHASSEN 1 78TH ST EAST OF MARKET BLVD WESTBOUND AXLES /2 Beek beginning Mon 05 Nov 1990 I TIME Monday Tuesday Wednesday Thursday Friday Saturday Sunday Weekday Week I BEEN 5 6 7 8 9 10 11 Average Average 00:00 - - 47 - - - - 47 - 01:00 - - 9 - _ - - _ . _ - 9 - 02:00 - - 14 - - - - 14 - 03:00 - - 6 - - - - 6 - 04:00 - 12 - - - - 12 - 05:00 - - 37 - - - - 37 — 06:00 - - 193 - - - - - 193 - 07:00 - - 369 - - - - 369 - I 08:00 - - 269 - - - - 269 - 09:00 - - 224 - - - - - 224 10:00 - 175 `- - - - 175 - I 11:00 - - 222 - 12:00 - 336 -- - 336 — 13:00 - - 270 - - - - 270 - 14:00 - - 298 - - - - 248 - I •15:00 - 476 - - - - - 476 - 16:00 - 592 - - - - - 592 - 17:00 - 786 - - - - - 786 - 18:00 - 464 - - - - - 464 - 19:00 - 317 - - - - - 317 - 20:00 - 203 - - - - - 203 - 21:00 - 155 - - - - - 155 - I - - 135 - - - - - 135 - 2::00 - 54 - - - - - 54 - 12. 16. 18 1 24 HOUR TOTALS 1 7:0; -19:00 - - - - - - - - - 06:0C-22:00 - - - - - - - - - I 0::0(.-24:00 - - - - - - - - - ..:0: -4:00 - - - •- - - - - - Sb:: PEAL. HOUR 7:00 FEiF. VOLUME - - 369 - - - - 369 - P FEAT: HOUR I - FEAT. VOLUME - - - - - - - - 1 1 1 1 • Striper Roscoe Fausch Printed at 18:31 :43 on 07 Nov 1990 1 1 APPENDIX B 1 1 1 1 1 1 1 1 1 1 1 1 1985 HCM: UNSIGNALIZED INTERSECTIONS Page - ************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** IDENTIFYING INFORMATION 1 AVERAGE RUNNING SPEED, MAJOR STREET.. 30 1 PEAK HOUR FACTOR 1 AREA POPULATION 12000 1 NAME OF THE EAST/WEST STREET WEST 78TH STREET NAME OF THE NORTH /SOUTH STREET GREAT PLAINS ROAD 1 NAME OF THE ANALYST LEW I DATE OF THE ANALYSIS (mm /dd /yy) 01/18/92 TIME PERIOD ANALYZED PM PEAK HOUR 1 OTHER INFORMATION.... PK HR VOLUMES FROM FALL 1990 INTERSECTION TYPE AND CONTROL 1 INTERSECTION TYPE: T- INTERSECTION 1 MAJOR STREET DIRECTION: NORTH /SOUTH CONTROL TYPE WESTBOUND: STOP SIGN 1 TRAFFIC VOLUMES 1 EB WB NB SB 1 - - -- - - -- - - -- - - -- LEFT -- 196 0 327 THRU -- 0 130 112 1 RIGHT -- 483 167 0 1 NUMBER OF LANES 1 EB WB NB SB LANES -- 2 2 2 1 1 • 1 II I ADJUSTMENT FACTORS Page -2 II PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS EASTBOUND - -- - -- - 1 WESTBOUND 0.00 90 20 N II NORTHBOUND 0.00 90 20 N SOUTHBOUND 0.00 90 20 N II VEHICLE COMPOSITION I % SU TRUCKS % COMBINATION AND RV'S VEHICLES % MOTORCYCLES I EASTBOUND - -- - -- - -- WESTBOUND 0 0 0 II NORTHBOUND 0 0 0 SOUTHBOUND 0 0 0 1 CRITICAL GAPS 1 TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10 -2) VALUE ADJUSTMENT CRITICAL GAP I MINOR RIGHTS WB 5.50 5.50 0.00 5.50 1 MAJOR LEFTS SB 5.50 5.50 0.00 5.50 I MINOR LEFTS WB 7.00 7.00 0.00 7.00 IDENTIFYING INFORMATION 1 NAME OF THE EAST/WEST STREET WEST 78TH STREET NAME OF THE NORTH /SOUTH STREET GREAT PLAINS ROAD I DATE AND TIME OF THE ANALYSIS 01/18/92 ; PM PEAK HOUR OTHER INFORMATION.... PK HR VOLUMES FROM FALL 1990 1 1 1 1 1 CAPACITY AND LEVEL -OF- SERVICE Page -3 11 POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY ji MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c= c - v L p M SH R SH 1 MINOR STREET WB LEFT 216 342 215 215 -1 RIGHT 531 944 944 944 413 MAJOR STREET 1 SB LEFT 360 793 793 793 433 A 1 IDENTIFYING INFORMATION 1 NAME OF THE EAST/WEST STREET WEST 78TH STREET NAME OF THE NORTH /SOUTH STREET GREAT PLAINS ROAD DATE AND TIME OF THE ANALYSIS 01/18/92 ; PM PEAK HOUR OTHER INFORMATION.... PK HR VOLUMES FROM FALL 1990 1 1 1 1 1 1 1 1 1 ' 1985 HCM: SIGNALIZED INTERSECTIONS Page -1 *************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** IDENTIFYING INFORMATION ' NAME OF THE EAST/WEST STREET West 78th Street NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard AREA TYPE CBD NAME OF THE ANALYST LEW ' DATE OF THE ANALYSIS 02/20/92 TIME PERIOD ANALYZED PM PK HOUR L OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS TRAFFIC VOLUMES EB WB NB SB LEFT 0 196 0 327 THRU 0 0 130 112 RIGHT 0 483 167 0 ' RTOR 0 0 35 0 (RTOR volume must be less than or equal to RIGHT turn volumes.) 1 1 1 1 1 • 1 II INTERSECTION GEOMETRY Pagel NUMBER OF LANES PER DIRECTION INCLUDING TURN BAYS: EASTBOUND = 0 WESTBOUND = 2 NORTHBOUND = 2 SOUTHBOUND = 2 II EB WB NB SB LANE TYPE WIDTH TYPE WIDTH TYPE WIDTH TYPE WIDTH II 1 12.0 L 12.0 T 12.0 L 12.0 • 2 12.0 R 12.0 R 12.0 T 12.0 II 3 4 II 5 II 6 L - EXCLUSIVE LEFT LANE T - EXCLUSIVE THROUGH LANE , LT - LEFT /THROUGH LANE TR - THROUGH /RIGHT LANE LR - LEFT /RIGHT ONLY LANE R - EXCLUSIVE RIGHT LANE LTR - LEFT /THROUGH /RIGHT LANE I ADJUSTMENT FACTORS GRADE HEAVY VEH. ADJACENT PKG BUSES 1 ( %) ( %) Y/N (Nm) (Nb) PHF EASTBOUND 0.00 2.00 Y 20 0 0.90 I WESTBOUND 0.00 2.00 Y 20 0 0.90 NORTHBOUND 0.00 2.00 Y 20 0 0.90 SOUTHBOUND 0.00 2.00 Y 20 0 0.90 II Nm = number of parking maneuvers/hr; Nb = number of buses stopping/hr CONFLICTING PEDS PEDESTRIAN BUTTON (peds/hour) (Y /N) (min T) ARRIVAL TY • EASTBOUND 50 N 19.8 3 I WESTBOUND 50 N 19.8 3 NORTHBOUND 50 N 11.3 3 SOUTHBOUND 50 N 11.3 3 II min T = minimum green time for pedestrians IDENTIFYING INFORMATION 1 NAME OF THE EAST/WEST STREET West 78th Street NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard II DATE AND TIME OF THE ANALYSIS 02/20/92 ; PM PK HOUR OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS • • 1 II SIGNAL SETTINGS - OPERATIONAL ANALYSIS Page -3 ACTUATED LOST TIME /PHASE = 3.0 CYCLE LENGTH = 90.0 II EAST/WEST PHASING 1 PHASE -1 PHASE -2 PHASE -3 PHASE -4 EASTBOUND I LEFT THRU RIGHT PEDS II WESTBOUND .. LEFT X X II THRU RIGHT X PEDS X 11 NORTHBOUND RT X X SOUTHBOUND RT II GREEN 17.0 12.0 0.0 0.0 YELLOW + ALL RED 4.0 4.0 0.0 0.0 1 NORTH /SOUTH PHASING PHASE -1 PHASE -2 PHASE -3 PHASE -4 II NORTHBOUND LEFT THRU X II RIGHT X PEDS X 1 SOUTHBOUND LEFT X THRU X X RIGHT II PEDS EASTBOUND RT I WESTBOUND RT X GREEN 13.0 32.0 0.0 0.0 YELLOW + ALL RED 4.0 4.0 0.0 0.0 I IDENTIFYING INFORMATION II NAME OF THE EAST/WEST STREET West 78th Street NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard DATE AND TIME OF THE ANALYSIS 02/20/92 ; PM PK HOUR 1 OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS II • 1 VOLUME ADJUSTMENT WORKSHEET Page LANE LANE ADJ. 1 MVT. ADJ. LANE GRP. NO. UTIL. GROWTH GRP. PROP PROP VOL_ PHF VOL_ GRP. VOL_ LN FACT. FACT. VOL_ LT _R EB LT 0 0.90 0 TH 0 0.90 0 RT 0 0.90 0 WB LT 196 0.90 218 L 218 1 1.000 1.000 218 1.00 0.01 TH 0 0.90 0 RT 483 0.90 537 R 537 1 1.000 1.000 537 0.00 1.0 NB LT 0 0.90 0 TH 130 0.90 144 T 144 1 1.000 1.000 144 0.00 0. RT 167 0.90 147 R 147 1 1.000 1.000 147 0.00 1.0 SB LT 327 0.90 363 L 363 1 1.000 1.000 363 1.00 0.01 TH 112 0.90 124 T 124 1 1.000 1.000 124 0.00 0.00 RT 0 0.90 0 * Denotes a Defacto Left Turn Lane Group 1 IDENTIFYING INFORMATION ' NAME OF THE EAST/WEST STREET West 78th Street NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard DATE AND TIME OF THE ANALYSIS 02/20/92 ; PM PK HOUR OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS 1 1 1 1 1 1 1 SATURATION FLOW ADJUSTMENT WORKSHEET Page -5 ' IDEAL ADJ. SAT. NO. f f f f f f f f SAT. FLOW LNS W HV G p BB A RT LT FLOW ' EB WB ' L 1800 1 1.000 0.990 1.000 1.000 1.000 0.900 1.000 0.826 1325 R 1800 1 1.000 0.990 1.000 0.800 1.000 0.900 0.850 1.000 1091 NB T 1800 1 1.000 0.990 1.000 1.000 1.000 0.900 1.000 1.000 1604 R 1800 1 1.000 0.990 1.000 0.800 1.000 0.900 0.843 1.000 1082 SB L 1800 1 1.000 0.990 1.000 1.000 1.000 0.900 1.000 0.950 1524 T 1800 1 1.000 0.990 1.000 0.800 1.000 0.900 1.000 1.000 1283 1 IDENTIFYING INFORMATION 1 NAME OF THE EAST/WEST STREET West 78th Street NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard DATE AND TIME OF THE ANALYSIS 02/20/92 ; PM PK HOUR ' OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS 1 1 1 1 1 1 1 1 CAPACITY ANALYSIS WORKSHEET Page -11 ADJ. ADJ. SAT. FLOW LANE GROUP 1 FLOW RATE FLOW RATE RATIO GREEN RATIO CAPACITY v/c (v) (s) (v /s) (g /C) (c) RATIO i EB WB • L 218 1325 0.164 0.378 501 0.435 *1 R 537 1091 0.492 0.567 618 0.868 NB T 144 1604 0.090 0.156 249 0.579 R 147 1082 0.135 0.533 577 0.254 SB 1 L 363 1524 0.238 0.367 559 0.650 * T 124 1283 0.097 0.556 713 0.175 II Cycle Length, C = 90.0 sec. Sum (v /s) critical = 0.493 Lost Time Per Cycle, L = 12.0 sec. X critical = 0.569 II IDENTIFYING INFORMATION 1 NAME OF THE EAST/WEST STREET West 78th Street I NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard DATE AND TIME OF THE ANALYSIS 02/20/92 ; PM PK HOUR OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS 1 1 1 II 1 1 1 1 LEVEL -OF- SERVICE WORKSHEET Page -7 ' DELAY LANE DELAY LANE LANE DELAY LOS ' v/c g/C CYCLE d GROUP d PROG. GRP. GRP. BY BY RATIO RATIO LEN. 1 CAP. 2 FACT. DELAY LOS APP. APP. ' EB WB L 0.435 0.378 90.0 15.8 501 0.4 1.00 16.2 C 17.7 C R Q.868 0.567 90.0 12.6 618 8.9 0.85 18.3 C NB T 0.579 0.156 90.0 26.8 249 2.4 0.85 24.9 C 16.0 C ' R 0.254 0.533 90.0 8.6 577 0.1 0.85 7.4 B SB ' L 0.650 0.367 90.0 18.0 559 1.9 1.00 19.9 C 16.4 C • T 0.175 0.556 90.0 7.5 713 0.0 0.85 6.4 B ' Intersection Delay = 17.0 (sec /veh) Intersection LOS = C IDENTIFYING INFORMATION ' NAME OF THE EAST/WEST STREET West 78th Street NAME OF THE NORTH /SOUTH STREET Great Plains Boulevard DATE AND TIME OF THE ANALYSIS 02/20/92 ; PM PK HOUR 1 OTHER INFORMATION: FALL 1990 TURNING MOVEMENT COUNTS 1 11 1 1 1 1 1 APPENDIX C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SRF No. 0921634 1 MEMORANDUM TO: File 1 FROM: Lawrence E. Williams 1 DATE: April 20, 1992 SUBJECT: REVISED MARKET SQUARE SHOPPING CENTER AND ITS IMPACTS 1 ON THE INTERSECTION OF WEST 78TH STREET AND MARKET BOULEVARD A revision of the impacts of the new development located in the southwest quadrant at the intersection of West 78th Street and Market Boulevard located in the City of Chanhassen (See Figure 1, ' Site Plan). The Market Square Shopping Center will have a Phase 1 development of 85,000 sq. ft. gross leasable area on which the traffic study is based. The November 13, 1990 study was based on full development of the shopping center (approximately 98,000 sq. ft. GLA). There is approximately another 42,000 sq. ft. GLA of property in three lots that are 1 assumed undeveloped for this study. The total number of p.m. peak hour trips and daily trips into and out the shopping center were estimated using the trip generation 1 rates from the 1991 Institute of Transportation Engineers "Trip Generation, 5th Edition" report. A total of 560 p.m. peak hour trips and 6,000 daily trips are projected. The trips were than distributed to the approach roadways and driveways based on existing traffic volumes and predicted driveway patterns. This distribution along with the driveway in ' and out proportions are summarized in Table 1 and Table 2 and shown on Figure 2. ' Using the above trip distribution and the existing p.m. peak hour traffic volumes, projected turning movements at the intersection of West 78th Street and Market Boulevard were forecasted. These 1 movements as well as the existing volumes are shown in Figure 3. A daily assignment of the forecasted trips was also done using existing 1990 counts and is shown in Figure 4. 1 1 ••■••■• ■ Ada... ■.....■.. 1 WP.00•■•■•••• ...N. ......' I E S T '', 7...'"il I • .•■•■... "......"".......7■■=........,.... 1..........„ ...■,..■..., ' /.... '.. fr '..■......: . , / LOT 4 . •••■/M1 7 % '.. . ''.. ..0 ••■•■ ;if 1 1 1 . 1 frt ....■ ■•■■•■■■ • • 1 ."."....=."' LOT 2 .1 ! • NI / un 3 1 I. • r 1 I 1. --- -___ , 1 / ..._._ / L ..1 -,._ E ..... / --/. ; %..■ I I sk, i OUTLOT A ....... : • -74A “ •-■ I / ' •••—••. :::// ,., ) • / --- '0 (. ..11 • t. . / --- 11' .....• i.P.. i ' 7 ‘ i .r i v nils ! . — ( / I - 1111WIr % oji: I f 0 • i — 1 ....... ___. 1 . ' to ......■...... ,,.... PROPOSED ROM i 1 I 1 r - Fr....... I. I 0 .... -4 • % ' r 9.1 - • ii ''S .. --... c:-) = C . • . • ..'. .m. : . r l' . _____ -- . , . \41.-... .2 tz . ...--....-- l r. . ' 1 !: ag am .._ ,..... . / ......... ( AINIMIND . MOM& .■., MVPS maw cuss .......... _ --- CD 1 f - , , — • 2 . 2 1 I • . - t I t t I ........ 0 LOT 1 I rl I ._, ., ,...._......... ...... cz) c o ‘-= cc . • mr.......■ I \ ...... = 4 , ..'""- l' .,* ..... ..s.1. ---- ., I 7 j , _ . r •- .. --) ........ , ' V .,.. 44,:..7.:_ii.:......i . ) , :....., s:\ of .4:7-••-•'''' / ... • • .. : -1 '. ,. : Li PROPOSED t ' ma •••••• .....j.:::::::.....,A'. • 7.........\\* NAM . \ ., N., ../ \ • ' N ...._ _'' ' , . • ...", I ! corta. i 1 , . \ • . , \ __.. .:- . • i. .. — 1 ..1............_.._,..._ 4 (.1 if il \ ••••• ••••■••=610. c I A STRGAR-ROSCOE-FAUSCH, INC SRF CONSULTING ENGINEMS CITY OF CHANHASSEN FIGURE Site Plan 1 SR NO. 0901391 Market Square Shopping Center F II TABLE 1 I TRIP DISTRIBUTION TABLE FOR THE MARKET SQUARE SHOPPING CENTER TRIPS GENERATED = 558 PM PEAK HOUR 1 APPROACH TRIPS BY DRIVEWAY TRIPS BY TRIPS DIRECTION DIRECTION ACCESS ACCESS NO. IN OUT II NO. % IN OUT % % 78TH ST. 117 21% MONTEREY DR. 3 3 5% 5% 1 WEST MID -BLOCK 78TH 41 0 70% 0% MID -BLOCK MARKET 15 56 25% 95% I 78TH ST. 123 22% MID -BLOCK MARKET MID -BLOCK 78TH 61 43 100% 70% EAST 0 18 0% 30% MARKET 6 1% MID -BLOCK MARKET 3 3 100% 100% II BLVD. NORTH U MARKET BLVD. 312 56% SOUTH MARKET 16 16 10% 10% MID -BLOCK MARKET 141 141 90% 90% NORTH II TOTAL 558 100% 279 279 II * ASSUMES 50% DISTRIBUTION IN /OUT 1 II 1 1 1 1 1 1 1 TABLE 2 TRIP DISTRIBUTION TABLE FOR THE MARKET SQUARE SHOPPING CENTER 1 TRIPS GENERATED = 6007 DAILY 1 APPROACH TRIPS BY DRIVEWAY TRIPS BY TRIPS DIRECTION DIRECTION ACCESS ACCESS NO. IN OUT NO. % IN OUT % % 78TH ST. 1261 21% MONTEREY DR. 32 32 5% 5% 1 WEST MID -BLOCK 78TH 442 0 70% 0% MID -BLOCK MARKET 158 599 25% 95% 78TH ST. 1322 22% MID -BLOCK MARKET 661 463 100% 70% 1 EAST MID -BLOCK 78TH 0 198 0% 30% MARKET 60 1% MID -BLOCK MARKET 30 30 100% 100% 1 BLVD. NORTH MARKET 3364 56% SOUTH MARKET 168 168 10% 10% 1 BLVD. MID -BLOCK MARKET 1514 1514 90% 90% NORTH TOTAL 6007 100% 3004 3004 * ASSUMES 50% DISTRIBUTION IN /OUT 1 1 1 1 1 . 1 1 1 !Y :1 6 z t% — , -,.__. ; , warp • •■■....■ 1 L 1 119 —_ N' E t i 7 E i MI S i R E E t • i i , — . • ___ . _ i 2.2. I - '' ' 1 L OT 2 I 1 . �. ' �� L� 3 ' i ' = .e T t . / 1 1 _ w. ▪ .��" 1 / .� w � I - otmoT i ` ` , - — -1.�' / Cr :--- ___.. / • e memo .. � , ' a Mara t_ t th I a LILL"' ,. ... t____ = J Y . i ~ ' > {, . 4 '� « _ ,TI_ __M• I ` Furs NIGHT a 1 _ j ' ` ....___ a l DoT i i ii =w o c o� 'k — 1 . 1 I ,t— — '''ai. 1 r" — -- . (-- 1 f) ....4.! - .. ii il 1 r_ro. „..\-- . _ / \ \ 16 1 �� 314 _ 7- • 111 9 • 1 I . STRGAR- ROSCOE- FAUSCH , S RF CONSU TIJCENG hJE S ' Trip Distribution 2 SRF NO. 0901391 Market Square Shopping Center I , • 1 1 G ' J m L!J Q 2 S } 22 (22) F- 680 (680) �-- 141 (84) ( (10) 25 . I r W. 78TH STREET T w • XXX = P.M. PEAK PROJECTED VOLUMES (ONLY MARKET SQUARE SHOPPING CENTER GENERATED TRIPS) (X(X) = 1990 ESTIMATED TURNING MOVEMENT VOLUMES • SRF E -FAU CONSULTING s GAR-ROSCOE FAUSC' LILAC CITY OF CHANHASSEN CO FIGURE PROJECTED TRAFFIC VOLUMES SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 1 1 I d • J m cc ti J 1 E--- 6310 (5650) (4760) 5120 —> 1 � W. 78TH STREET O ' XXX = DAILY PROJECTED VOLUMES - (ONLY MARKET SQUARE SHOPPING CENTER GENERATED TRIPS) (XXX) = 1990 TRAFFIC COUNTS 1 ' S R F STGAR-ROSCOE- FAUSCEi,INC FIGURE CONSULTING ENGINEERS CITY OF CHANHASSEN PROJECTED TRAFFIC VOLUMES 4 SRF NO. 0921634 W. 78TH STREET SIGNAL JUSTIFICATION REPORT 1 File - 2 - April 20, 1992 The turning movement volumes are not significantly different than the previous study. The effect of pass -by trips was assumed not to significantly affect the volumes at West 78th Street and Market Boulevard, most of the pass -by trips are assumed to come from T.H. 5 south of the site. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S TRGAR - RO CONSULTING ENGINEERS E- FAUSCH, INC. i TRANSPORTATION ■ CIVIL ■ STRUCTURAL ■ PARKING ■ LAND SURVEYORS SRF No. 0901391 '- MEMORANDUM TO: Paul Krauss, AICP Planning Director 1 FROM: Dennis R. Eyler, P.E. Principal DATE: November 13, 1990 SUBJECT: MARKET SQUARE SHOPPING CENTER AND ITS IMPACT ON THE INTERSECTION OF 78TH STREET AND MARKET BOULEVARD During our October 30, 1990 meeting, you requested an analysis of ' the impact of traffic generated by the proposed Market Square Shopping Center on the intersection of 78th Street and Market Boulevard (see Figure 1). The following is a summary of the procedures of our analysis: 1. Twenty -four hour traffic volumes were collected on each leg of the subject intersection. These volumes were then broken down ' into approach p.m. peak hour turning movements using the computer program CINCH. Figure 2 shows these p.m. peak hour volumes. 2. The total number of p.m. peak hour trips into and out ,of the shopping center were estimated using the trip generation rates from the 1987 Institute of Transportation Engineers "Trip Generation" report. A total of 648 trips were projected. Trips generated by the vet clinic, cleaners and supermarket expansion are included in this estimate. It should be noted ' that 43 percent of these trips are estimated to be pass -by trips. Pass -by trips are those trips generated from the traffic stream passing by the shopping center and are not ' diverted from other roadways. In other words, 57 percent of the trips are new trips to the adjacent roadways. 3. The trips were then distributed to the approach roadways and ' driveways based on existing traffic volumes and predicted driveway patterns. This distribution along with the driveway in -out proportions are summarized in Table 1 and shown on ' Figure 3. 4. Using the above trip distribution and the existing traffic volumes, future turning movements at the intersection of 78th Street and Market Boulevard were forecasted. These movements are shown in Figure 4. ' Suite 150, One Carlson Parkway North, Minneapolis, Minnesota 55447 612/475 -0010 FAX 612/475 -2429 • J ....... j I OW ••■■■••■■•■• ... I 1 / . . • .■ : V i • ! ............ .1: / I I LCIT 3 I T / ! ,----.., 1 1 I ...„......... I • _____ / L. ... '. 1 r . 1 v ,,,.....' / LOT 4 / "r" . • .\ I / OUTLOT A . :i / . . ( •4 ; / / -.4 / • • i .'" / ..... ... 1/" . • • I I I./ ■ .. . ..: • / Cr ..4" • • • • • i i • r .., , i ______ / a ...... .. 1 ........... I. ••••■•■•■ rem= mom • .-•-• 9 i i I •r" • ,..../ ' , , ", 4 ; .... :--1 ... ' t .--- ) - l 4, ,....ts ........... 4 (.. ,. - 7. — • ( -- - • 1 ... / : ( I L ° - * • I' ■■■■■•■••• ••■ - w ) . ' . '...- ..,....... .= r ir ........... • ..... --; i , a Furs MCKT OAS - ! a • •-...7----:- r-- - = J..-- 1--c..__: 3 ! LOT 1 I 1 . ----- 0 i I 1 I : -- ;:7. -- n . 1 • - I 1.. ,,,,, .- 'ZS' ° " - ...,••■ . a l \ .--- I . I , _ I.• _,•......, \ ----.7 T.: i'" :.;....:,.. *....:.: 1 ...... w -----.---- I . I I 1 ..., - ...-- • .... -"- 1 \ - • - r- % c T ARO ..,1 ft / , \••., • '. 0 : i • PROPOSED I . i D • A 1 1 A \ \ ,. ...=, ( "' - . ) ) -.. V V I .., ? ...) / . 'N . ey.f.....: : . . -- • _ • , r. ....?- , .... • — , - I it r j I 1 1 111 SRF STRGAR-ROSCOE-FAUSCH, INC. CONSULTING ENGINEERS CITY OF CHANHASSEN Site Plan HGURE 1 1 SRF NO. 0901391 Market Square Shopping Center I 1' , 1 - v� 1,195 1 1 t N • N O w- e * 4 1 ,' s 4 2 2 V 1 J .0___ 680 5,2 io 84 5 f 7 8 T1.+ S'. 1 4p 13 _. 3.88 _* r 4, 884 _ 1 6 01 . 6i: 111 1 ' : 1, 5S8 I T• 3 Is 1 TR IX) r 74 0 1 i ' F R °M M N /oar - rRZFFrc vac.uM c 5 44 5 I 1 1 SRF srRCAR- ROSCOE FAUSCx, INC CON5ULTtNC ENGINEERS CITY OF CHANHASSEN FIGURE Traffic Volumes 2 1 SRF NO.0901391 Existing 1 1 TABLE 1 TRIP DISTRIBUTION TABLE FOR THE MARKET SQUARE SHOPPING CENTER II 1 . Approach Trips By Driveway Trips By In /Out* Direction Direction Access Access Trips I No $ No % In (49 %) Out (51 %) 78th St. 136 21 Monterey Dr. 7 5 3 3 1 West Mid -Block 78th 95 70 47 48 Mid -Block Market 34 25 16 19 78th St. 143 22 Mid -Block Market 143 100 70 73 1 East Market 6 1 Mid -Block Market 6 100 3 3 Blvd. North Market 363 56 South Market 36 10 18 18 1 Blvd. Mid -Block Market 327 90 160 167 South 1 TOTAL 648 100 648 317 331 1 * In -Out % comes from the ITE "Trip Generation" Report. 1 1 1 1 1 1 II 1 . , 1 21% / 136 (----=------ ts, I s .. 7 STNi STREET IL ______ t 22% / 143 /„.—___ 1 . ' I i l ,: \ : 1 '' . LOT 2 I t I I : I - ..i ! T: =_........,...„.. 1 1 01 ii s )-- 1 101.3 j fl ,...=.....„=. :1 . 1 6 1 i --7.--- 1-,,,, / ,, -... • r =4 / 1 / :— • .=‘,.. A ••• 'o" :, 1 / • I OUTLOT A / . •Sc,l . — / P E •-,i 1 — • ii. / Ci:'_."_,.1 / ,. i a PROPOSED REM 1 / :'tv-s . ■ loP.. " ....- ,..I\ 4 1.. .." 1 t 1 --I... .M.T.4./...."... • _ w 01■■•• •••••• •••••■••• i I , ir: I . / 1 .. ••• ONININ . % ........ .:: 1.— - • 72 , - I I ti 4 1 ' ...,::_, . \ a r —, ,...--.H • . m ,..* mamma. O i t ..l ... 1 ..,• A ................ .T.....• ) DI - ( WI 0 • !' 0. . 1; . 1 ■.••••.'. ' X 7:..L:... ....2:::: g l ' ■•■.J " 0 TRIPS: . - - • I: ;:... -----• 1 1 IN 317 OUT 331 -.1 e --m:._: I ' - ..,. i i I 648 • i 1 I 1 -4! J . - - . ° l• - = = cm) '-= = , A.., ,.. ,..„.•- _ ..._ . 1 . (- ____ - „---77---- 1 ,,. , 1 • ‘..... .... .. _ *--. -- ----"' Z • {,:, , . : .4 ".... 7T 7...... 1' ...■.. i 1 .. . ., ; ; . - 7 -- \--,.. • : - #. E go , \ \ 1 ', -,-; . I = i/. P . V '. `.... ....... !- \ \ 5 _,-). • 1 „ • 111 \ .=_L , I 1 __ i ......—. ._ 56% / 363 ...„ \ • 0,.....; 549 1 \ _ • i r I J 1 1 INC. CONSULTING ENGINEERS CITY OF CHANHASSEN FIGURE Trip Distribution 3 1 SRF NO.0901391 1 N. • .o 2I . 0 _ - - - ___ __. - -_ _ 1 j 5 I - -- . _ v - _7g TN ST 5 -- �-- 4 - . - - - - - - - 26_ a, o - 70 SR STRGAR- ROSCOE- FAUSCH, We CITY OF CHANHASSEN Traffic Volumes 4 SRF NO. 0901391 Future 1 II II Mr. Paul Krauss, AICP -7- November 13, 1990 11 The projected traffic volumes of the intersection fall short of meeting the Peak Hour Volumes warrant of the MNMUTCD by about 30 vehicles on the minor street approach. 1 However, to say that a signal at this intersection is not justified based on the projected volumes alone may be premature. In preparing our projection, we were conservative with the number of II vehicles assigned at the intersection. Another factor that should be considered is the time frame for the opening of the shopping center. If the opening is a year or more in the future, the I traffic generated by the shopping center along with the background growth of the traffic could easily meet the Peak Hour Warrant. Therefore, we recommend that the City begin the necessary steps for 1 the installation of a traffic signal. To accommodate the proposed traffic, regardless of whether or not a II traffic signal is installed, we recommend the intersection improvement shown in Figure 5. Left turn lanes should be installed on each approach to reduce the delay to through moving traffic. Corner turning radius should be increased to at least 35 feet. I This would allow right turns to be made without encroaching into oncoming traffic lanes. The center median should be cut back as shown to open up the intersection and facilitate left turning II traffic. Right turn lanes are also added to the east and south approaches. A suggested phasing diagram is also included in Figure 5 in the II event that the intersection is signalized. With this phasing sequence, the intersection should function at a Level of Service C or better. I We also recommend the striping of 100 foot left turning lanes on Market Boulevard at its intersection with the mid -block driveway. These lanes would remove left turn from through traffic, thereby II reducing delay. In addition to the analysis of the intersection, we have looked at 1 the site plan of the shopping center and have some comments regarding traffic circulation. 1. Traffic circulating the main parking lot must enter the main I entrance roadway (from mid -block Market Boulevard driveway) to circulate around the north end of the lot. We recommend that a boulevard island be built and the parking aisle end islands be I moved to the south. The interior islands could be removed to regain lost parking spaces. This will allow circulation without interfering with roadway traffic. 1 1 1 I I. . i r • • • P 5 G , • • • 4 ' 2- 1 0 • i a i -• r t b IIIIP 4 / 1. +t -e 11 l ... te *or; r \ .__ '� 7sTi� tT�tEE • P4 p• l) it 11 •sniff - . • 1 iI • . ' 0 • ' . / / ' • • SRFCI STRGAR- ROSCOE- FAUSCH, INC TY OF CHANHASSEN FIGURE CONSULTING ENGINEERS Intersection Improvements 5 SRF NO. 0901391 78th St & Market Boulevard 1 ` Mr. Paul Krauss, AICP -8- November 13, 1990 2. Parking adjacent to the building fronts is not recommended. Parking in this location distracts from the appearance of the buildings and interferes with traffic traveling on the roadway. ' If parking must remain along the building front, it should be diagonal parking to increase the ease of parking maneuvers. 3. All corner radii are shown as 20 feet. A corner radius of 20 feet will force a passenger car to encroach into the lane of oncoming traffic while making a right turn. At a minimum, 35 feet should be provided for a turning radius. 4. The right turn only island located at the 78th Street mid -block driveway is not needed. A one -way sign mounted in the median will do the same job at a fraction of the cost. ' If you have any questions regarding our findings or recommendations, please feel free to contact us. 1 DRE/ l j c 1 1 1 1 1 1 1 1 1 , 1