TO: Don Ashworth, City Manager De . 1-
1 Date Submitted to CommissIory
FROM: Charles Folch, City Engineer Olk
Date Submitted to Caatr$
1 DATE: April 22, 1992 L - L 7 - 3 Z-
SUBJ: Award of Bids for Market Square Storm Sewer and Roadway Improvements
1 Project No. 90 -13
1 On Thursday, April 16, 1992, bids were received and opened for the Market Square Storm
Sewer Extension Project. The right turn lanes on Market Boulevard into the Market Square
project and the bus shelter relocation have been added to the scope of this project by
1 addendum. The reason for adding these work items to the original project resulted from
the necessity to meet critical time schedule deadlines with the Market Square development
project. The low bidder for the project was Ryan Contracting Company, Inc. at $149,759.70.
I This is approximately $50,000 less than the engineer's estimate of $200,000. It is apparent
that the bidding climate is very favorable for project owners right now. The low bid is
I significantly less than the comparable bids received for the project last year.
References for Ryan Contracting have been checked and favorable responses on other
I municipal contracts were received. It appears that Ryan Contracting is capable of
performing the required work of this project.
I I would therefore recommend that the City Council award the Market Square Storm Sewer
and Road Improvement Project No. 90-13 contract to Ryan Contracting Company, Inc. in
the amount of $149,759.70.
1 ktm
1 Attachment: Letter from Jon Horn of BRW dated April 21, 1992
c: Dave Hempel, Sr. Engineering Technician
I Gary Ehret, BRW
Jon Horn, BRW
Tom Ryan, Ryan Contracting
I
Is
1 t4, PRINTED ON RECYCLED PAPER
APR 22 '92 09 :43 BRW INC. P.2
1
I
1
IL. h W
Imo
II April 21, 1992
II Mr. Charles Folch, PE
B A W IIve. City Engineer
II City of Chanhassen
690 Coulter Drive
Chanhassen, MN 55317
II RE: Market Square Storm Sewer Extension Project
CP 90 -13
Contract Award
I Dear Mr. Folch:
1 Planning On Thursday, April 16, 1992, bids were received and opened for the
Transportatcon above — referenced project. The bids which were received are as
Engineering follows:
I Urban Design
Bidder Amount
Thresher Square
I 700 Third Street 5o. 1. Ryan Contracting, Inc. $149,759.70
Minneapolis, 2. Northdale Construction Company, $ 184,187.50
MN 55415 Inc.
612/370-0700 '3. Rickert Excavating, Inc. $214,829.75
III Fax 612/370 -1378
Engineer's Estimate $200,000.00
I Minneapolis
Phoenix All bids were submitted with proper bid guarantees in the amount of
Denver ten percent (10%) of the total bid price, with the exception of the
I Orlando Northdale Construction bid which was submitted with a five percent
San Diego (5%) bid bond. The bids of Ryan Contracting and Northdale
Seattle Construction were found to be correct, but a small error was found
in the Rickert Excavating bid. The error did not, however, change
I Donald W. Rirgrose the bid order. A bid tab summary sheet is attached for your
Richard P Wolsfeld information.
Peter E. Jarvis
1 Thomas F. Carroll A majority of the work included as a part of this project was
CraigA Amundsen previously advertised and bid for construction in 1990 and 1991.
Donald E. Hunt All previous bids were rejected due to the inability of the Market
I John B, McNamara Square developer -to consummate their financing and provide the City
Richard la Pilgrim with the required security. Bids received for construction in 1992
Dale N. Beckmann are comparable with bid prices previously received for 1990 and 1991
1 Jeffrey L. Benson construction.
Ralph C. Blum
Cary J. Erickson
John C. Lynch
I
Paul N. Bay
APR 22 '92 Q8 :43 BRN INC0 P.
Mr. Charles Folch
April 21, 1992 II
Page 2
. 1
This year's project scope includes storm sewer and turn lane
construction consistent with the 1991 project scope with a few
exceptions. Turn lane construction on West 78th Street west of
Market Boulevard has been deleted from the project scope as
requested by City staff. The scope of the lighting relocation work
included as a part of the project has also been modified as a result
of the elimination of the work on West 78th Street. The work on
Bowling Alley Road has been modified to include the construction of
the entire bus turnaround. The 1991 project included only the
driveway aprons for the turnaround. ,
The low bidder is Ryan Contracting, Inc., with a total bid price of
$149,759.70. The Ryan Contracting bid is approximately $50,000.00
• less than the Engineer's Estimate, a difference of approximately
twenty -five percent (25 %). Based on bid prices received from
previous years for this project and the Engineer's Estimate, it
appears that the bids were reflective of a competitive bid
environment. We, therefore, recommend award of the Market Square
Storm Sewer Extension Project, CP 90 -13, to Ryan Contracting, Inc.,
for the low bid price of $149,759.70. '
Subject to City Council approval, we anticipate commencing
construction by May 11, 1992. All work required by the project will '
be completed by June 19, 1992.
Please call if you have any questions or we can provide any
additional information.
Sincerely, ,
BRW, INC.
.n B Horn, PE
Project Engineer