Loading...
1i. Contract with RCM ) I • 4 =-CITY OF wrimmommom 1 , 1 • -4Voir CHANHASSEN 0 ,, 690 COULTER DRIVE• P.O. BOX 147• CHANHASSEN, MINNESOTA 55317 I (612) 937-1900 • FAX (612) 937-5739 n by efts Adrrhistratot Endorsee! ✓ B W A 1 MEMORANDUM IAodifed ROpctea TO: Don Ashworth, City Manager Det "� Date Submitted to Co;nmissior IFROM: Gary Warren, City Engineer Dete Submitted to Council DATE: March 22, 1990 :• 3 •AID-qi ISUBJ: Approve Amended Professional Services Contract with Rieke Carroll Muller Associates, Inc. (RCM) for 1 Comprehensive Plan Update File No. PW-134 1 In June of 1988 the City contracted with RCM to assist with the updating of the Utilities SectionCpf the Comprehensive Plan. With the change in City Planners, the Comprehensive Plan Update 1 was put on hold and, similarly the.�work with RCM was not completed. With the recent thrust of the City to expand the MUSA area and complete the Comprehensive flan Update, we have found it 1 necessary to expand the scope of services for RCM to include the Comprehensive Plan Update and addressing the -MUSA area expansion and the Bluff Creek interceptor. &; 1 The attached March 8, 1990 letter from CM modifies their June 27, 1988 contract to include this additional scope. This item was budgeted in the Administrative Trust Fund and the fees appear 1 appropriate for the modified scope of services. It is therefore recommended thathe,March== 8, 1990 revised scope II of services and contract,amount be,_.approved and authorized and .a n .,_. revised lump sum contract 'Ceiling-of ~'$1/,=�5B-�be establ�.shed for this contract • Iktm - Wi •n. ; Attachment: March 8, 1990 letter. rom RCM. • 6114 II Vly 1 • I . 1 March 8, 1990 1 Mr. Gary Warren, P.E. City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 • RE: Comprehensive Plan Update (Revised) ' RCM Project No. 10012.01 Dear Mr. Warren: 1 Review of our file reveals that you have been billed $10,350.00 (90%) on the $11,500.00 contract for the update of the Comprehensive Sewer Plan (CSP). Based on our meeting of February 23, 1990, it is our understanding that the following revised stope of work is desired: r-, 1. Redoing the CSP to consider moving MUSA line as shown on the year 2000 land use plan and revised population projections provided by Paul Krause. riele 2. Initiate discussions with Metro Waste Control Commission to , mullerer determine interceptor availability (Bluff Creek Interceptor), both associates,inc. temporary as well as permanent facilities. evineers a land rtects 3. Write the water system section of the comprehensive plan based on the surveyors updated water plan by OSM. equal u nity employer Based on the revised information developed as outlined above, the comprehensive sewer plan and water plan sections of your Comprehensive Plan will be revised. We proposed to provide these services as additional services as outlined in our letter of agreement dated June 27, 1988. Our estimated cost to provide this services is $7,400.00. The additional work would expand our lump sum contract from $11,500.00 to $17,750.00 maximum. If this proposal meets with your approval, a letter of authorization would allow us to proceed based on our June 27, 1988 contract. If you have any questions or wish to discuss this proposal, please feel free to contact me. Thank you for the opportunity to provide this proposal and we hope to have the pleasure of working with you to complete the Comprehensive Plan. Sincerely, - / _ Robert C. 'obertson, •.E. RIEKE CARROLL MULLER ASSOCIATES, INC. RCR/jj CITY OF CHANHASSEN 10901 red circle drive MAR 0 91990 box 130 s 2 935�minnesota 55343 ENGINEERING DEPT.