1m. Herman Field park grading and surfacing award of bids I1 'VV..
1
C I TY O F --04
1 CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
I (612) 937-1900 • FAX (612) 937-5739 Actim ;, i- _ ..,..a r,
II MEMORANDUM Rote � -
DA. .. S"!S_%/_
TO: Don Ashworth, City Manager „,
IFROM: Todd Hoffman, Park and Recreation Coordinator -7-- .,r t, "
IIDATE: May 14, 19 91 S"�0 T t_,_-
SUBJ: Herman Field Park Grading and Surfacing, Award of Bids,
IIImprovement Project No. 87-07
On April 22, 1991, the City Council approved the plans and
I specifications and authorized advertising for bids on the above
mentioned project. As you are aware, the bids for this project
were opened this morning, Tuesday, May 14, . 1991 at 10:00 a.m.
I Three bids were received as summarized in the attached tabulation
of bids prepared by Mr. Scott Harri of VanDoren Hazard Stallings,
Inc. , the consulting firm employed on this project. As noted, the
low bidder was Matt Bullock Contracting of St. Michael, Minnesota.
IThe low base bid is $25,270.75. The engineer's estimated base bid
was $35,992.50. As can be seen, the low bid is in favor of the
I city. The base bid contains the clearing and grubbing, excavation,
aggregate, culvert, silt fence, sod and seeding necessary to
complete the installation of the access road, grading of the active
I play area within the park, and restoration work associated with
both areas.
Three alternate bids were solicited as outlined in the attached
I report. We are fortunate to have received such a favorable base
bid as it allows the city to accept Alternate No. -2, paving of
access drive and parking lot in the amount of $17,758.00. As you
1 concurred in our recent conversation concerning this project,
paving the access road and parking area is desirable at this time
and should be completed as a portion of the initial project. The
I remaining alternates totaling $10,274.70 can be completed in-house
at a future time. Approving the base bid and Alternate No. 2 would
require an expenditure of $43,028.75, with the remaining $6,971.25
(14% of the $50,000 budgeted) covering engineering costs.
II Reference checks of Bullock Construction have been completed as
noted in the attached report.
II
I
Mr. Don Ashworth
May 14, 1991
Page 2
Recommendation
' It is recommended that the Herman Field Grading and Surfacing
Improvement Project base bid and Alternate No 2 be awarded to Matt
Bullock Construction Co. , Inc. in the amount of $43, 028 .75.
Attachments
1. Letter from Scott Harri, VanDoren Hazard Stallings, Inc.
2 . Bid Tabulation
pc: Charles Folch, Assistant City Engineer
Scott Harri, VanDoren Hazard Stallings, Inc.
•
(Cp VanDoren II
Hazard
Stallings,Inc.
Architects • Engineers • Planners
May 15 , 1991 I
II Mr . Todd Hoffman
Park & Recreation Coordinator
City of Chanhassen
I
P . 0 . Box 147
Chanhassen , MN 55317
Ref : Herman Field Park Improvements I
Improvement Project No . 87-07
VHS Project No . 91-302 I
Dear Todd :
Enclosed is the bid tabulation for bids received on subject project
I
on May 14 , 1991 . Three bids were received ranging from a low of
$25 , 270 . 75 to a high of $41 ,998 . 00 . The estimate for the project
is $35 ,992 . 50 . The low bid is substantially below the estimate and
II
the other two bidders and represents an excellent bid for the City .
The low bid was received from Matt Bullock Contracting of St . I
Michael , Minnesota . Bullock has been in business for the past 25
years . They have reported their business volume to be $750 ,000
annually the past few years . They also indicated they would stand
behind their bid and were interested in performing the work . I
Bullock ' s main business practice is grading and excavation . All
other work needed for the project would be provided through
I
subcontractors . They have completed similar park grading and
paving projects for the cities of Coon Rapids , Ramsey , Plymouth and
Dayton , Minnesota . Those projects ranged in size from $100 ,000 to
I$150 ,000 . Our reference checking has indicated the work was
completed satisfactorily .
In addition to the base bid , three alternate bids were received for
I
expanded work on the site and are summarized as follows :
o Alt . No . 1 - Construct grass walkway - $4 ,514 .70 I
o Alt . No . 2 - Pave access drive and parking lot - $17 ,758 . 00
o Alt . No. 3 - Construct trail across wetland - $5 ,760 . 00
We would recommend accepting Alt . No . 2 paving of the access road
I
and parking lot if your budget allows . The work contained in the
other alternates can be more readily phased in in the future .
I
1
3030 Harbor Lane North, Bldg. II, Suite 104, Minneapolis Minnesota 55447-2175 (612) 553-1950 I
I
I
' Mr . Todd Hoffman
May 15 , 1991
Page 2
1
' We recommend award of bid to Matt Bullock Contracting Company , Inc .
for the base bid amount of $25 ,270 . 75 plus Alternate No . 2 in the
amount of $17 , 758 . 00 for a total amount of $43 ,028 . 75 . We will be
' available to discuss this at your convenience .
Sincerely
VAN DOREN-HAZARD-STALLINGS , INC .
�7e+f H
' R. Scott Harri , P . E .
' - Enclosure
RSH/ ev
1
I
HBIDTAB . L03
I
I
TABULATION OF BIDS FOR
HERMAN FIELD PARK
I
CITY OF CHANHASSEN,MN. IMPROVEMENT PROJ. 87-07
BID OPENNING MAY 14,1991 II MATT BULLOCK HARTMAN FORD
ENGINEER'S EST. CONTRACTING CO., INC. EXCAVATING,INC. CONSTRUCTION CO., INC.
ITEM QUANTITY AMT. EXTEN. AMT. EXTEN. AMT. EXTEN. AMT. EXTEN.
BASE BID
II
1 Clearing and Grubbing 1 LS $7,500.00 $7,500.00 $6,000.00 $6,000.00 $15,000.00 $15,000.00 $12,440.00 $12,440.00
2 Common Excavation 4875 CY $2.50 $12,187.50 $1.35 $6,581.25 $2.25 $10,968.75 $3.00 $14,625.00 il
3 Aggregate Surfacing,C1. 5 460 CY $16.00 $7,360.00 $15.00 $6,900.00 $10.50 $4,830.00 $18.00 $8,280.00
100% Crushed
4 15" CMP 36 LF $20.00 $720.00 $14.50 $522.00 $28.00 $1,008.00 $18.00 $648.00
5 15" Metal Apron 2 ER $175.00 $350.00 $45.00 $90.00 $250.00 $500.00 $200.00 $400.00
6 Silt Fence, Type 1 525 LF $3.00 $1,575.00 $1.50 $787.50 $3.00 $1,575.00 $1.40 $735.00
7 Sod 1100 SY $3.00 $3,300.00 $1.40 $1,540.00 $2.80 $3,080.00 $1.70 $1,870.00 I
8 Seeding 3 AC $1,000.00 $3,000.00 $950.00 $2,850.00 51,000.00 $3,000.00 $1,000.00 $3,000.00
ESTIMATED COST BASE BID $35,992.50 $25,270.75 $39,961.75 $41,998.00 II
ALTERNATE NO. 1 (Clear,Grub and Seed Trail)
1 Clear and Grub Trail 2235 LF $2.00 $4,470.00 $1.50 $3,352.50 $3.25 $7,263.75 $0.40 $894.00 II
2 Seed and Mulch Trail 2235 LF $0.85 $1,899.75 $0.52 $1,162.20 $1.80 $4,023.00 $0.20 $447.00
ESTIMATED COST ALTERNATE NO. 1 $6,369.75 $4,514.70 $11,286.75 $1,341.00
ALTERNATE NO. 2 (Bituminous Paving for Access Road and Parking Lot) II
t Aggregate Base,C1. 5 225 CY $16.00 $3,600.00 $15.00 $3,375.00 $10.50 $2,362.50 $14.00 $3,150.00 II(Nod.) 100: Crushed
2 Type 31 Base Course 327 TON $25.00 $8,175.00 $29.00 $9,483.00 $34.00 $11,118.00 $30.00 $9,810.00
Mixture
3 Type 41 Wearing Course 140 TON $30.00 $4,200.00 $35.00 $4,900.00 $38.00 $5,320.00 $31.00 --$4,_40.00-
ESTIMATED COST ALTERNATE NO. 2 $15,975.00 $17,758.00 $18,800.50 $17,300.00
ALTERNATE NO. 3 (Trail Across Wetland Area)
I
1 Superdeck Nature Trail 160 LF $35.00 $5,600.00 $36.00 $5,760.00 $59.00 $9,440.00 $34.00 $5,440.00
-
ESTIMATED COST ALTERNATE NO. 3 55,600.00 $5,760.00 $9,440.00 $5,440.00 II