4. 2005 MUSA Area ImprovmentsCITYOF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Ohanhassen. MN 55317
Administration
Phone: 952.2271100
Fax: 952 2271110
Building Inspections
Pl~one: 9522271180
Fax: 952.2271190
Engineering
Phone: 952227 1160
Fax: 952 2271170
Finance
Phone: 952.2271140
Fax: 952 2271110
Park & Recreation
Phone: 952 2271120
Fax: 9522271110
Recreation Center
2310 Coulter Bouleva[d
Phone: 9522271400
Fax: 952227.1404
Planning &
Natural Resources
Phone: 952.2271130
Fax: 9522271110
Public Works
1591 Park Road
Phone: 952 2271300
Fax 952 2271310
Senior Center
P~<:ne: 952 2271125
Fax: 952 227 1110
Web Site
www ci chani assert mr1 us
MEMORANDUM
TO: Paul Oehme, City Engineer/Dir. of Public Works
FROM: Matt Saam, Assistant City Engineer
DATE: February 18, 2004
SUBJ'
Authorize Preparation of Feasibility Study; Approve Consultant
Work Order for 2005 MUSA Area Improvements
Project No. 04-05
REQUESTED ACTION (Simple Majority Vote Required)
The City Council is requested to attthorize the preparation of a feasibility study
for street and utility improvements within the 2005 MUSA and to approve a
consultant work order with Kimley-Hon~ & Associates in the amount of
$43,300.O0.
BACKGROUND
On December 8, 2003, the City Council approved the final AUAR and mitigation
plan for the 2005 MUSA.
DISCUSSION
As recommended in the previously approved AUAR for the 2005 MUSA, staff is
proposing to move for~vard with the preparation of a feasibility study for the area.
While the City could wait for a developer to petition for the improvements, staff
believes it is in the City's best interest to be proactive and initiate the feasibility
study. This will allow us to get a handle on costs, financing/assessment options,
and the improvements that are necessary prior to development of the area in 2005.
The City of Chanhassen ,, A growing community with clean lakes quality schools a charming ,Iowntc, v,xl thr~'vir~g bus nesses ',,~,,n'd,uO ~r~i s auJ b{au, di Jl [)arks ,~a :," ", ii,,,-, ,:,rk an] [,'ay
Paul Oehme
February 18, 2004
Page 2
2005 MUSA Map
The feasibility study will look at:
The extension of trunk sanitary sewer and watermain improvements.
· Improvements to the existing road system surrounding the area.
· The construction of an east/west collector road through the site.
· Associated drainage/storm sewer improvements.
· Provide estimated project costs for all improvements.
· Provide aproject schedule.
· Evaluate alternatives to minimize cost related to the proposed improvements.
· Financing/assessment options for the proposed improvements.
Staff solicited proposals from two of the engineering firn~s in the City's pool. The
following table lists the proposals that were received from the two firms:
Engineering Firm
Kimley-Hom
proposal Cost
$43,300
Bolton & Menk $91,524
Paul Oehme
February 18, 2004
Page 3
It is staffs opinion that the low cost from Kimley-Horn can be attributed to their
previous experience with the AUAR and TH 212 projects. Kimley-Horn's
proposal includes a number of meetings with staff and residents through the
completion of the feasibility study. Staff anticipates a few neighborhood
meetings with residents as the feasibility study is being completed.
The cost of the feasibility study will be included as part of the overall project cost.
The City's portion of the cost will come from a combination of MSA and
sewer/water utility funds.
jms
Attachment: Kimley-Horn Proposal
C:
Kate Aanenson, Community Development Director
Jon Horn, Kimley-Horn
Marcus Thomas, Bolton & Menk
g:\eng\public\04-05\authorize feasibility.doc
~lll~_~ Kimley-Horn
and Associates, Inc.
February 3, 2004
·
Suite 345N
2550 Universi~ Avenue West
St. Paul, Minnesota
55114
Mr. Matt Saam, P.E.
Assistant City Engineer
City of Chanhassen
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Re:
Proposal for Feasibility Study Preparation
2005 MUSA Area Expansion
City Project No. 04-05
Dear Mr. Saam:
Thank you for the opportunity to submit this proposal for consulting
engineering services related to the preparation of a feasibility report for
roadway improvements and the extension of trunk sanitary sewer, water
main, and storm sewer utilities for the 2005 MUSA expansion area of
Chanhassen. This proposal has been prepared to address the items
requested in your January 13, 2004 request for proposals.
The 2005 MUSA expansion area is generally bordered by the following
roadways:
· Lyman Boulevard (CSAH 18) on the north
· Audubon Road (CSAH 15) on the west
· Pioneer Trail (CSAH 14) on the south
· Future Powers Boulevard (CSAH 17) on the east
The proposed Mn/DOT TH 212 project runs through the southeastern
portion of the 2005 MUSA expansion area.
Kimley-Horn is very familiar with the project area and the proposed
improvements through our other work for the City, and we are well suited
to provide the services required for this project.
Our Project Understanding, Scope of Work, Estimated Costs, and
Schedule are detailed below.
·
TEL 651 6,45 4197
FAX 651 645 5116
Kimley-Horn
and Associates, inc.
Mr. Matt Saam, P.E.
February, 3, 2004
Page 2 of 7
PROJECT UNDERSTANDING
Based upon information included in your request for proposals, and our
knowledge of the Chanhassen 2005 AUAR and the Mn/DOT TH 212
project, we understand that this project includes a feasibility study analysis
for the follmving improvements:
Water Main
Assess the feasibility of extending trunk water main into the 2005 MUSA
area. Trunk water main facilities currently proposed for the area include
the following:
· 16" water main, a PRV and related improvements along future
Powers Boulevard betwveen Lyman Boulevard and Pioneer Trail.
· 16" water main and related improvements along Lyman Boulevard
between Audubon Road and Powers Boulevard. This may also
include a water main extension along Lyman Boulevard west of
Audubon Road.
· 16" water main and related improvements along Lyman Boulevard
between Powers Boulevard and TH 101.
· 12" water main and related improvements along Pioneer Trail
between Audubon Road and future Powers Boulevard.
· 12" water main, a PRV and related improvements along Audubon
Road between Lyman Boulevard and Pioneer Trail.
Sanitary Sewer
Assess the feasibility of extending trunk sanitary sewer into the 2005
MUSA area. Trunk sanitary sewer facilities are currently proposed to
include the following:
· Extension of a trunk sanitary sewer to meet future development
needs within Subdistrict BC-3 of the Upper Bluff Creek Sewer
District as identified within the City's 1998 Comprehensive Sewer
Policy Plan.
· Extension of two trunk sanitary sewers to meet future development
needs within Subdistrict BC-2 of the Upper Bluff Creek Sewer
District as identified within the City's 1998 Comprehensive Sewer
Policy Plan.
· Extension of a trunk sanitary sewer and a lift station to meet future
development needs within Subdistrict LB-1 of the Lower Bluff
Kimley-Horn
and Associates, Inc.
Mr. Matt Saam, P.E.
February 3, 2004
Page 3 of 7
Creek Sewer District as identified within the City's 1998
Comprehensive Sewer Policy Plan.
Possible relocation of existing Lift Station #24.
Storm Sewer
Expand on information within the City's 1994 Surface Water Management
Plan (SWMP) to develop recommended storm sewer and ponding
improvements for the project area. The project area is included within the
Bluff Creek and Lake Susan Storm Drainage Districts. The following
tasks need to be performed as a part of this analysis.
· Develop schematic plans for proposed storm water improvements
to collect, store and treat runoff from the project area. These plans
must be developed considering the recently adopted National
Pollutant Discharge Elimination System (NPDES) Phase II
requirements for storm water management.
· Coordinate proposed storm drainage improvements with storm
drainage facilities being constructed as a part of the TH 212
improvements.
Roadway hnprovements
Assess the feasibility of constructing the following roadway
improvements:
· Construction of the East-West Collector roadway between
Audubon Road and Powers Boulevard. The total length of this
roadway segment is approximately 6,000 feet. This will include
the installation of a traffic signal at the Audubon Road intersection.
· Construction of the North Connector roadway between the East-
West Collector roadway and Lyman Boulevard. The total length
of this roadway segment is approximately 1,400 feet.
· Construction of the South Connector roadway between the East-
West Collector roadway and Pioneer Trail. The total length of this
roadway segment is approximately 1,800 feet.
· Construction of the School Area Road in the southeast comer of
the Lyman Boulevard and Audubon Road intersection. The total
length of this roadway segment is approximately 2,800 feet.
· Construction of two cul-de-sac roadways in the southeast portion
of the study area. The total length of these roadway segments is
Kimley. Horn
and Associates, Inc.
Mr. Matt Saam, P.E.
February 3, 2004
Page 4 of 7
approximately 600 feet. These improvements also include fight-
turn and left-turn lane improvements along Powers Boulevard.
Construction of dual westbound left-turn lanes on Lyman
Boulevard at Audubon Road and two southbound through lanes on
Audubon Road south of the intersection. This would include
traffic signal modifications at the intersection.
· Improvements to Lyman Boulevard including right-turn and left-
turn lanes at Audubon Road and the North Connector roadway.
· Improvements to Audubon Road including right-turn and left-turn
lanes at the Lakeview Drive and East-West Collector roadway
intersections.
· Improvements to Pioneer Trail including right-turn and left-turn
lanes at the South Connector roadway and Bluff Creek Drive.
· Construction of fight-turn and left-turn lanes on BluffCreek Drive
at the Pioneer Trail intersection.
· Reconstruction of Lyman Boulevard between Powers Boulevard
and TH 101.
Some of the roadxvay improvements identified above have been included
as a part of the scope of Mn/DOT's TH 212 project. The feasibility report
would establish a financing plan and estimated assessments for those
improvements that are included as a part of the TH 212 project.
The feasibility study analysis will accomplish the following objectives:
A. Verify the scope of the improvements detailed above and
consider/investigate any alternatives.
B. Determine estimated fight-of-way/easement requirements.
C. Determine estimated construction, right-of-way/easement and
engineerin~administrative costs.
D. Determine a proposed financing plan for the proposed improvements,
including the investigation of assessment options.
E. Prepare a preliminary assessment roll for the proposed improvements.
F. Prepare a schedule for the implementation of the proposed
improvements.
SCOPE OF WORK
The following is a detailed summary of the services included as a part of
our Scope of Work.
Kimley-Horn
and Associates, Inc.
Mr. Matt Saam, P.E.
February 3, 2004
Page 5 of 7
Feasibility Study Analysis
Kimley-Hom will complete the following services as a part of the
feasibility study phase of the project.
mo
Conduct a kick-off meeting with City staff to review the scope
of the project. It may also be beneficial for Carver County to
attend this meeting.
Gather existing base mapping (electronic AutoCAD files) and
as-built information for the project area. We have assumed
that this information will be provided by the City. We will also
conduct a field review of the project area to confirm the
information in the base mapping and as-builts and to identify
any special project issues/concerns.
After gathering the existing conditions information and
conducting the kick-off meeting, we will investigate the
proposed improvements and prepare a draft feasibility report.
The feasibility report will be prepared based upon the
following outline:
Proposed Improvements
Roadway
Sanitary Sewer
Water Main
Storm Drainage
· Right-of-Way/Easement Requirements
· Estimated Costs
· Proposed Financing Plan
· Proposed Assessments (with Preliminary Assessment Roll)
· Proposed Schedule
· Summary and Recommendations
The feasibility report will include exhibits illustrating the
proposed improvements. We have assumed that the City will
provide the property information needed to prepare the
preliminary assessment roll.
D. The draft feasibility report will be submitted to City staff for
Kimley-Horn
and Associates, Inc.
Mr. Matt Saam, P.E.
February 3, 2004
Page 6 of 7
review and comment. We have assumed that we will attend
one meeting with City staff to review the draft of the feasibility
report.
After receiving comments and input from City staff, we will
make revisions to the draft report and complete the final
feasibility report. We have assumed that we will attend one
meeting with City staff to review the final feasibility report.
F. We have assumed that we will attend up to three (3) City
Council meetings as follows:
· One City Council work session to present the draft report.
· One City Council meeting to present the final report.
· One City Council meeting for a public hearing.
We have assumed that we will prepare background information
for and attend up to a total often (10) property owner, agency,
and/or public involvement meetings.
Our Scope of Work does not include any of the following services:
· Traffic engineering analysis or modeling. We have assumed that we
will use the traffic information included within the AUAR.
· Field surveying or aerial mapping. We have assumed that the City
will provide adequate electronic base mapping for the preparation of
the feasibility report graphics
· Soil borings/geotechnical analysis. We have assumed that roadway
pavement sections will be developed considering the City's current
standards.
· Wetland delineation services. We have assumed that we will rely
upon the wetland information included as a part of the AUAR.
· Storm drainage modeling. We have assumed that we will rely upon
the modeling information included as a part of the SWMP.
· Investigation of the extension of private utilities (gas, telephone,
electric, etc.) into the project area.
ESTIMATED COSTS
Kimley-Hom proposes to perform all services for the project on an hourly
(cost plus) basis using the attached hourly rate schedule for 2004. The
following is a summary of our estimated costs for the project.
Kimley-Horn
and Associates, Inc.
Mr. Matt Saam, P.E.
February 3, 2004
Page 7 of 7
Work Task
Estimated Fee
mo
B.
C.
D.
E.
F.
G.
Kick-off Meeting
Gather Existing Conditions Information
Prepare Draft Feasibility Report
Review Meeting
Prepare Final Feasibility Report
City Council Meetings
Property Owner/Public Involvement Meetings
Subtotal
Reimbursable Expenses (5.5% of Labor Fee)
Total Estimated Cost
$ 1,000
$ 2,000
$ 22,000
$ 1,000
$ 3,000
$ 2,000
$ 10,000
$ 41,000
$ 2,300
$ 43,300
Our total estimated cost for the Scope of Work included as a part of this
proposal is, therefore, $43,300 including all labor and reimbursable
expenses.
SCHEDULE
Work will be completed based upon a schedule agreed upon with the City
of Chanhassen. A possible schedule for the project is as follows:
Begin Work
Kick-off Meeting
Draft Feasibility Report Complete
City Council Work Session to Review
Draft Report
Final Feasibility Report Complete
City Council Receives Final Feasibility
Report
Public Hearing
March 1, 2004
Week of March 1 - 5, 2004
April 30, 2OO4
May 10, 2004
May 14, 2004
May 24,2004
June 14,2004
Thank you again for the opportunity to submit this proposal. Please let me
know if you have any questions or you need any additional information.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Attachment: 2004 Chanhassen Rate Schedule
SCHEDULE A
City of Chanhassen
Kimley-Horn and Associates, Inc.
Schedule of Rates
Effective January 1, 2004 - December 31, 2004
Classification Rate
Administrative Assistant
CADD Technician
Clerical
Client Manager
Drafter
Field Technician
Graduate Eng./Planner 1
Graduate Eng./Planner II
Principal
Project Engineer/Planner
Project Manager
Senior Administrative Assistant
Senior CADD Technician
Senior Designer
Senior Field Technician
Senior Project Manager
$ 67.50
$ 67.50
$ 52.50
$160.00
$ 47.50
$ 82.50
$ 8O.OO
$ 90.00
$182.50
$ 95.00
$115.00
$ 85.00
$ 77.50
$100.00
$110.00
$130.00
Reimbursable expenses (copy/printing charges, plotting,
mileage, delivery charges, faxes, etc.) will be charged
as an office expense at 5.5% of the labor fee. Any
subconsultant charges will be excluded from the office
expense and will be passed directly to the City with no
Kimley-Horn markup.
Additional rates may be negotiated at a later date for
classifications or services not included above.