Loading...
5a&b. West 79th Street Public hearing & Plans & Specs I CITY OF 1 i0414 cHANBAssEN 1 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX (612) 937-5739 zwu. . . .✓ DRIP MEMORANDUM `, ITO: Don Ashworth, City Manager FROM: Charles Folch, Asst. City Engineer DATE: April 17, 1991 y_2 2_ e?/ I SUBJ: Authorize Preparation of Plans and Specifications for Improvements to 79th Street East of Trunk Highway 101/Great Plains Boulevard Project 91-8 IThe project consultant, Scott Harri of Van Doren, Hazard, Stallings, Inc . will be present at the City Council meeting on 1 Monday, April 22, 1991 to provide a brief presentation of the feasibility report which was received be the City Council at their last regular meeting and to address any questions or comments concerning the proposed improvement project. As I had 1 discussed briefly at the last City Council meeting, the proposed improvements include a street widening to accommodate turn lanes for west bound traffic at the intersection with Trunk Highway 1 101, a bituminous overlay, concrete curb and gutter, storm sewer, street lighting, and landscaping along the north and south boulevard areas . The estimated total project cost is $73, 353 .00 . 1 The project is considered feasible from an engineering standpoint. The project costs are proposed to be financed through special I assessments of the benefitting properties . Those properties benefitting from the road improvement have been determined to be Lot 2 and portions of Lots 1 and 3 of the proposed Gateway First I Addition . The storm sewer costs are proposed to be assessed on an 80/20 split, to Lots 2 and 3 based on the percentage of contributing run-off . I The project design and construction schedule has been developed to be compatible with the schedule of the Rapid Oil development project on Lot 2. This schedule calls for having plans and 1 specifications prepared for City Council approval on the May 6 . meeting with a contract award on May 20, 1991. Therefore, acquiring authorization for the preparation of plans and I specifications at the April 22, 1991 City Council meeting is important in maintaining this schedule. II I I 11 Don Ashworth, City Manager April 17, 1991 Page 2 ' The feasibility report has been repaired to address the key elements associated with this project. It is therefore recommended that the City Council approve the feasibility study ' and authorization of plans and specifications for improvements to 79th Street east of Trunk Highway 101/Great Plains Boulevard, Project No. 91-8. c: Todd Gerhardt, Asst . City Manager Paul Krauss, Planning Director Dave Hempel, Sr. Engineering Technician Brad Johnson, Lotus Realty Bob Mikulak, Valvoline Attachment:. 1. Location map . I I 1 I I r I I --1 114 Cji �o l .�. f :_ 4LREI4S . r � S T HUGE ' . n r. ` SCHOOL D CHURCH En iige o le,t le 13 z 0 imi E Cilx ,.. Et › (mai la a ...1_ = -0 Ilk s , — ell R 0 ,........ 46 IF' 11111 d‘ TA IIM Mr '5 MI EMI hi= MP Ihoo..............,,,N\ •Z 0111111 MI 4 .., , , . , it so . AL imi um mi• .,._______,.. — •• EN .., ea . . . . . . . . . . iii. INN NM Alt