G-2 Bluff Creek CottagesCITY OF
cwANeassEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Sharmeen Al -Jaff, Senior Planner
DATE: August 12, 2013 Q l
SUBJ: Rezoning, Site Plan Approval and Conditional Use Permit for
construction of a Continuing Care Retirement Facility; and Resolution
Removing Property from the Rural Service District
Bluff Creek Cottages - Planning Case #2013 -08
PROPOSED MOTION
"The Chanhassen City Council approves Rezoning of property from Agricultural
Estate District (A2) to Mixed Medium Density Residential District (R8), Site Plan
Approval for construction of a Continuing Care Retirement Facility (Bluff Creek
Cottages), Conditional Use Permit to allow development within the Bluff Creek
Overlay District, and a Resolution removing property from the Rural Service District,
subject to the conditions of approval and adoption of the attached Findings of Fact "
City Council approval requires a majority vote of City Council present.
EXECUTIVE SUMMARY
The developer is requesting a Rezoning from Agricultural Estate District (A2) to
Mixed Medium Density Residential District (R8), Conditional Use Permit to allow
development within the Bluff Creek Overlay District; Site Plan approval for the
construction of a continuing care retirement facility, and a Resolution removing
property from the Rural Service District. The site is located north of Pioneer Trail and
west of Bluff Creek Boulevard. Access to the site will be gained off of Pioneer Trail.
The site is zoned Agricultural Estate District.
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on July 16, 2013 to review the
proposed development. The Planning Commission voted unanimously to recommend
approval of the project. The July 16, 2013 Planning Commission minutes are in the
Consent Agenda portion of the City Council packet.
Two concerns were raised by neighbors who attended the Planning Commission
meeting:
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Todd Gerhardt
Bluff Creek Cottages — Planning Case 2013 -08
August 12, 2013
Page 2 of 3
Concern: The creek running along the east side of the property creates a barrier for connecting
to the City of Chanhassen's sanitary sewer system. The proposed sanitary sewer service for this
property will connect to the City of Chaska's sanitary sewer system. The City of Chaska is
agreeable to the proposed connection, but must approve the sewer plans. The residents of the
neighborhood to the east questioned the capacity of the existing sewer system.
Response: The City of Chaska will hire a consultant to confirm the capacity of the system. The
developer will be responsible for paying the City of Chaska for these consulting services.
Approval of this application is contingent upon the City of Chaska approving this connection.
Concern: The view from the homes located in the City of Chaska, east of the subject site.
Response: Staff directed the applicant to provide a cross section of the westerly elevation of the
building. The first floor of the home is at an elevation of 913 and is 32 feet high. The subject
building is situated at an elevation of 913 and is 35 feet high. Existing vegetation will provide
screening during the spring and summer months. The site will be more visible during the winter
months. The separation between the closest structure and the proposed building is 300 feet.
Todd Gerhardt
Bluff Creek Cottages — Planning Case 2013 -08
August 12, 2013
Page 3 of 3
RECOMMENDATION
Staff recommends approval of a Rezoning of property from Agricultural Estate District (A2) to
Mixed Medium Density Residential District (R8), Site Plan Approval for construction of a
Continuing Care Retirement Facility (Bluff Creek Cottages), Conditional Use Permit to allow
development within the Bluff Creek Overlay District, and Resolution removing property from the
Rural Service District, subject to the conditions of approval and adoption of the attached Findings
of Fact.
ATTACHMENTS
1. Resolution.
2. Staff Report Dated July 16, 2013.
g1plan\2013 planning cases\2013 -08 bluff creek cottages\resubruittal 6 -14 -13 \executive sum ary.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: August 12, 2013 RESOLUTION NO: 2013-
MOTION BY:
SECONDED BY:
A RESOLUTION REMOVING PROPERTY
FROM THE RURAL SERVICE DISTRICT
WHEREAS, the City of Chanhassen has established rural and urban service districts; and
WHEREAS, property within the Metropolitan Urban Services Area is, or can be, served by
sewer and water service; and
WHEREAS, the City of Chanhassen must determine this property which shall be located
within the rural service district; and
WHEREAS, property that has received approval from the City for development purposes
may no longer be considered rural.
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
specifies the property in Exhibit 1 be removed from the Rural Service District.
Passed and adopted by the Chanhassen City Council this 12a' day of August, 2013.
ATTEST:
Todd Gerhardt, City Manager Thomas A. Furlong, Mayor
YES NO ABSENT
g: \plan\2013 planning cases\2013 -08 bluff creek cottages\resubmittal 6- 14- 13\rural service
district resolution.doc
EXHIBIT 1
LIST OF PROPERTIES TO REMOVE
FROM THE RURAL SERVICE DISTRICT
August 12, 2013
PID Number
25- 0270400 BLUFF CREEK SENIOR HOUSING LLC
PROPOSED MOTION:
"The Chanhassen Planning Commission recommends that City Council approve a Rezoning of
Property from Agricultural Estate District (A2) to Mixed Medium Density Residential District
(R8), Site Plan Approval for construction of a Continuing Care Retirement Facility (Bluff Creek
Cottages), Conditional Use Permit to allow development within the Bluff Creek Overlay District,
subject to the conditions of approval and adoption of the attached Findings of Fact and
Recommendation."
SUMMARY OF REQUEST: The applicant is requesting a Rezoning of 8.9 acres of property 6Y7
from Agricultural Estate District (A2) to Mixed Medium Density Residential District (R8), Site
Plan Approval for construction of a Continuing Care Retirement Facility (Bluff Creek
Cottages), and a Conditional Use Permit to allow development within the Bluff Creek Overlay
District. Notice of this public hearing has been mailed to all property owners within the required
500 feet. Staff is recommending approval of the request with conditions.
LOCATION: North of Pioneer Trail and west of Bluff Creek Boulevard.
APPLICANT: Community Asset Development Group John Klingelhutz
1403 Valley View Road 1560 Bluff Creek Drive
Chaska, MN 55318 Chaska, MN 55318
Mr. David Pokorney
Phone: 952- 448 -4444
davookomey@vmaii.com
PRESENT ZONING: Agricultural Estate District (A -2)
2030 LAND USE PLAN: Residential Medium Density (Net density 4 -8 Units /Acre)
ACREAGE: 8.9 Acres
DENSITY: N/A
LEVEL OF CITY DISCRETION IN DECISION- MAKING: The City has a relatively high
level of discretion in approving rezonings because the City is acting in its legislative or policy -
making capacity. The rezoning must be consistent with the City's Comprehensive Plan.
The City has limited discretion in approving or denying conditional use permits, based on
whether or not the proposal meets the conditional use permit standards outlined in the Zoning
Ordinance. If the City finds that all the applicable conditional use permit standards are met, the
permit must be approved. This is a quasi - judicial decision.
SCANNED
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 2 of 23
The City's discretion in approving or denying a site plan is limited to whether or not the
proposed project complies with Zoning Ordinance requirements. If it meets these standards, the
City must then approve the site plan. This is a quasi- judicial decision.
PROPOSAL /SUMMARY
The request consists of multiple applications to facilitate the construction of a continuing care
retirement facility (Bluff Creek Cottages). The request includes a Rezoning from Agricultural
Estate District (A2) to Mixed Medium Density Residential District (R8), Conditional Use Permit
to allow development within the Bluff Creek Overlay District; and Site Plan approval for the
construction of a continuing care retirement facility.
The site is located north of
Pioneer Trail and west of
Bluff Creek Boulevard.
Access to the site will be
gained off of Pioneer Trail.
The site is zoned
Agricultural Estate District.
The following is a summary
of the requests:
1. Rezoning:
The first request is to rezone
the property from
Agricultural Estate District
to Mixed Medium Density
Residential District.
2. Conditional Use
Permit:
The second request is for a
Conditional Use Permit to
allow development within
LOOMK MWTM LN �P ,y�• '�
SUBJECT
PROPERTY
a "'v
� TPE�QM IN
�'1 °r s:44
the Bluff Creek Overlay District. A tributary to Bluff Creek runs along the northeastern portion of
the site. The City of Chanhassen established the Bluff Creek Overlay District by ordinance in
1998 to protect the Bluff Creek Corridor, wetlands, bluffs and significant stands of mature trees
through the use of careful site design and other low- impact practices. This parcel is partially
encumbered by the Bluff Creek primary zone. The applicant is requesting a conditional use
permit to allow development next to the primary zone.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 3 of 23
3. Site Plan:
The final request is for a site plan to construct a 13,700 square -foot, one - story, 24 -bed continuing
care retirement facility. The total permitted site coverage is 35 percent. The proposed
development has a total hard coverage area of 8.9 %.
The design of the building is attractive and is proposed to be constructed of high - quality
materials. They include Cultured Stone at the entry and paneling at the main body of the
building. All elevations that can be viewed by the public have received equal attention. Parking
is buffered from views by landscaping and the building.
A trail extends along the
southeast portion of the site.
The applicant will extend a
sidewalk from the building to
the trail to separate pedestrian
from vehicular traffic.
Access to the site is provided
via a curb cut off of Pioneer
Trail. Any work within the
right -of -way will require
approval of the jurisdictional
agency.
Staff regards the project as a
well - designed development.
The overall design is sensitive
to the surroundin area Based
06
6
� r
g
upon the foregoing, staff is recommending approval of the rezoning, subdivision and site plan
with conditions as outlined in the staff report.
APPLICABLE REGULATIONS
Chapter 20, Article II, Division 2, Amendments
Chapter 20, Article II, Division 6, Site Plan Review
Chapter 20, Article XIV, Division 2, "R -8" Mixed Medium Density Residential District
Chapter 20, Article XXIII, Division 9, Design Standards for Multifamily Developments
Chapter 20, Article XXXI, Bluff Creek Overlay District
BACKGROUND
This parcel is constrained by the Bluff Creek Overlay district, steep slopes and bluffs, wetlands
and shoreland overlay district. The applicant is requesting that the area be rezoned mixed
medium density residential and that a conditional use permit be granted for development within
the Bluff Creek Overlay District.
Planning Commission
Bluff Creek Cottages – Planning Case 2013 -08
July 16, 2013
Page 4 of 23
The Land Use Plan designates the area that is
north of Pioneer Trail and west of Bluff Creek
Drive as Residential Medium Density. This
category has been established to accommodate a
medium- density residential development. The
medium density category, which includes units
with a maximum net density of 8.0 units per
acre, accommodates townhouses, two - family
and multi - family dwellings, but would also
permit the development of the continuing care
retirement facility.
SITE PLAN
— ; Ae I
ILI
In order to provide a better understanding of the overall development, staff will first review the
site plan component, which in turn leads to the rezoning. The building must comply with the
Design Standards for the multi - family district and the standards set in the continuing care
retirement facility. The city code requires the development to have an attractive design and use
durable materials. Site coverage may not exceed 35 percent. The total hard surface coverage
proposed on the site is 8.9 %.
The design of the building is attractive and is proposed to be constructed of high- quality
materials. They include Cultured Stone at the entry and paneling as the main body of the
building. All elevations that can be viewed by the public have received equal attention. Parking
is buffered from views by landscaping. A sidewalk is proposed to be extended along the south
edge of the parking lot and access driveway to connect with an existing trail along Pioneer Trail.
It will separate pedestrian from vehicular traffic. The trash enclosure for the building has not been
shown on the plans. The structure must be screened from views and constructed of the same
materials as the building. The added landscaping and boulevard trees will provide a calming effect
to a busy area.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 5 of 23
The site plan request is for a 13,700 square -foot, one -story, 24 -bed continuing care retirement
facility. The building has a pronounced entrance, utilizes durable exterior materials, and exhibits
articulation. The building maintains all required setbacks.
The following applies to the continuing care retirement facilities:
(1) The facility shall maintain state licensing.
(2) The facility shall conform to the requirements of the Minnesota State Building Codes and
Fire Codes.
(3) The facility shall be connected to municipal services.
(4) The facility shall be of residential style and character with a maximum structure height of 35
feet.
(5) Parking areas shall be screened from public or private right -of -way and adjacent single -
family residential areas.
(6) One -third parking space per bed shall be provided with an additional parking space for every
employee on the largest single shift.
(7) The facility shall be located in a medium or high- density district with a gross density not
exceeding 16 beds per acre.
(8) Access to the site shall be from a collector or arterial street as defined in the comprehensive
plan.
Finding: The site will be licensed and conform to the requirements of the Minnesota State
Building and Fire Codes. The site will be connected to municipal services. The building has a
residential appearance to it. It maintains a one -story appearance and most of the parking is
located northeast of the building. The building has a capacity of 24 individuals and will require
3 employees on the major shift. This will translate to 11 parking spaces. The applicant is
providing 15 spaces. The access to the site will be via Pioneer Trail.
LIGHTING /SIGNAGE
The applicant prepared a lighting photometrics plan. Light levels for site lighting shall be no
more than one -half foot candle at the project perimeter property line. This does not apply to
street lighting. Light fixtures shall be downcast and the light shall be cut off at a 90- degree angle
as required by the city code. All fixtures shall be shielded.
The applicant has not shown any signs on the site. One monument sign shall be permitted on the
site. The size of the sign may not exceed 24 square feet nor be higher than 5 feet. The sign shall
be set back a minimum of 10 feet from the property line. The sign must comply with the sign
ordinance. The letters shall be backlit and use individual dimension letters, at least one -half inch
deep. The sign materials shall be compatible with the building. The applicant must apply for a
sign permit.
PARKING
City code requires one -third parking space per bed with an additional parking space for every
employee on the largest single shift. The building has a capacity for 24 individuals which
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 6 of 23
translates to 8 parking spaces. The major shift will have 3 employees. The total number of
parking spaces required is 11. The applicant is providing 15 parking spaces.
ARCHITECTURAL COMPLIANCE
Size. Portion and Placement
Entries: The building has a pronounced entrance.
Articulation: The building incorporates adequate detail and has been tastefully designed. The
architectural style is unique to the buildings but will fit in with the surrounding area. The
building will provide a variation in style through the use of Cultured Stone and siding. The
building utilizes exterior materials that are durable and of high quality.
Signs: All signage must meet the sign ordinance.
Material and Detail
High quality materials are being used on the building.
Color
The colors chosen for the building are earth tones. The selection is unique, but blends in with the
surrounding buildings.
Height and Roof Design
The maximum building height permitted is three stories. The building meets the ordinance
requirement. The roofline is staggered, adding articulation to the design of the building. The
ordinance requires a pitched element on building. Multiple dormers are used to break the
expanse of the pitched roof to comply with this requirement. All rooftop equipment must be
screened from views.
Facade Transparency
All facades viewed by the public contain more than 50 percent windows and/or doors.
Loading Areas, Refuse Areas, etc.
The trash enclosure has not been shown on the plans. The structure must be hidden from views
and utilize the same materials as the building. Recycling space and other solid waste collection
space should be contained within the same enclosure.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 7 of 23
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the City shall consider the development's compliance
with the following:
(1) Consistency with the elements and objectives of the city's development guides, including the
comprehensive plan, official road mapping, and other plans that may be adopted;
(2) Consistency with this division;
(3) Preservation of the site in its natural state to the extent practicable by minimizing tree and
soil removal and designing grade changes to be in keeping with the general appearance of the
neighboring developed or developing areas;
(4) Creation of a harmonious relationship of building and open space with natural site features
and with existing and future buildings having a visual relationship to the development;
(5) Creation of functional and harmonious design for structures and site features, with special
attention to the following:
a. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures and
uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in
terns of location and number of access points to the public streets, width of interior
drives and access points, general interior circulation, separation of pedestrian and
vehicular traffic and arrangement and amount of parking.
(6) Protection of adjacent and neighboring properties through reasonable provision for surface
water drainage, sound and sight buffers, preservation of views, light and air and those aspects
of design not adequately covered by other regulations which may have substantial effects on
neighboring land uses.
Fes: The proposed development is consistent with the City's design requirements, the
comprehensive plan, the zoning ordinance, the design standards, and the site plan review
requirements. Staff is recommending approval of the request with conditions. The site design is
compatible with the surrounding developments. It is functional and harmonious with the area.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 8 of 23
Staff regards the project as a reasonable use of the land. The overall design is sensitive to the
City's image. Based upon the foregoing, staff is recommending approval of the site plan with
conditions outlined in the staff report.
The applicant is proposing to rezone the
property from A2, Agricultural Estate District,
to R8, Mixed Residential Medium Density
District.
The area to the north is occupied by the Liberty
at Bluff Creek townhouse development. The
area to the northeast of the subject site is
occupied by single - family homes and is guided
Residential Low Density, and the area to the
southwest contains a single - family home and is
located in the City of Chaska.
The 2030 Land Use Plan shows this area designated for development as Medium Density
Residential, net density of 4 - 8 units per acre. Appropriate zoning for this land use is R -8, RLM, or
PUD -R. The use consists of a single building with 24 individual rooms. The occupants of the
building will be individuals that need assistance with their mobility and will not put the same level
of demand on the infrastructure that a typical medium density development would (i.e. trip
generation, parking, etc.). The R -8 District is the only residential zoning district that permits this
type of development.
This area is in the Metropolitan Urban Service Area (MUSA). Staff is recommending that this
area be rezoned to R -8 and finds that the rezoning is consistent with the Comprehensive Plan.
NORTH
SOUTH
EAST
WEST
DEVELOPMENT
Liberty at Bluff
City of
Chaska/Shadow
Liberty at Bluff
Open Space
Creek
Wood
Creek
LAND USE
Residential
Residential Low
Residential
Parks and Open
Medium Density
Density
Medium Density
Space
PUD -R Planned
PUD -R Planned
Unit
Single Family
Residential Low
Unit
ZONING
Development
and Medium
Development
Residential
District
Density District
Residential
District
District
The 2030 Land Use Plan shows this area designated for development as Medium Density
Residential, net density of 4 - 8 units per acre. Appropriate zoning for this land use is R -8, RLM, or
PUD -R. The use consists of a single building with 24 individual rooms. The occupants of the
building will be individuals that need assistance with their mobility and will not put the same level
of demand on the infrastructure that a typical medium density development would (i.e. trip
generation, parking, etc.). The R -8 District is the only residential zoning district that permits this
type of development.
This area is in the Metropolitan Urban Service Area (MUSA). Staff is recommending that this
area be rezoned to R -8 and finds that the rezoning is consistent with the Comprehensive Plan.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 9 of 23
CONDITIONAL USE PERMIT
A tributary to Bluff Creek transects the northern portion of this property. For this reason a
portion of the property lies within the Shoreland Overlay District and the Bluff Creek Overlay
District. In discussions with the applicant, they have no intention of developing farther north
toward Bluff Creek and have suggested donating this area to the City. This would connect two
city -owned parcels and would go towards the goal of a continuous greenway.
The applicant's proposed development is consistent with the Bluff Creek Overlay District
management goals and the TMDL study. A 40 -foot setback is required from the Bluff Creek
Primary Zone boundary.
Staff notes that the proposal is consistent with the Comprehensive Plan and generally consistent
with the Zoning Ordinance.
CONDITIONAL USE PERMIT FINDINGS
In evaluating a conditional use permit, the city should consider the developer's compliance with
the following:
1. The proposed development will not be detrimental to or degrade the public health, safety,
comfort, convenience or general welfare of the neighborhood or the city.
2. The proposed development will be consistent with the objectives of the city's comprehensive
plan and this chapter.
3. The proposed development will be designed, constructed, operated and maintained so to be
compatible in appearance with the existing or intended character of the general vicinity and
will not change the essential character of that area.
4. The proposed development will not be hazardous or disturbing to existing or planned
neighboring uses.
5. The proposed development will be served adequately by essential public facilities and
services, including streets, police and fire protection, drainage structures, refuse disposal,
water and sewer systems and schools; or will be served adequately by such facilities and
services provided by the persons or agencies responsible for the establishment of the
proposed use.
6. The proposed development will not create excessive requirements for public facilities and
services and will not be detrimental to the economic welfare of the community.
7. The proposed development will not involve uses, activities, processes, materials, equipment
and conditions of operation that will be detrimental to any persons, property or the general
welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors,
rodents, or trash.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 10 of 23
8. The proposed development will have vehicular approaches to the property which do not
create traffic congestion or interfere with traffic or surrounding public thoroughfares.
9. The proposed development will not result in the destruction, loss or damage of solar access,
natural, scenic or historic features of major significance.
10. The proposed development will be aesthetically compatible with the area.
11. The proposed development will not depreciate surrounding property values.
12. The proposed development will meet standards prescribed for certain uses as provided in the
Conditional Use article.
COMPLIANCE TABLE
Ordinance Requirements (R -8)
Proposed
Lot
Area
3 acres
8.9 acres
Frontage
150 feet
246 feet
Depth
150 feet
626 feet
Lot Coverage
35%
8.9%
Building Height
Principal
three stories (35 feet)
one story (21 feet)
Accessory
one story
NA
Building Setbacks
Front yard
25 feet
Approx. 80 feet
Rear yard
25 feet
Approx. 322 feet
Side yard
10 feet
Approx. 144 feet
south property line)
Bluff Creek Primary
40 feet
62 feet
Wetland
Buffer 16 feet
buffer setback 40 feet
Buffer 16.5 feet
buffer setback 82 feet
Parking Requirements
Stalls
1/3 space per bed = 8
1 per employee largest shift = 3
Total = 11
15
Front yard
25 feet
100 feet
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -08
July 16, 2013
Page 11 of 23
GRADING AND DRAINAGE
This site is bordered to the northeast by Bluff Creek and to the southwest by a wetland. The
existing grading directs stormwater on the southwest part of the site to the wetland and directs
stormwater on the north part of the site to the creek. Stormwater on the southeast part of the site
(within MnDOT right -of -way) flows into the Pioneer Trail ditch system.
The proposed grading plan would create a stormwater pond northwest of the proposed building.
This pond would collect the stormwater runoff from the parking lot and the outdoor space
adjacent to the building. The overflow will drain to the wetland in the southwest area of the
property.
The proposed grading plan includes an infiltration basin. The stormwater from the ground
between the infiltration basin and the driveway will drain to the basin and will overflow into the
wetland in the southwest area of the property.
The lower half of the driveway and the ground adjacent to the driveway will drain onto Pioneer
Trail.
The site is 8.9 acres in area and appears to have close to one acre of disturbed area. The drainage
map associated with the HydroCAD model indicates that over 1.5 acres will be disturbed. This
means that the development will require an NPDES construction permit. The City shall be
provided confirmation of the permit and a Surface Water Pollution Prevention Plan ( SWPPP)
must be prepared and submitted to the City for review and comment prior to any earth - disturbing
activities.
In addition to the submittal of the SWPPP and the required elements under the NPDES
construction permit, the plan set must be consistent with Chapter 19 of Chanhassen City Code.
The following comments relate to the grading/erosion control plan (Sheet C3.0). The inclusion
of a bioretention feature is consistent with the desire to reduce volume discharging to Bluff
Creek. It is important that a detailed plan is prepared and submitted showing how the feature
will be protected from construction traffic and sedimentation while the remainder of the site is
being constructed. The bioretention area must remain undisturbed until the remainder of the site
is graded. Upon construction of the area, only light equipment should be used in the infiltration
area and perimeter control measures shall be erected around the bioretention feature. These shall
remain in place until the contributing area is stabilized.
All details pertaining to erosion prevention and sediment control shall be from the city's detail
plates unless otherwise approved. In no case may wooden posts be used. The placement of silt
fence shall be moved to include all graded areas, and inlet protection shall be provided at the
existing catch basins on Pioneer Trail downstream of the site and on all proposed catch basins
until the site has been stabilized.
The curb cut swale to the pond shall be stabilized as addressed in the section entitled "Surface
Water Management ". The plans must be signed by a registered engineer. An existing
topography plan sheet must be included in the plan set. The developer's engineer must submit a
soils report and boring log for this site indicating the soil conditions, permeability and slope.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 12 of 23
The plans must show the elevations at the corners of the proposed building. The grading at the
east corner of the building must be adjusted so that water will flow away from the building. The
grading plans must be amended so that no slopes exceed 3:1. The plans must identify any
stockpile areas that will be used during construction.
RETAINING WALLS
One 4 -foot high retaining wall is proposed between the east comer of the building and the
driveway. The developer's engineer must call out the 6 -foot retaining wall around the "outdoor
space" in the plans and include top and bottom of wall elevations.
The following materials are prohibited for retaining wall construction: smooth face, poured in
place concrete (stamped or patterned concrete is allowed), masonry, railroad ties or timber.
Walls taller than 6 feet shall not be constructed with boulder rock.
The developer's engineer must adjust grading at the face of the east retaining wall to create a
swale so water will flow away from both the wall and the building. The retaining walls will be
privately owned and maintained. All retaining walls over 6 feet high and within 10 feet of a
sidewalk or other public way must have a fence or other barrier. This condition includes the
areas where the building foundation will act as a retaining wall.
DRIVEWAY AND PARKING LOT
The developer proposes a 24 -foot wide, 500 -foot long driveway that leads to a parking lot with
14, 90- degree stalls and a turnaround for emergency vehicles.
Before vehicles enter Pioneer Trail, the driveway must provide a landing area that starts at least
50 feet back from the crosswalk and is at a 2% maximum grade. The parking lot aisle must be
26 feet wide. The turnaround must allow enough room for a fire truck to turn and exit the
parking lot without going through the parking spaces. Approved turnarounds include a 100 -foot
hammerhead and a 70 -foot diameter cul -de -sac.
UTILITIES
The creek running along the east side of the property creates a barrier for connecting to the City
of Chanhassen's sanitary sewer system. The proposed sanitary sewer service for this property
will connect to the City of Chaska's sanitary sewer system. The City of Chaska is agreeable to
the proposed connection, but must approve the sewer plans. Although the downstream facility
has sufficient capacity for the proposed building, any additional sanitary sewer capacity needed
for this site in the future cannot be accommodated by this connection. The developer's engineer
must show the detailed lift station design and location in the plans. The sanitary sewer will be
privately owned and maintained.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 13 of 23
The watermain service for this property will run parallel to Pioneer Trail and connect to the City
of Chanhassen's water system at Bluff Creek Boulevard. The connection to Chanhassen's
watermain system must be shown in the plan.
The proposed watermain will be privately owned and maintained. The watermain that is parallel
to Pioneer Trail must be 8 inches to accommodate fire flows. The developer's engineer shall
model fire flows to the development to ensure the watermain pipe size is adequate. Fire hydrants
are required every 400 feet, and gate valves are required every 800 feet.
The proposed sewer and water connections lie within Carver County right -of -way. The
developer must acquire the appropriate permits for utility installation.
This property has outstanding assessments from previous improvement projects that were
deferred due to the property's Green Acres status. Changing the zoning for this property will
cause the assessments to come due.
An assessment for Bluff Creek Boulevard improvements with a principal of $7,918.72 was
deferred and has been accruing interest at 6% since 2008. As of July 9, 2013, the assessment
amount was $11,005.42.
Assessment for TH 212 improvements with a principal of $11,790.06 was deferred and has been
accruing interest at 6% since 2006. As of July 9, 2013, the assessment amount was $16,494.30.
Water and sewer trunk and hook -up fees are to be collected with the development contract. Both
the sewer and water hook -up fee will be assessed at the rate for the City of Chanhassen in effect
at that time. The developer will need to apply for a no -fee plumbing permit from the City of
Chaska before connecting their sanitary service.
EASEMENTS
MnDOT right -of -way separates the Bluff Creek Cottages property from Pioneer Trail (County
Road 14). An access agreement must be obtained from MnDOT and Carver County to allow the
driveway to connect to Pioneer Trail. An encroachment agreement must be obtained from
MnDOT and Carver County to allow construction of private utilities in the right -of -way.
Ten -foot wide drainage and utility easements are required over all public utilities.
WETLANDS
There are two wetland basins located on the property. Currently, no delineation has been
submitted or approved for either basin. Given the distance between the proposed improvements
and the likely wetland boundaries, it is not imperative that a delineation be performed on the
basins. However, for the purposes of establishing buffers and setbacks, an elevation shall be
established and agreed to by the city which will approximate the extent of the wetland. The plan
set must clearly indicate that these wetlands are not delineated in accordance with 1987 US
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 14 of 23
Army Corps of Engineers Wetland Delineation Manual. Any future expansion of grading
activities and/or construction area will require that the wetlands are delineated in a manner
consistent with the accepted practice of wetland determination and delineation.
The more westerly basin is located within both Chanhassen and the City of Chaska. The invert
elevation for the outlet from this basin is set at 893.62'. Given bounce and capillary movement
of water within the soils, the boundary shall be assumed to be at 894' and the buffer and setback
shall be from this contour. The plan sheets must be amended to reflect this.
The drainage and utility easement must be recorded against the property and must include the
wetland and the buffer or these areas shall be dedicated to the city. Further, the plans must show
the proposed location of the wetland buffer monuments and these monuments must be installed
prior to the release of the final plat. A vegetation management plan will be required for any
disturbed buffer area or any buffer that is unacceptable as described in section 20 -142 of city
code.
SHORELAND OVERLAY AND BLUFF CREEK OVERLAY DISTRICTS
Bluff Creek transects the northern portion of this property. For this reason a portion of the
property lies within the Shoreland Overlay District and the Bluff Creek Overlay District. Bluff
Creek is impaired for turbidity and for fish indices of biological integrity (IBI). The Total
Maximum Daily Load study and Stressor Identification Report both indicate that flow volumes
contribute to both impairments. The Bluff Creek Corridor Feasibility report identifies the
acquisition and preservation of a continuous greenway corridor from the headwaters near
Minnewashta Park to the Minnesota River. In discussions with the applicant, they have no
intention of developing further north toward Bluff Creek and have suggested donating this area
to the city. This would connect two city -owned parcels and would go towards the goal of a
continuous greenway.
The proposed development is consistent with the Bluff Creek Overlay District management goals
and the TMDL study.
SURFACE WATER MANAGEMENT
Two stormwater management features are being proposed. The retention pond is to receive
drainage from the parking area and the building through a 4- foot curb cut in the parking lot. It
has been staff s experience that these swales are prone to erosion problems. The model should
be modified to indicate the discharge velocity at the curb cut. If it exceeds three (3) cfs the water
should be piped to the pond. This is the preferred method of conveyance.
The rip rap should be extended all the way to the normal water level of 905.0 and the geotextile
should have a high permittivity rating. Because of the long -term maintenance issues associated
with this inlet, it shall be the property owner's responsibility to maintain this inlet and an
operations and maintenance manual shall be developed and submitted to the city for review and
records. This O &M shall include the biofiltration feature as well.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 15 of 23
The outfall for the pond shall be pulled back toward the pond so that it is far enough removed
from the 894' contour such that no part of the rip rap needs to extend into the wetland area. If
practicable to do so from an engineering standpoint, it should discharge before reaching the
buffer area.
The other stormwater management feature is a bioretention basin located south of the building.
A detailed construction plan must be developed and provided to the city for review and
comment. This plan shall be consistent with the Minnesota Stormwater Manual "Design criteria
for bioretention ".
A percolation test using an infiltrometer such as a double ring or modified Philip Dunne shall be
provided for determining infiltration rates. Currently the model assumes am infiltration rate of
0.37 inches/hour. This exceeds the design infiltration rates for B soil groups, as found in the MN
Stormwater manual, by nearly 20 %. This is even more problematic as it appears likely that a
portion of the feature overlies a soil unit with a `C' classification. The model shall be amended
to reflect the results of the soil borings and infiltrometer tests.
Soil borings have not been provided. These are necessary to have reasonable assurance that
three feet of separation exists between the bottom of the basin and the highest known ground
water level.
Pretreatment is required before discharging into the bioretention feature. This can be done with a
forebay, a grass swale or a sump manhole. The plan must be amended to include the proposed
pretreatment method.
Soils shall be amended within the feature as indicted in the MN Stormwater Manual. An
underdrain system is highly recommended. The feature shall be designed to draw down in 48
hours time.
A detailed vegetation management plan shall be developed and submitted. This plan should
include a plant schedule and anticipated annual maintenance. It may be included as part of the
operations and maintenance manual.
The final 150 feet of the entrance will not be captured and treated on -site but will instead ran into
Pioneer Trail. The applicant must receive approval from Carver County for this condition. It is
also likely that during larger events, additional runoff will enter Pioneer Trail as a result of blow
by as the catch basins cannot accommodate the runoff. The applicant shall provide a spread and
run calculation for the proposed catch basin configuration.
LANDSCAPING
Minimum requirements for landscaping include 696 square feet of landscaped area around the
parking lot, one landscape island or peninsula, two trees for the parking lot, and bufferyard
plantings along the property lines. The applicant's proposed as compared to the requirements for
landscape area and parking lot trees is shown in the following table.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 16 of 23
Applicant meets minimum requirements for trees and landscaping in the parking lot area.
Buffe and Requirements
Required
Proposed
Vehicular use landscape area
696 s . ft.
>696 s . ft.
Trees/ parking lot
2 trees
2 trees
Islands or peninsulas/parking arking lot
1 islands/ eninsulas
1 islands/ peninsulas
Applicant meets minimum requirements for trees and landscaping in the parking lot area.
Buffe and Requirements
Required plantings
Proposed plantings
4 Overstory trees
4 Overstory trees
Bufferyard A — west prop. Line, 480'
4 Understory trees
12 Understory trees
8 Shrubs
Existing vegetation
1 Overstory trees
Existing vegetation and
Bufferyard A — north prop. Line,
1 Understory trees
distance meet buffer
2 Shrubs
requirements
4 Overstory trees
1 Overstory trees
Bufferyard A — east prop. Line, 400'
4 Understory trees
9 Understory trees
8 Shrubs
26 Shrubs
Existing wooded area
1 Overstory trees
3 Overstory trees
Bufferyard A — south prop. Line, 140'
1 Understory trees
2 Understory trees
2 Shrubs
12 Shrubs
The applicant meets minimum requirements for bufferyard plantings.
The applicant does not show foundation plantings around the exterior footprint of the building.
City ordinance requires that foundation plantings be included in order to improve the appearance
of a structure. The applicant shall revise the landscape plan to include a mix of plantings, such
as perennials and shrubs, around the footprint of the building.
The plans show sidewalks that connect to City trails. Full park fees in lieu of parkland dedication
shall be collected in full at the rate in force.
The site is subject to a payment of $12,000 in park dedication fees (24 beds X $500 per bed).
RECOMMENDATION
Staff recommends approval of the Bluff Creek Cottages subject to the conditions of approval.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 17 of 23
A.
"Planning Case #2013 -08 to rezone 8.9 acres of property zoned A2, Agricultural Estate District,
to R -8, Mixed Medium - Density Residential for Beehive Home Subdivision contingent upon
site plan approval, as shown in plans dated received June 14, 2013, and adoption of the
Findings of Fact."
B. CONDITIONAL USE PERMIT
"The conditional use permit for Planning Case 2013 -08 for Bluff Creek Cottages as shown in
plans dated received June 14, 2013, and including the attached Findings of Fact and
Recommendation, subject to the following conditions:
The plans are amended to read "Assumed wetland boundary — area not delineated per 1987
Corps Manual."
2. The 894' contour is the assumed wetland boundary for purposes of determining buffer and
setbacks.
3. Wetland buffer shall be shown to measure twenty (20) feet as is consistent with a Manage 2
wetland. The setback from this buffer shall then be thirty (30) feet.
4. That portion of the property containing the Bluff Creek Primary Zone and the tributary to
Bluff Creek is dedicated to the city as per discussion with applicant and city staff.
5. The applicant must apply for and receive a NPDES construction permit prior to any earth -
disturbing activity.
6. The applicant must prepare a SWPPP consistent with the NPDES construction permit
requirements (Part III) and submit this SWPPP to the city for review and comment.
7. The construction of the bioretention area shall be phased such that it is not disturbed until
after the rest of the site has been graded. The plans shall be amended to reflect this and
perimeter control shall be installed that will prevent the operation of equipment and the
stockpiling of materials in this area.
8. Sediment control Best Management Practices shall remain in place around the bioretention
basin until the area tributary to the basin is stabilized.
9. Inlet protection shall be installed on the double catch basin on Pioneer Trail located
downstream of the site prior to commencement of earth - disturbing activities. Inlet protection
shall be installed on all catch basins and curb cuts interior to the site after installation until
final stabilization is met.
10. All outfalls, including the curb cut, shall be stabilized within 24 hours of connection.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 18 of 23
11. The rip rap for the curb cut shall extend, uninterrupted, to the normal water level of the
proposed pond (905.0').
12. The geotextile fabric shall have a permittivity value of 0.5 or higher.
13. The model shall be amended to show that the peak discharge rate at the curb cut is no greater
than 3.0 cfs during the 25 -year storm event. If this cannot be achieved, the applicant is
strongly encouraged to use pipe to convey stormwater runoff.
14. An operations and maintenance manual shall be provided to the city for review and approval
and shall cover the bioretention feature and the swale inlet into the pond.
15. The outfall for the stormwater detention pond shall be pulled away from the wetland such
that there is adequate room to install all rip rap without any disturbance below the 894'
contour. If practicable to do so, the outfall shall be pulled entirely outside of the wetland
buffer area.
16. The bioretention feature shall be designed in a manner consistent with the Minnesota
Stormwater Manual "design criteria for bioretention ".
17. A detailed plan for the bioretention feature, including phasing, soil amendments, underdrain
(if necessary) and planting schedule shall be provided to the city for review and approval.
18. Percolation tests shall be performed in the bioretention area to determine infiltration rates.
The model shall be amended based upon these findings and provided to the city.
19. The bioretention feature shall be designed such that it drains within 48 hours.
20. Pretreatment shall be provided prior to discharge to the bioretention feature. This shall be a
grass swale consistent with the MN Stormwater Manual "Guidelines for filter strip pre-
treatment sizing ", a forebay or a sump manhole at least three feet in depth.
21. The applicant must receive permission from Carver County for the proposed runoff condition
into Pioneer Trail and provide a spread and run calculation to show that the proposed catch
basin will capture the ten -year event or otherwise design the storm sewer to capture this
event.
22. The applicant is responsible for all other permits and approvals."
C. SITE PLAN APPROVAL
"The site plan consisting of a 13,700 square -foot continuing care retirement facility, Planning
Case 2013 -08 for Bluff Creek Cottages as shown in plans dated received June 13, 2013, and
including the attached Findings of Fact and Recommendation, subject to the following conditions:
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 19 of 23
Building Official Conditions:
1. The proposed structure is required to have an automatic fire extinguishing system.
2. All plans must be prepared and signed by design professionals licensed in the State of
Minnesota. A geotechnical (soil evaluation) report is required.
3. Designs \plans for retaining wall(s) exceeding four feet in height must be prepared and signed
by a structural engineer.
4. Detailed building code - related requirements have not been reviewed; this will take place
when complete structural /architectural plans are submitted.
5. Structures and site must meet Minnesota Accessibility Code.
6. The owner and /or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
Fire Marshal Conditions:
1. Add one hydrant at the intersection of Pioneer Trail and the entrance road.
2. In addition to 12 -inch address numbers on the building, address numbers will be required at
driveway entrance. Contact Chanhassen Fire Marshal for requirements.
3. A PIV, Post indicator valve will be required.
4. Yellow painted curbing and "No Parking Fire Lane" signs are required. Contact Chanhassen
Fire Marshal for details.
5. City Engineer shall verify that the purposed fire apparatus turnaround is sufficient.
6. A three -foot clear space must be maintained around fire hydrant(s).
Planning Conditions:
1. All rooftop and ground equipment must be screened from views.
2. Approval of the site plan application is contingent upon approval of the rezoning and
conditional use permit for Planning Case 2013 -08.
3. The monument sign may not exceed 24 square feet in area nor be higher than 5 feet. The
sign shall be located 10 feet from the property line.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 20 of 23
4. Sign illumination and design shall comply with ordinance. If illuminated, the letters shall be
backlit and use individual dimension letters, at least one -half inch deep. The sign materials
shall be compatible with the building. The applicant must apply for a sign permit.
The trash enclosure for the building has not been shown on the plans. The structure must be
screened from views and constructed of the same materials as the building. Recycling space
and other solid waste collection space should be contained within the same enclosure as the
trash.
6. Light levels for site lighting shall be no more than one -half foot candle at the project
perimeter property line. This does not apply to street lighting. Light fixtures shall be
downcast and the light shall be cut off at a 90- degree angle as required by the city code. All
fixtures shall be shielded.
Park and Trail Conditions:
1. Park fees in the amount of $12,000 shall be collected as part of the site plan permit.
Engineering Conditions:
1. An agreement must be obtained from MnDOT and Carver County to allow the driveway to
connect to Pioneer Trail (County Road 14) and to allow construction of private utilities in the
right -of -way.
2. The applicant must apply for and receive a NPDES construction permit prior to any earth -
disturbing activity.
3. The applicant must prepare a SWPPP consistent with the NPDES construction permit
requirements (Part III) and submit this SWPPP to the city for review and comment.
4. The construction of the bioretention area shall be phased such that it is not disturbed until
after the rest of the site has been graded. The plans shall be amended to reflect this and
perimeter control shall be installed that will prevent the operation of equipment and the
stockpiling of materials in this area.
5. Sediment control Best Management Practices shall remain in place around the bioretention
basin until the area tributary to the basin is stabilized.
6. Inlet protection shall be installed on the double catch basin on Pioneer Trail located
downstream of the site prior to commencement of earth - disturbing activities. Inlet protection
shall be installed on all catch basins and curb cuts interior to the site after installation until
final stabilization is met.
7. All outfalls, including the curb cut, shall be stabilized within 24 hours of connection.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 21 of 23
8. The rip rap for the curb cut shall extend, uninterrupted, to the normal water level of the
proposed pond (905.0').
9. The geotextile fabric shall have a permittivity value of 0.5 or higher.
10. The plans must be signed by a registered engineer.
11. Ten -foot drainage and utility easements are required over all public utilities.
12. An existing topography plan sheet must be included in the plan set.
13. The grading plans must be amended so that no slopes exceed 3:1.
14. The developer's engineer must submit a soils report and boring log for this site indicating the
soil conditions, permeability and slope.
15. The plans must show the elevations at the corners of the proposed building and where the
building foundation is acting as a retaining wall.
16. The plans must identify any stockpile areas that will be used during construction.
17. The developer's engineer must call out the 6 -foot retaining wall around the "outdoor space"
in the plans and include top and bottom of wall elevations.
18. The following materials are prohibited for retaining wall construction: smooth face, poured -
in -place concrete (stamped or patterned concrete is allowed), masonry, railroad ties or
timber. Walls taller than 6 feet shall not be constructed with boulder rock.
19. The developer's engineer must adjust grading at the face of the east retaining wall to create a
swale so water will flow away from both the wall and the building.
20. The retaining walls shall be privately owned and maintained.
21. All retaining walls over six feet high and within 10 feet of a sidewalk or other public way
must have a fence or other barrier. This condition includes the areas where the building
foundation will act as a retaining wall.
22. Before vehicles enter Pioneer Trail, the driveway must provide a landing area that starts at
least 50 feet back from the crosswalk and is at a 2% maximum grade.
23. The parking lot aisle must be 26 feet wide.
24. The turnaround must allow enough room for a fire truck to turn and exit the parking lot
without going through the parking spaces.. Approved turnarounds include a 100 -foot
hammerhead and a 70 -foot diameter cul -de -sac.
25. The plans are amended to read "Assumed wetland boundary — area not delineated per 1987
Corps Manual."
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 22 of 23
26. The 894' contour is the assumed wetland boundary for purposes of determining buffer and
setbacks.
27. Wetland buffer shall be shown to measure twenty (20) feet as is consistent with a Manage 2
wetland. The setback from this buffer shall then be thirty (30) feet.
28. That portion of the property containing the Bluff Creek Primary Zone and the tributary to
Bluff Creek is dedicated to the city as per discussion with applicant and city staff.
29. The model shall be amended to show that the peak discharge rate at the curb cut is no greater
than 3.0 cfs during the 25 -year storm event. If this cannot be achieved, the applicant is
strongly encouraged to use pipe to convey stormwater runoff.
30. An operations and maintenance manual shall be provided to the city for review and approval
and shall cover the bioretention feature and the Swale inlet into the pond.
31. The outfall for the stormwater detention pond shall be pulled away from the wetland such
that there is adequate room to install all rip rap without any disturbance below the 894'
contour. If practicable to do so, the outfall shall be pulled entirely outside of the wetland
buffer area.
32. The bioretention feature shall be designed in a manner consistent with the Minnesota
Stormwater Manual "design criteria for bioretention ".
33. A detailed plan for the bioretention feature, including phasing, soil amendments, underdrain
(if necessary) and planting schedule shall be provided to the city for review and approval.
34. Percolation tests shall be performed in the bioretention area to determine infiltration rates.
The model shall be amended based upon these findings and provided to the city.
35. The bioretention feature shall be designed such that it drains within 48 hours.
36. Pretreatment shall be provided prior to discharge to the bioretention feature. This shall be a
grass Swale consistent with the MN Stormwater Manual "Guidelines for filter strip pre-
treatment sizing ", a forebay or a sump manhole at least three feet in depth.
37. The applicant must receive permission from Carver County for the proposed runoff condition
into Pioneer Trail, and provide a spread and run calculation to show that the proposed catch
basin will capture the ten -year event or otherwise design the storm sewer to capture this
event.
38. The applicant is responsible for all other permits and approvals.
39. The developer's engineer must show the detailed lift station design and location in the plans.
40. The City of Chaska must approve the sanitary sewer plans.
41. The sanitary sewer and watermain shall be privately owned and maintained.
Planning Commission
Bluff Creek Cottages — Planning Case 2013 -8
July 16, 2013
Page 23 of 23
42. A plan sheet is required to show the watermain extension from the driveway to the
connection to Chanhassen's watermain system.
43. The watermain that is parallel to Pioneer Trail must be 8 inches for fire flow conditions.
44. The developer's engineer shall model the watermain extension for fire flow demand to the
development to ensure the watermain pipe size is adequate.
45. Fire hydrants are required every 400 feet, and gate valves are required every 800 feet.
46. This property has outstanding assessments from previous improvement projects that were
deferred due to the property's Green Acres status. Altering the zoning for this property will
cause the assessments to come due.
47. Water and sewer trunk and hook -up fees are to be collected with the development contract.
48. A permit is required for any work within the MnDOT or Carver County right -of -way.
49. A temporary construction easement will be required for the installation of utilities within
road right -of -way.
Miscellaneous Conditions:
1. The applicant shall work with staff on minor plan modifications.
ATTACHMENTS
1. Findings of Fact and Recommendation.
2. Development Review Application.
3. Reduced Copy of Plans dated "Received June 14, 2013 ".
4. Public Hearing Notice and Affidavit of Mailing.
g: \plan\2013 planning cases @013 -08 bluff creek cottages\resubmittal 6- 14- 13\staffreportAoc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
IN RE:
Application of Community Asset Development Group and John Klingelhutz to Rezone
approximately 8.9 acres from Agricultural Estate (A -2) to Mixed Medium Density Residential
District (R -8); Site Plan Review for a Continuing Care Retirement Facility (Bluff Creek
Cottages); and a Conditional Use Permit to allow development within the Bluff Creek Overlay
District.
On July 16, 2013, the Chanhassen Planning Commission met at its regularly scheduled meeting
to consider the application of Community Asset Development Group and John Klingelhutz to
rezone approximately 8.9 acres from Agricultural Estate (A -2) to Mixed Medium Density
Residential District (R -8); Site Plan Review for a 13,700 square -foot Continuing Care
Retirement Facility (Bluff Creek Cottages); and a Conditional Use Permit to allow
development within the Bluff Creek Overlay District. The Planning Commission conducted a
public hearing on the proposed rezoning preceded by published and mailed notice. The Planning
Commission heard testimony from all interested persons wishing to speak and now makes the
following:
FINDINGS OF FACT
1. The property is currently zoned Agricultural Estate District, A -2.
2. The property is guided in the Land Use Plan for Residential Medium Density.
3. The legal description of the property is as follows:
That part of the Southwest Quarter of the Northeast Quarter and the Northwest
Quarter of the Southeast Quarter of said Section 27, Township 116, Range 23
West of the Fifth Principle Meridian, described as follows:
Commencing at the southeast corner of said Southwest Quarter of the Northeast
Quarter; thence on an assumed bearing of North 00 degrees 28 minutes 53
seconds West, along the east line of said Southwest Quarter of the Northeast
Quarter, a distance of 528.00 feet; thence on a bearing of South 89 degrees 31
minutes 07 seconds West, a distance of 617.10 feet; thence on a bearing of South
00 degrees 28 minutes 53 seconds East, parallel with said cast line of the
Southwest Quarter of the Northeast Quarter, a distance of 665.28 feet; thence on a
bearing of South 80 degrees 28 minutes 53 seconds East, a distance of 626.58 feet
(620.50 feet deeded), to the east line of said Northwest Quarter of the Southeast
Quarter; thence on a bearing of North 00 degrees 28 minutes 16 seconds West,
along the said east line of the Northwest Quarter of the Southeast Quarter, a
distance of 246.08 feet to the point of beginning.
4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible
adverse affects of the proposed amendment. The six (6) affects and our findings
regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City
Comprehensive Plan.
b) The proposed use is or will be compatible with the present and future land uses of
the area.
c) The proposed use conforms with all performance standards contained in the
Zoning Ordinance.
d) The proposed use will not tend to or actually depreciate the area in which it is
proposed.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
Site Plan Review
a) The proposed site plan is consistent with the elements and objectives of the city's
development guides, including the comprehensive plan, official road mapping,
and other plans that may be adopted;
b) The proposed development is consistent with the site plan review requirements of
city code;
c) The proposed site plan preserves the site in its natural state to the extent
practicable by minimizing tree and soil removal, preserving as permanent open
space the land within the Bluff Creek primary zone and designing the site in
keeping with the general appearance of the area;
d) The proposed site plan creates a harmonious relationship of building and open
space with natural site features and with existing and future buildings having a
visual relationship to the development;
e) The proposed site plan creates a functional and harmonious design for structures
and site features, with special attention to the following:
1) An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
2) The amount and location of open space and landscaping;
3) Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
4) Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
f) The proposed site plan protects adjacent and neighboring properties through
reasonable provision for surface water drainage, sound and sight buffers,
preservation of views, light and air and those aspects of design not adequately
covered by other regulations which may have substantial effects on neighboring
land uses.
6. Conditional Use Permit:
a. The proposed development will not be detrimental to or degrade the public health,
safety, comfort, convenience or general welfare of the neighborhood or the city.
b. The proposed development will be consistent with the objectives of the city's
comprehensive plan and this chapter.
c. The proposed development will be designed, constructed, operated and maintained so
to be compatible in appearance with the existing or intended character of the general
vicinity and will not change the essential character of that area.
d. The proposed development will not be hazardous or disturbing to existing or planned
neighboring uses.
e. The proposed development will be served adequately by essential public facilities and
services, including streets, police and fire protection, drainage structures, refuse
disposal, water and sewer systems and schools; or will be served adequately by such
facilities and services provided by the persons or agencies responsible for the
establishment of the proposed use.
f The proposed development will not create excessive requirements for public facilities
and services and will not be detrimental to the economic welfare of the community.
g. The proposed development will not involve uses, activities, processes, materials,
equipment and conditions of operation that will be detrimental to any persons,
property or the general welfare because of excessive production of traffic, noise,
smoke, fumes, glare, odors, rodents, or trash.
h. The proposed development will have vehicular approaches to the property which do
not create traffic congestion or interfere with traffic or surrounding public
thoroughfares.
i. The proposed development will not result in the destruction, loss or damage of solar
access, natural, scenic or historic features of major significance.
j. The proposed development will be aesthetically compatible with the area.
k. The proposed development will not depreciate surrounding property values.
1. The proposed development will meet standards prescribed for certain uses as
provided in the Conditional Use article.
The planning report #2013 -08 dated July 16, 2013, prepared by Sharmeen Al -Jaff et al is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Rezoning, Site
Plan Review and the Conditional Use Permit.
ADOPTED by the Chanhassen Planning Commission this 16a' day of July, 2013.
CHANHASSEN PLANNING COMMISSION
IMm
Its Chairman
pg: \plan\2013 planning cases\2013 -08 bluff creek cottages\mubmival 6- 14- 13\findings of fact.doc
9
f-y�6F
v o
•+•
133HS 213A0�
O
p j1
fa y F p
tl
to d_
tl10S3NNIW N333tlN.3
1F
U
ONISHOH
LOIN3S N3SStlHNtlHO
�.i.
e
o
Z
z o
0 0
x
z
o
VJ
V
w
h
ff
O O
�
Z
5
a>
70
7
L
WW
�rwj
wzw
C:
rn
U)
—
~
ai j J
w °
w
z
tt
z
er
a
a
w
a a
U a
m rc
¢
0
tt
F
£ F
r-
Z
\ V
J
w
r
o
_
a o
w
w
W
Z)
w
=
uow
o j o
vx
o
n�u
N
o
0
o
w
w H
1 §E
WQ
ma
O
(n
U ro U
U U
U
U
U
� Q
Q
w ebb x
IO
z
O
O O
m
W °haw
UW
m M
m M
N
m
N
N
N N
m
N
m
yi¢
OYz�
//��
Y�
Z u£3
FAN
Z
+
Z
0
Q
a
Z
U
Q
fr
K W
N
O
LL
..
O �/^,
LL v/
? y/J
OZ,
UO�n
\
F W m
U0KM
Z
Z
C
W
L
v/
<
{
V i
y
y
0
U
yy
� u
Pd
w i m
- 90 -
o zi -
Z
t-
w°w11
_
O
Z
U
W
♦—
,�_i
�
LI._
^,
ASV __. ,
° x
•�
..
J.
�
1
yZN
vJ
!
"-ago F�
Q OU
Z
OOZm
Q U
F- > O
z oo°m
C)
U
�5
/
/
/
/
/
\\ \
JI
3 - g
B @
6 �3
5$ SE 4
eN
a Heg ep =
e� a�
i
�rb
d
o_ 1
s8 §\ n
�In
ri_i
s� —
3.tS.94W. '.
�w �oivpvmM qq
�,49 a
Or
k
NVId 31151tlN13 O 7
(
2
3
b1053NNIW'N365bHNtlH'J N
a ss ! [ :
-' "' s
Y�.I S
ONISOON NOIN3S N3SStlHNtlH7 e
8aoo LL �.
� o €_
Wo
z
'nzh
�Fw-
E $
c
Z $N -_
o�sio io 9$
V% a mm
w
a a i'a
d.
i� E®aa4ppkpk�y'
IL
J fT�N'�ZBB`G
�5
/
/
/
/
/
\\ \
JI
3 - g
B @
6 �3
5$ SE 4
eN
a Heg ep =
e� a�
i
�rb
d
o_ 1
s8 §\ n
�In
ri_i
s� —
3.tS.94W. '.
3 996 .R �� nNw I y
NtlOE-INOO O 7
f NOISOb3 'N3SStlHNVH'J M / ONVtl J'J
b1053NNIW
ONISOOH NOIN3S N3SStlHNtlH3
Ng
w ` to
4— i!
H m aS 3W a;WO° a4 ,o>
O uz a w 5`u a pom m Z
F Illlggi�•
oz �g =�oa3e� ew y; „���°w F �i01
Z .30 "�
0 �« 66�
o x s = =apgo„ m g= o- EWte 3 eee o§g
a amk< s :wpm �o agg?
g aa gg
J \
ke
� 1111 � � � I .'� • . • , I 1
���,,,// ,� ii it � {��\e� t /e /�T�, C, •�� :/� l / -
C-
-IS
' 1 I
•x
9 g
1181H X3 �3n18
q• � {•{ + y�
$5; �
' tl1033NNIW'N3SSbHNbH'J
•�/
° 5 F
- r3
.. . F
ONISnOH LOINES N39SVHNVHO
v O
a€
s�
pzFagg e�R
ESp gPg
ig�s
y:vn
�m
o10
iii tl
..
- FF ;5➢
p
°cn
EWE
II�I
�e n 3�
Of
0FFSig@ 4Ea
F€€ y
;gPS
ogET
6€`se
i §gs
NT
@Tm
jq9
y
@s
?S5R
€Sa5_
_
%g$Ee
§E
°y
LL psi« X03«
$?
a3��=
c'o
o
Z '2 5
%m
{a�q
fit
a�
W gggqtd5aggy=
mms
SI.[
a_S
vxo
m`om
.� A @�ania:
C-
-IS
' 1 I
q
\
NV'Id Alllllfl AiIVNIWll3 d
4
a
l
��Oppp
�
/
b1053NNIW N355tlHNtlH'J
V
$ �
x
e
�Jl
�
tlXi;fA^3
i
`��g�F
l�e
p�
N'.
JNISOOH LOIN3S N3SSVHNVHO
O
\
\
\
a
/
/
/
/
/ y
/
NW29'53°W
i
/
/
i
/
i
/
/ � E
on
_. �� 4 .'V •v d v
Aw
N. ,
y \
w 99
� ®off
21 0
E r �
ro
/
�o
°d .'Y 3 €
ON of o €z
aZFa q Mn�
"�< oa � � ee -
F 0
Y�vo bm B3� by :
fn o��k o d,3
Z 1, _ ; ewe aF p =a
EE
- zp
a�\
ro
\ 6
\ l
l
\' O
� `yoJi
\
/ G�C /; \
y�;
rR
\
l
��Oppp
/
�Jl
2O
l�e
N'.
°d .'Y 3 €
ON of o €z
aZFa q Mn�
"�< oa � � ee -
F 0
Y�vo bm B3� by :
fn o��k o d,3
Z 1, _ ; ewe aF p =a
EE
- zp
a�\
ro
\ 6
\ l
l
\' O
� `yoJi
\
/ G�C /; \
y�;
rR
E
au
w�
F�
NY
3
w�
a�
S
H�
Oq
Y p�
I F YJ/n e
r e �� tltle
Y
9� xane a.•. _ p�C kkki � d[� I � w fr
A 11E18oe. v a 8 igpaq l� 9�! l
q tlkh!
(1(.1h, o
d� Y3P62�� £2Y
Epppv a<g g 55
22ga d'��x
4
` j{ pg sus
774s �qi Y�§ �'s sy2a� e e �� sa egg
a lli� .i8 �! 3. ape
z ¢'
� � ¢ eseY
p4
2
tl10S3NNIN'N3SSVHNtlN'J
,^ $
L /
e:y
gR
Pg6or
9NISOOH YOIN3S N3SSVHNtlHD
E
au
w�
F�
NY
3
w�
a�
S
H�
Oq
Y p�
I F YJ/n e
r e �� tltle
Y
9� xane a.•. _ p�C kkki � d[� I � w fr
A 11E18oe. v a 8 igpaq l� 9�! l
q tlkh!
(1(.1h, o
d� Y3P62�� £2Y
Epppv a<g g 55
22ga d'��x
4
` j{ pg sus
774s �qi Y�§ �'s sy2a� e e �� sa egg
a lli� .i8 �! 3. ape
z ¢'
� � ¢ eseY
p4
pp°
e:y
Pg6or
4
€
g
g
J
g s g EEC
MY
�.
e
�e1s1
p
P
"" tl Yl Yi
N
4
��O
� �
tG92O
axw msry
[�2tl
$
S
Mg
aN
g D�§�
a
z�
6
el
a'.8
m
g
NMI
3
�
E
au
w�
F�
NY
3
w�
a�
S
H�
Oq
Y p�
I F YJ/n e
r e �� tltle
Y
9� xane a.•. _ p�C kkki � d[� I � w fr
A 11E18oe. v a 8 igpaq l� 9�! l
q tlkh!
(1(.1h, o
d� Y3P62�� £2Y
Epppv a<g g 55
22ga d'��x
4
` j{ pg sus
774s �qi Y�§ �'s sy2a� e e �� sa egg
a lli� .i8 �! 3. ape
z ¢'
� � ¢ eseY
a g sw�3dtl�SONax'munx Fade
053NN
@
68 NVId '[
bI O
@ 9
tl1IW'N3SStlHNtlHJ � S
Opp 88855 t 6 F ___ @ ',SNISHOH 801N3S N39SVHNVHO
I k" e
ayy
Yy
to g�3`s@y g ° "� a @ p@p g @3 a 5ggg Yan A @' a @e "a` v 3 - ❑ 9�
� a � e 2 u �YS 1 "giro€ � ➢e Q � '� @ � e _ A•� a Z
' s `sY g@ @ - @ @ i @ gp @ a
Q YCryryppyy3< a 0 gb g °ry g9@ [ g [q
Z i 4 0 8
€ R ?YYY3A Y� =9 b i gg a § 2 MY+n 3 6d J aaY?
C7 er 43333n„ y@ s "S
Z �� Aa AA @^ a 3 � Ys $ e t � �€ y n & @'d " �tle � 4 �IS egi a- Ij •.
H A @$a e5 g 2 E� a w e; s A n y Y g a prop 2fce ?#� € i s@ ➢d 3,.
yak }3333 � Re c @ ga E s A@ 7Y a �g P 1 @:R Ida Ia sg � @ �€ `� `§ � � •, � > dd
A�A
a $E :� 3@ n 2: � ; a� � � i $e �Y �� 33s `@ 24$= 3@� � A4 $ ? a€ s� @� @� � ,'� Y .p, • �Oi
I
r-
Wy,
i
C �
gS28
02
■
Cn
1 � >f i
� G
w
0
w
esg �
s Z
firs
C)
w
Q
f
W
W
W
K
F
1 Y,
� 144 a
tit �a it fat !
J, fill
4 1i,
�j ; 4 ?flit t fa i a it! a'4
ro t Yitlii4 ft o f i ,: F ?ts
a�ggiq
\
}
�6
F
i
K�
N 4�
,C' W
i F5�
I
k /
e /
{
X_ a \p
t�l -
.F `' •t
6 �^
' lid
�5
v-
�j.
N
`O
4a
sg
a
j
A C/
J
a� ica
i
CCO
�.t
u^
K\ I
i
W
a
o
�o
� F
W
Q N
z<
m
0
U
Q
R� Fy
W
_6 UZ
8 gg�
z
Zee
0
0=
W%
CI G
it
N?
N
W
F
r
0
v
Y
W
W
1'
f..1
W
W
J
LG
Q
O
l.�
v
N
N
fill N S N"O Jo
35 IIOINBS
Z 6 Z 3imo din'le
a
€gi
f z6Z {5ig a
SNOIIVA313 2101'131X3
N i
N3SStlH OJO
L e
S30tl1L03 2101N35
awnm N3321OAAMS
t�
+Mlilre.iY.,..
Co qty Raid 15 - 4
Gougy.RA 14
aim
Go Ste earth feet 1000
meters, 400
ir?IPrI
CITY OF CHANHASSEN
7700 Market Boulevard — P.O. Box 147
Chanhassen, MN 55317 — (952) 227 -1100
DEVELOPMENT REVIEW APPLICATION
Applicant Name and Address:
CHESTNUT GROUP, LLC
1560 Bluff Creek Drive
Chanhassen NAN
Contact:
Phon Iohn atddkconstmction com
Email:
Planning Case No. 3 -O
CITY OF CHANHASSEN
RECEIVED
PIAR '15 2013
CHANHASSEN PLANNING DEPT
John Klingelhutz
—_1560 Bluff Creek Drive
Chanhassen MN
Contact:
Dhnnn• 1=�v
tmar:
NOTE: Consultation with City staff is required prior to submittal, including review of development
plans
Comprehensive Plan Amendment
---- XXItional Use Permit (CUP) VAS
Interim Use Permit ([UP)
Non - conforming Use Permit
Planned Unit Development` ,
xx $500
_ Rezoning 5b
_ Sign Permits
_ Sign Plan Review
�'WRlan Review (SPR)*
Subdivision*
i 4o k 1 &4CG
Son t to 1.4'r �
Temporary Sales Permit
Vacation of Right -of -Way /Easements (VAC)
(Additional recording fees may apply)
Variance (VAR)
Wetland Alteration Permit (WAP)
Zoning Appeal
Zoning Ordinance Amendment
Notification Sign - 200
xx (City to install and re e)
X Escrow F " Fees/Attorney Cost* too
.$5 UP P ACNARNVAP/Metes nds
- $450 Ivor B PA I Z l5 CIC l l"!4
TOTAL FEE $ $1,815 1.%L owe ISO
An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing.
*Five (5) full-size folded copies of the plans must be submitted, including an 8 %" X 11" reduced
copy for each plan sheet along with a digital copy in TIFF -Group 4 ( *.tit) format.
**Escrow will be required for other applications through the development contract.
ee
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for
each application,
PROJECT NAME: BLUFF CREEK SENIOR HOUSING
LOCATION: NORTHWEST CORNER OF PIONEER TRAIL AND BLUFF CREEK DRIVE
LEGAL DESCRIPTION AND PID: SEE ATTACHED 25- 0270400
TOTAL ACREAGE:
WETLANDS PRESENT: YES XX NO
PRESENT ZONING: AS AGRICULTURAL ESTATE IAol
REQUESTED ZONING:
RESIDENTIAL Mil
PRESENT LAND USE DESIGNATION: RESIDENTIAL
REQUESTED LAND USE DESIGNATION: RESIDENTIAL
REASON FOR REQUEST: WE ARE PROPn.Swr Tn r nN
THAT WILL BE FOCUSED ON INDIVUDUAISTHAT NEED MEMORY CARE. THE BUILDING WILL CONSIST OF
24 SFDROOMS
FOR SITE PLAN EMPREVIES : Include number
4 ANY G VEN TIMEes: and now employees:
This application must be completed in full and be typewritten or dearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application_
A determination of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
autt>wization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
COMMUNITYASSET
DEVELOPMENT GROUP
1403 Valley View Rd
Chaska, Mn 55318
952- 448 -4444
3/10/2013
Kate Aanenson, Community Development Director
City of Chanhassen
7700 Market Blvd
Chanhassen MN 55317
Dear Ms. Aanenson,
We represent the Chestnut Group that is proposing to construct a 24 unit senior memory
care on the 8.2 acre parcel it owns off of Pioneer Trail. Because of wetland and bluffs the
developable portion of the parcel is approximately 3.5 acres resulting in a density of 6.8
units per developable acre. The property is currently zoned residential and we are seeking
a rezoning, conditional use permit and site plan approval to develop this facility. Enclosed
are:
1. Location map
2. Site plan
3. Grading and utility plan
4. Landscape Plan
5. Hydraulic Report
6. Building floor plan
7. Building elevation
8. Set of building images
Servicing this site with sanitary sewer is a challenge since the closest Chanhassen
sanitary sewer is located to the north and would require the construction of a force main
through the wooded ravine. Consequently, based on discussions with the City staff we
have contacted the City of Chaska to explore the feasibility of connection to the City of
Chaska utility system to the west. Based on those discussions, we believe that executing
an agreement for service through Chaska is feasibly and we would pursue this option as a
condition of site plan approval.
After you have had a chance to review, please contact me at your convenience to review
in greater detail. Thank you for your cooperation and we truly look forward to working with
you on this exciting project. Call me with any questions at 952 - 448 -4444
Sincerely
1�I
David Pokorney
Community Asset Development Group
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on July
3, 2013, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that
on said date she caused to be mailed a copy of the attached notice of Public Hearing for Bluff
Creek Cottages — Planning Case 2013 -08 to the persons named on attached Exhibit "A ", by
enclosing a copy of said notice in an envelope addressed to such owner, and depositing the
envelopes addressed to all such owners in the United States mail with postage fully prepaid
thereon; that the names and addresses of such owners were those appearing as such by the
records of the County Treasurer, Carver County, Minnesota, and by other appropriate records.
Subscribed and sworn to before me
this day of 2013.
otary blic
"�.� °_ KIM T. MEUWISSEN
s Notary Public- Minnesota
'i �.� - -; � My Commission Expires Jan 31, 2015
C
d
1-�
C
C Ni
@ N
d E
SE
U °
� U
7
(- C
® C
d @
U d
° C
Z N
N
@
L
C
@
L
LEI
d
d
2
C
O) O
C N
C
d E
2 E
O
Q U
a rn
0_ C
o C
C
d @
U _ a
O C
Z N
N
@
t
m
L
U
J
d
0
d O_ N
.0 @ d
o w >
N
(v a
m
,
N
> 0
a m W O Z L
U
)
(M
I+ C
I
voC W
'O
7 O @
0 N
Q
m p
= >m N_ O > d s
�Jv_='
>,
0_
M
d @
0
❑O.7
j
a 0
@ 01- d
M C
C C O O e
w
Ud
o° (U c
p0 Em y
�mJ
ov m
•AN
N ,
d O
7
o @ M d 0
O O ,
-2v
m om«E_ o om
nNed
E
�
° N
Ll C O s
'3
O
O C R N
p) L@ -0 c
E cc
�E E - m 0
" o .,.E -:5 L
a
9L
'c0
>
0
co
a) -. .0
0 O
C y
>`
Mt C
E E
t -E c
mc
m
N
Y d
t.
(/J O
O 0 d
•O
L J6
m O
7 m_5 EL E F, = v > a
m
.i
UaaL
L
7U `
u
E O E
U
d d
En m>CE O v
? ry
N
j.(6 N d
O
COw Q Q O D� c 7 E
M
E M
�-
E
t
ro
`
C O
'--
_ d
O 0O
7
C 7
w w_
E w - N vUm
Ewm_Om E-EE 5 v c
-'�iOO-�
.02
�--
m0
7
7@N
OU
m0 d
w U O m
_
` nstO ma
a�-
EQ
0 h0
w
7O
m
O) M L d
00
m
0EC
m o OO o"oN o _ •N 2
M m
uomv°°
O.90
O
O
E '
1
U
O
O d
O)C
�
3 O
L
N E O y
c�mm0-- E
2 - m Eo
E n
v mp
O,
r
Od
wOC
C
O-
E O a
O C
dC
N d O
a w M
mm
a O
cm�c
dU°nv
r
M M.-
c: v -
E
L O 0 (D
->
0 4) .O
ID 04 �
M
C
oac v =uc, 1 0 2 u c
U c
o
m
.0@
U vO
c
E
d
O )O) d a) ' M
C j
E
°«yE`0 U 3d n
o T E K
� E 3 a v E - L onv v a d «� m
M
Qc m
) M
0
>
:
O d0
-n0
dO e
y¢Tya OaTpaa mL a
'm
o
c
@
E'CU d
N
- y
C 7 L U
dO)
O
d E 0 0 " _ y
'-
aom wE EL
v c J mc oL
O N
N
t
OD 7 d
>
d
@ N
@ Q J
U O U O
: 3 d
Jc
'a
<0 9
U
L @
o
w O O)
C
0 y C �Y
?=E
•10
mi
mv�ac
° m @
aq am n
acm_ m m>= jc °
--
>
-.
=.amdC
U
O
3>d
N
y)
C
w
d U M 7 0
oE
$, vc N m En m o d
- °o
-M we
...V
C
0
I )
a
M
M
N y)
� NO
�` �O
M E" U aE
«T
E
>
>
U
o X d
Q
E
a
E U O °@
v@I
d Co L
cc -
TO amd
-
mph
..
>�U>trnCO
.Q@ -
E'C
d c
N
CLc d E
@ 0 O
« J o
O_
E
@«
'O
M
m QO)
p
O
E
Cw
L 7 d
M O.
_ d
U O C '
.>
E d mo
n¢ -a '- N � cp
om-- v dcy , �c
M c2
(6
0 (D
7's
E
L
.0
o
E
c
Emry
oa L
W.- c
2
N N m
0
O
L a 7
T 0
d O >1 N N
Eo-m m:y 0-En cV
U o Lo
F-!
mN
O
M.0 NL E m O
Da c_ c« E
0_
Z QH
@ @O�NMdwM
- d NLENO.d
¢ omEcU W O yoa aO rna
6a0a' rm E'OE:5MOw x m dc
'Z m
m Umo oY
Et d M °o n l
E' - E o mm y
wC
E oz
d
C
d._
O."
Ois
0 E C
oa E E m`mm`aom x�c wv'g amc aacm
O 2 a
E
~
Q d
M M
U N a==N mN L
a o c dcnm -c mN Eu owm ypo
E
O
N
@'t
O
'C
CL
O d
r o L« y o£ n ° 'o 3 y° c
d
C .
MvO
Q@
w E
E
mE 0 _ . s
o SNw Nc
U
E 3 d Jdd
.mTE
O
O
O.
O O
d
0
m MnaiF
rnK�ma
p nvv 0 E2
¢ap«U3
Q
Q
O.@
d
�n
4) 0 O « M
r @ LN -C Qa
O ..L.. C 3 C L 1.1/ i C L
m
c
=
MoN N
> QONO�yM
q c �v m3
3t� cam dm �¢� -a z
o
_0
Q ,
'O
0.0 7
N Y C N ,.-_ @
O
aci�o
a m a v o 1° c> °n `m a>i d 3'm
>,
OD
�� @ 3
j
@ m= U y
C C
@ d C.M-_ O O
a;
mart Eno vT vnv Cd v'oc
0
m
O C 3 O`
d O d N C O
3 o E E n E w 8 v
E
m
U cc U
W' C
j
p
U c
Td Co O.d
Q ->O
m E• 6
a w y m
10w °-'3a
v
O'w
0 M
m
O
E -OO M
01 >,E @
tq L C
C
and v C_0 bm _JC c-
Nv- a>« c c m c
C
d Nm
>�M'U_
Q Q
Y d
�L
U d 0- f�
�LE CE °>r
3 O 0 @
NLN C'w ..mOn._7Ln Om X00
7p m JELEm m vm
t m
:-,
.F. E d N 0 @- E
d 7 U 0 0 C U d '°
c .Ua
E n a o 3 a. 3 N 2 m 0 v
E=E
L mY
7@ M d l6
d
ii c
c O Y
w O-O.a .0 E
O@ M C d d 0
E >�."' 7 d O) d
'V aJ -t mv..T.m I a E `09
N m slay Eo5.E m NOc
~
@
UC Ca
d p >
'--
0 O 70
7 0)M O.0 Q
C E 7
d w O C. r L
3m m - W vv
@« o nwE` =NO �- °So
.02
°)0 U fdgU
Q
7
7�
M c O U
O..- d
O) d
L U O mH
E @ >
y
a .um.N a
c- E o Nom- v cC
moo E voc 5 a m -o ff
E 0
M d 7
L..
O`
m�
°
c d C- M L N
om'
d O O a @ d
g O v- 3� v 3 v c e m
c- m u E
O.-O
o
O
E d N
0O r d
U
'6
O9
�'C d N
E 3`0 E-0
O M N N -dO N d
•� .. Cl) Ma C_
a m °v m- m o nC
o_ w v w ) W w
vrE �cmcc
O d
-
w w V-- C
C
f6 @ O n 0 c
d�
d C M d d ar
O O.
..co N_tE
a v 0 v v c p_ m v v T'3 p a y
>n
«
M O OU
:. ',K
d
dd 3 C- m
Yc
O.@ 7 >
d N L M U d
°
c 0E n° wv E° ums c
ovcv ='"r L"m OE p Lo U..c
o
d
7
E
3
L 0 „ 4) a) 'O
M 01 M C O O d >+ d
m E
U c 'c L m
a E m o E
m
N d C C
Q m
0
'0 d
U O C) > y
@@ 7@
O. L d T'j E
ui E' d o r v y m
¢ u o a a d L a a a
M c
9
M
N
C>
>
c d
'O' >0-do
C.
d� OUM O.O d'OC
T p a u T a
vr0- Uv -m�'o J w" 5Jy
'3 ` E
C
O m
@
E•CU
O aLi
7@
>
d
@ N
C 7 U U
O. O) O
@Q -N
E O a) O
d d Q- O y Y .�
UDUO.
avm E o `aw 5L
m O a C w m J m C N O N C m C ...
K no. -vvcu J9
N N�d'Oi"O
CQ
@.t.N
7C'3 M
O@
y 3�N Ld_tl1NN
po„5
cy o.at EOVC�E.0 �m Lm�
co
c d w c...
O� @
N
I- c
o
N D)
U d C G
d M M« 0 C •L+
d U o 3 ;; E
m e =Y, -,mss Ja� �V yw�� !in•-
a
vap �'
...V
C
c
�Ny 3 3
M
M
N y)
(p
w 7 d >
O O'.� @
M @ 7
_
M d@ C' O O).� O E
N
Nm'> on =v(gc o� N
v v c �, N m
_ v E n-' v'_a n
-5,2
7
N-O f �`
O'd3.
Q
d n
C
E 0 0)mU @ U
d C Cd
O' L 0 @ >. >cOY
ECLM O
My5NwY a- mJmv>o vow
v'>,_.. w -U wNma $mamr
y
>'0
O KX d_ U
_O A
M M °.'C -_ O.dL
n@ @ L�dU
«Er.t
y-
TU)v
G• >W E'�a�
_
Q..m�3 m EU°L
m_M (L,) a) Qi�
Emunm NL O ~NC��>'J NOI
@«
(6
N 0 d O)
C' C O
7's
E
O
cl
7 �c(pp .L.L d Ec
m O d
3 >.._ G'� M O)d a. C
U O =
^06C
nE cam d� ~w =v`a QAE O -NL mo
°- « c
W.- c
2
?
L m
O. U U L l
U
d
d -
mN
L d�Fy
N a
OTNN)
Oa oc n00.0 mm A00� �ot t
mrn
0_
Z QH
@ @O�NMdwM
- d NLENO.d
U �U 3
-0 E 5 v
m Umo oY
Et d M °o n l
E' - E o mm y
a'm dS ami
w y E 9v n m o r
i
aww
c
cdE m om a v
` ox °C
o
at
E
'C
CL
U)
d OE r ° n 0
rnmaov cnw
M
M
MvO
0d
Oc onmM N:fio
o U wO.m
nn
E 2 � o
+O
O
E
cO m c
m an d oE . o «
� p L u z
Q
O.@
d
a °m 0
C 3 50 m E
2
2L -S N N
J
o.
IL -j
U U'A 3 a N¢ m n m m
.
=Y ° ° °a= _ I nena along ime to I �HA1 AVERY® 5160®
Use Avery® Template 5160® j Feed Paper expose Pop -up Edgem j ��1
ANITA L & RICHARD A LANG
1840 FREEDOM LN #205
CHANHASSEN MN 55317 -4769
BARBARA DUDGEON
1840 FREEDOM LN #103
CHANHASSEN MN 55317 -4663
BRENT A GORACZKOWSKI
2687 SHADOW WOOD CT
CHASKA MN 55318 -1106
CHASKA CITY
1 CITY HALL PLAZA
CHASKA MN 55318 -1962
COLLEEN M CAJIGAS
9630 INDEPENDENCE Cl R #202
CHANHASSEN MN 55317 -4693
DEBRA CHENOW ETH
1829 FREEDOM LN
CHANHASSEN MN 55317 -4556
ERIC L & COLLEEN P CROWELL
2694 SHADOW WOOD CT
CHASKA MN 55318 -1106
GERALYN GRUSS
9680 WASHINGTON BLVD # 2
CHANHASSEN MN 55317 -4655
JAMES D & SHEILA G ARMSTRONG
9661 INDEPENDENCE CIR
CHANHASSEN MN 55317 -4653
JAMES S & KRISTEN R VIPOND
2690 SHADOW WOOD CT
CHASKA MN 55318 -1106
kiquettes faciles a peler
Utilisez le gabarit AVERY® 51600
ASHLEY GOEDERT
9657 INDEPENDENCE CIR
CHANHASSEN MN 55317 -4653
BENJAMIN R LURIE
9640 INDEPENDENCE CIR # 1
CHANHASSEN MN 55317 -4695
BRUCE E & MARCINE A JABLONSKI
2661 SHADOW LN
CHASKA MN 55318 -1109
CHRISTOPHER J OWEN
2706 SHADOW WOOD CT
CHASKA MN 55318 -1106
DANIEL H & MOLLY ANN HUSCHKE
9645 INDEPENDENCE CIR
CHANHASSEN MN 55317 -4653
EDWARD J & DEBRA K WEST
1837 FREEDOM LN
CHANHASSEN MN 55317 -4556
FEDERAL HOME LOAN MTGE CORP
5000 PLANO PKWY
CARROLLTON TX 75010 -4900
ILEANA GABRIELLE TUDOR
9640 INDEPENDENCE CIR # 2
CHANHASSEN MN 55317 -4695
JAMES J & VIRGINIA E O'BRIEN
9630 INDEPENDENCE CIR #203
CHANHASSEN MN 55317 -4693
JAMESON M RITTER
1809 FREEDOM LN
CHANHASSEN MN 55317 -4556
Repliez a la hachure afin de
Sens de reveler le rebord Po u
chargement P- Mc P
AUDREY ELIZABETH TALKINGTON
PO BOX 881
CHANHASSEN MN 55317 -0881
BERNARD E & PATRICIA A PEROZ
175 SE SAINT LUCIE BLVD #1371
STUART FL 34996 -4765
CARVER CO 55318 2729 TRUST
150 PIONEER TRL # 163
CHASKA MN 55318 -1167
CHRISTOPHER JOHN WOODROW
9660 WASHINGTON BLVD #4
CHANHASSEN MN 55317 -4657
DEBBIE R DRESSEN
9640 INDEPENDENCE CIR #4 UNIT
CHANHASSEN MN 55317 -4695
ERIC E PEDERSEN
2718 SHADOW WOOD CT
CHASKA MN 55318 -1106
FREDERICK W POTTHOFF III
9640 INDEPENDENCE CIR #8
CHANHASSEN MN 55317 -4695
JAMES D & DEBRA J KEPPLER
2670 SHADOW WOOD CT
CHASKA MN 55318 -1107
JAMES M & SUSAN E KEELER
1817 FREEDOM LN
CHANHASSEN MN 55317 -4556
JEFFREY D & STACY D KERFELD
2702 SHADOW WOOD CT
CHASKA MN 55318 -1106
www.avery.com
1- 800 -GO -AVERY
�..y aava a I ® Bend along line to I i�a l gy�RY® 5160® j
Use Avery® Template 51600 11 Feed Paper expose Pop -up EdgeTM V 1
JENNIFER L DOMHOLT
9640 INDEPENDENCE CIR #6
CHANHASSEN MN 55317 -4695
JEWEL TURCOTTE
9653 INDEPENDENCE CIR
CHANHASSEN MN 55317 -4653
JOHN KLINGELHUTZ
PO BOX 89
CHASKA MN 55318 -0089
JULIANNA M DAPPER
9688 WASHINGTON BLVD
CHANHASSEN MN 55317 -4613
K HOVNANIAN T &C HOMES AT MN
12701 WHITEWATER DR STE 120
HOPKINS MN 55343 -4109
KELLI J GROFF
9640 INDEPENDENCE CIR #5
CHANHASSEN MN 55317 -4695
LARRY SCHULZ
23662 OAKVIEW HEIGHTS TRL
FERGUS FALLS MN 56537 -8164
LISA ESPINOSA
2722 SHADOW WOOD CT
CHASKA MN 55318 -1106
MARYAM 0 YUSUF
9680 WASHINGTON BLVD #1
CHANHASSEN MN 553174655
MORONI J & LINDA A ST JOHN
1840 FREEDOM LN #102
CHANHASSEN MN 55317 -4663
Etiquettes faciles a paler
UtOisez le gabarit AVERY® 51600
JENNY S LEDDING
12143 FIELD DOWNS DR
RIVERTON UT 84065 -3164
JOHN D & JULIE A MYHR
2685 SHADOW WOOD CT
CHASKA MN 55318 -1106
JORGE BRAVO
9640 WASHINGTON BLVD # 3
CHANHASSEN MN 55317 -4659
JUSTIN M GIVEN
1840 FREEDOM LN #204
CHANHASSEN MN 55317 -4769
KARA JEAN HANRAHAN
9696 WASHINGTON BLVD
CHANHASSEN MN 55317 -4613
KERRI D RONNING
1840 FREEDOM LN #203
CHANHASSEN MN 55317 -4769
LIBERTY ON BLUFF CREEK MASTER
7615 SMETANA LN SUITE 180
EDEN PRAIRIE MN 55344 -4702
MARC RAKOTOMALALA
9660 WASHINGTON BLVD #1
CHANHASSEN MN 55317 -4657
MATTHEW A HORNADAY
33 E CAMINO REAL APT 314
BOCA RATON FL 33432 -6152
MYRON J & KARYL A MUEHLBAUER
2698 SHADOW WOOD CT
CHASKA MN 55318 -1106
Repliez a la hachure afin de
Sens de reveler le rebord Po u
chargement P- me P
JESSE JOHNSON
9649 INDEPENDENCE CIR
CHANHASSEN MN 55317 -4653
JOHN H ZUCK JR
2665 SHADOW WOOD CT
CHASKA MN 55318 -1107
JOSEPH W & CARRIE DORN
1833 FREEDOM LN
CHANHASSEN MN 55317 -4556
K HOVNANIAN LIBERTY ON BLUFF C
12701 WHITEWATER DR STE 120
HOPKINS MN 55343 -4109
KEITH R & ANN M WYMAN
2674 SHADOW WOOD CT
CHASKA MN 55318 -1107
KEVIN H & KARLA J JOHNSON
2681 SHADOW WOOD CT
CHASKA MN 55318 -1107
LIBERTY ON BLUFF CREEK MASTER
7615 SMETANA LN #180
EDEN PRAIRIE MN 55344 -4702
MARK D MINTER
9660 WASHINGTON BLVD # 2
CHANHASSEN MN 55317 -9657
MAVONNE NELSON
1840 FREEDOM LN UNIT 202
CHANHASSEN MN 55317 -4663
NANCY L BIBER
1813 FREEDOM LN
CHANHASSEN MN 55317 -4556
www.avery.com
1- 800 -GO -AVERY
euay reel— i Uwl> i A Bend along line to i ��,� i
Use Avery® Template 51600 41 Feed Paper expose Pop -up Edgem i UU. AVERY® 5160® i
1
OLEKSANDR ZOZULYA
9660 WASHINGTON BLVD #3
CHANHASSEN MN 55317 -4657
PAUL BARTH
9630 INDEPENDENCE CIR # 103
CHANHASSEN MN 55317 -4693
PAULA ANN GIOVANNETTI
9630 INDEPENDENCE CIR #106
CHANHASSEN MN 55317 -4693
ROBERT C & LIBBY FAIRCHILD
2678 SHADOW WOOD CT
CHASKA MN 55318 -1107
ROBERT JR & PATRICIA THEIRAULT
15516 CANYON RDG
EDEN PRAIRIE MN 55347 -1404
SALIM KATHAWALLA
14583 BOULDER POINT RD
EDEN PRAIRIE MN 55347 -2437
SHARON A STEVENS
9640 WASHINGTON BLVD #1
CHANHASSEN MN 55317 -4659
STEEN C & LINDA L JACOBSEN
2737 SHADOW WOOD CT
CHASKA MN 55318 -1105
TERRA L SAXE
9692 WASHINGTON BLVD
CHANHASSEN MN 55317 -4613
TODD & MARGARET MEISSNER
2733 SHADOW WOOD CT
CHASKA MN 55318 -1105
Etiquettes faciles a peter
Utilisez le gabarit AVERY® 51600
PADAM SINGH SAINI
39430 CIVIC CENTER DR APT 411
FREMONT CA 94538 -6708
PAUL R & LINDA M DEROCHER
2686 SHADOW WOOD CT
CHASKA MN 55318 -1106
RHONDA SUE ANDERSON
2689 SHADOW WOOD CT
CHASKA MN 55318 -1106
ROBERT CHARLES JEWELL
9630 INDEPENDENCE CIR #102
CHANHASSEN MN 55317 -4693
ROSS D & ROBYN E JOHNSON
9684 WASHINGTON BLVD
CHANHASSEN MN 55317 -4613
SANDRA K FAGAN
1840 FREEDOM LN #104
CHANHASSEN MN 55317 -4663
SPENCER T & JILL R COWAN
2714 SHADOWWOOD CT
CHASKA MN 55318 -1106
STEPHEN W & SALLY A CLARK
617 TUPELO WAY
CHASKA MN 55318 -1885
THE RYLAND GROUP INC
7599 ANAGRAM DR
EDEN PRAIRIE MN 55344 -7399
WESLEY & LORRAINE V KAHLER
1840 FREEDOM LN #101
CHANHASSEN MN 55317 -4663
Sens de
Repliez a -1a hachure afin de
rev6ler le rebord Po u Mc
char9ement P• P b
PAMELA ARLENE SCHWARTZBAUER
9680 WASHINGTON BLVD #3
CHANHASSEN MN 55317 -4654
PAUL S KARNO
2682 SHADOW WOOD CT
CHASKA MN 55318 -1106
RICHARD H & MICHELE J IMDIEKE
2710 SHADOW WOOD CT
CHASKA MN 55318 -1106
ROBERT J & PEGGY S JASKOLSKI
9630 INDEPENDENCE CIR #105
CHANHASSEN MN 55317 -4693
ROY NEES
1840 FREEDOM LN # 105
CHANHASSEN MN 55317 -4663
SAULI J PIENINIEMI
9665 INDEPENDENCE CIR
CHANHASSEN MN 55317 -4653
STATE OF MINNESOTA - DOT
1500 W COUNTY ROAD B2
ROSEVILLE MN 55113 -3174
STEVEN & LYNN WACHTER
1825 FREEDOM LN
CHANHASSEN MN 55317 -4556
THOMAS & JANINE FUEHRER
2725 SHADOW WOOD CT
CHASKA MN 55318 -1106
DAVE POKORNEY - COMMUNITY
ASSET DEVELOPMENT GROUP
1403 VALLEY VIEW ROAD
CHASKA MN 55318
www.avery.com
1- 800-GO -AVERY