Loading...
1b Change Order Proj 98-16MEMORANDUM CITYOF CHANHASSEN i CiO, Ce,to' D~qt,e, 1>0 Box 147 .'t*a**hassen, Mi,,esota 55317 &o,e 612.937. I900 Ge, era/~t.x' 612. 93Z5739 ,tgi,eri,g Fax 612.93Z9152 tb/ic S,(~O, ~t.x' 612. 93<2524 (~'b wlt,m d. chmthasse11, mu. us TO: FROM: DATE: SUB J: Scott Botcher, City Manager Anita L. Benson, City Engineer December 6, 1999 Approve Change Order No. 1 to Lake Drive West Project No. 98-16 The purpose of this change order is to compensate the contractor for additional work performed on the Lake Drive West project. This work was performed at the direction of the Engineer and the cost associated with this work was included in the total project cost which ivas assessed. The work included in this change order is installation of geotextile reinforcing fabric on Lake Drive in the vicinity of Mallory Court. The geotextile fabric was needed due to unstable subgrade in this area. Additionally, an existing sanitary sewer line was repaired to eliminate a leak which was discovered when televising the line. The total cost increase due to this change order is $4,423.65. I recommend approval of Change Order No. 1 in the amount of $4,423.65 which will result in a revised contract amount of $886,576.45. Attachn~ent: Change OrderNo. 1 c: Dave Hempel, Assistant City Engineer g:\eng\public\98-16\co I memo.doc w/th c/c,m /akes, a..h'~' scho(~& ~ c~,a;mi.g dow.tow., thrid, g busi.esses, a.d. bemdfid w~d:s, ? ~,re,~t oh~ce to li~;e, work, j/~ Eionestroo Rosene HAnderlik & Associates Engineers & Architects IOwner: City of Chanhassen. 690 City Center Dr. PO Box 69. Chanhassen. MN, 553 Date December 3,:J999I Contractor: S M Hentges & Sons [no, 650 Quaker Ave Ste 200, PO Box 69. ,.Jordan. MN. 55352 I Bond Company: General Accident Insurance Co. of America. 436 Walnut St Philadelphia, PA, i910: Bond No: SB004§184 CHANGE ORDER NO. 1 LAKE DRIVE WEST IMPROVEMENTS CLIENT PRO3ECT NO.98-16 BRA FILE NO. 393-98-8 I0 Description of Work : Part "A" - Compensate contractor for installing geotextile fabric on Lake Drive t:d'Mallory Court. The subgrade in this area was wet and soft. Part "B" - Compensate contractor for repairing leak in existing sanitary sewer between NIH #54 and MH #55. The leak in the sewer was found when sewer lines were televised prior to starting grading. Contract Unit Total No. Item Unit , Quantity Price Amount CHANGE ORDER NO. 1 Part A - Geotextile Fabric I Gcotextile Fabric SY 2156 $ I. l0 Total Part A $2.371,60 $2,371 ~60 Part B - Sewer Repair I Foreman HR 1.5 $57.00 2 400 Komatsu backhoe & operator HR 6 $140.00 3 950 Cat loader & operator HR 6 $85.00 4 Compactor HR 1.5 $25.00 5 I 1/2" Clear rock for sumping TON 5 $11.00 6 Cement LS I $40.00 7 Laborers HR 8.5 $35.00 8 10% Profit & Overhead LS 1 $186.55 Total Part B Part A - Gcotextile Fabric Part B - Sewer Repair Total Change Order No. I $85,50 $840.00 $510.00 $37;50 $55.00 $40,00 $297,50 $186.$5 $2,052.05 $2,371 $2,O52.05 $4,423."65 Change Order No. I Original Contract Amount Previous Change Orders This Change Order Revised Contract Amount (including this change order) $882,152.80 $o.oo $4,423.65 $886,576.45 Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. Approvedlby Co/{tractor: ! Date Date: Approved by Owner: CITY OF CHANHASSEN Date cc: Owner Contractor Bonding Company Bonestroo & Assoc. Change Order No. I