IITO: Gary Warren, City Engineer -.
FROM: Charles Foich, Assistant City Engineer
!3 '
IDATE: October 3 , 1990
SUBJ: Approve Final Plans and Specifications for Stage 1
1 Grading of CSAH 17 (Powers Boulevard S .A.P. No. 10-617-12)
Project No. 90-19
1 The Stage I Grading of County State Aid Highway 17 (Powers
Boulevard) will involve excavation and embankment operations at
two locations adjacent the existing roadway totaling
I
approximately 1900 lineal feet. The work will be contained
between the intersections of Lyman Boulevard and Lake Susan Hills
Drive.
IThe material required for the embankment operations will come
from a borrow site located on and adjacent to the southeast
I portion of the Lake Susan Hills West 4th Addition (see Attachment
No. 1) . The borrowed quantity amounts to approximately 65,000
cu. yds . A grading plan for the borrow area has been submitted
showing the existing and proposed topographic contours. The
1 excavated borrow area will yield a level topography for the site
more conducive for future development of this area which is zoned
multi-family residential.
IIThe excavation and embankment operations will involve hauling the
material from the borrow site on the west side of Powers
I Boulevard across to the east side, via one designated crossing
location, and placing the embankment material east of the
existing roadway for future construction of the northbound lanes.
The project' s specifications require that the existing County
1 Road 17 be maintained open to traffic during the construction
period. Required traffic control devices- are specified to
conform to the Minnesota Manual Uniform Traffic Control Devices
Iand the Minnesota Standard Signs Manual, Parts 1, 2A1 ENGINEERING COPY
Received
IRevision No.
Approved by City Engineer
Date LC14190 c- ,, 11(4 " _
Approved by City Council
I
Gary Warren
October 3 , 1990
Page 2
Construction operations are anticipated to start on or soon after
October 9, 1990 with an estimated 20 working days to complete the
project .
Erosion control measures (hay bales and/or silt fence ) are being
installed throughout the project. The County will be seeding
upon completion.
The Watershed District has scheduled this item to go before the
' Board on Wednesday , October 4, 1990 . Approval is anticipated.
It is therefore recommended that the City Council approve the
construction plans for Stage I Grading of CSAH 17 (Powers
' Boulevard) dated September 20 , 1990 subject to the following
modifications:
1 . The specifications item S-7 . 3 shall be modified to read that
"construction operations shall not start prior to 8:00 AM on
Saturdays" .
2 . Specification S-10 .1 shall be modified to include
indemnification of the City of Chanhassen, its officers and
employees from all suits , actions , claims, etc .
' 3 . Applicant shall obtain and comply with all requirements of
the Watershed District permit.
jms
Attachment: 1 . Location map.
1 2 . Letter from Roger Gustafson dated September 20 ,
1990
c: Roger Gustafson , Carver County Engineer
Brian Olson, Argus Development
I
1
,or 4 1 g iira.d.„, 3
1 ,
\% ,._.•
eel ansiwIll
I ..•eV A a ini I I....1618 7 I I I I 11(.., ,..
::Zryn 2-'44/
— 4114, IV.4'•61.# I g, . .k-e-
.11/M111/4/
' 4111111111, apsit .1%<C'ci ' ,,,Cit
I
: , '`'..m.rew END PROJEC aft a
s 1
9 11111
k 5 <s3
:, 11111t," AI 1 ;
..-. .4./7.) .
411priLir I
pVgE COURT
. R2
1111111/ \• tiklir4k , 1
DO
I
. A
ImikS\opilif i ..ou.„..0,
■0„, ,iiii ,
I
101' •. .?
V-. .
s.
.:.
0' I
io
z "X
i; ' :•;•:•
/ =.•. 4e' / :...
I
_..:Ii.!z;
.039,*7
,ii:2 t':itfi p:Alks:tt ilt ! ::: 1
Il
e‘rr ,..„ =,..,4,%!_,01:6.4•Z'fi: C.1,'4.i __, :: .::
Ne ,c.4.;.,,!i• ;:‘,.7'tg.4?0*.tgl ::::. 1
- . ;'.. ..:Pi::‘;.4,W. kW, •' ' ::::::i I
,,;;ANi ,. .,....., K:* 1
I
BORROW AREA•lit',k3'6-t-',44.,-1.12-1- ' , iiiiiii i
4 I-;:•-.:. pKi SuSAN HILLS
,:.,,5,S1,:rt c.:..,,,.V..,'-'1 , • ••••.. 1 5.,.26 1.30 .
1
I
'Y.?cipr:eit-.!1.1x:-....,c:'-!!,;.1.,•:=4....4.4---. c:.,..... r' ek■6, .650 I'
--,..,Ze:..,c•r•F:Ye4t..:1,,,,,,f...,.k , ,,•.+' ,, ,
• 2,,:ta:'9 :`,.k.izt,t;14t.:( i I
/'
/•,c-ii::::!.A..4-t.:;:k„-,."..,..,..fr, 1
-k--
7r A
, EMBANKMEN/AR •
f„; 5 (
I /
1 ,
, / 4
/ •::.::,::
/
/ 2 4 111•
.;:i.::::
1 ,
.:.:.:.:.
3 I .:.•:...
20S
Mal,.•
• :.:::: alp
4i :•.:..:
t .... A
f k, 1 :1 1
Il\\F.' S
1111 #P
e.6
1 g 4
3 cT I 1 1 1 ..'"
'r":4'•:.•:.'.
I
I Hi
1 1 L(SiOf \ 1 , 7 5 4.r-„,,,,v jami
... , 2
,I.A./111
)k 1
I
. „
• se• ....s.
__-.rr.--; N- 17 ••• „ A
.G.Irt•
PROJECT LOCATION 1
ATTACHMENT # 1 I
• CARVER COUNTY COURTHOUSE
PUBLIC WORKS DEPARTMENT 600 EAST 4TH
(612)448-1213 CHASKA,MINNESOTA
55318
COUNTY OF CA1 V EQ
September 20, 1990
Mr. Gary Warren, P.E.
City Engineer
City of Chanhassen
690 Coulter Drive
P.O. Box 147
' Chanhassen, MN 55317
RE: Stage I Grading of CSAH 17 (Powers Blvd. )
S.A.P. 10-617-12
Dear Mr. Warren:
' Attached for your review are the final plans for the Stage I
Grading of CSAH 17 . Also attached is a proposed resolution for
City Council approval of the plan.
Since this is a County State-Aid Project inside City limits,
it is necessary to have a resolution from the City approving the
plan. If your review of the plan is favorable, please schedule
with the City Council for approval .
If you have questions or concerns regarding this project,
' feel free to contact me. If you feel it is necessary for me to
attend the City Council meeting when this resolution is
presented, let me know when it is scheduled on the agenda.
Thank you for your time in this matter.
Sincerely,
' A r CITY OF CHANHASSEN
Roger M. Gustafson, P.E. MEM
County Engineer SEP 2.41990
' RMG,sjc ENGINEERING DEPT.
Attachments
61712apr.lt
1 AJJirmatiue Action/Equal Opportunity Employe
'ATTACHMENT #2