Loading...
6. Lake Ann Park shelter, 1991 budget amendment ! ,,, CITY OF 6 _____ I CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937-1900 • FAX (612) 937-5739 IIMEMORANDUM TO: Don Ashworth, City Manager 7 1 FROM: Todd Hoffman, Park and Recreation Coordinator 1 DATE: May 14, 1991 SUBJ: Lake Ann Park Picnic/Recreation Shelter, Consider 1991 iBudget Amendment . This item was tabled by the City Council on April 22, 1991 to give 1 residents an opportunity to comment on this proposed park improvement project. The Council also desired additional time to review details associated with the park shelter prior to taking Iaction on this item. I believe the coverage received in the May 2, 1991 edition of the Chanhassen Villager fulfills the Council's wish of ensuring the public is aware of this capital improvement project. I have not received any negative calls or comments in this regard. I have had the opportunity to discuss the shelter with the Mayor and the majority of Council members to ensure that their questions and inquiries are being addressed. I am confident 1 that the dissemination of information which has occurred since April 22nd, combined with the attached detailed cost estimations prepared by VanDoren Hazard Stallings, Inc. in consultation with Istaff, fulfills the Council's requests of April 22. I am very aware of the City Council's position on guaranteeing city expenditures are made responsibly. I have strived to instill this I theme in the current eight month planning effort now reaching its culmination. The final estimated budget figures as outlined in the attached report represent clearly "thought out" expenditures. The I finished product based on this proposal would provide significant social and economic benefit to the city and would nurture resident pride in their park system. Admittedly, the recommended project scope includes expenditures which are initially greater than other 1 alternatives. However, by recognizing short—and long term maintenance costs and other future capital costs which would result from choosing lower up front costs, it becomes apparent which 1 alternatives are "cost saving". In short, an initial wise investment will clearly eliminate the expenditure of significant dollar amounts each year following completion of the project. I 1 I Mr. Don Ashworth May 15, 1991 Page 2 However, as recognized by the City Council, cost reductions are always possible. Potential areas which could be cut have been ' identified in Mr. Koegler's report. If it is the pleasure of the Council, they may elect to recommend these reductions. Other than the elimination of the cedar shakes, this action would result in a ' significant visual change, these potential cost reductions are relatively painless. Lastly, it is important to again point out that the funding sources for this project would be the park/trail acquisition and development and utility expansion funds. All ' assets accumulated in these funds are generated through fees collected at the time of building permit issuance for residential, commercial and industrial development. These funds are established ' per Chanhassen City Code, stating it is the city's desire to provide for the welfare of its residents through the construction of public facilities and provision of public services. ' With this, it is recommended that the City Council amend the 1991 Park Acquisition and Development Capital Improvement Program to include an additional $90, 000 ($110, 000 is currently budgeted) to ' be transferred from the gam]- Park/Trail Acquisition and Development Fund, authorize the expenditure of up to $100,000 from the Utility Expansion Fund, and authorize preparation of plans and ' specifications for the Lake Ann Park Picnic/Recreation Shelter. Attachments 1. Memo from Mark Koegler dated May 14, 1991. 2 . Picnic/Recreation Shelter Proposed Scheme Revised April 15, 1991. ' Manager's Comments: Costs associated with this project are exaggerated by the inclusion of sewer and water. Justifications to ' install sewer and water to the 150 acre park site exists with or without the shelter building. Having the ability to provide water service to the ballfield's concession stand and having water faucets/fountains available for public use are being continuously requested. Similarly, the city would not permit either a well or septic system for any type of development where municipal sewer and water were available and which served 10, 000-20,000 people per ' year. Again, the magnitude of the project, i.e. providing sewer and water to a 150 acre site is a significant project in and of itself. ' The current estimate of $150,000 to $165,000 for the shelter building is reasonable given the multiplicity of uses proposed for the structure, i.e. public restrooms, changing area, concessions, storage/rental, picnicking and community gatherings. The cost is actually less than the Lake Susan Shelter - $225, 000 (albeit that figure does include the costs for the municipal well associated ' with that facility) . I I Mr. Don Ashworth May 15, 1991 Page 3 Similar to the Mayor and most Council members, I attended most of 1 the Park and Recreation Commission meetings where the proposed shelter was discussed. The Park Commission looked to and has , already made cost reductions. I would ask that the City Council approve the Park and Recreation Commission's recommendation to amend the budget and to prepare plans and specifications for this project. 1 1 I I VIVanDoren azard H Stallings,Inc. Architects • Engineers • Planners MEMORANDUM ' TO: Todd Hoffman FROM: Mark Koegler ' DATE: May 14, 1991 ' SUBJECT: Lake Ann Park Picnic Shelter As a follow-up to our recent discussion, we have refined the cost projection information for ' the proposed picnic shelter building at Lake Ann Park. Major project costs involve the construction of the building and the installation of utilities to serve the structure. The following is a breakdown of projected utility costs: ' Water ' Providing water to the site can be accomplished in one of two ways, either through the extension of an existing watermain or by installing a well. ' Option 1 - Watermain Extension ' This option involves the extension of the existing watermain that is located along the southern boundary of the park abutting TH 5. Extension of the watermain would entail the installation of a six inch water line from TH 5 to the existing softball concession building and the installation of a new two inch line serving the proposed picnic shelter. This configuration would make water available in the future should the City decide to install irrigation in any of the ball fields. The total estimated cost of the new watermain construction is $36,400.00. ' Option 2 - Well Installation ' This option includes the drilling of a new well in the vicinity of the proposed picnic shelter including all required controls, hydro pneumatic tank, etc. The well which would be designed to serve only the new building has an estimated cost of $6,000.00. ' Comment 1 In providing water to serve the new building, water quality and quantity need to be considered. Water quality can best be ensured through an extension of the municipal water system rather than through the use of an on-site well. On-site wells are subject to potential ' ground water contamination and require constant monitoring when used in public buildings. 3030 Harbor Lane North, Bldg. II, Suite 104, Minneapolis Minnesota 55447-2175 (612) 553-1950 I May 14, 1991 1 Page Two The extension of the municipal watermain can also guarantee the quantity of water available for use in the proposed picnic shelter. Quantity is an important issue in providing fire protection for the new building. Option 1 would enable the installation of hydrants to serve various areas of the park. Option 1, the extension of the existing municipal water system is the recommended alternative for providing water to the proposed Lake Ann Park shelter. This option represents a good long term investment for the City because it ensures both the quality and quantity of water required for the proposed building. The estimated cost of Option 1 is $36,400.00. Electrical ' When the lighting was installed in baseball field #1, provisions were made for the future extension of electrical service into other portions of the park. An electrical line is proposed to be installed from the existing light pole north of the backstop area to the existing picnic shelter and then on to the proposed picnic shelter. The projected cost of the electrical installation is $10,400.00. At the present time, we are working with NSP to examine the potential of providing street lighting along Lake Ann Park's internal roadway system. Such a system could also make power available to both the existing concession building and the proposed shelter. Information on this option should be available for presentation at Monday's City Council meeting. Sanitary Sewer , The proposed picnic shelter building will have complete restroom facilities necessitating the need for sanitary sewer service. Waste treatment can be handled in the following ways: , Option 1 - Holding Tank This option involves the installation of two 1,500 gallon holding tanks near the existing lower level parking lot. Effluent would be pumped from the proposed building through a small force main to the tank location. The total estimated cost of this option is $14,300.00. , The holding tank would need to be pumped by a private contractor on an as needed basis. Based upon estimates of beach usage, it appears that the tanks may need to be pumped at least twice per week throughout the summer season. At $200.00 per pumping, the total cost over the summer is estimated at approximately$5,200.00. As use of the beach continues to rise in future years and as metro waste fees continue to escalate,seasonal pumping costs will rise proportionately. I IMay 14, 1991 Page Three IOption 2 - Drainfield I The waste treatment needs of the proposed picnic shelter could be handled by an on-site septic drainfield system. Assuming that soil conditions are adequate,waste could be pumped from the building to a drainfield on top of the hill. The cost of this option including the lift I station pump, a small forcemain and the drainfield laterals is estimated at $19,180.00. I The primary concern in considering the drainfield option is the potential for system failure and the leakage of untreated effluent into Lake Ann. In order to prevent this from occurring,the City would have to implement a thorough maintenance program and designate Ia suitable, alternate drainfield location should the initial lateral system fail in the future. Option 3 - Greenwood Shores Connection I This provides option rovides a direct connection to Chanhassen's municipal sanitary sewer collection P P rY I system. It involves the installation of a lift station and construction of a forcemain system around the east side of Lake Ann with a connection to the Greenwood Shores lift station. The projected cost of this alternate is $33,100.00. IOption 4 - TH 5 Connection I Like Option 3, this alternative also provides a direct connection to Chanhassen's sanitary sewer system. In this case, the system consists of a lift station and a combination forcemain/gravity sewer system connecting to a existing line abutting TH 5. The projected 1 cost of this alternative is $50,000.00. Comment IThe alternates for providing sanitary sewer service to the proposed picnic shelter range from $14,300.00 to $50,000.00. Both the on-site system and the holding tank options present I lower cost methods of providing required services but do so at a higher risk to the environment and in the case of the holding tank, with higher annual maintenance costs. Connections to the existing municipal system at either Greenwood Shores or along TH 5 I represent long term, permanent solutions to providing required sanitary service. Therefore, the connection to Greenwood Shores with an estimated cost of $33,100.00 is the recommended sanitary sewer alternative. IBuildin g Costs IIn recent discussions on the proposed picnic shelter, additional information was requested. The requested information includes: 1) provide a more detailed cost estimate, 2) examine potential cost reductions, and 3)compare the estimated square footage cost of the proposed U May 14, 1991 1 Page Four shelter to comparable buildings. Cost estimates at this stage of any building project should I be considered preliminary since they are based on a concept plan rather than on detailed building plans. Despite this fact, it is possible to provide more detailed cost estimates on I the various components of the project. The following is a cost estimate for the proposed Lake Ann picnic building based on the I concept approved by the Park and Recreation Commission. The estimate follows the CSI format which is typically used in building specifications. The columns include a description of the item and estimated cost. Potential cost deletions are shown in the third column. I ITEM EST COST DELETE DIVISION 1 (Contract Administration) Included in I Mobilization, Bonds, Insurance other items DIVISION 2 Site ' Excavation, Perimeter & Underslab Drainage and Waterproofing $ 7,000.00 I Sidewalks and Aprons 3,100.00 DIVISION 3 (Concrete) I Retaining Walls, Slabs and Bldg. Walls 21,080.00 Floor Treatment 4,200.00 I Prestress Planks and Topping 7,025.00 DIVISION 4 (Masonry) I Concrete Block Walls 14,990.00 Delete Bullnose and Stop Dressing Area Walls at 6' High $ 1,300.00 111 Stone Facing - Upper and Lower Levels, Chimney and Column 28,500.00 Substitute Split Face Block - Lower Level at I Concession Area Only 3,500.00 DIVISION 5 (Metals) I Steel Column 600.00 Misc. Lintels 225.00 Bench Brackets 120.00 I Pipe Railing 750.00 I I I IMay 14, 1991 Page Five IDIVISION 6 (Wood and Plastic) Heavy Timber Framing for Roof 12,000.00 I Substitute Framing Alternative - Steel with Wood Box Enclosure 6,000.00 Redwood Benches 600.00 I Blocking 350.00 Plywood Doors 200.00 Cabinet & Fold Down Tables (Upper Level) 700.00 IDIVISION 7 (Moisture Protection) Cedar Shake Roof (Fire Retardant) 6,500.00 ISubstitute Class A Heavy Shingles 3,000.00 Metal Edging and Flashing 320.00 Metal "Shed" Roof 900.00 ICaulking 250.00 I DIVISION 8 (Doors, Windows & Hardware) Walk Doors 1,750.00 Rolling Doors 3,055.00 I Hardware 3,500.00 Window and Access Door 650.00 I DIVISION 9 (Finishes) Painting/Sealing Timbers and Deck 1,750.00 Interior Painting (Walls) 2,723.00 I Interior Painting (Ceiling) 815.00 Substitute for Interior Painting - Utilize Prefinished Masonry w/4' Painted Wainscot I in Toilets 1,500.00 Doors and Frames 1,500.00 Miscellaneous Painting 500.00 IDIVISIONS 10 THROUGH 14 Toilet Specialties 2,050.00 IElectric Hand Dryers 1,800.00 Food Service Cabinets 1,250.00 Rental Counter and Shelves 1,500.00 I DIVISION 15 (Mechanical) I Plumbing 13,650.00 Exhaust Fans 1,340.00 I U May 14, 1991 I Page Six DIVISION 16 (Electrical) Lighting 12,400.00 Delete Landscape Lighting 2,500.00 Power 4,820.00 TOTAL $164,463.00 ($17,800.00) ' The delete column presented in the above information represents possible deletions and substitutions the purpose of which is to reduce the total cost of the project. Based upon ' these identified items, the shelter ranges in cost from $164,463.00 to $146,663.00. With a total estimated building cost of$164,463.00,the cost of the building equates to $60.25 ' per square foot. Utilizing nationwide building survey information, it is possible to compare this figure to comparable public structures. Community center buildings without specialized athletic equipment have an average cost of $73.65 per square foot. Rest area buildings commonly being built by midwestern departments of transportation are currently averaging $122.25 per square foot for one story structures and $149.00 per square foot for two story structures. TOTAL PROJECT COSTS I The information presented previously in this memorandum identifies the cost of various portions of the project. The following presents a complete listing of all identified estimated costs based on the plan approved by the Park and Recreation Commission. Building $ 164,463.00 Contingency (10%) 16,445.00 A/E Fees (8%) 13,150.00 Subtotal $ 194,058.00 Sanitary Sewer $ 33,100.00 ' Water 36,400.00 Electric 10,400.00 A/E Fees (7%) 6,000.00 , Subtotal $ 85,900.00 TOTAL $ 279 958.00 Note: Contingencies are included in the sanitary sewer, water and electric estimates. 1 I 3 May 14, 1991 Page Seven IIf all of the identified substitutions and alternates are chosen, the following represents the total estimated project cost. IBuilding $ 146,663.00 Contingency (10%) 14,700.00 IA/E Fees (8%) . 11,700.00 Subtotal $ 173,063.00 IUtilities as Above $ 85,900.00 ITOTAL $ 258,963.00 I I I I I I I I I I I I 4- \'(4 s5-'70 1. ',`'"0^ mil,, -4`` /4^ \ 6' :t it I! F 1. _`.. _.R" T Z m . 1/oI _ . N co S U •• /�- CT • s Z - ii 'V f U s. I , p a N p Y \ m \ O z 0 A c I I m ,/ z DD_ N � ice' / / m { r• D n 2 g:i1 Z / O , r 'Lc t�tij`!{( r4 � `-ao • ,� °rte co '. -,„ . , m O e _ o c = n �fm A _F n D N m " m n a NN n f N v, z D n x D __ A A n O S \____._T- D r", Vii . 'oIo Z - o c � -0 \ o• �fin) FR T//`�� - Z pm_ \\O Iri � j