1d ChngOrderWell9 TestDrillProjCITY OF CHANHASSEN 7700 Market Boulevard FROM: P0 Box 147 Ohanhassen Mia 55317 DATE: Administration Pi~one: 952 22~ 1100 Fax: 952 2271110 SUBJ: Building Inspections Phone: 952227 1180 Fax: 952 2271190 Engineering P!lCrE 952 22T 1160 Fax 952227!! 70 Finance Phone: 952 227 1140 Fax; 952 227 1110 Park & Recreation Phone: 952 327 1120 Fax: 9,52227 1110 Recreation Center 2310 Coulter Boulevard Pl~one: 9522271400 Fax 952 22~ 1404 Plannin~t & Natural Resources Phone: 9522271130 Fax: 952 2271110 Public Works C: !591 Park Phone 952.22~ 1300 Fax: 952 22~ 1310 Senior Center Pt',one 9522271 i25 Fax~ %2227 1110 Web Site ,W,W ? c!lar!!la,%811 r'ql~ 3 s MEMORANDUM Todd Gerhardt, City Manager Matt Saam, Acting Public Works Director/City Engineerf'?'? / January 6, 2004 Approve Change Order No. 1 tbr Well 9 Test Drilling Project No. 03-02 Requested Action (Simple Majority Vote Required) City Council is recommended to approve a change order in the amount of $11,483.00 for the test well drilling on the Well 9 project. Discussion This change order is due to the failure of the first test drilling at Well 3 to yield a quality water producer from thc drift aquifer. The contractor then had to move to Sugar Bush Park and redo the test well drilling. The revised line item amounts are shown on the attached change order sheet from Bolton & Menk. This work is necessary for completion of the project; therefore, staff recommends approval of the change order. Attachment: Change Order No. 1 Jon Peterson, Bolton & Menk Kelley Janes, Utility Superintendent g:\cng\public\03-02\approvc change order 1.doc The City of Chanhassen · A growlrg comflk/eity '.~i!h cleau lakes quality s;1;(,a!s t l:allqir/q (J(u.',l lo.:¢ t!iri.ir',I t3u nu %so~; :,u':i qkl r,~i~ iud b(iihtifui '/,irks :r(:at l,:: U.:, .... ~ ~ SECTION 00991 - CHANGE ORDER (Instructions on reverse side) PROJECT: Well No. 9 - Test Well DATE OF iSSUANCE: January 5, 2004 OWNER: City of Chanhassen OWNER's Contract: Well No. 9 - Test Well CONTRACTOR: Keys Well Drilling Co. ENGINEER: Bolton & Menk, Inc. You are directed to make the following changes in the Contract Documents. Description: No.1 EFFECTIVE DATE: September 24, 2003 See Attached Table tbr Contract Modifications. Reason for Change Order: We began test well at well #3 site, abandoned this site due to poor aquifer formation at this location. Relocated at Sugar Bush Park site. Attachments: (List documents supporting change) N/A CHANGE IN CONTRACT PRICE: Original Contract Price $22~685.00 Net changes from previous Change Orders No.__to No.__ $_0.0 Contract Price Prior to this Change Order $22,685.00 Net Increase (Increase/'Deiu:ease) of this Change Order S 11,483.00 Contract Price with all approved Change Orders $34,168.00 RECOMMENDED: By: Engincer (Authorized Signature) Date: EJCDC No. 1910C8-B (1990 Edition) APPROVED: By: CHANGE IN CONTRACT TIMES: Original Contract Times Substantial Completion : 30 days or dates Ready lbr final payment : 3~0 days or dates Net changes from previous Change Orders No.__to No.__ (&days Contract Times prior to this Change Order Substantial Completion : 30~ days or dates Ready lbr final payment : 30~days or dates Net Increase (Increasc/~ of this Change Ordcr 8~0days Contract 'l'imcs with all approved Change Orders Substantial Completion : 110 days or dates Nov. 25, 2003 P, eady for final payment : 110 _days or dates Nov.. 25, 2003 ACCF. PTED: By:. Owner (Authorized Signature) [)ate: Date: Contractor (Authorized Signature) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. CHANGE ORDER PAGE 00991-1 CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format fbr handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Contract Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed, any effect of a Change Order thereon should be addressed. For supplemental instructions and monitor changes not involving a change in the Contract Price or Contract Times, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the fbrm, including a description of the changes involved and attachment based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the tbrm, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to Contract Price or to Contract Times, cross out the part of the tabulation that does not apply. CHANGE ORDER PAGE 00991-2 Chanhassen Test Well No. 9 Change Order #1 Modifications Add Items Bid Item 1 -Mobilize/Demobilize: 1 ~ $3,500 each = Bid Item 2 - Drill 8" Open Hole: 328 LF @ 18.00/LF = Bid Item 3 - F & 1 4" Casing: 58 LF ~ $8.00/LF: Bid Item 4: - Grout with Near Cement: 3 cy c~$325/cy = Bid Item 8. - Test Pumping: 0.5 HR ~ $70.00/HR Bid Item 10. - Permanently Seal Test Well: 1 ea ~, $800.00 Bid Item 11. - Grout for Sealing Test Well: 6 cy ~ $325.00/cy Subtotal Subtotal Net Change Order Deduct Items Bid Item 5. - Drill 3-7/8 Open Hole: 63 LF ~ $15.00/LF Bid Item 4. - Water Analyses: 1 ea. ~ $1,200 each Amount $3,500.00 $5,904.00 $464.00 $975.00 $35.O0 $800.00 $1,950.00 $13,628.00 $945.00 $1,200.00 $2,145.00 $11,483.00 CHANGE ORDER PAGE 00991-3