1q. Feasibility Study for Country Suites 4 T I TY OF • • CHANHASSEN • 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 • T` (612) 937-1900 • FAX (612) 937-5739 MEMORANDUM u I TO: Don Ashworth, City Manager FROM: Gary Warren, City Engineer DATE: March 7, 1990 SUBJ: Accept Feasibility Study for Country Suites Hotel Site Project No. 89-25; Waive Public Hearing; Order Plans and Specifications; Approve Plans and Specifications and Authorize Advertising for Bids The attached feasibility study covers the utility and surface improvements for the Country Hospitality Suite Hotel site located in the southeast corner of Market Boulevard and West 78th Street. The improvements scheduled for the site include storm sewer, watermain, sanitary sewer, bituminous paving and concrete curb and gutter, concrete sidewalks and site lighting. These elements are being closely coordinated obviously with the Country Suites construction which is currently underway. The total project cost including 30% overhead is estimated in the feasibility study to be $311,000. This figure has been adjusted dawn somewhat in the plans and specifications phase to $304,400. These costs are proposed to be assessed ' entirely against the benefitting properties which are owned by Bloomberg Canpanies, Inc. and CH Suites Partners. As noted in the appendix to the feasibility study, both property owners have executed development contracts on ' file with the City waiving their public hearing and assessment contention rights. The attached plans were prepared in concert with the developer's staff on the hotel site. Minor modifications still need to be done to these plans to reflect the bus access issue recently resolved with the developer. This will be completed before the plan sets are distributed to bidders. Although unusual, it appears that all elements of the project are in order for the Council to entertain a recamiendation to accept the feasibility study, waive the public hearing, order plans and specifications, approve plans and specifications, and authorize advertising for bids for the Country Suites Hotel Site Improvement Project No. 89-25. ktm ' Attachments: 1. Feasibility study. 2. March 6, 1990 letter from BRW. 3. Construction plans. c: Gary Ehret, BRW Bloanberg Companies CH Suites Partners • PLANNING TRANSPORTATION ENGINEERING URBAN DESIGN BRW. INC THRESHER SQUARE 700 THIRD STREET SOUTH • MINNEAPOLIS.MINNESOTA 55415 • PHONE 612'370-0700 FAX 612.370-1378 IIMarch 6, 1990 II Mr. Gary G. Warren, PE CITY OF CIIAMMRHASSEN City Engineer GESI �D� City of Chanhassen MAC 07 1990 II 690 Coulter Drive Chanhassen, MN 55317 Country Hospitality Suites Site Improvements ENGINEERING DEP1. IRE: City Project 89-25 IDear Gary, We are currently completing the plans and specifications for the construction of site improvements for the Country Hospitality Suites development. The plans and II specifications detail the requirements for the construction of storm sewer, san- itary sewer, and water main utilities to serve the site, as well as bituminous paving, sidewalk construction, and site lighting. Existing building demolition, I miscellaneous removals, site grading, and other related work are not included as a part of the scope of this project since this work will be performed by the site developer as required by the redevelopment agreements with the City. A more detailed description of the work to be performed by the developer and by IIthe City is provided in our March 1990 feasibility report for the improvements. We have completed an Engineer's Estimate for the project as summarized below. II The project cost estimate previously prepared for the feasibility study is also shown for your information and comparison. II COST ESTIMATE March 6, 1990 • Bid Engineer's Feasibility Study ISchedule Item Estimate Estimate A Bituminous Paving $ 96,500.00 $104,230.00 I B Storm Sewer 49,500.00 34,650.00 49,020.00 C Water Main 34,650.00 D Sanitary Sewer 14,500.00 13,450.00 E Lighting 39,000.00 37,850.00 $234,150.00 $239,200.00 II It should be noted that the estimates are for the construction costs onlx, and do not include any allowances for administrative or overhead costs. IAN AFFILIATE OF THE BENNETT.RINGROSE.WOLSFELD.JARVIS.GARDNER.INC GROUP DAVID J BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E.JARVIS LAWRENCE J.GARDNER THOMAS F CARROLL CRAIG A AMUNDSEN DONALD E HUNT MARK G SWENSON JOHN B.McNAMARA RICHARD D.PILGRIM DALE N.BECKMANN DENNIS J SUTLIFF JEFFREY L.BENSON RALPH C.BLUM DAVID L GRAHAM IMINNEAPOLIS DENVER PHOENIX TUCSON ST.PETERSBURG Mr. Gary G. Warren March 6, 1990 Page 2 We recommend that the City Council authorize the advertisement for bids for this project on Monday, March 12, 1990. If the Council chooses to proceed with this project, a tentative schedule is outlined below. It is important to note that the schedule for the public improvement work is dependent on the developer's schedule for the building demolition, general removals, and grading of the site. Plans and Specifications Approved March 12, 1990 1 Advertise for Bids March/April 1990 Receive Bids April 12, 1990 Award Contract April 23, 1990 Begin Construction May 7, 1990 Complete Construction July 16, 1990 Subject to City Council approval , we are prepared to proceed in this manner. If you have any questions, please do not hesitate to call. I Sincerely, TL.AA-a Gary A. hret, PE Project Manager GAE/sk File 7-8903 1 11 I I