Loading...
2e. Approve contract amendment No 3 for Country Suites CITYOF -- • 1 6 90 COULTER DRIVE • BOX 147 • CHANH (612) 937 -1900 P.O. • FAX (612) 9ASSEN37 -5739 , MINNESOTA 55317 I ti . . MEMORANDUM • II TO: Don Ashworth, City Manager / fL c^ i FROM: Gary Warren, City Engineer ("D`'J\ ,.. II DATE: January 8, 1991 - _ I- ! _q / SUBJ: Approve Contract Amendment No. 3 for Country Hospitality II Suites Hotel Improvement Project No. 89 -25 1 Attached for approval is Contract Amendment No. 3 for the Country Hospitality Suites project. The scope of the contract amendment is summarized in the attached letter dated January 7, 1991 from BRW. As noted therein, the majority of the changes were at the 1 request of the owners and the City has on file letters of authorization and acknowledgement of assessments for the change order amounts as noted. 1 The City Council on October 22, 1990 approved $9,355 of this contract amendment for the landscaping improvements. Therefore, the net authorization at this time is an additional $30,186.67. II I recommend approval of this item in the amount of $39,541.67. I find the attached Contract Amendment No. 3 is in accordance 1 with the work as authorized and recommend the City Council's approval of this item as submitted. 1 ktm Attachments: 1. January 7, 1991 letter from BRW. 2. Contract Amendment No. 3. 1 c: Gary Ehret, BRW 1 1 1 1 II I r -7 1' Th' PLANNING ' t. TRANSPORTATION ENGINEERING �� r` �° URBAN DESIGN I BRW. INC. • THRESHER SQUARE • 700 THIRD STREET SOUTH • MINNEAPOLIS, MINNESOTA 55415 • PHONE: 612/370.0700 fAX. 612/370.1378 January 7, 1991 • II Mr. Gary Warren, PE City Engineer II City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 I RE: Contract Amendment No. 3 Country Hospitality Suites C.P. 89 -25 II Dear Mr. Warren: Attached for your review and approval are six copies of Contract Amendment I No. 3 for the above - referenced project. This amendment addresses work completed at the request of the property owner or as directed by City._staff 1 Specifically: Items A and B represent work related to the Animal Fair site which was requested by the Bloomberg Companies and was outside the original scope of the project. Item C is the additional landscaping previously approved I by the City Council; however, minor additional items of work (irrigation) were requested and provided at the direction of the Developer, thus modifying the previously- approved amount. I Item D: Electrical lighting includes the installation of two additional parking lot lights in front of the Animial Fair building as requested by Bloomberg Companies. Item E is the final completion of the lighting system by a union I contractor (Killmer Electric) as requested by the Developer. To our knowledge, this amendment represents all final modifications to the contract. These costs are assessable through previous agreements between the II City and Hotel site developer /property owner and will be a part of the final assessment roll. II Please process the Contract Amendment as soon as your schedule allows. Sincerely, II WtNC. - ,1‘, 1 . j I. Project Manager �I , - ; :qr :1 I II GE/sb Attachments .IAN 10 is :E i cc: File 79007 #6735 FRPIRE ' ;EE (.s DEPT. I AN AFFILIATE OF THE BENNETT, RINGROSE. WOLSFELD. JARVIS, INC GROUP DAVID J BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E. JARVIS THOMAS F CARROLL CRAIG A AMUNDSEN DONALD E HUNT MARK G SWENSON I JOHN 5 McNAMARA RICHARD C PILGRIM DALE N BECKMANN DENNIS J. SUTLIFF JEFFREY L BENSON RALPH C. BLUM DAVID L. GRAHAM GARY J. ERICKSON MINNEAPOLIS DENVER PHOENIX TUCSON + ST. PETERSBURG SAN DIEGO II NAV COPY. CITY COPY. C/ CITY OF CHANHASSEN CONTRACTOR COPY CONTRACT AMENDMENT INSPECTOR COPY II Project: - Country Hospitality Suites Site Improvements -. II City Project Number: 89 -25 Amendment Number: (3) Three Date: January 7, 1991 11 Contractor: Alber Construction, Inc. The additions, revisions and corrections contained herein shall be made to the II contract documents for the project and shall become a part of the Scope of Work. Description of Changes: II A. The Contractor has installed a 6 -inch PVC roof drain pipe to provide 11 drainage for a building to be constructed east of and adjacent to the Hotel Property. The 6 -inch roof drain pipe was installed at the request of Bloomberg Companies, Inc. Hourly rates for equipment and personnel were obtained from the Contractor II and approved by the Engineer prior to the performance of the work. The hourly rates and respective times required for each item are summarized below. Equipment costs do not include the operator unless otherwise noted. II The hourly rates include all Contractor overhead and profit. Item Unit Quantity Unit Price Amount II John Deere Backhoe HR 4.0 $ 27.25 $ 109.00 Air Compressor HR 4.0 11.67 46.68 II Foreman with Pickup HR 4.0 57.70 230.80 Pipelayer HR 4.0 37.21 148.84 Labor and Equipment Cost $ 535.32 II The additional material required for the completion of the work is as described below: 1 Item Unit Quantity Unit Price Amount 6 -inch PVC LF 23.0 $ 1.84 $ 42.32 II 6 -inch Plug EA 1.0 2.50 2.50 Material Cost $ 44.82 II r .� Subtotal $ 580.14 :, Alber 15% Markup 87.02 Total $ 667.16 II JAN 10 1931 i CA3 -1 II . 1/ ' , A new lump sum pay item has been added to the contract documents for the 1 installation of the 6 -inch roof drain. The lump sum unit price includes all equipment, labor and material costs required for the completion of the work. 1 BID SCHEDULE B - STORM SEWER ADD • 1 Original Quantity Amount . Seq. No./ Unit Contract Increase/ Add/ 1 Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 13/ 6 -inch Roof LS $ 667.16 0.00 1.00 $ 667.16 Drain 1 Net Contract Change Add $ 667.16 I B. The Contractor has made repairs to a 6 -inch sanitary sewer line serving the Animal Fair Building. The repairs were performed at the request of Bloomberg Companies, Inc. -- II Hourly rates for equipment and personnel were obtained from the Contractor and approved by the Engineer prior to the performance of the work. The hourly rates and respective times required for each item are summarized II below. Equipment costs do not include the operator unless otherwise noted. The hourly rates include all Contractor overhead and profit. 1 Item Unit Quantity Unit Price Amount 235 Backhoe HR 5.0 $ 82.87 $ 414.35 966 Loader HR 5.0 69.55 347.75 II CA 15 Dynapac Compactor HR 1.0 32.46 32.46 Pickup HR 4.5 6.96 31.32 Foreman with Pickup HR 4.5 57.70 259.65 1 Backhoe Operator HR 5.0 43.93 219.65 Loader Operator HR 5.0 43.24 216.20 Pipelayer HR 4.0 37.21 148.84 1 Bottom Man HR 4.0 36.98 147.92 Oiler HR 5.0 33.76 168.80 Labor and Equipment Cost $ 1,986.94 II 1 1. 1 1 CA3 -2 1 e 11 The additional material required for the completion of the work is as described below: II Item Unit Quantity Unit Price Amount 6 -inch PVC LF 31.0 $ 1.52 $ 47.12 II Fernco Adapters EA 2.0 8.70 17.40 1 1/2 -inch Rock CY 4.0 10.95 43.80 Pit Run (Sand) CY 4.0 -7.42 29.68 .' Material Cost $ 138.00 Subtotal $ 2,124.94 II Alber 15% Markup 318.74 Total $ 2,443.68 A new lump sum pay item has been added to the contract documents for the II repair of the 6 -inch sewer line. The lump sum unit price includes all equipment, labor and material costs required for the completion of the work. II BID SCHEDULE D - SANITARY SEWER ADD II Original Quantity Amount II Seq. No./ Unit Contract Increase/ Add/ Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 9/ Repair LS $ 2,443.68 0.00 1.00 $ 2,443.68 II 6 -inch Sewer Net Contract Change Add $ 2 443.68 II C. The Contractor has installed landscape materials and irrigation system on property surrounding the Hotel. This work was performed at the request of the Country Hospitality Suites Hotel Partnership. II The items required to perform this work are described below: II BID SCHEDULE H - LANDSCAPING . ADD Original Quantity Amount II Seq. No./ Unit Contract. Increase/ Add/ Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 1/ Greenspire EA $ 350.00 0.00 9.00 $ 3,150.00 II Linden (3 1/2 ") II 2/ Marshalls ASN EA $ 300.00 0.00 1.00 $ 300.00 (3 1/2 ") II CA3 -3 II Original Quantity Amount II Seq. No./ Unit Contract Increase/ Add/ Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 3/ Royality Crab EA $ 200.00 0.00 2.00 $ 400.00 II (2") 4/ Colorado Spruce EA $ 240.00 0.00 6.00 $ 1,440.00 II (8') . 5/ Dwarf Korean EA $ 25.00 0.00 95.00 $ 2,375.00 I Lllac Sod SY $ 1.50 0.00 775.00 $ 1,162.50 II 7/ Rock Mulch SY $ 4.00 0.00 160.00 $ 640.00 8/ Irrigation LS $ 525.00 0.00 1.00 $ 525.00 II and Sod (east side main entrance) I 9/ Irrigation LS $ 438.00 0.00 1.00 $ 438.00 (west side main entrance) ' 10/ Plastic Edger LF $ 1.50 0.00 300.00 $ 450.00 11 Subtotal $10,880.50 Alber 7% Markup 761.64 Total $11,642.14 II Net Contract Change Add $11,642_ D. The Contractor has furnished and installed 2 (two) parking lot lighting I assemblies in the parking lot directly north of Animal Fair. The lighting assemblies were installed at the request of Bloomberg Companies, Inc. The items required to perform this work are described below: BID SCHEDULE E LIGHTING II ADD Original Quantity Amount II Seq. No./ Unit Contract Increase/ Add/ Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 5/ 5'x24° Form EA $ 28.31 0.00 2.00 $ 56.62 II Tube 6/ 1 "x36" Anchor EA $ 13.31 0.00 8.00 $ 106.48 II Bolt II CA3 -4 II II Original Quantity Amount Seq. No./ Unit Contract Increase/ Add/ II Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 7/ Rebar Cage EA $ 19.06 0.00 2.00 $ 38.12 8/ 10' Ground Rod EA $ 12.62 0.00 2.00 $ 25.24 II 9/ 1" PVC LF $ .27 0.00 240.00 $ 64.80 I 10/ 1" PVC Coupling EA $ .53 0.00 7.00 $ 3.71 11/ #10 Thin Wire LF $ .11 0.00 1500.00 $ 165.00. II 12/ #8 Thin Wire LF $ .17 0.00 640.00 $ 108.80 13/ Black Tape EA $ ` 2.18 0.00 2.00 $ 4.36 II 14/, Ground Rod EA $ 2.52 0.00 2.00 $ 5.04 II Clamp 15/ Concrete CY $ 105.42 0.00 2.00 $ 210.84 16/ Twin Head EA $ 1,573.00 0.00 2.00 $ 3,146.00 II Lighting Assembly - II Complete 17/ Fuse Holder EA $ 8.47 0.00 4.00 $ 33.88 18/ 5A Fuse EA $ 2.36 0.00 4.00 $ 9.44 II • 19/ #12 Thin Wire LF $ .07 0.00 160.00 $ 11.20 II 20/ Underground LS $ 1,000.00 0.00 1.00 $ 1,000.00 Piercing II 21/ Electrician HR $ 40.00 0.00 62.00 $ 2,480.00 Subtotal $ 7,469.53 II Alber 7% Markup $ 522.87 Total $ 7,992.40 Net Contract Change Add $ 7 99_ II II II II CA3 -5 II II i E. The Contractor installed parking lot and walkway lighting assemblies on the I Country Hospitality Suites Hotel Site. This work was performed by union electricians at the request of D.W. Hutt Construction representing Country Hospitality Suites Hotel Partnership. II The items required to perform this work are described below: BID SCHEDULE E - LIGHTING II ADD Original Quantity Amount I Seq. No./ Unit Contract Increase/ Add/ Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 22/ 250V Fuse EA $ 9.22 0.00 34.00 $ 313.48 II Holder 23/ 5A Fuse EA $ 2.36 0.00 34.00 $ 80.24 II 24/ 1 1/4" PVC LF $ .37 0.00 70.00 $ 25.90 25/ Splice Kit EA $ 13.27 0.00 1.00 $ 13.27 II 26/ 1 1/4" Chase EA $ 1.83 0.00 1.00 $ 1.83 Nipple II 27/ 1 1/4" PVC EA $ .31 0.00 3.00 $ .93 I 28/ 1 1/4" Lock EA $ .33 0.00 3.00 $ ' .99 Nuts 29/ Grey Wire Nuts EA $ .18 0.00 85.00 $ 15.30 II 30/ Red Wire Nuts EA $ .09 0.00 60.00 $ 5.40 II 31/ 1" PVC LF $ .27 0.00 60.00 $ 16.20 32/ 2 Carnies EA $ 4.10 0.00 4.00 $ 16.40 • II 33/ Rubber Tape - EA $ 1.45 0.00 1.00 $ 1.45 Roll II 34/ Black Tape - EA $ 2.18 0.00 5.00 $ 10.90 Roll I 35/ PVC Glue - Can EA $ 6.66 0.00 1.00 $ 6.66 36/ Pole Outlet EA $ 5.63 0.00 2.00 $ 11.26 II 37/ Duplex Recept EA $ .94 0.00 2.00 $ 1.88 38/ Metal Recept EA $ 1.22 0.00 1.00 $ 1.22 II Cover 1 CA3 -6 ,. i • Original Quantity Amount Seq. No./ Unit Contract Increase/ Add/ ' Mn /DOT No. Item Unit Price Quantity (Decrease) (Deduct) 39/ #12 Thin Wire LF $ .06 0.00 40.00 ..$ 2.40 II 40/ Red Wire Nuts EA $ .09 0.00 6.00 $ .54 41/ Concrete CY $ 105.42 0.00 4.80 $ 506.02 42/ Underground LS $ 280.00 0.00 1.00 $ 280.00 Piercing 1 43/ Electrician HR $ 40.00 0.00 352.00 $14,100.00 44/ Lot Sweeping LS $ 285.00 0.00 1.00 $ 285.20 II Subtotal $15,697.47 • Alber 7% Markup 1,098.82 II Total $16,796.29 Net Contract Change Add $16 796_29 ' 1 SUMMARY 1 • Item A Net Add $ 667.16 Item B Net Add $ 2,443.68 Item C Net Add $11,642.18 Item D Net Add $ 7,992.40 Item E Net Add $16,796.29 Contract Amendment No. 3 Total $39,541.67 1 CA3 -7 1 ,_ I [ 1 APPROVALS 1 R ECOMME�iDE B : B , By: � _. Ti t1 a /! * - 1 4P' Date / • 1 ACCEPTED Al e Construction, Inc. By: Title ���w —• Date / - yo G/ 1 1 APPROVED BY: City of Chanhassen By: Title Date 1 1 =1 1 1 1 1 1 1 1 1 CA3 -8