Loading...
E-7. Galpin Boulevard-West 78th St Intersection Improvements: Award ContractCITY OF CHANHA33EN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanl MEMORANDUM TO: Paul Oehme, Director of Public Works /City Engineer l" FROM: Stephanie Bartels, Project Engineer DATE: October 14, 2013 0� SUBJ: Galpin Boulevard/West 78rh Street Intersection Improvement: Award Construction Contract PROPOSED MOTION "The City Council awards a construction contract for the Galpin Boulevard/West 78th Street Intersection Improvement to Parrott Contracting, Inc. in the amount of $24,937.00." City Council approval requires a simple majority vote of the City Council present. West 78th Street is a local collector road running east -west, parallel to Minnesota Trunk Highway 5. A multi -use trail is on the north side of West 78Th Street. At the intersection of Galpin Boulevard and West 78`h Street, Galpin Boulevard traffic is not required to stop unless a pedestrian is using the crosswalk on the north leg of the intersection. In order for a pedestrian on the West 78Th Street trail to cross Galpin Boulevard, he or she must travel across three lanes of traffic which is more than 94 feet of pavement to reach the other side of the street. Future development planned for this area is expected to increase the pedestrian traffic at this intersection. As both the pedestrian and vehicular traffic in this part of Chanhassen increase, this long crossing will become problematic. To increase pedestrian safety, the proposed project will construct a concrete median to the north leg of the Galpin Boulevard/West 78th Street intersection. This median will provide a six -foot wide pedestrian refuge to increase safety. Chanhassen is a Community for Life - Providing far Today and Planning forTomorrow Paul Oehme Galpin Boulevard/West 78`h Street Intersection Improvement October 14, 2013 Page 2 The refuge will permit pedestrians to cross one direction of traffic at a time, allowing them to focus on one or two lanes rather than having to anticipate traffic for the entire width of the road. When this project is complete, a pedestrian will have to cross no more than two lanes of traffic or 36 feet of pavement at a time. On September 26, 2013, quotes were received. The quotes are shown below: Bidder Base Bid Parrott Contracting, Inc. $24,93700* New Look Contracting, Inc. $35,383.50 GMH Asphalt Corporation $45,475.00 *Notes recommended quote to be awarded. The lowest quote received for this project was from Parrott Contracting, Inc. This contractor has completed work in Chanhassen in the past and their work has been acceptable. Attachments: 1. Galpin Boulevard/W. 78th Street Median Plan Sheet 2. Resolution g: \mg\stephanieb \galpin & w78th median \131014_award coast. contmets.doc F Ar iA e i �w It ' �I! r, Galpin Blvd / W 78th St Median Chanhassen, MN r' PEDESTRIAN CURB RAMP (BUILT TO ADA STANDARDS) 4' CONCRETE WALK CONCRETE CURB 8 GUTTER DESIGN 6418 A �Q .J M t. Ri r CURB 8 GUTTER -SIGN BTE SIGN // CONCRETE WALK tUNCATED DOMES PEDESTRIAN CURB RAMP (BUILT TO ADA STANDARDS) 4' CONCRyE�TE�pWyALK j T.I Ira . I 0 23 SD HORMOITAL SCALE IN FEET CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: October 14, 2013 RESOLUTION NO: 2013- MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING QUOTE AND AWARD CONTRACT FOR CONSTRUCTION OF A CONCRETE PEDESTRIAN MEDIAN ON GALPIN BOULEVARD AT W. 78' STREET WHEREAS, quotes were received, opened and tabulated for construction of a concrete pedestrian median on Galpin Boulevard at W. 78th Street, and the following quotes were received: Bidder Base Bid Parrott Contracting, Inc. $24,937.00* New Look Contracting, Inc. $35,383.50 GMH Asphalt Corporation $45,475.00 AND WHEREAS, Parrott Contracting, hic. had the lowest responsible quote with a total quote amount of $24,937.00. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract in the amount of $24,937.00 with Parrott Contracting in the name of the City of Chanhassen for construction of a concrete pedestrian median on Galpin Boulevard at W. 78th Street. Passed and adopted by the Chanhassen City Council this 14`h day of October, 2013. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT