Action by City Administrat6t
MEMORANDUM Ertdarsed t/ U v
Pi
' Modified _
TO: Don Ashworth, City Manager
Gary ► City g Warren Cit Engineer Date Submitted to commission
DATE: January 17 , 1990 bete Submitted to Cou,cii
/ yG _
SUBJ: Authorize Preparation of Plans and Specifications for
Phase II of West 78th Street Detachment Project
' Project No. 87-2B
' I initially dictated this item presuming that the original
feasibility study for the West 78th Street Detachment Project,
which was updated in August of 1989 , would suffice for this
phase of the project. Upon review, I thought it more appropriate
' to step back for a minute and take a fresh look at the Phase II
improvement area to address a number of issues more thoroughly.
With the acceleration of Trunk Highway 5 improvements currently
scheduled for a November 16, 1990 letting, and with development
pressure for the City to proceed with improvements for Lake Drive
West between Powers Boulevard and Audubon Road, the necessity to
' proceed with Phase II improvements is upon us .
The scope of improvements which was contained in the original
' feasibility study is shown on the attached Figures 7 and 8. This
reflects urbanizing this segment of the roadway from Trunk
Highway 5 to just south of the new Lake Drive intersection with
concrete curb and gutter and storm sewer appurtenances. If Lake
' Drive West is to be built in. 1990/91, it seems appropriate that
this section of County Road 17 should be improved from Trunk
Highway 5 to the intersection of Lake Drive West. Similarly, the
' westerly connection of Lake Drive West to Powers Boulevard is
currently in temporary construction due to the soil correction
effort. This segment would also be completed to a final road
section with the County Road 17 upgrade.
With the extension of the County Road 17 improvements to Lake
Drive West, additional players will probably be encountered on
the assessment rolls . Similarly, the project cost which was
prepared in 1988 will also be updated and expanded to address the
current segment. The original feasibility study estimated
I
I
II Don Ashworth
r January 17 , 1990
Page 2
approximately 46% of the $1 . 9 million total project (Phases I and
PP Y P
II ) to be assessable. Phase II was estimated to cost $567 ,600 .
' It is therefore my recommendation that the City Council not
proceed with the plans and specifications for Phase II at this
time but instead authorize the preparation of an updated
feasibility study for this section of County Road 17 from Trunk
Highway 5 to the Lake Drive West intersection just south of
Purgatory Creek. It is recommended that the firm of BRW, who
performed the work on the original feasibility study, be
authorized to prepare this update for the City.
Attachments: 1. Figure 3 of the original feasibility study.
2 . Figure 7 of the original feasibility study.
' 3 . Figure 8 of the original feasibility study.
4 . Figure 11 of the original feasibility study.
5 . Figure 14 of the original feasibility study.
6 . Figure 15 of the original feasibility study.
' 7 . Figure 16 of the original feasibility study.
c: Gary Ehret, BRW
' Roger Gustafson, Carver County Engineer
I
I
— 1111111 NM INIII MN MN MN MI MI NM NM MO N NM I MI MN 11111 —
I1
II I �` +
T1
O 111
- CHANHASSEN
TRACT B W I 1
FIGURE Fl URE 5 . Y 11 POWERS BLVD.(C.S&H. 17)
_._ E = WEST 78TH STREET
FIGURE 6 I DETACHMENT
W.78TH STREET
TRUNK �, ; FEASIBILITY
,
- °''
r STUDY
' - =- .3" l 1r 1 C.P. 87-2
1 oNiyq r r
oa
I -- 11
1 OUTLOT B ∎'\ 1111 lila I ' �\I
•'• i 1
LEGEND
_ _Roq ___ _ EXISTING RIGHT-OF-WAY
P , ,� ,' ---=PROPOSED RIGHT-OF-WAY
\• <2`ii, , �, B _ IP' s EXISTING ROADWAYS
\ / - el M PROPOSED RECONSTRUCTION
4/ III ode PROPOSED CURB &GUTTER'
• LANE " ''/ _____ PROPOSED ROADWAYS
Soo ,,1y OUTLOT A ( BY OTHERS ) ;1
• or, a°
W - ""LIMITS OF EXPANDED VIEW
°� = LAKE DRIVE
OUTLOT F
�
I ' ROADWAY
- -
..
t
OUTLOT B IMPROVEMENTS
Ii ■ o 400 eoo
OUTLOT o 4 ,
J OUTLOT E / ,
iNt rnienimid
�$- // - NORTH
o ;/ h.NNINO 3
/ TR�NSPORTI,t,7N
�( /, EN6,NEER,., FIGURE
/, fIRYt •RCN,TEC TORE
• // BENNETT.RINOROSE.WOISEELD.JARViS.GARDNER.,NC. I
// / [MESMER SQUARE TOO MOROSE N.. MNNE.PO4S.NN SS.,S
+ �/ LAKE SUSAN • —I-
-- -- — �-
•
0
e
POWERS BLVD. SOUTH OF HWY. 5 CHANHASSEN
- , POWERS BLVD.(C.SAH. 17)
Ci WEST 78TH STREET
DETACHMENT
cc I
FEASIBILITY
—_---1--=_--1--------A UNITED MAILING BLDG. e I 0- % I • ? I I VICTORY ENVELOPE Co STUDY•; i is, � e I C.P. 87-2
EXISTING PAVEMENT '"''"'"" +.-N-1 L__ --
T TO REMAIN I I I
MA I • : I
., "" ' I E EXISTING GRAVEL SHOULDER
--- - - _�� NEW 8624 CURB&GUTTER LEGEND
•
_„ EXISTING MEDIAN / \
-- -- ---JL—LER TURN LANE -� --� I Fp_V ♦LEFT TURN LANE ` ��NTY O ----EXISTING RIGHT—OF—WAY
__ .-- ---_____-_°`— __ ��*, Rp i1/p / ? ---PROPOSED RIGHT—OF—WAY
_-- �; < ; I Z _ EXISTING ROADWAY
_ PROPOSED ROADWAY
w .-� PROVIDE CONTROLLED < �� / ` `TEOTT�N��., / kJ'/
4,..,., I OUTLET \\ \4'�f'`:` •.�' ��i`' 1, STORM SEWER
>—>�—>—EXISTING S O S
" c �` PROPOSED STORM SEWER
., ! ( P'• �° " " - EXISTING GRAVEL y i •—•>—•—>—
PROPOSED..--.::::::„.__Do,..., _ J,,s _ XISTING\ SHOULDER \ 'y
.....\ POND `, —PROPOSED CURB & GUTTER 1
•- •'1-- R 1 T \ I NEW 8624 CUPB&GUTTER (�
i I / X11 J�� „ --°----r'--EXISTING SANITARY SEWER
/1 ' I ~v } I 4 ;;; —A—I—± —EXISTING WATERMAIN
- ' % PROPOSED
INSTANT WEBS BLDG. \ �'
IMPROVEMENTS
/� / o 100 200/ 1€ 1 AI
J/ /
N. / / // / NORTH
V
/ ■■
` •
\\\ as
E e�CiC„� TRRR6 O 7
EO Y E FIGURE
J
THRESHER SQUARE TI M° S. JARVIS.O IS.RN .INC.
TMES,ER Sp//JIE 100 TNND Si.S. unREAFOUS,W 55.16
- MI ME In 111111 ME 111111 - - II. MI MN OM MN 1111111 111111 1111111 -
— — — IIII — — — — — — — — — — — s
. „J..,New ..++
e
POWERS BLVD. SOUTH OF R.R. TRACKS CHANHASSEN
.. POWERS BLVD. (C.SAH. 17)
_. WEST 78TH STREET
EXISTING GRAVEL SHOULDER
FEASIBILITY I
DETACHMENT
4--,. g, STUDY
;\ END CURB a GUTTER C.P. 87-2 •
\4/T.
\\ NEW 8824 CURB 8 GUTTER
EN. URB N
LEGEND
3 r. R ', EXISTING PAVEMENT TO REMAIN
EXISTING RIGHT-OF-WAY
�'1 \ —-PROPOSED RIGHT-OF-WAY
\F RQgO •• -EIS(ISTNG GRAVEL SHOULDER
cC8�'�,;;� R , EXISTING ROADWAY
,,� ►. `,!_ NO. 17 1— PROPOSED ROADWAY
N
Z >–>-0—>—EXISTING STORM SEWER
�L / v ��hEI[EXISTNO MEDIAN
Y"� -_ v t->-*->-PROPOSED STORM SEWER
PROPOSED Q ; / ��__� ===_4 >_v .f_
<v � / F, t `=--`"=--�- -'.:� PROPOSED CURB & GUTTEF
DETENTION POND k" ///'" �-
v { -- -- - - < < -�EXISTING WATERMAIN
-__._-__ ,�-�/r NEW 8824 CURB`d GUTTER EXISTING GRAVEL SHOULDER- LI 1 PROPOSED
S \ IMPROVEMENTS
J L t -
- ® r�i zoo
���
NORTH
•
L _ J BIEW
RANESNKNO
8
ARCNIfECfURE FIGURE
RENNEff RINGROSE.WOL SFELD.JARVIS.GARDNER.INC.
TNRER ER SGOARE 700 tN91D St.9.. MINNEAPOLIS,MN SS•IS
0 '
fh
, , '74"t,°M'Bi1a:'mW 41 0,•//,...e# ./ww# ,,KMAKFMNFrra11Y 4 +'Xn,.Uw;414 .SAPRAH1G' .2 N:.wa .OT 44.rr.....,.,
• 1
R,6 I
PM' 4O. E 40' I 9
52' 9' S' 8114001 SPEC.2357 I MY WEMR15 COME
LANDSCAPE SIDEWALK BMX COAT 61X7166-SPEG2341
1. r 6' 1 2' 12' ■ ,2• 12' , 12' _.2' 3....AREA ./_ _
11KL PAIN i LANDSCAPE 1 CRRISE COURSE
SEC'US^n— / " � a•w x301 \\\\\\\\\\\\ are%- C.0341
.o47rt. I .a'rrr .0F/T7 rr- =",>a. a �? y7:8A6pplI�pA U/ ////Il NNC%S CRUSXEDIT['QASE MsrtuMTERIAL�r PLACED ON PRE►MW 61166 W FOR AT-UNOOT SPED 2021 III' PEC, ,307C4 4'TSCLJ S I 7'ASSREOATE SASE,
W' s SOD CLS-SPEC.221
-••TOPSOIL 6 SOD W. 78TH ST. TORSO!L 6 SEED) INSET A BITUMINOUS MATERIAL
ALL Ds7ulem nREU INSET B
ALL DISTURBER ARCAS FOR TACK COAT.�I SPEC 2357-AS*00116
MW n £ n 75' RAT
K. ..
M• - S.1.LANE I C NQ LANE ••
20' Y0,
'_A CA"*:-:n • LANDSCAPE AREA
�,, :2' '2' ro' I E' 12' 12' 2' 15' _ YS'
II'� I•EFT TURN LASE
•
L4-1120101L --.-.12 --. <1 _:Si. �Q:<� I .013E I I --AM. Qyl� t •4'A I w
L DISTURBED BSEED �_
' ALL ORTUIBW AREAS _.� +
471).SOIL3 S^O—' \ 470PSOL1160D
L-PROPOSEC 5624 NEW CO NTY 1 7 PROPOSED 1624
MRS 35'177E1 PAM 6 GUTTER
NORTH OF HWY. 5 AU'"3dL•""°
ALL DISTIRNW AREY
� ~` TYPICAL SECTION ON TANGENT �.-
STA 64.57.43 To 72.4:,56
PROFILEGRADEISGRADING GRADE ON C-S 6,L.AND t N 9.1. -N...,,,,,...
i ` 'r :7.4,71•77.09 TO 76•401APPROXI
• r i5. • I P 9D 2U , 21'
.
1 30'VCXIGE RECOVERY AREA
R
VI
Y IY
12' 0' ' r I7' IP• 10'
-
141 I ..Q13> bill. I 4'TOPSO't 0,5001 • I 'MIL... 41112L.
',"` •+. OR N04D6E0 CONSTXUC7�ON
• •_._++ ME TYPICAL SECTION 3EL0'M WR
4 PCtrL O.EEO IN EMBANKMENT
IN EXCAVATION '
EXISTING CO. 17
75' 7 Q ru 75'
RIM
26, 115,LANE E N.N.LANE
9.U I LANDSCAPE AREA 20 LANDSCAPE AREA BIKE PATH
4:1 _ �2'1 '2' 7 '7' r r 12' I 12' 2' I' .' Is'
I I 1
I .Ml'/. , I I I I I 04A-_ . -—--Ot.R - 04'
4.120101L u,615 ►SEED - __- 4•I
ALL DISTURBED AREAS
evEMSCL&SOO— , I -14'701011,11300 r TOPSOIL•SEED
` ALL DISTURBED AREAS
` `PROPOSED 0624 EXISTING 1624 PROPOSED 1624
1 CAWS R SL'^ER CUM 6 GUTTER CUM 6 GUTTER -
• • EXISTING ROADWAY I TYPICAL SECTIONS
, NEW COUNTY 17 E
SOUTH OF HWY. 5 fiiiiv T RAMO"R"TMAMT,1OMO M . FIGURE
ARCHITECTURE
DIn * J. :UtR1M R
D .OW"h10 T*110 f1.L. ::E: , ! 1 1
M - R - NM - - ■r. MN MI OM I• NM - MN A
OM - - r
- -
A .
W
,.
CHANHASSEN
STREET TREES POWERS BLVD. (C.S.A.H. 17)
Ci
cc SHRUB MASSING WEST 78TH STREET
_
-c g- I CONIFEROUS AND ORNAMENTAL FEASIBILITY
cc E ¢ 1 �
UNITED MAILING BLDG. } f TREE MASSING STUDY I
' i BLDG.
-� ---3"----17–:-1-- -+ ...: H.P.S. LIGHT FIXTURE C.P. 87-2
4
Q::rw „; _-•__ ice. .
-.I E f , 8' BIKE PATH
- L:::: -- - LEGEND
40 i
-------------- 00UNTY, -
�:_ ....
CHANHASSEN
POWERS BLVD. (C.S.A.H. 17)
l SHRUB MASSING WEST 78TH STREET
DETACHMENT
- - STREET TREES FEASIBILITY
STUDY
END CURB&GUTTER H.P.S. UGHT FIXTURE
C.P. 87-2
• - CONIFEROUS AND ORNAMENTAL
‘N's. .`,\ TREE MASSING
/I 8E BIKE PATH
i \ :: . N�` otA_ N LEGEND
2j %; ----EXISTING RIGHT-OF-WAY
\ ` ��►�� �'��, i ----PROPOSED RIGHT-OF-WAY
END CURB&GUTTER " U7
�, �O " �� _. • I ' O I -=EXISTING ROADWAY
�" O
J _ �•�r°, „ � r 1_ PROPOSED ROADWAY
��► ;� :-
4 / ' •=aZSt�� t ��7.QtlZ:i/ FR. >99WNq RF
.. - v•
7l
I ‘S LANDSCAPE
I, CONCEPT
' 1E1 ill.6111rilial
NI • NORTH
f
IIR'i% �GAAIAG 15
TRGNSVGRIGIIOM
£NGNiEERiNO FIGURE `
GRGAIIECTURE
- . SENNETT DIAGNOSE.WOISEELO JARVIS.G•RDNER.INC
THRESHER SOIGNE 100 TIRO SI S ANNEAROUS.AN SS.IS
40 •
IIIII NM I I U. NM MI M M
•
41
OUTLOT A VM1`-•'� �4
/0771, OUTLOT B ∎NESS 9$GAP"4 NN R-Ef01C� ounor a � "yry�yOy/ yln y�/y p•
� CHANHASSEN_____ ,y/W N A y 4y ALT. A _ . y,,yy � POWERS BLVD.(c.s.A.H. »)
m PROPOSED
WORM PIPE >,. ETENT1011k OUTLOT ♦ OTHERSyh SCI WEST 78TH STREET
TRUNK �anma / �uyl�„, '• q �FiET I I DETACHMENT
>�• III > :aanls I FEASIBILITY
..-- --_____ ; 12 .3 IT10N -- STUDY
r�i 1 cK RI G2 �LOT '3 C.P. 87-2
`�as / , N D P” / LEGEND
' �- N / a, +soaoo 2 I s
2 'CLOT /441•0O‘�O I 1 '/ ea o � ` I ` EXISTING RIGHT-OF-WAY
j � ¢', 2 " \� \ DE ENTION a II. —--PROPOSED RIGHT-OF-WAY
I P11IkXISTINO ' 11 I POND � �\� BY OHERS) euaD I I EXISTING ROADWAY
! + ICI / `" "` i j PROPOSED ROADWAY
\ _ + I , : e—'—o EXISTING STORM SEWER
�� s ��' PROPOSED STORM SEWER
QQP , O •—•-•-•-•— CO. 17 ROADWAY ASSESSMENT
� � �// I, `5550050 1 a�A � NOS N. OF.HWY 5
• , / `z 4. 1 y -----W. 78TH STREET ASSESSMENT
,� p1 CO. 17 ROADWAY ASSESSMENT
—°''07' 1 S. OF HWY 5
LANE STORM SEWER ASSESSMENT
I , N. OF HWY 5
„y, • Y°001'•i
in 0 Y. OUTLOT A
a I p II 1000400 STORM SEWER ASSESSMENT
I, I S. OF HWY 5
i 1 -------WATERMAIN ASSESSMENT
LoT F h LAKE DRIV SANITARY SEWER ASSESSMENT
,° N° II" II, , HPSSE 5 ASSESSMENTS
N S
OS /�U yV CITY of G PU51NE 9001110
�\ � II �• CHANHASSEN 3A0 ALTERNATE A
OUTLOT D pe , 'I /1,/ :; OUTLOT B
111 N�NgS \L r E , rV/ ` AETErsMoR 0 400 800
GHPvVg1N i h // '% ,,.
\'• Q• � �, �, ''� CITY OF NORTH
—.� // ;;,�, .,,,.,;,/*7 CHANHASSEN
• /' n ✓ 'OUTLOT C
yr Q �4r ..' '\ 5 'aIIMY RIINNINO • 6
'/ R'ti�e"�� `.` +RA"ENOINEERIN6 FIGURE
' \ ARCHITECTURE
' RENNETT.RIN0N0SE.WOLSEELO.JARVIS.OARONER.INC.
4' TI ESHER SOJARE TOO THEiD ST.A. OWNEA00US,NN ISOIN
/ LAKE SUSAN -�-