Loading...
2d. Funding Agreement with MnDOT for turn lanes on Hwy 101 at Sandy Hook and Choctaw Circle l I 4.d, CITYOF _______ II 111 :4111111r . 1 690 COULTER DRIVE • P.O. BOX 147• CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX (612F937'67' GINS niNG COPY N R^csived IMEMORANDUM Revis'.an NI). 'ID: Charles Folch, Asst. City Engineer Approved by C ty r.c'!I i Date •2 / FROM: Dave Hempel, Sr. Engineering Technician Approved by City Cou:cii DATE: May 1, 1991 Date 1 SUBJ: Approve Cooperative Construction Agreement with MnDC►r for Auxiliary Turn Lanes on Southbound Trunk Highway 101 at Sandy Hook Road and Choctaw 1 Circle; Project No. 89-26 The attached Cooperative Construction Agreement has been prepared by the = 1 .Minnesota Department of Transportation (MnD(7r) to address specific responsiblities with regards to construction and funding. As noted, therein the State will reimburse the City 100% for the cost of the Trunk Highway 101 right turn lane construction as set forth within this agreement. Related _ 1 construction costs in excess of the State's share, if any, will be paid out of the City's local State Aid Fund No. 415. IAs the City Council may recall, the City previously received bids back in September 1990 with anticipation of an executed Cooperative Agreement with MnDCIT. However, MnDOr was not able to prepare a Cooperative Agreement for this project due to delays in easement negotiations. In addition, the City only 1 received one bid, which was approximately $13,000.00 higher than the engineer's estimate. Since that time the necessary easement has been acquired and the Cooperative Construction Agreement has been prepared consistent with 1 negotiations for the installation of these improvements. Staff has recently readvertised for bids on this project. The bid opening is scheduled for May 14, 1991 with consideration by the City Council on May 20, 1991. IIThis improvement project does not include the auxiliary turn lanes on Trunk Highway 101 at Cheyenne Trail and Pleasant View Road as previously requested by the City Council on October 8, 1990. MnDC►r's policy for implementing safety 1 related improvements such as auxiliary turn lanes are considered once a year. Requests for such improvements are formally submitted by municipalities to MnDOT in May of each year. MnDCT prioritizes the requests according to the level of 1 safety and costs of the project. Written responses with the results are sent out in August. Staff will be formally requesting these auxiliary turn lanes on southbound Trunk Highway 101 at Pleasant View Road and Cheyenne Trail this month for MnDOT's consideration. Construction could tentatively be scheduled for 1 October 1991. It is therefore recommended that the Cooperative Construction Agreement for S.P. 1 2736-35 (T.H. 101 = 187) be approved and authorized for execution. Attachment: 1. Cooperative Construction Agreement 1 itotkNESO,.bt Minnesota Department of Transportation Metropolitan District Z Transportation Building ISt. Paul, Minnesota 55155 ��yrOF TO. Oakdale Office, 3485 Hadley Avenue North, Oakdale, Minnesota 55128 IGolden Valley Office, 2055 North Lilac Drive, Golden Valley, Minnesota 55422 Reply to Telephone No. 1"2/'4k4.3 I 41z 4-111 I I9r Cc t'irt e DR, CITYfeee €: /'# e-#.494vy/P-55A/ C/1hV4i 17/i9 1jC� "'MI ATTENTION: CH17/2 LE5 1�I2 SAS/ I SS 317 STATE PRCUECT: 27 3 SJ' (T. ,V. !p/) IAGREEMENT NO.: ‘07 E Z 4 TYPE OF AGREEMENT: 6*-l7e'6`°, CC?N S T I I . .=..= I 1. The original 'L and copies of this agreement must be signed by the appropriate city/oeunt-y officials. IMust bear the city's/eos seal. I 2. 3 copies of the city's/®e 's resolution designating officers to execute the agreement must be certified, including seal. II 3. When this agreement becomes fully executed, one of the copies will be returned to the city/county. 1 Kindly return the executed agreement and resolutions to: �han C. cko I Agreement Specialist Minnesota Department of Transportation I 5801 Duluth Street Golden Valley, MN 55422 1 1 Cebittig7- MINNESOTA 1.990 An Equal Opportunity Employer I 67824 CITY OF CHANHASSEN • I RESOLUTION BE IT RESOLVED that the City of Chanhassen enter into Agreement No. 67824 I with the State of Minnesota, Department of Transportation for the following purposes, to-wit: I To provide for payment by the State to the City of the State's share of the costs of the right turn lane construction and other associated construction to be performed I upon and along Trunk Highway No. 101 at Sandy Hook Road and at Choctaw Circle within the corporate City limits under State Project No. 2736-35 (T.H. 101=187). I BE IT FURTHER RESOLVED that the proper City Officers are hereby authorized and directed to execute such agreement. 1 CERTIFICATION I State of Minnesota County of Carver I City of Chanhassen I I hereby certify that the foregoing Resolution is a true and correct copy of the I resolution presented to and adopted by the Council of the City of Chanhassen at a duly authorized meeting thereof held on the day of , 1991, I as shown by the minutes of said meeting in my possession. I City Manager I I I r 1 ' PRE-LETTING SERVICES STATE OF MINNESOTA AGREEMENT NO. DEPARTMENT OF TRANSPORTATION SECTION COOPERATIVE CONSTRUCTION 67824 AGREEMENT S.P. 2736-35 (T.H. 101=187) State Funds ORIGINAL Agreement between AMOUNT ENCUMBERED The State of Minnesota Department of Transportation, and $41,349.72 ' The City of Chanhassen Re: State cost right turn lane construction upon and along AMOUNT RECEIVABLE ' T.H. 101 at Sandy Hook Road and at Choctaw Circle in Mone) Chanhassen I THIS AGREEMENT is made and entered into by and between the State of ' Minnesota, Department of Transportation, hereinafter referred to as ' the "State" and the City of Chanhassen, Minnesota, acting by and through its City Council, hereinafter referred to as the "City". 67824 1 WITNESSETH: WHEREAS the City is about to perform right turn lane construction and other associated construction upon and along Trunk Highway No. 101 at Sandy Hook Road and at Choctaw Circle within the corporate City ' limits in accordance with City-prepared plans, specifications and/or special provisions designated by the City as City Project No. 89-26 and by the State as State Project No. 2736-35 (T.H. 101=187) ; and WHEREAS all of the right turn lane construction is to be performed 1 within the Trunk Highway No. 101 right-of way limits; and I WHEREAS the City has requested participation by the State in the costs of the right turn lane construction; and WHEREAS the State will reimburse to the City 100 percent of the costs of the Trunk Highway No. 101 right turn lane construction as hereinafter set forth; and WHEREAS Minnesota Statute section 161.20, subdivision 2 authorizes ' the Commissioner of Transportation to make arrangements with and cooperate with any governmental authority for the purposes of ' constructing, maintaining and improving the trunk highway system. 2 411 I 67824 IT IS, THEREFORE, MUTUALLY AGREED AS FOLLOWS: ARTICLE I - CONSTRUCTION BY THE CITY Section A. Contract Award and Construction The City shall receive bids and award a construction contract to the lowest responsible bidder, subject to concurrence by the State in that award, in accordance with State-approved City plans, specifications and/or special provisions designated by the City as City Project No. 89-26 and by the State as State Project No. 2736-35 ' (T.H. 101=187) . The contract construction shall be performed in accordance with State-approved City plans, specifications and/or ' special provisions which are on file in the office of the City's Engineer and in the office of the Commissioner of Transportation at ' St. Paul, Minnesota, and are made a part hereof by reference with the same force and effect as though fully set forth herein. ' Section B. Documents to be Furnished to the State The City shall, within 7 days of opening the bids for the ' construction contract, promptly submit to the State's District Engineer at St. Paul a certified copy of the low bid and an abstract of all bids together with the City's request for concurrence by the State in the award of the construction contract. The City shall not award the construction contract until the State advises the City in writing of its concurrence therein. ' 3 I 67824 I Section C. Cancellation of Agreement Each party to this agreement reserves the right to withdraw from and cancel this agreement within 30 days after the opening of bids if either party determines any or all bids to be unsatisfactory; the withdrawal from or cancellation of the agreement shall be I accomplished by either party serving a written notice thereof upon the other. Supervision and Inspection Section D. Direction, Supervl ection of Construction p The contract construction shall be under the direction of the City ' and under the supervision of a registered professional engineer; however, the State cost participation construction covered under this , agreement shall be open to inspection by the State's District Engineer at St. Paul or his authorized representatives. The City shall give the District Engineer five days notice of its intention to start the contract construction. 1 The responsibility for the control of materials for the State cost participation construction covered under this agreement shall be on the City and its contractor and shall be carried out in accordance ' with Specifications No. 1601 through and including No. 1609 as set forth in the State's current "Standard Specifications for , Construction". I 4 I 67824 Section E. Completion of Construction The City shall cause the contract construction to be started and completed in accordance with the time schedule in the construction Icontract special provisions. The completion date for the contract construction may be extended by an exchange of letters between the appropriate City official and the State's District Engineer for unavoidable delays encountered in the performance thereof. Section F. Additional Construction, Plan Changes, Etc. The State shall not participate in the cost of any contract construction that is in addition to the State cost participation iconstruction covered under this agreement unless the necessary State funds have been encumbered prior to the performance of the additional ' contract construction and the terms and conditions in the following ' paragraph have been met. All changes in the plans, specifications and/or special provisions for the State cost participation construction covered under this agreement and all addenda, change orders and/or supplemental agreements entered into by the City and its contractor for State cost participation construction covered under this agreement must be approved in writing by the State's District Engineer before payment is made by the State therefor. 5 d-� I 67824 1 Section G. Compliance with Laws, Ordinances and Regulations The City shall, in connection with the award and administration of ' the construction contract and the performance of the contract construction, comply and cause its contractor to comply with all Federal, State and Local laws, including Minnesota Statute section , 16B.101, and all applicable ordinances and regulations. Section H. Right-of-Way. Easements and Permits The City shall, without cost or expense to the State, obtain all rights-of-way, easements, construction permits and/or any other ' permits and sanctions that may be required in connection with the contract construction, and shall promptly furnish the State with 1 certified copies of the documents for those rights-of-way, easements, construction permits and/or other permits and sanctions. The City shall, within 90 days after the satisfactory completion of the City-owned utilities contract construction, submit to the I Director of the State's Pre-Letting Services Section five copies of a permit application, including "as built" sketches, for all City-owned utilities constructed upon and within the trunk highway right-of-way. ' Application for permits shall be made on State form "Application For Utility Permit On Trunk Highway Right-Of-Way" (Form TP2525) . I i 6 1 I 67824 ARTICLE II - BASIS OF PAYMENT BY THE STATE ' Section A. SCHEDULE "I", A SCHEDULE "I" is attached hereto and made a part hereof by reference. The SCHEDULE "I" includes all anticipated State cost ' participation construction items and the construction engineering cost share covered under this agreement. Section B. State Cost Participation Construction 100 PERCENT ' All of the right turn lane construction to be performed upon and along Trunk Highway No. 101 at Sandy Hook Road and at Choctaw Circle within the corporate City limits under State Project No. 2736-35 (T.H. 101=187) . The construction includes, but is not limited to, ' those construction items as described and tabulated on Sheet No. 2 of the attached SCHEDULE "I". ' Section C. Construction Engineering Costs The State shall pay a construction engineering charge in an amount equal to 8 percent of the total cost of the State participation construction covered under this agreement. Section D. Addenda. Change Orders and Supplemental Agreements The State shall share in the costs of construction contract addenda, ' change orders and/or supplemental agreements which are necessary to complete the State cost participation construction covered under this 7 KOL 67824 1 agreement and which have been approved in writing by the State's District Engineer. Section E. Settlements of Claims The State shall pay to the City its share of the costs of any ' settlements of claims made with the City's contractor. All liquidated damages assessed the City's contractor in connection ' with the construction contract shall result in a credit shared by the State and the City in the same proportion as their total construction , cost share covered under this agreement is to the total contract construction cost before any deduction for liquidated damages. 1 ARTICLE III THE STATE PAYMENT BY H Section A. Estimate and Advancement of the State's Cost Share ' It is estimated that the State's share of the costs of the contract construction plus the 8 percent construction engineering cost share and a $3,000.00 contingency amount is the sum of $41,349.72 as shown " in the attached Preliminary SCHEDULE "I". The attached Preliminary SCHEDULE "I" was prepared using estimated unit prices. Upon receipt I and review of the construction contract bid documents described in Article I, Section B. of this agreement, the State shall then decide 1 whether to concur in the City's award of the construction contract ' and, if so, prepare a Revised SCHEDULE "I" based on construction contract unit prices. The contingency amount is provided to cover , 8 1 1 11 67824 overruns of the plans estimated quantities of State cost 1 participation construction and/or State-approved additional construction including construction engineering costs. 1 1 The State shall advance to the City the State's total estimated cost share, less contingency amount, as shown in the Revised SCHEDULE "I" 1 after the following conditions have been met: 1 1. Encumbrance by the State of the State's total estimated cost share, including contingency amount, as shown in the Revised ISCHEDULE "I". 1 2. Execution of this agreement and the State's transmittal of same 1 to the City along with a copy of the Revised SCHEDULE "I" and a letter advising the City of the State's concurrence in the award 1 of the construction contract. 1 3. Receipt by the State of a written request from the City for the 1 advancement of funds. The request shall include certification by the City that the construction contract has been executed by 1 all necessary parties. 1 Whenever it appears the cost of the State participation construction Icovered under this agreement is about to exceed the current amount of encumbered State funds, the City shall notify the State's District II 9 ' 11 ° I 67824 1 Engineer in writing prior to performance of the additional State cost participation construction. Notification shall include an estimate in the amount of additional funds necessary to complete the State ' cost participation construction including construction engineering costs and the reason(s) why the current amount encumbered will be , exceeded. The State shall, upon its approval of the additional State cost participation construction, submit a request for encumbrance of the necessary additional funds to the Minnesota Department of Finance. That action will have the effect of amending this agreement so as to include the State's share of the costs of the additional , construction. I Should the City cause the performance of additional contract construction which would otherwise qualify for State cost participation covered under this agreement, but for which the State ' has not previously encumbered funds, that additional contract construction is done at the City's own risk. The City shall notify , the State's District Engineer in writing of the additional State cost participation construction. Notification shall include an estimate in the amount of additional funds necessary to cover the additional State cost participation construction including construction engineering costs and the reason(s) why the current amount encumbered ' was exceeded. If the State approves the additional State cost participation construction, the City's claim for compensation along with a request for encumbrance of the necessary additional funds ' 10 1 I 67824 shall be submitted to the Commissioner of Finance for review pursuant to Minnesota Statute section 16A.15, subdivision 3, but no guarantee is made that the claim will be approved by the Commissioner of ' Finance. If the Commissioner of Finance certifies the claim for compensation and the request for encumbrance of the necessary additional funds therefor, that action will have the effect of ' amending this agreement so as to include the State's share of the costs of the additional construction. If the State determines that the submittal of a claim for compensation is warranted and it is deemed legally necessary to supplement this agreement, and if the claim is approved and a supplement to this agreement in connection with the claim is prepared and processed, the first $3,000.00 of the claim will not be eligible for payment. ' Section B. Records Keeping and Invoicing by the City The State shall provide the City with a Payment Processing Package containing a Modified SCHEDULE "I" form, instructions, and samples of ' documents for processing final payment of the State participation construction cost covered under this agreement. 1 The City shall keep records and accounts that enable it to provide the State with the following: ' 11 I 67824 1 1. A copy of the Modified SCHEDULE "I" which includes final quantities of State cost participation construction. i 2. Copies of the City contractor's invoice(s) covering all contract construction. i 3. Copies of the endorsed and cancelled City warrant(s) or check(s) paying for all contract construction. ' 4 . Copies of all construction contract change orders and/or ' supplemental agreements. 5. A certification form attached to a copy of the Final 1 SCHEDULE "I", both of which shall be provided by the State. The certification form shall be signed by the City's Engineer in I charge of the contract construction attesting to the following: a. The satisfactory performanpe and completion of all contract I construction in accordance with State-approved City plans, specifications and/or special provisions. , b. The acceptance and approval of all materials furnished for the State cost participation construction covered under i this agreement relative to compliance of those materials to the State's current "Standard Specifications for Construction". I 12 ' I 11 67824 c. Full payment by the City to its contractor for all contract ' construction. 6. When requested by the State, copies, certified by the City's Engineer, of material sampling reports and of material testing results for the materials furnished for the State cost participation construction covered under this agreement. 7. A formal invoice (original and signed) in the amount due the ' City as shown in the Final SCHEDULE "I". As provided by Minnesota Statute section 16B.06, subdivision 4, the books, records, documents, and accounting procedures and practices of ' the City relevant to this agreement are subject to examination by the ' contracting department or agency, and either the legislative auditor or the state auditor as appropriate. Section C. Final Payment by the State Upon completion of all contract construction, the State shall prepare 11 a Final SCHEDULE "I" based on final quantities of State cost participation construction and shall submit a copy to the City. If ' the final cost of the State participation construction covered under this agreement exceeds the amount of funds advanced by the State, the ' State shall promptly pay the difference to the City without interest. If the final cost of the State participation construction covered 13 t4 I 67824 1 under this agreement is less than the amount of funds advanced by the State, the City shall promptly return the balance to the State , without interest. Procedures relevant to preparation of the Final SCHEDULE "I" and final payment of the State participation construction cost covered under this agreement are detailed in the ' Payment Processing Package, which the State shall furnish the City. Pursuant to Minnesota Statute section 15.415, the City waives claim for any amounts less than $2.00 over the amount of State funds previously advanced to the City, and the State waives claim for the return of any amounts less than $2.00 of those funds advanced by the State. I ARTICLE IV - GENERAL PROVISIONS Section A. Replacement of Castings I The City shall furnish its contractor with new castings and/or parts for all inplace City-owned facilities constructed hereunder when , replacements are required, without cost or expense to the State. Section B. Maintenance by the City Upon satisfactory completion of the storm sewer facilities and City- owned facilities construction to be performed within the corporate 1 City limits under the construction contract, the City shall provide for the proper maintenance of those facilities, without cost or expense to the State. Furthermore, neither party to this agreement ' 14 11 67824 shall drain any additional drainage into the storm sewer facilities that was not included in the drainage for which the storm sewer facilities were designed without first obtaining permission to do so ' from the other party. The drainage areas served by the storm sewer ' facilities constructed under the construction contract are shown in a drainage area map, EXHIBIT "Drainage Area", which is on file in the office of the State's District Hydraulics Engineer at Golden Valley and is made a part hereof by reference with the same force and effect ' as though fully set forth herein. Section C. Claims The City at its own sole cost and expense shall defend, indemnify, save and hold harmless the State and all of its agents, officers and employees of and from all claims, demands, proceedings, actions or ' causes of action of whatsoever nature or character arising out of or by reason of contract construction, construction engineering and/or maintenance covered under this agreement including an action or claim which alleges negligence of the State, its agents, officers and employees. All employees of the City and all other persons employed by the City in the performance of contract construction, construction engineering and/or maintenance covered under this agreement shall not be considered employees of the State. All claims that arise under the Worker's Compensation Act of the State of Minnesota on behalf of the ' 15 I 67824 1 employees while so engaged and all claims made by any third parties as a consequence of any act or omission on the part of the employees 1 while so engaged on contract construction, construction engineering and/or maintenance covered under this agreement shall in no way be the obligation or responsibility of the State. I Section D. Nondiscrimination 1 The provisions of Minnesota Statute section 181.59 and of any applicable ordinance relating to civil rights and discrimination shall be considered part of this agreement as if fully set forth ' herein. I Section E. Agreement Approval Before this agreement shall become binding and effective, it shall be approved by a City Council resolution and receive approval of State I and City officers as the law may provide in addition to the Commissioner of Transportation or his authorized representative. , 1 i 16 I 67824 IN TESTIMONY WHEREOF the parties have executed this agreement by their Iauthorized officers. 1 DEPARTMENT OF TRANSPORTATION City of Chanhassen Recommended for approval: IBy . / Mayor IIBy ,2,,,7 ta ,� 7' Director Pre-Letting Services Section Date 1 By By IDistrict Engineer City Manager II By Date Deputy Division Director Technical Services Division 1 DEPARTMENT OF ADMINISTRATION Approved: Approved: 1 By Deputy Commissioner By of Transportation (Authorized Signature) i Date Date (Date of Agreement) OFFICE OF THE ATTORNEY GENERAL Approved as to form and execution: 1 By Special Assistant Attorney General 1 17 1 e PRELIMINARY SCHEDULE "I" Agreement No. 67824 City of Chanhassen Preliminary: April 15, 1991 S.P. 2736-35 (T.H. 101=187) State Funds Right turn lane construction performed under City Contract with located on T.H. 101 at Sandy Hook Road and at Choctaw Circle. STATE COST PARTICIPATION From Sheet No. 2 $35,509.00 Construction Engineering (8%) 2,840.72 Total State Cost $38,349.72 (1) Contingency Amount 3,000.00 Amount to be Encumbered $41.349.72 (1) For the State's use only as described in the body of the agreement - 1 - i MI s I - w NM • - • • i MS = r M I - - OM M N NM M OM MN MI IMII MN I OM MN E • E I MIMI OM 67824 ITEM S.P. 2736-35 (T.H. 101=187) UNIT QUANTITY UNIT PRICE I C(S) NUMBER I WORK ITEM I I (1) I 2021.501 MOBILIZATION LUMP SUM 1.00 1 500.00 1 00.00 TREE 8.00 50.00 400.00 2101.502 CLEARING TREE 8.00 50.00 400.00 2101.507 GRUBBING FT. 60.00 2.00 1 2104.501 REM. SURMOUNTABLE CONC. CURB AND GUTTER LIN. FT. 1 200.00 .50 1220.00 0.00 CU.2104.503 REMOVE BITUMINOUS SURFACE S YD 930 00 2.00 1 600.00 2105.501 COMMON EXCAVATION 484.00 7.50 3 630.00 2211. 501 AGG. BASE CL 5 100 CRUSHED UARRY STONE TON 142 .00 35.00 4 970.00 2331.514 TYPE 31 BASE COURSE MIXTURE TON 72.00 35.00 2 520. 00 2341.508 TYPE 41 WEARING COURSE MIXTURE 44.00 2.00 88.00 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1.00 9 002 .00 9 000.00 0412.601 CONSTRUCT KEYSTONE RETAINING WALL LUMP SUM 1.00 400.00 400.00 2501.515 15" R. C. PIPE APRON WITH TRASH GUARD EACH 100.00 24.00 2 400.00 2503 .511 LIN. FT.. 15" R. C. PIPE SEWER PIPE CLASS 5 LUMP SUM 1.00 400.00 400.00 5 4 601 EXTEND EXISTING FIRE HYDRANT LUMP 00 000.00 00 00 2506 509 CONS RUCT CAT ..AS_N DESIGN A EACH 05 602 attllO4Z _ :“4 *_.W.A aallt-4*-4q-+WAl►& :4 gllg-•1kl!MW � k CZM 0 440 00 535.50 UMINOUS CURB IN 688.0 500.00 500 0564 602 INSTALL TRAFF C SIGNS AND POSTS LUMP SUM 280.00 20 56.00 0564 603 4" SOLD INE - WHITE PAINT LIN. FT. 0573 603 SILT FENCE TYPE LIN. FT 00.00 5. 00 500.00 POUND 1.00 00 55 00 2575.502 SEED MIX URE 50 S YD. 760.00 2 00 1 520 00 75 05 SODDING WN S. O 00 IIINIIIIIIIIIIM 0 - 0 - 2 -