Loading...
2h. Accept storm sewer improvement for PMT addition 0 . CITYOF = „A., 1 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM ,7 I TO: Charles Folch, Assistant City Engineer 1- /0w1 FROM: Dave Hempel, Sr. Engineering Technician f ' -- - - .0' _ �., DATE: January 9, 1991 / y � ���- I SUBJ: Acceptance of Storm Sewer Improvements for PMT Addition File No. 90 -13 LUR I As a part of the site plan and final plat approval for Lot 1, Block 1 of PMT Addition, it was necessary for the developer to extend the City's storm sewer system through the parcel. Staff has inspected this project and found it to be ready for the 1 City's acceptance. It is therefore recommended that the storm sewer improvements I lying within the public drainage and utility easement for Lot 1, Block 1, PMT Addition be accepted for public ownership contingent upon receipt of an acceptable maintenance bond from the contractor guaranteeing the storm sewer improvements for a I two -year period commencing on the date of this acceptance. In addition, the developer shall reimburse the City in the amount of $495.06 for development inspection fees. 1 lap Attachment: 1. Location map c: Al Iversen, PMT Corporation 1 1 1 II 1 1 \ -----.L--/--,__f,..__ - .____-- . _____::_-._ : ._.."- LAKE 1 ANN ' i PARK / . . f� 1 i 1 1 i . 1 OB REfUM Flit U \I\ LEVARD --4-----a--- P4f EMI bM' I � / / CO fli o ct at 1 1 1 liko 6 D 1 cGLYNN RO k illi. \ tra ___ PROJECT 111b Ifr illil 9111C LOCATION 1 s. /-; , t: - ..-1 �P CHMENT LI • ... .-•_ A *--d, oto •-- AN 4