Loading...
1e. Downtown Redev. Phase II 11 1e, 1 CITYOF ________ 1a 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I Iftill,. (612) 937-1900 • FAX (612) 937-5739 MEMORANDUM t' '`r "`" ,-P.-. I T0: Don Ashworth, City Manager ;�; .- ✓ apt IFROM: Gary Warren, City Engineer t*} -'1 DATE: October 3, 1990 ISUBJ: Approve Contract Amendment No. 2 for Downtown : , _. , ..1 Redevelopment , Phase II -. - Improvement Project No. 86-11B The attached Contract Amendment No. 2 has been prepared to I include new bid items and contract quantities as required by the following modifications to the contract scope: TH 5 Temporary Intersection Improvements IA. At the request of Rosemount, Inc. , the TH 5/Market Boulevard intersection was upgraded from a right-in/right-out both I north and south of TH 5 to a full intersection. The upgrading to a full intersection required significant additional work not included in the origianl contract I documents . The improvements to the north side of TH 5 were carried out by the contractor. Item A of Contract Amendment No. 2 summarizes the additional work required. IB. Concrete Sidewalk - Market Boulevard In conjunction with the proposed site development of the I Crossroads National Bank, the Market Boulevard trail system and the TH 5 trail system, it was decided that a six-foot concrete walk should be added to the east side of Market I Boulevard from Bowling Alley Road to West 79th Street. This walk was not included in the original plans and specifications . Item B of Contract Amendment No. 2 provides payment to the contractor for this work. IAs you are aware, Rosemount Engineering has been billed for the engineering and construction activities associated with the I modified intersection of Market Boulevard at TH 5 . Concerning the sidewalk addition to Market Boulevard, this was found necessary in order to provide continuity with the trail section I 1 I Don Ashworth October 3, 1990 Page 2 and crossing proposed for TH 5 at Market Boulevard. The City currently has sidewalk and trail either built or planned ( in the ' case of the Ward property) across the entire frontage of Lake Drive from the easterly border at Dell Road to Powers Boulevard. The Market Boulevard segment therefore provides the necessary ' completion of this network. The net impact to the project costs is an add of $57 , 810 . 22 for an amended contract ceiling amount of $759 ,990 . 72. It is ' therefore recommended that the attached Contract Amendment No. 2 for the Downtown Redevelopment, Phase II Project No. 86-11B be approved for execution. ktm Attachment: Contract Amendment No. 2 c: Gary Ehret, BRW 1 1 BRW Copy City Copy V • Contractor Cop} inspector Copy CITY OF CHANHASSEN CONTRACT AMENDMENT Project: Chanhassen Downtown Redevelopment Phase II City Project No. : 86-11B Amendment No. : (2) Two Date: October 1, 1990 Contractor: Midwest Asphalt Corporation The additions, revisions and corrections contained herein shall be made to the contract documents for the project, and shall become a part of the Scope of Work. Description of Changes: I A. The Contractor has performed additional work to construct temporary im- provements for the Market Boulevard and Highway 5 intersection. The inter- section improvements were made as directed by City staff to satisfy the requests of Rosemount, Inc. , for the installation of a temporary signal system at the intersection. I The additional intersection improvements include earthwork, bituminous paving, striping and signing. The additional intersection improvements have resulted in the creation of a new bid schedule and pay items as detailed below. Bid Schedule J - TH 5 Temporary Intersection Improvements I ADD ORIGINAL QUANTITY , AMOUNT I SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 1/ 2021.501 Mobilization EA $450.00 0.00 3.00 $1,350.00 2/ I 2105.501 Common Excavation CY 1.50 0.00 810.00 1,215.00 3/ 2105.507 Subgrade Excavation CY 1.50 0.00 1,926.00 2,889.00 4/ 2105.523 Common Borrow CY 1.50 0.00 2,269.00 3,403.50 5/ Geotextile Fabric SY 0.58 0.00 350.00 203.00 CA2-1 I I 11 ORIGINAL QUANTITY AMOUNT 11 SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ UNIT Mn/DOT NO. ITEM PRICE QUANTITY (DECREASE) (DEDUCT) I 6/ Aggregate Base 2211.503 Placed Class 5 TON $ 5.81 0.00 935.46 $5,435.02 7/ Bituminous Material I2331.514 for Mixture TON 135.00 0.00 6.49 876.15 8/ Base Course II2331.514 Mixture TON 8.90 0.00 354.00 3,150.60 9/ Bituminous Material 2341.504 for Mixture TON 135.00 0.00 6.30 850.50 I10/ Wearing Course 2341.508 Mixture TON 10.95 0.00 105.00 1,149.75 II11/ Bituminous Material 2357.502 for Tack Coat GAL 1.00 0.00 50.00 50.00 II12/ Bituminous Island LS 5,937.89 0.00 1.00 5,937.89 13/ Furnish and Install II2564.531 Sign Panels Type C SF 22.00 0.00 121.00 2,662.00 14/ 4" Solid Line White I0564.603 Paint LF 0.23 0.00 2,018.00 464.14 15/ 4" Double Solid 0564.603 Yellow Paint LF 0.47 0.00 2,275.00 1,069.25 I16/ 24" Solid Line 0564.603 Yellow Paint LF 1.80 0.00 303.00 545.40 I17/ Pavement Message 0564.602 Type I Turn EA 70.00 0.00 15.00 1,050.00 I 8/ 1 2575.502 Seeding Type A AC 1,100.00 0.00 1.85 2,035.00 II19/ Sandblasting LF 0.52 0.00 4,440.00 2,308.80 20/ 3" Rigid Steel IConduit LF 13.16 0.00 100.00 1,316.00 21/ Traffic Control LS 1,450.32 0.00 1.00 1,450.32 II Net Contract Change Add $39,411.32 II CA2-2 II I I B. The Contractor has performed additional work to construct concrete sidewalk along Market Boulevard as requested by City staff. The sidewalk was constructed along the east side of Market Boulevard from Bowling Alley Road to the south end of the permanent Market Boulevard roadway construction. The sidewalk construction also required the relocation of an existing concrete storm sewer pipe apron. The sidewalk construction has resulted in the creation of two new pay items as detailed below: Bid Schedule B - Roadway ADD ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 23/ 4" Concrete 2521.501 Sidewalk SF $ 2.95 0.00 4,542.00 $13,398.90 24/ Relocate 24" RC I Pipe Apron EA 5,000.00 0.00 1.00 5,000.00 Net Contract Change Add $18,398.90 I I I I I I I I CA2-3 I 1 I 11 SUMMARY Current Contract Amount $ 702,180.50 Item A Net Add $ 39,411.32 Item B Net Add $ 18,398.90 Contract Amendment No. 2 Add 57,810.22 Amended Contract Amount $ 759,990.72 APPROVALS: ' RECOMMENDED BY: BRW, Inc. i By: Alta, Title Project Manager Date / 3 9 I i I ACCEPTED BY: Midwest Asphalt Corporation By: 42-t - c cti- Title V 73. e-o/ci5; Uc 7c.) Date /c II I APPROVED BY: City of Chanhassen By: Title Date 1 CA2-4 1