1c. Plans & Specs for West 79th Street /e CITY OF 1! CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937-1900 • FAX (612) 937-5739 Action bar ChY MEMORANDUM TO: Don Ashworth, City Manager 1 w. FROM: Charles Folch, Acting City Engineer DATE: May 15, 1991 5 U 9J SUBJ: Approve Plans and Specifications for Improvements to West i 79th Street, East of Trunk Highway 101; Authorize Advertising for Bids; Project No. 91-8 ' The plans and specifications for the West 79th Street Improvement Project have been prepared in accordance with the City Standard Specifications for construction, and accomplish the scope of improvements as described in the feasibility report. Preparation of these plans has yielded a refinement of the ' project work item quantities from the feasibility report. Minor revisions to the quantities and cost estimates are typical as more detailed information becomes known during the plan preparation phase. The work item unit costs have also been adjusted to reflect the current market conditions displayed in recent bids received on similar sized City projects. At 1 the present time, bids for these smaller sized projects have not been as favorable as in the past few years. There are a few important factors that have an affect on this such as the amount and size of other jobs available for bidding, economic conditions, recent and forecasted weather trends, ect. Currently, there are a lot of available projects and the weather has been less that cooperative for construction activities. As a result, the engineer's estimate for the construction cost has been increased to $62,275.00 to reflect a 1 refinement of project quantities and the current market conditions. This is approximately $4,300.00 higher than the construction cost estimate from the feasibility report. Given the important timing coordination with the Valvoline Rapid Oil development, I would recommend that we proceed with the advertising for bids on the project. If the bids are found to be unfavorable, alternatives for 1 increasing the project funding and/or reducing the overall cost will have to be investigated. Therefore, it is my recommendation that the plans and specifications for improvements to West 79th Street, East of Trunk Highway 101, Project No. 91-8 be approved and authorization be given to advertise for bids. ' c: Dave Hempel, Sr. Engineering Technician Scott Harri, Van Doren Hazard Stallings 1 Bob Mikulak, Rapid Oil Brad Johnson, Lotus Realty 1 C I TY 0 F CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 ' (612) 937-1900 • FAX (612) 937-5739 ' MEMORANDUM ' TO: Don Ashworth, City Manager FROM: Charles Folch, Acting City Engineer DATE: May 20, 1991 SUBJ: Award of Bids for Construction of Well No. 6 and Pumphouse Project No. 91-1 ' The bid opening for the Well No. 6 and Pumphouse, Project No. 91-1, was held on Friday, May 17, 1991 . A total of 5 bids were received ( see attached bid tabulation ) . The bids ranged from a low of $147, 482 to a high of $178 , 411, with Gilbert Mechanical ' Contractors , Inc . being the confirmed low bidder . The low bid, is approximately $10, 000 lower than the engineer 's estimate of $158 ,150 . It is therefore recommended that the new Well No. 6 ' and Pumphouse, Project No. 91-1, be awarded to Gilbert Mechanical Contractors , Inc . in the amount of $147, 482 conditioned upon the City receiveing an executed Contract Agreement, Contractors ' Performance Bond and Certificate of Insurance within ten ( 10 ) calendar days as specified in the proposal form. c: Dave Hempel, Sr . Engineering Technician ' Jerry Boucher, Utility Supertintendent Jim Bullert, B.A. Liesch & Associates ' Attachments: 1 . Location Map. 2 . Bid Tabulation . 3 . Engineer 's Estimate. 4 . Letter of Recommendation Dated (5/17/91 ) Y 2 ? § § , 8 8 0 i ' '! ' I I 1 ..I I .... 1 .u.. CMPlSTMAS -/ —_ HENNEPIN. COUNTY J�' LAKE ��, -• ••1 • ' .141I//:f11114,/ .,..n ... '∎ ___6200 vois�` _ ry :PA Ip�/4.4.--: I'.1": 'boo 1/47,V,..,/""t■klAkritri."ktPrt• '•:=:7.1.1111j _ 41.4,, lig iiiirt.,-rm.. ,..4, .._ 1,6,),,,h,t4.. da,....s. ._.tr... ....___,„,_r,,,„,.....„.., .I. , it. __„. -.41 if • -0.00-1. kill r.,�ice.+ _:.: ?�.n11114"N::kvw.: j% •• : C. i hpnuu•: e. 5, 11 zr../..ti, v. . 1":"1,1-V 11 .1 • ,,�i�,`' V'4xjT ; `� -4700 _ •7 ilk . ••T.,y ��'.1 C r� L.4_5:11.:. �..; , ' • 4 .. 4.00 �/a�i!��j=! �i=. \'�'\:11.- „sc.._ : 4.00 ---4 -° -*6. .e-,ark ir."""US''-.1,..ii-f”' &,..,..- .1110. -• NI e c 1.1.4..AI 1111a . .•1�e• 4:411‘.. roc � .....�.„�' Mw4•� ►��. .rte ILS!iIISONS. �.. ENN�••�•f - '�c��• #1.:_ ,,: 0;0' •%.. \ "KE PROJECT LOCATION • P400 '746 �•-gipp!I -4....---.-. i wlL ' 41 .I.A.:; -. 11 y. t. •y .- __._ : 44, :—. , II .t, N_=�if i!f A111 iam!maw j - ►700 r i.�0m i11NU� - ' .sMl sr' u.JEL_ .....____:._..mw ,_ '+ ice=t=J°L'.'� -4'`f T-. .l4.•\ .r_%-._ . • ' — 40pr r • .ii g rig - �, � ��riso f e,:r. , ____, ______ \:,, . OS. a 4,,,,-$ ' - - . . SUSAN ,. WEl.i„j .gg) _ • ., %#;,/r\� ' i R/CE r SN _L AN_ E ., i1Ii Ii — .t.—w.- 1 pt �;",`��iii,--.1..,, ' .- . —Moo:i__ - .. , 9 _ /' J t • _ ` — 4 0 1 c T f S ? .�':r 1 ' , _: ATTACHMENT 1 4/%- b IWELL NO. 6, PUMPHOUSE AND CONTROLS CITY OF CHANHASSEN . IMAY 17, 1991 Q BIDDER BID AMOUNT .U'/c7 �0�/� �OD�•I A & K CONSTRUCTION, INC. $ /5:5: 3,73 _ 1.------ !/ 9038 110TH STREET NORTH ..77 ISTILLWATER, MN 55082 IFORD CONSTRUCTION CO., INC. / i/ 3 99 61---"--P.O. BOX 667 / EXCELSIOR, MN 55331 I v GILBERT MECHANICAL CONTRACTORS, INC. /�� d/BZ t`o 3012 CLINTON AVE. S. MINNEAPOLIS, MN 55408 P & L MECHANICAL, INC. d oO I 23640 DAVENPORT ST. NE /7P, 1////� _ I BETHEL, MN 55008 I IIRICHMAR CONSTRUCTION, INC. ` '.5 2 j 3 & 0 o a i .k"---7776 ALDEN WAY FRIDLEY, MN 55432 I II - I I I9 f/ gf4 go-g---r--: ///k4e7. I I I ATTACHMENT 2 I IENGINEERS ESTIMATE CHANHASSEN WELL AND PUMPHOUSE NO. 6 IAPRIL 1991 Unit Total INo. Item Unit Price Quantity Price 1 Mobilization L.S. $9,000 1 L.S. $9,000 I 2 Watermain & Accessories L.S. $24,000 1 L.S. $24,000 3 Electrical Controls L.S. $20,000 1 L.S. $20,000 4 Chemical Feed Systems L.S. $4,000 1 L.S. $4,000 5 Pumphouse L.S. $35,000 1 L.S. $35,000 6 Site Work L.S. $15,000 1 L.S. $15,000 7 Drill Pilot Hole L.F. $10.00 220 L.F. $2,200 8 Ream Pilot Hole for 14" Casing L.F. $22.50 180 L.F. $4,050 I 9 F&I Neat Cement Grout C.Y. $30.00 180 L.F. $5,400 10 F&I Neat Cement Grout C.Y. $200.00 7 C.Y. $1,400 I 11 Drill Formation for Screen L.F. $30.00 40 L.F. $1,200 12 F&I 12" SS Well Screen L.F. $175.00 40 L.F. $7,000 13 Develop Well Hours $75.00 60 Hours $4,500 I 14 F,I & Remove Test pump L.S. $1,500 1 L.S. $1,500 15 F,I & Remove Discharge Pipe L.S. $100 1 L.S. $100 16 F,I & Remove Measuring Device L.S. $100 1 L.S. $100 I17 Conduct Pumping Test Hours $50 72 Hours $3,600 18 Cap and Disinfect Well L.S. $100 1 L.S. $100 I19 F&I Well Pump L.S. $20,000 1 L.S. $20,000 TOTAL ESTIMATED COST $158,150 ljs:chan4-18/11016 I I I I I I ATTACHMENT 3 LES=SEEZ============= 131721121223===g11114 MA`s 17 '91 15:50 B.A.LIESi=H ASSOC. P.2/2 11-'1. --A - 11-1!11114111/ 1!!! BRUCE A. LIESCH ASSOCIATES, INC. 71V- g HYDRQGEOLOGISTS • ENGINEERS • ENVIRONMENTAL SCIENTISTS 13400 15th Avenue No •Plymouth,MN 55441.612-559-1423•FAX No;559-2202 May 17, 1991 ' Mr. Charles Folch Acting City Engineer City of Chanhassen ' 690 Coulter Drive Chanhassen, MN 55317 RE: Well No. 6 Dear Mr. Folch: ' We have reviewed the bids for Well No. 6, Pumphouse and Controls. The five bids were relatively closely spaced and were on either side of our estimate of $1 58,000, indicating ' to us that the bids were realistic and competitive. We hereby recommend that you award the contract to the low bidder, Gilbert Mechanical Contractors, Inc. in the amount of $147,482.00. ' Sincerely, Y 1 J mes 13ul1ert, P.E. ' mawatr5-17/11018.00 I I ' ATTACHMENT 4