Loading...
3. Lake Drive West Plans & Specs � 3 C I TY 0 F -- : CHANHASSEN ' 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 40•• .' (612) 937-1900 • FAX (612) 937-5739 1 MEMORANDUM NOTE: If an additional copy of the feasibility TO: Don Ashworth , City Manager study is needed, please 1 contact Kim Meuwissen in FROM: Gary Warren, City Engineer Engineering. Thank you. DATE: April 18 , 1990 1 SUBJ: Public Hearing for Lake Drive West Improvement Project No. 90-1; Authorize Preparation of Plans and Specifications As will be recalled, City Council accepted the feasibility study for Lake Drive West from County Road 17 to Audubon Road at the April 9, 1990 meeting. A public hearing was called for April 23, 1990 and appropriate notices were placed with the affected 1 property owners and the newspaper. A preliminary assessment roll was included in the appendix to the report. Basically, from an assessment standpoint, four property owners are impacted by the 1 project; that being Lake Susan Hills West Partnership, Redmond Products, the City ' s park property, and the David Stockdale property which fronts on Audubon Road. 1 As noted in the attached April 11, 1990 letter from Ryan Construction Company, Redmond Products has requested that the Redmond project be removed from any further consideration as it 1 relates to the Chanhassen approval process . Apparently Redmond' s new Chief Operating Officer, Mr. Larry Perkins, is reviewing the feasibility of the planned expansion and until he is satisfied, 1 their site development will not proceed. Since the impetus for the City ' s project was the petition of Redmond, it appears prudent for the City to withhold any further progress on this project until such time as Redmond has reaffirmed their interest 1 in proceeding. This would be done by providing the City with appropriate financial guarantees to cover the expense for the preparation of the plans and specifications. 1 It is therefore recommended that the City Council, after the close of the public hearing, authorize the preparation of plans 1 and specifications conditioned on the receipt of an appropriate agreement from Redmond Products stating that they agree to be assessed for the cost of the improvements as utl_;... ed ia. —the jeasibiltty stud�� , waive their rights to objecting to the 1 I Don Ashworth April 18 , 1990 Page 2 assessments and demonstrate clear ownership of the property. As an alternative, it would also be acceptable for Redmond Products 1 to provide the City with a letter of credit or cash escrow in the amount of $120 ,000 to cover the cost of the preparation of plans and specifications and other up-front administrative charges 1 which the City will incur prior to receiving bids. ktm Attachment: April 11 , 1990 letter from Ryan Construction. c: Gary Ehret, BRW 1 John L. Strittmatter , Vice President, Ryan Construction Company Larry Perkins, Chief Operating Officer, Redmond Products iJvc i i 1 1 1 1 1 1 1 1 pyium CONOF STRUCTION MINNESOTA COMINC.PANY , ' April 11, 1990 APR 16 1993 Mr. Todd Gerhardt CITI OF CHANHASSEN CITY OF CHANHASSEN 690 Coulter Drive Chanhassen, MN 55317 RE: REDMOND PROJECT , Dear Todd: As we discussed last Friday, we are requesting that the Redmond ect J ro ' P be removed from any further consideration as it relates to the Chanhassen approval process. The project of this magnitude and one that impacts Redmond so dramatically must be carefully reviewed to insure proper location, size, and level of technical refinement and this effort is currently underway. ' Following this thorough project review, I will contact you regarding any changes. In the interim, Larry Perkins, the new Chief Operating Officer of Redmond and I would like to meet with you during the week of April 16th. As we have discussed on other occasions, could you please have available for our review a brief outline of the tax increment assistance the City is offering Redmond based on the latest design we have submitted. Todd, I want to thank you and your staff for the time and energy you have given the Redmond project to date and hope that we will have the opportunity to continue the effort to its successful completion. Sincerely, RYAN CONSTRUCTION COMPANY OF MINNESOTA, INC. ' j6/1/1k) 31410//1414011A. John L. Strittmatter ' Vice President JS25/20/dm cc: Jim Ryan Larry Perkins 700 INTERNATIONAL CENTRE, 900 SECOND AVENUE SOUTH, MINNEAPOLIS, MINNESOTA 55402 TELEPHONE 6121339-9847 FAX 612/337.5552 , REAM7600 Parklawn Avenue CENTER Edina,Minnesota 55435-5174 (612)835-7600 April 23, 1990 Chanhassen Mayor and City Council Y Y 690 Coulter Drive ' Chanhassen, MN 55317 RE: Lake Drive West Project 90-01 Honorable Mayor and City Council: ' This letter is submitted to request changes and express concerns in the referenced Feasibility Study. The main concern is the issue of zoning of property adjacent to the road. When the PUD was done originally the R-12 zoning that the city requested for the site was to accommodate apartments. Since then the city added the R-16 zoning to accomplish the objectives of the R-12 in ' the PUD. We expected City cooperation in changing the zoning and request action to upgrade the PUD agreement with R-16 zoning replacing the R-12, With the report, the individual infra structure items have been ' discussed with Gary Warren and our concerns are explained below: WATER MAIN This site had a substantial assessment as part of the Chanhassen ' Hills- CR 17 Trunk Water Main Exterior in 1987. Outlots E and F were not assessed at that time although benefit was received. We will expect credits for this trunk cost and any oversizing to be built as ' part of the final design. Perhaps some TIF will be required for the cost of water main in this project. ' SANITARY SEWER The design should conform to the site plan that we submitted as part of the PUD approvals. We will want to provide input to the ' construction drawings to assure service locations and depths to accomodate future uses on the site. STURM DRAINAGE ' We engaged Ilickok Associates to do an overall Drainage Study for Lake Susan Hills. This utilized an existing pond and created a new pond at the Southeast corner of our property. This assessment ' study shows the whole site being assessed and is incorrect. The topography and past construction for storm sewer as part of the Hickok report will eliminate nearly all of this site from assessment for Storm Drainage. Personal Interest ' Professional Results 1121 4 Chanhassen Mayor and City Council ' April 23, 1990 Page 2 ' ROADWAY We will want to provide input for curb cut access to the • property as part of the contruction drawing. ' It is felt that the $91,000 for 24 street lights is excessive and less costly alternatives need to be explorded. The economic climate for the 1990's do not warrant the gilding of specification at the expense of creating unnecessary financial ' burdens on the builders committing to the sites. Deferment of assessments is requested as part of the payment of ' construction on our property. The market for apartments is very questionable for the next 3 to 5 years and this project puts an undue burden on the owners for a market that is currently very soft and outlooks are for level or declining demand. We shall work with the city in the construction of the Lake Drive West with the expected support of objections and concerns previously mentioned in this letter. Sincerely, Don Patton 11