Loading...
2k. Contract time exteions, Chan SCADA project { C ITYOF -- CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashwofth, City Manager FROM: Charles Folch, Asst. City Engineer DATE: March 5, 1991 SUBJ: Approve Contract Time Extension, Chanhassen SCADA Project Project No. 90 -3 I have recently been notified by the project consultant, Dean Sharpe of Orr - Schelen - Mayeron & Associates, that the general contractor for the project, Bentec Engineering, has recently requested a time extension to the contract substantial completion date. This extension request has resulted primarily from the delay in receivng the FCC license which inturn delayed the ordering of the Microwave Data Systems radios. It was initially anticipated that the FCC license would be received on /or around November 9, 1990. However, the license was not - actually received until December 17, 1990. Since that time there has been further delays in acquiring the radios from the manufacturer. A March 22, 1991 delivery date is currently anticipated. The system cannot be completed nor tested without these radios. The original contract substantial completion date was February 28, 1991. Bentec Engineering Corporation is requesting a 1 substantial completion date extension to May 3, 1991 based on the March 22 delivery of the radios. Bentec Engineering Corporation has been steadily proceeding with the completion of this system and has re- emphasized that their first priority of the project is to have the lift station monitoring system operational. Given the aforementioned circumstances that have occurred it is my recommendation that the substantial completion date for the SCADA System Project No. 90 -3 be extended from February 28, 1991 to May 3, 1991. Attachments: 1. Letter from Dean Sharpe of OSM. 2. Letter form Bentec Engineering Corporation. c: Dave Hempel, Sr. Engineering Technician Jerry Boucher, Utility Superintendent Dean Sharpe, OSM Randy Redetzke, Bentec Engineering Corporation 1 Orr _ Schelen Ma yeron & Associates,.Inc. I 2021 East Hennepin Avenue Minneapolis, MN 55413 February 21, 1991 612 - 331 -8660 FAX 331 -3806 Engineers ' Surveyors Planners Mr. Charles Folch ' Assistant City Engineer City of Chanhassen 690 Coulter Drive P.O. Box 147 ; : ,,- Chanhassen, MN 55317 Re: Chanhassen SCADA Project - City Project #90-3 F F L ;' • , OSM Commission No. 4630.00 Dear Mr. Folch: Bentec Engineering Corporation has requested a time extension to their contract. This ' extension request is mainly due to delay in receipt of the FCC license for the radios. A copy of Bentec's letter is attached for your review. We concur that this request is justified and the proposed phased start-up of the system is in the City's best interest. We recommend that the requested time extension be granted. If you have any questions on this matter, please contact us. Sincerely, ' ORR- SCHELEN- MAYERON & ASSOCIATES, INC. 46(4 Dean R. Sharpe jah Enclosure c: PVS HCO File BENTEC ENGINEERING CORP. 13050 PIONEER TRAIL EDEN PRAIRIE, MN 55347-4113 TELEPHONE 612 - 944 -7000 AECE1VE11 FAX 612 -944 -9514 Orr- Schelen- Mayeron & Assoc. COMM. # �30•G2� February 5, 1991 FEB 03 1991 i1 v d p1 Na ina fir; G 01;,1 � OSM �ttilr 2021 East Hennipen Avenue ��-� ' Suite 238 IN Minneapolis, MN 55413 Attn: Dean Sharpe Ref: Supervisory Control and Data Acquisition System ' City Project # 90 -3, City of Chanhassen Dear Mr. Sharpe: This letter is intended to request a formal extension in the completion date ' of the above referenced project. The current substantial completion date is February 28, 1991. Our magor difficulty in meeting this date at this time is the inability to acquire the Microwave Data Systems radios. As you are aware these are a critical part of the complete system. Failure to have these radios in our possession prohibits us from completing the enclosures or doing any testing on the system. Timely completion of the project was originally based on receipt of the FCC license on November 9th, 1990. This license was actually received on December 17, 1990. Due to the frequency delay and continuing delays from Microwave Data Systems we are currently expecting receipt of the radios by March 22nd, 1991. At that time we can install the radios in the enclosures and begin testing of the system. Our intention is to have the lift station monitoring operational as the first phase of the project. We then want to proceed cautiously into the water system. By cautiously I want to ensure that the system installed is operating with full reliablity. I'm being cautious because of the critical nature of the water system. Once the water system turnover is started it must proceed without interruption. We want to avoid any undo problems for the City in water system down time or additional labor cost to the City. With the assumption that the radios will arrive on Microwave Data Systems ' revised schedule, we beleive that the substantial completion could be complet- ed by May 3rd, 1991. 1 priority in getting the system o Our first p y g g operational will be the lift station Y P as we understand that this is the most critical portion for the City.' Our 1 intention is to mount enclosures at the lift stations prior to having radio installed into the panels. ' Your assistance in this project Is greatly appreciated. Respectfully, ' Randy Redetzke Manager Systems Engineering RR /dlm 7 u 1 igg3 �,.��Y FFg ti 1 7 ; Itii; , • 1 1