Loading...
1b-2. Dev Cont-P&S Vasserma 3rd CITYOF 7700 Markd Boulevard PO Box !47 6hanhassen, MN 55317 Administration Phone 952227 1100 Fax: 9522271110 Building Inspections Phone: 952,2271180 Fax: 952 227 1190 MEMORANDUM TO: FROM: DATE: Paul Oehme, Director of Public Works/City Engineer Matt Saam, Assistant City Engineer fl./~0 February 1'7, 2004 SUBJ: Approve Development Contract and Construction Plans and Specifications for Vasserman Ridge 3rd Addition Project No. 04-04 Engineering Phone: 952227.1160 Fax 9522271170 Finance Phone: 9522271140 Fax: 952 2271110 Park & Recreation Phone: 9522271120 Fax 952.2271110 Recreation Center 2310 Coulter Boulevard Phone: 952.2271400 Fax: 9522271404 Planning & Natural Resources Phone 9522271130 Fax: 9522271110 Public Works 1591 Park Road Phone: 9522271300 Fax: 9522271310 Senior Center Phone: 952 2271125 Fax 952.2271110 Web Site wwwci chanhassen mn us The attached development contract incorporates the conditions of approval from the final platting and construction plans and specifications review process. Staff has calculated the required financial security to guarantee compliance with the terms of the development contract at $603,236 and the administration fees total of $148,199 which includes all of the required SWMP and Park fees. No City funds are needed as part of this private development project. The applicant has also submitted detailed construction plans and specifications for staff review and City Council approval. Staffhas reviewed the plans and specifications and finds the plans still need some minor modifications. Staff requests that the City Council grant staff the flexibility to administratively approve the plans after working with the applicant's engineer to modify the plans accordingly. It is therefore recommended that the construction plans and specifications for Vasserman Ridge 3'.0 Addition dated January 30, 2004, prepared by Schoell & Madson, Inc. and the development contract dated February 23, 2004 be approved conditioned upon the following: The applicant shall enter into the development contract and supply the City with a cash escrow or letter of credit in the amount of $603,236 and pay an administration fee of $148,199. 2. The applicant's engineer shall work with City staff in revising the construction plans to meet City standards. Attachments: 1. 2. Development Contract dated February 23, 2004. Construction plans and specifications are available for review in the Engineering Department. Breakdown of administration fees dated February 1'7, 2004. List of needed plan modifications. c: Marc Anderson, Lundgren Bros. Construction, Inc. g:~eng"projects\xasscrman ri0ge 3rd\approve dc,doc The City of Chanhassen · A growing conmkmity with clean lakes, quality schools, a channing downtown ti,riving businesses wind%l trai!s and h, eau~,ik[! pa ks A 1~ t [:,ace [)h,: ,¢,,,, 'K ~ d r ;i}, CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA VASSERMAN RIDGE 3}m ADDITION DEVELOPMENT CONTRACT/PUD AGREEMENT (Developer Installed Improvements) TABLE OF CONTENTS SPECIAL PROVISIONS PAGE 2. 3. 4. 5. 6. 7. 8. 9. REQUEST FOR PLAT APPROVAL ............................................................................ SP- 1 CONDITIONS OF PLAT APPROVAL ........................................................................ SP-1 DEVELOPMENT PLANS ............................................................................................ SP- 1 IMPROVEMENTS ........................................................................................................ SP-2 TIME OF PERFORMANCE ......................................................................................... SP-2 SECURITY .................................................................................................................... SP-2 NOTICES ....................................................................................................................... SP-3 OTHER SPECIAL CONDITIONS ................................................................................ SP-3 GENERAL CONDITIONS ............................................................................................ SP-6 GENERAL CONDITIONS 2. 3. 4. 5. 6. 7. 7A. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. RIGHT TO PROCEED ................................................................................................. GC-1 PHASE DEVELOPMENT ........................................................................................... GC- 1 EFFECT OF SUBDIVISION APPROVAL .................................................................. GC-1 IMPROVEMENTS ....................................................................................................... GC- 1 IRON MONUMENTS .................................................................................................. GC-2 LICENSE ...................................................................................................................... GC-2 SITE EROSION CONTROL ........................................................................................ GC-2 EROSION CONTROL DURING CONSTRUCTION OF A DWELLING OR OTHER BUILDING .................................................................................................................... GC-2 CLEAN UP ................................................................................................................... GC-2 ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS .................................... GC-2 CLAIMS ........................................................................................................................ GC-3 PARK DEDICATION .................................................................................................. GC-3 LANDSCAPING .......................................................................................................... GC-3 WARRANTY ............................................................................................................... GC-4 LOT PLANS ................................................................................................................. GC-4 EXISTING ASSESSMENTS ....................................................................................... GC-4 HOOK-UP CHARGES ................................................................................................. GC-4 PUBLIC STREET LIGHTING ..................................................................................... GC-4 SIGNAGE ..................................................................................................................... GC-4 HOUSE PADS .............................................................................................................. GC-4 RESPONSIBILITY FOR COSTS ................................................................................. GC-4 DEVELOPER'S DEFAULT ......................................................................................... GC-6 MISCELLANEOUS B. C. D. E. Construction Trailers ........................................................................................ GC-6 Postal Service .................................................................................................... GC-6 Third Parties ...................................................................................................... GC-6 Breach of Contract ............................................................................................ GC-6 Severability ....................................................................................................... GC-6 F. Building Permits ............................................................................................... GC-6 G. Waivers/Amendments ....................................................................................... GC-7 H. Release .............................................................................................................. GC-7 I. Insurance ........................................................................................................... GC-7 J. Remedies ........................................................................................................... GC-7 K. Assignability ..................................................................................................... GC-7 L. Construction Hours ........................................................................................... GC-7 M. Noise Amplification .......................................................................................... GC-8 N. Access ............................................................................................................... GC-8 O. Street Maintenance ............................................................................................ GC-8 P. Storm Sewer Maintenance ................................................................................ GC-8 Q. Soil Treatment Systems .................................................................................... GC-8 R. Variances ........................................................................................................... GC-8 S. Compliance with Laws, Ordinances, and Regulations ...................................... GC-9 T. Proof of Title ..................................................................................................... GC-9 U. Soil Conditions ................................................................................................. GC-9 V. Soil Correction .................................................................................................. GC-9 W. Haul Routes ............................................................................................................ GC-9 X. Development Signs ................................................................................................ GC-9 Y. Construction Plans ............................................................................................... GC- 10 Z. As-Built Lot Surveys ........................................................................................... GC-IO ii CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) VASSERMAN RIDGE 3m) ADDITION SPECIAL PROVISIONS AGREEMENT dated February 23, 2004 by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City"), and, LUNDGREN BROS. CONSTRUCTION, INC., a Minnesota corporation (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for Vasserman Ridge 3rd Addition (referred to in this Contract as the "plat"). The land is legally described on the attached Exhibit "A". 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract and furnish the security required by it. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A: Final plat approved February 23, 2004, prepared by Schoell & Madson, Inc. Plan B: Grading, Drainage and Erosion Control Plan dated January 30, 2004, prepared by Schoell & Madson, Inc. Plan C: Plans and Specifications for Improvements dated January 30, 2004, prepared by Schoell & Madson, Inc. Plan D: Landscape Plan dated July 25, 2002, prepared by Kevin G. Norby & Associates. Revised 3/24/99 SP-1 4. Improvements. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Underground Utilities (e.g. gas, electric, telephone, CATV) H. Setting of Lot and Block Monuments I. Surveying and Staking J. Landscaping K. Erosion Control $. Time of Performance. The Developer shall install all required improvements by November 15, 2004. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6. Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit from a bank or cash escrow ("security") for $603,236.00. The amount of the security was calculated as 110% of the following: Sanitary Sewer $ 81,341.00 Watermain $ 56.179.00 Storm Sewer, Drainage System, including cleaning and maintenance $ 65.664.00 Streets $ 250,078.00 Street lights and signs $ 2,100.00 Erosion control $ 2.125.00 Engineering, surveying, and inspection $ 32.024.00 Landscaping $ 58,885.00 TOTAL COST OF PUBLIC IMPROVEMENTS $ 548~396.00 This breakdown is for historical reference; it is not a restriction on the use of the security. The security shall be subject to the approval of the City. The security shall be for a te~zn ending SP-2 June 30, 2005. The City may draw down the security, without notice, fbr any violation of the terms of this Contract. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of the original amount until all improvements are complete and accepted by the City. 7. Notice. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: Marc S. Anderson Lundgren Bros. Construction, Inc. 935 East Wayzata Boulevard Wayzata, MN 55391 Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by registered mail in care of the City Manager at the following address: Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (952) 227-1100. 8. Other Special Conditions. A. The applicant shall enter into the development contract and supply the City with a cash escrow or letter of credit in the amount of $603,236.00 and pay an administration fee of $148,199.00 B. The applicant's engineer shall work with City staff in revising the construction plans to meet City standards. C. Nineteen (19) connection charges are required to be paid upon final plat approval of the third addition. Based on the current 2004 rate, the total amount due payable to the City for the 19 additional connections charges will be $90,041 (19 ~ $4,739). In addition, each newly created lot will be subject to City sanitary sewer and water hook up charges at the time of building pernfit issuance. The 2004 trunk utility hook-up charges are $1,458 per unit for sanitary sewer and $2,814 per unit for water. D. Lots 10 and 24, Block 2 need to be revised to meet the 50-foot minimum lot frontage. E. Detailed grading, drainage, tree removal and erosion control plans will be required for Lots 4-8, Block 2 at the time of building permit application for City review and approval. In addition, as-built surveys will be required on said lots prior to occupancy. SP-3 F. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes and traffic control plans. G. Staff will work with the engineer to correct the drainage calculations. H. Prior to final platting, storm sewer design data will need to be submitted for staff review. Depending on the size of the drainage area, additional catch basins may be required at that time. The storm sewer will have to be designed for a 1 O-year, 24-hour storm event. Drainage and utility easements will need to be dedicated on the final plat over the public storm drainage system including ponds, drainage swales, emergency overflows, access routes for maintenance, and wetlands up to the 100-year flood level. The minimum easement width shall be 20 feet wide. Emergency overflows from all stormwater ponds will also be required on the construction plans. I. Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type I erosion control fence be used for the area around the existing pond in the southxvest portion of the site. This will prevent silt and dirt from washing into the pond during home construction. A 75-foot rock construction entrance has been shown at the entrance of Ridgeview Way off of West 78th Street. J. Utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications have been submitted for staff review. The applicant is also required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies will be required prior to construction, including but not limited to MPCA, Department of Health, MnDOT, etc. K. Encroachment agreements will be required for the islands within the right-of-way. L. The applicant shall include a draintile system behind the curbs to convey sump pump discharge from homes not adjacent to ponds. M. All plans must be signed by a registered engineer. N. The developer shall be responsible for installing all landscape materials proposed in rear yard areas and buffer yards. O. Tree preservation fence shall be installed at the edge of the grading limits on Lots 4-10, Block 2 prior to any construction. A conservation easement shall be placed in the rear of Lots 4- 8, Block 2 over said lots. P. The following lots shall be custom graded: Lots 4-8, Block 2. Any trees removed on said lots in excess of proposed tree preservation plans will be replaced at a ratio of 2:1 diameter inches. SP-4 Q. All of the proposed house pads must have a rear yard elevation at least three feet above the HWL of adjacent ponds. R. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420). S. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained around Basins 1, 3 and the wetland mitigation areas. A wetland buffer 10 to 30 feet in width (with a minimum average of 20 feet) shall be maintained around Basin 2. T. Wetland buff'er areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of City staff, before construction begins and shall pay the City $20 per sign. U. All structures shall maintain a 40-foot setback from the edge of the wetland buffer. V. All proposed trails and trail easements shall be located outside of the wetland buff'er area. W. The grading and erosion control plan shall show the actual wetland buffer widths proposed to meet the minimum average buffer width requirements as well as the 40-foot wetland buffer setback. X. Drainage and utility easements shall be provided over all existing wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds. Y. Prior to permit submittals the developer shall meet with the Inspections Division to discuss the design and construction of the twinhomes. Z. Final grading plans and soil reports must be submitted to the Inspections Division belbre building permits will be issued. AA. A 1 O-foot clear space must be maintained around fire hydrants, i.e., street lamps, trees, bushes, shrubs, Qwest, Xcel Energy, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. BB. When fire protection, including fire apparatus access roads and water supplies for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. Pursuant to 1997 Minnesota Uniform Fire Code Section 901-3. CC. In the cul-de-sacs with the center island "no parking" signs will be required. Contact Chanhassen City Fire Marshal for additional information. SP-5 DD. No burning permits will be issued for trees to be removed. Trees or shrubs must be either removed from site or chipped. EE. Submit street names to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. FF. All remaining Park and Trail fees be collected per City ordinance. GG. All lots meet the standards of the R-4 zoning district. HH. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained around Basins 1, 3 and the wetland mitigation areas. A wetland buffer 10 to 30 feet in width (with a minimum average of 20 feet) shall be maintained around Basin 2. (Those buffers considered for Public Value Credit (PVC) under the Wetland Conservation Act (WCA) shall maintain a minimum width of 16.5 feet.) II. Type III silt fence shall be provided adjacent to all wetland fill areas, areas to be preserved as buffer or, if no buffer is to be preserved, at the delineated wetland edge. Any disturbed wetland areas shall be reseeded with MnDOT seed mix 25 A, or a similar seed mix that is approved for wetland soil conditions. All upland areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched, covered with a wood-fiber blanket or sodded within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. JJ. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Army Corps of Engineers) and comply with their conditions of approval. 9. General Conditions. The general conditions of this Contract, approved by the City Council on February 23, 1998 are attached as Exhibit "B" and incorporated herein. SP-6 CITY OF CHANHASSEN (SEAL) BY: AND: Thomas A. Furlong, Mayor Todd Gerhardt, City Manager LUNDGREN BROS. CONSTRUCTION, INC.: BY: Marc S. Anderson, Vice President STATE OF MINNESOTA ) ( SS. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this __ day of ., 20 , by Thomas A. Furlong, Mayor, and by Todd Gerhardt, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC STATE OF MINNESOTA ) ( SS. COUNTY OF ) The foregoing instrument was acknowledged before me this __ day of 20 , by Marc S. Anderson, the Vice President of Lundgren Bros. Construction, Inc., a Minnesota corporation. DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 NOTARY PUBLIC SP-7 EXHIBIT "A" TO DEVELOPMENT CONTRACT LEGAL DESCRIPTION OF SUBJECT PROPERTY: Outlot B, VASSERMAN RIDGE 2ND ADDITION, according to the recorded plat, Carver County, Minnesota, Outlot E, VASSERMAN RIDGE, according to the recorded plat, Carver County, Minnesota, And The most easterly 543.98 feet of the following described property: That part of the Southeast Quarter of Section 9, Township 116 North, Range 23 West, Carver County, Minnesota, described as follows: Commencing at the southeast comer of said Southeast Quarter of Section 9; thence on an assumed bearing of North 88 degrees 41 minutes 39 seconds West along the south line of said Southeast Quarter 719.46 feet to the point of beginning of the land to be described; thence North 0 degrees 12 minutes 42 seconds West, parallel with the west line of the East Half of said Southeast Quarter, 800.78 feet; thence North 88 degrees 41 minutes 50 seconds West, parallel with the north line of said Southeast Quarter, 603.70 feet; thence North 0 degrees 12 minutes 42 seconds West, parallel with said west line of the East Half of the Southeast Quarter, 1891.37 feet to the north line of said Southeast Quarter; thence North 88 degrees 41 minutes 50 seconds West along said north line of the Southeast Quarter 467.88 feet to the northwest comer of the east 30 acres of the West Half of said Southeast Quarter; thence South 0 degrees 12 minutes 42 seconds East along the west line of said east 30 acres of the West Half of the Southeast Quarter of Section 9 a distance of 2692.10 feet to the south line of said Southeast Quarter of Section 9; thence South 88 degrees 41 minutes 39 seconds East along said south line of the Southeast Quarter 1071.58 feet to the point of beginning. EXCEPTING THEREFROM That part of the Southeast Quarter of the Southeast Quarter of Section 9, Township 116 North, Range 23 West, shown as Parcel 212A on Minnesota Department of Transportation Right of Way Plat Numbered 10-13 as the same is on file and of record in the office of the County Recorder in and for Carver County, Minnesota. SP-8 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) EXHIBIT "B" GENERAL CONDITIONS 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office of the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. 3. Effect of Subdivision Approval. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 4. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits from the Metropolitan Council Environmental Services and other pertinent agencies before proceeding with construction. The City will, at the Developer's expense, have one or more construction inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer shall also provide a qualified inspector to perform site inspections on a daily basis. Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of quality in accordance with the engineer's design. The Developer or his engineer shall schedule a GC-1 preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff; to review the program for the construction work. 5. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 6. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 7. Site Erosion Control. Before the site is rough graded, and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion control requirements. Erosion control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion control, the City will authorize the removal of the erosion control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion control measures. 7a. Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished the City to guarantee compliance with City Code 5 20-94. 8. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. 9. Acceptance and Ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final GC-2 inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement to the City Engineer certifying that the project has been completed in accordance with the approved plans and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of the public improvements shall be by City Council resolution. 10. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 11. Park Dedication. The Developer shall pay full park dedication fees in conjunction with the installation of the plat improvements. The park dedication fees shall be the current amount in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council resolutions. 12. Landscaping. Landscaping shall be installed in accordance with Plan D. Trees which can cause a public nuisance, such as cotton producing trees, or can be a public hazard, such as bug infestation or weak bark, are prohibited. The minimum tree size shall be two and one-half (21/2) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October 1 through May 1 these conditions must be complied with by the following July 1 st. Upon expiration of the time period, inspections will be conducted by City staff to verify satisfactory completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the security to satisfy the requirements. The City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 20-94 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. GC-3 13. Warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the City. All trees, grass, and sod shall be warranted to be alive, of good quality, and disease free at the time of planting. All landscape plantings shall be warranted for eighteen (18) months from the time of formal acceptance by the City. The Developer or his contractor(s) shall post a letter of credit or other security acceptable to the City to secure the warranties at the time of final acceptance. The security amount shall be 100% of the total construction cost. 14. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with development plans and City Ordinance. 15. Existing Assessments. Any existing assessments against the plat will be re-spread against the plat in accordance with City standards. 16. Hook-up Charges. The Developer also acknowledges overall sanitary sewer and water trunk availability to the site and the hook-up charges established by the City as reasonable compensation for oversizing costs previously incurred, as well as, long-term maintenance. Said hook-up charges are collectible at time of building permit unless a written request is made to assess the costs over a four year term at the rates in effect at time of application. 17. Public Street Lighting. The Developer shall have installed and pay for public street lights in accordance with City standards. The public street lights shall be accepted for City ownership and maintenance at the same time that the public street is accepted for ownership and maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street light installed in the plat. The fee shall be used by the City for furnishing electricity and maintaining each public street light for twenty (20) months. 18. Signage. All street signs, traffic signs, and wetland monumentation required by the City as a part of the plat shall be furnished and installed by the City at the sole expense of the Developer. 19. House Pads. The Developer shall promptly furnish the City "as-built" plans indicating the amount, type and limits of fill on any house pad location. 20. Responsibility for Costs. A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final GC-4 acceptance of improvements. This fee does not cover the City's cost for construction inspections. The fee shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3%) of construction costs; ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3%) of construction costs for the first $500,000 and two percent (2%) of construction costs over $500,000; iii) if the cost of the construction of public improvements is over $1,000,000, two and one-half percent (21/=%) of construction costs for the first $1,000,000 and one and one-half percent (1V:%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be detemfined based upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer shall reimburse the City for all costs incurred by the City for providing construction inspections. This cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 20E of this Agreement. C. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees tbr all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. D. In addition to the administrative fee, the Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. GC-5 G. Private Utilities. The Developer shall have installed and pay for the installation of electrical, natural gas, telephone, and cable television service in conjunction with the overall development improvements. These services shall be provided in accordance with each of the respective franchise agreements held with the City. H. The developer shall pay the City a fee established by City Council resolution, to reimburse the City for the cost of updating the City's base maps, GIS data base files, and converting the plat and record drawings into an electronic format. 21. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license fbr the City to act, and it shall not be necessary for the City to seek a Court order l~br permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 22. Miscellaneous. A. Construction Trailers. Placement of on-site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre-construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance with the local Postmaster's request. C. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce this Contract or for allowing deviations from it. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. The City may also issue a stop work order halting all plat development until the breach has been cured and the City has received satisfactory assurance that the breach will not reoccur. E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Building Permits. Building permits will not be issued in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the GC-6 streets needed for access have been paved with a bituminous surface and the site graded and revegetated in accordance with Plan B of the development plans. G. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release. This Contract shall run with the land and may be recorded against the title to the property. After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. I. Insurance. Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. J. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assignabili _ty. The Developer may not assign this Contract without the va'itten permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. L. Construction Hours. Construction hours for required improvements under this contract shall be from 7:00 a.m. to 6:00 p.m. on weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such activity allowed on Sundays or any recognized legal holidays. Under emergency conditions, this limitation may be waived by the consent of the City Engineer. Any approved work performed after dark shall be adequately illuminated. If construction occurs outside of the permitted construction hours, the Developer shall pay the following administrative penalties: GC-7 First violation $ Second violation $ Third & subsequent violations 500.00 1,000.00 All site development and construction must cease lbr seven (7) calendar days M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms, and similar devices is prohibited in conjunction with the construction of homes, buildings, and the improvements required under this contract. The administrative penalty for violation of construction hours shall also apply to violation of the provisions in this paragraph. N. Access. All access to the plat prior to the City accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. O. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing operations. The provision of City snow plowing service does not constitute final acceptance of the streets by the City. P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales) within the plat and the adjacent off-site storm sewer system that receives storm water from the plat. The Developer shall follow all instructions it receives from the City concerning the cleaning and maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end two (2) years after the public street and storm drainage improvements in the plat have been accepted by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special provisions of this contract, will be held by the City for the duration of the 2-year maintenance period. Q. Soil Treatment Systems. If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building permit. R. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. GC-8 S. Compliance with Laws, Ordinances, and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; 4. Watershed District(s); 5. Metropolitan Government, its agencies, departments and commissions. T. Proof of Title. Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. U. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. V. Soil Correction. The Developer shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department deternfines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi-lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. W. Haul Routes. Bluff Creek Drive from Trunk Highway 212 to Pioneer Trail (CSAH 14) may not be used by the Developer, the Developer's contractors or subcontractors as a haul route for the import or export of soil, construction material, construction equipment or construction debris, or any other purpose. X. Development Signs. The Developer shall post a six foot by eight tbot development sign in accordance with City Detail Plate No. 5313 at each entrance to the project. The sign shall be in place before construction of the required improvements commences and shall be removed when the required improvements are completed, except for the final lift of asphalt on streets. The signs shall contain the following information: project name, name of developer, developer's telephone number and designated contact person, allowed construction hours. GC-9 Y. Construction Plans. Upon final plat approval, the developer shall provide the City with two complete sets of full-size construction plans and four sets of 1 l'xl?' reduced construction plan sets and three sets of specifications. Within sixty (60) days after the completion of the utility improvements and base course pavement and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as-built plans, (2) two complete full-size sets of blue line/paper as-built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital file of as-built plans in both .dxf & .tif format (the .dxf file must be tied to the current county coordinate system), and (8) digital file of utility tie sheets in either .doc or .tif format. The Developer is required to submit the final plat in electronic format. Z. As-Built Lot Surveys. An as-built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as-built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. GC-10 CITY OF CHANHASSEN VASSERMAN RIDGE 3RD ADDITION PROJECT NO. 04-04 BREAKDOWN OF ADMINISTRATION FEES - 2/17/04 Based on $489,511 of Estimated Public Improvements 3% of Public Improvement Costs (up to $500,000) Street Lighting Charge (for electricity) 6 Light(s) @ $300.00 Final Plat Process (Attorney Fee for Review and Recording of Plat and Development Contract) Recording Fees a. Development Contract b. Plat Filing Park Fees 34 Lots @ $2,800/Iot Surface Water Management Fee GIS Fee ($25/plat and $10/parcel) TOTAL ADMINISTRATION FEES $ $ $ $ $ $ $ $ 14,685.33 1,800.00 450.00 30.00 30.00 95,200.00 35,618.49 385.00 148,199 Vasserman 3rd.FEE.xls The following is a list of recommended plan changes for Vasserman Ridge 3rd Addition 1. Show the driveway locations on the grading plan. 2. Show the horizontal curve data on the street plans. 3. Use City of Chanhassen 2004 detail plates. 4. Eliminate sanitary MH lA on the utility plan. 5. The minimum allowable storm sewer size 15-inch diameter. Revise the plans to comply. g:~,eng~,projects\vasscrman ridgc 3rd\plan changes.doc