Loading...
1i. Contract North Side Public Parking Lot 1 . , /,(.' /,(.OF 1 � ,. _ CHANHASSEN . . 1 • ..,.. , :. . :" , • 4 ,, .. 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX (612) 937-5739 I MEMORANDUM riic = _ . RefGcict^ TO: Don Ashworth, City Manager Date�� a-al- �` Date Sup ; c to i C:';t Sk,PI FROM: Gary Warren, City Engineer 0(.0/pwl1L.� Date s,Lbrni;,.,: ro Go;itrtf DATE: February 20 , 1990 a -a(. c, II SUBJ: Approve Contract Amendment No. 1 , North Side Public Parking Lot, Improvement Project No. 87-17 II The attached Contract Amendment No. 1 is being processed to I address the additions and revisions to the project scope which were experienced this past construction season for five elements of the construction . The attached Contract Amendment in detail summarizes the revisions and additions to the project scope. The II Contract Amendment is for an increase of $9 ,287. 55 to the project scope. The amended contract amount therefore is $551,749. 85. II I find this Contract Amendment in order and consistent with the scope of services provided by Shafer Contracting. It is therefore recommended that the City Council approve Contract I Amendment No. 1 for the North Side Parking Lot project in an amount of $9 ,287. 55 and establish an amended contract ceiling price of $551 ,749 . 85. 1 ktm Attachment: Contract Amendment No. I Ic: Gary Ehret, BRW II I I II 1 GAL) II City of Chanhassen IContract Amendment 7-8915 Project: North Side Parking Lot./City Offices City Project No.: 87-17 I Amendment No.: Date: One (1) February 26, 1990 Contractor: Shafer Contracting Co. Inc. II The additions, revisions and corrections contained herein shall be made to the IContract Documents for the project, and shall become a part of the Scope of Work. Description of Changes: IIA. The contractor pumped out and removed two septic tanks while excavating for the parking lot construction. IC Tank #1 was 6 ft. diameter x 6 ft. high and served the old Bakery Building. IC Tank #2 was 4 ft. diameter x 4 ft. high and served the old Labolo Building. ISchedule A - General Work. Unit I Item No. Item Unit Quantity Price Amount 1 Remove & Dispose EA. 1 00700 OWN Septic Tank (6'x6') II2 Remove & Dispose EA. 1 $250.00 $250.00 Septic Tank (4'x4') IIB. In order to make the water main connection behind the Heritage Square Shopping Center, the water service to the building had to be shut down. The I shut down was scheduled with the contractor for 5 a.m. in order to avoid delayed service during business hours. I Upon start of the work at 5:00 a.m. the contractor was directed by a repre- sentative of the City to cease his operation until 7:00 a.m. The contrac- tor incurred extra costs due to the 2 hour shut down. II I II Amendment No. 1 II February 26, 1990 Page Two Schedule E - Water Main I Unit Item No. Item Unit Quantity Price Amount I 1 Connection L.S. 1 $1;770 $362.00 Shut Down C. The existing sanitary sewer service to serve the Chanhassen Lawn & Sports I Building runs through the area of the new parking lot. The depth of this service conflicted in several locations with the construction of the parking II lot. The service had to be lowered for about 195 feet in order to avoid . freezing conditions. The contractor and the Engineer agreed in advance of the work to the unit costs for this item. Schedule D - Sanitary Sewer II Unit II Item No. Item Unit Quantity Price Amount 1 F & I San. Sewer L 1 $4,013.55 $4713755 Service (Lawn & Sports) D. A new storm drain connection to serve the Heritage Park apartment building II was constructed. The project contractor furnished and installed a 6" PVC storm lead to the building for future connection by the apartment building II contractor. (This was done based upon an agreement by City Staff and the Apartment Developer in order to reduce runoff to the existing Chanview storm sewer system.) IISchedule C Storm Sewer Unit I Item No. Item Unit Quantity Price Amount 1 F & I Storm L.S. 1 $27332.00 $2,362.00 Service (Apartment I Building) E. The contractor removed and disposed of two additional drain oil storage tanks at the Anderson Automotive Site which had not been identified on the plans. Removal of these tanks was required by the P.C.A. as well as to faci- ' litate construction of the parking lot. Schedule A - General Work • I Unit Item No. Item Unit Quantity Price Amount II 3 Remove and Dispose EA 2 $f7010-0700 $27M700 of Oil Tanks. . II I II Amendment No. 1 February 26, 1990 Page Three Summary ' Current Contract Amount: $542,462.30 ITEM A Add $550.00 ITEM B Add 362.00 ITEM C Add 4,013.55 ITEM 0 Add 2,362.00 ITEM E Add 2,000.00 ' Contract Amendment No. One Add $ 9,287.55 Amended Contract Amount $551,749.85 No changes to the construction schedule for the project shall be made due to the modifications which are included as a part of this Contract Amendment. Approvals: Recommended by: BRW, Inc. ' By: Title: Project Manager Date: Accepted By: Shafer Contracting Co. Inc. ' By: Title: Date: Approved by: City of Chanhassen By: Title: City Engineer Date: