Loading...
1d. Utilities in Chan Haven Plaza 0 i CITY OF -(,_ , I ‘‘ cHANHAs.sEN \t . ; 1 690 COULTER DRIVE • P.O. BOX 147• CHANHASSEN;MINNESOTA 55317 f - (612)937-1900 • FAX (612) 937-5739 IMEMORANDUM • • TO: Charles Foich, City 'Engineer IFROM: Dave Hempel, Sr. Engineering Technician 4t! / iry - 1 DATE: July 17, 1991 SUBJ: Accept Utility Improvements in Chanhaven Plaza 3rd Addition - Project No. 91-2 II . Attached is a letter from the project engineer requesting the >. 1 City accept, for perpetual maintenance and ownership, the utili- ties installed in the above-referenced project. Staff has inspected the project and finds that the project has been completed with the exception of some minor punchlist items that 1 will be completed within the next 30 days. Therefore, it is recommended that the City hereby accept the utility improvements within the plat of Chanhaven Plaza 3rd Addition contingent upon 1 completion of the outstanding punchlist items listed on the attached memo dated June 26, 1991. 1 jms Attachment: 1. Location map. 2 . Letter from Sunde Engineering dated June 24, 1991 1 3 . Punchlist dated June 26, 1991 c: ' Jerry Boucher, Utility Superintendent 1 Gerald Sunde, Sunde Engineering Donald Hagen, Hagen Properties 1 . 1 1 I I - . I 1 bli;d1 I 1 ft - .; EV 1 1 ant I Mire/sO ite� v 0. R I rn'ill VA 'FIR*" v. • Ire. 1 IMIII WU iiIMI t C'e ' / I —1 x ■ ( HA 0E11 *' 11°311 I VI) 1 "I Illir UW 7$TH `. 'To°. Plikim, I � i41 iii,D RIV:. V vt Pi SS i I Pr4411j 1111,1111X t411°6 III :i: c!; IPR.. , 'n * EYENNE I ■■ ft ZIIIK:1 lb 4" aillik R I 12t*K:W- i.. 141JjE fir # g 4 • rila At°0-. S I•1 Ell mat 4% . 1 gm ,iktV, wall pa, gear --w , 1 cl rI i■. ' .¢ - Ica; - _� , 1 . 1 LOCATION MAP ATTACHMENT 1 1 SUNDE ENGINEERING , INC. GERALD M. SUNDE, Consulting Engineer 9001 East Bloomington Frwy • Bloomington,MN 55420 • (612)881-3344 1 24 June 1991 Mr. Charles Folch 1 City Engineer City of Chanhassen 690 Coulter Drive P.O. Box 147 Chanhassen, MN 55317 Re: CHANHAVEN PLAZA 3RD ADDITION, 1 City Project No. 91-02 Dear Mr. Folch, 1 All the sanitary sewer, watermain and storm sewer on the above referenced project has been installed according to the plans and specifications. The required testing has been completed and has passed City requirements. We would like to request that the City of Chanhassen accept 1 these new utilities. Sincerely, Gerald M. Sunde, PE 1 CITY OF MPM SSE MEM JUN 5 1991 1 ElIGINEERING DEPT. 1 ATTACHMENT 2 1 • CITYOF 1 . Ff. cHANHAssEN „.„ y; 690 COULTER DRIVE • P.O. BOX 147• CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX(612)937-5739 MEMORANDUM TO: Steve Kirchman, Building Official FROM: Dave Hempel, Sr. Engineering Technician 01 •'I ' DATE: June 26, 1991 SUBJ: Issuance of Certificate of Occupancy for Systems Control Site ' Lot 1, Block 1 Chanhaven Plaza 3rd Addition Project No. 91-2 In an attempt to expedite issuance of a Certificate of Occupancy for the above-referenced site, staff has performed a walk-thru inspection and generated a punchlist. Listed below are the remaining: items to be corrected prior to formal acceptance by the City Council. The City's Engineering Department will sign off on the Certificate of Occupancy with the understanding these remaining punchlist items will be completed within the next 30 days . 1 . Provide and deliver two (2) internal chimney seals with extensions to the Chanhassen Utility Superintendent's office for future ' installation. 2 . Televise the mainline sanitary sewer and provide the City with a ' videotape and report as per specifications . 3 . Fine grade and reseed and mulch all disturbed areas . ' 4 . Install a witness sign behind the hydrant as per specifications. 004 5 . Add two sections of concrete curb along the westerly curbline. ' 6 . Replace the catch basin grates with the correct grates (Neenah R-3067-V) . • ' 7. Clean out all storm sewerlines and catch basins . • I pat 8 . Provide documentation that a conductivity test has been performed on the watermain or retest with City inspection. 1 1 1 ATTACHMENT 3 6 1 Steve Kirchman Page 2 II June 26 , 1991 9 . Provide two-year maintenance bond in the amount of 25 percent 1 ( 25%) of the contract amount for the utility improvements installed and the City's drainage and utility easements. II jms c: Jerry Boucher, Utility Superintendent . II Charles Folch, City Engineer • Harold Fox, Engelhardt•'& Associates ' Mike Branvold, Sunde Engineering, Inc. 1 Jay Hembroff , Imperial Developers . ACKNOWLEDGEMENT I I, Thomas Drewiske of Kraus-Anderson Construction, hereby agree to conditions 1 through 9 as stated above so that the Certificate of 1 Occupancy may be issued for Lot 1, Blob k ..1 Chanhaven Plaza 3rd Addition. ' 1 1 Thomas rewis e, Project Manager U, qt I Date 1 1 I I ' 1 • ` ,� - - II