Loading...
1c. Utility improvements in Minnewashta Highlands is, , /E r 4 C ITYOF ............ , i 1 \ Y CHANHASSEN - 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 � ` (612) 937 -1900 • FAX (612) 937 -5739 OFFICIAL ENGINEERING COPY Received MEMORANDUM Revision No. 1 Approved y ity Engineer TO: Charles Folch, City Engineer Date -/7- 1 FROM:: Dave Hempel, Sr. Engineering Technician � .ti Approv by City Council Date DATE: June 17, 1992 1 SUBJ: Accept Utility Improvements in Minnewashta Highlands Project No. 88 -6 1 Attached is a letter from the developer's engineer, Mr. William Engelhardt of Engelhardt 1 & Associates requesting the City of Chanhassen consider acceptance of the public utility improvements in the above - reference project. This particular project was granted a six- , month extension for installation of the public improvements; however, apparently due to financial troubles the project still is not complete. Staff has placed this item on the City Council agenda to help expedite closing of a house that was granted a building permit I previously which is adjacent to Minnewashta Parkway. The new house is unable to hook up to City utilities prior to the City formally accepting the utility improvements for ownership and maintenance. City staff has acknowledged completion and approval of the I necessary tests for acceptance; however, as of today staff still has not prepared a walk - through punch list of any necessary minor adjustments. I The letter of credit for this project is scheduled to expire on June 30, 1992. Staff has sent a certified letter to the developer, Ms. Ellie Schwaba, requesting a 60 -day extension on the letter of credit in order to complete the remaining public improvements with a deadline of June 23, 1992 to respond with an amended letter of credit. Should staff not receive the amended letter of credit, staff is prepared to draw on the existing letter of credit in order to complete the outstanding public improvements. The outstanding public improvements I consist of final wear course, minor landscaping and 21 Australian Pines. The grand total of the draw request would be $9,500. The existing letter of credit currently on file is listed in the amount of $16,360. 1 1 elfr 1 t4, PRINTED ON RECYCLED PAPER Mr. Charles Folch June 17, 1992 Page 2 Therefore, it is recommended that the City Council accept the utility improvements conditioned upon completion of the following items: 1. The developer supply a renewed letter of credit in the amount of $9,500 scheduled to expire August 31, 1992. ' 2. The developer and /or contractor supply the City with a maintenance bond to guarantee workmanship and materials for a two -year period from the date of acceptance (June 22, 1992). 3. The developer's engineer shall supply the City with a mylar as -built set of plans along with two blueline copies. 1 ktm Attachment: 1. Letter from Bill Engelhardt dated June 16, 1992. 2. Location Map. 3. Letter from Dave Hempel dated June 16, 1992. c: Ms. Ellie Schwaba Bill Engelhardt, Engelhardt & Associates Ron Olson, Olson Construction Mr. Doug Malam, Remax Realty 1 1 1 1 1 1 1 1 W.R. ENGELHARDT ASSOC. TEL No.612 -448 -8805 Jun 17,92 9:53 No.001. WILLIAM R. ENGELHARDT ASSOCIATES, INC. (r. I/Jai / /l.. y u0 i hA ?EL.1 ENE BOULEVARD CHASKA, MINNESOTA 55318 (6121 448 883)3 June 18, 1992 1 City of Chanhassen c/o Mr. David Hempel 690 Coulter Drive Chanhassen, MN. 55317 RE: Minnewashta Highlands Dear Mr. Hempel: ' This letter is to inform you that the utilities for the above project have been constructed in general conformance with the plans and specifications. Therefore, I hereby certify that the utilities are in general conformance with the plans and specifications. Very truly Y ours, WILLIAM R. ENGELHARDT ASSOCIATES, INC. ;4' William R. Engelhardt ' WEE/ las • ATTACHMENT 1 i :,bo pm _ . pillMsa ' v� --.: - - An r wail sk r Ab et; eiptia) ) 6700 " lir �� ' laEr MA, /11/ t p - a ;� R�rc� ',' LAKE 6800 1 i 11tOiglgili / f A OAKS RY ST- • i j �.�Q * r.�, ,, ROAD STRATFORD W a�� �� M / N N E W A S H T A_ 6900 BOULE •'� / STRATFO - d i 11 . 70 00 KINGS ROAD (( c g J �Nll l l� 7100 —� Q , CAKE - 4- „.' 41i ; Igi,, . Allpar :R 18 7200 — 1 Era ik = - :_ / , pis ,_ ),_ Cup. i( 1 7300 ` 0 MINNEWASHTA •1• PROJECT LOCATION I Cr COURT / + 1 [ / 7400 / liiil`■ \, • C o IOW TMS A NM 7500 • eVliah \ 7600— — ■ j , 7 1 i 7 700 � I c7 U ' 1800 - - _ .-___, ST PO O QReoR TuM 7900 1 1 1 I 8000 LOCATION MAP I 810'0 1 200 ATTACHMENT2 - 8 1 CITYOF CHANIIASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 June 16, 1' CERTIFIED MAIL Ms. Ellie Schwaba 1 3603 Red Cedar Point Excelsior, MN 55331 Re: Default of Development Contract - Minnewashta Highlands, Project No. 88-6 Dear Ms. Schwaba: On December 9, 1991, the Chanhassen City Council approved your request to extend the completion date for installation of the public improvements until May 31, 1992 for the above - referenced project. As of today, the remaining public improvements consist of final wear course and some landscaping items. On May 6, 1992 I sent you a letter regarding the status of the public improvements in Minnewashta Highlands. In that letter I indicated that the public improvements needed to be completed by May 31, 1992 and requested that you contact me no later than May 15, 1992 with a schedule for completion of the remaining improvements. As of today, I have had no communications with you and there are still remaining site improvements that are required to be completed prior to expiration of the letter of credit. The letter of credit is scheduled to expire on June 30, 1992. Please be aware that the City is prepared to draw on the letter of credit unless an extension to the letter of credit is received in my office by June 23, 1992. If the City does not receive the amended letter of credit extending the expiration date of the letter of credit a minimum of 60 days, the City will proceed on drawing on the letter of credit in the amount of 89,500 and proceed to have the remaining site improvements completed and paid for out of the funds drawn on the letter of credit. Please contact me as soon as possible regarding this project and no later than June 23, 1992. On another note, the City is considering accepting utility improvements at the June 22, 1992 City Council meeting contingent upon punch list items being completed and receipt of a two-year warranty bond and mylar as -built plans. I will be sending you a copy of the staff report when it is completed within the next few days. Sincerely, CITY OF CHANHASSEN 1 David C. Hempel Sr. Engineering Technician DCH:ktm c: Charles Folch, City Engineer Bill Engelhardt, Engelhardt & Associates Ron Olson, Olson Construction Bud Chambers, CMIC Mike Broback, Campbell, Knutson, Scott & Fuchs 1 t 4, PRINTED ON RECYCLED PAPE A TTACHMENT 31 F