1c Change Order Project 98-2CITYOF CHANHASSEN MEMORANDUM TO: Scott Botcher, City Manager FROM: Anita L. Benson, City Engineer DATE: November 29, 1999 SUB J: Approve Change Order No. 1 to Infiltration/Inflow Drainage Improvement Project No. 98-2 The above-referenced project constructed drainage improvements in the Near Mountain, Saddlebrook, Chanhassen Hills and Chaparral neighborhoods. This project is funded through the Surface Water Management Program with a total budget amount of $175,000. The construction contract was awarded to Wickenhauser Excavating, Inc. for the low bid amount of $173,846.50. During the construction phase of this project significant conflict with existing utilities, i.e. telephone, natural gas, cable TV occurre& Rather than require relocation of these utilities which would have resulted in a substantial delay to the project, the trench width was revised fi'om 24 inches to 18 inches. This reduction in trench width resulted in a unit price reduction for the pipe installation. At the direction of the engineer, the contractor installed an additional quantity of 585 LF of drainage pipe to address drainage problems identified during construction. The overall effect to the contract due to the above changes is an increase of $3,708.05. The final contract amount upon approval of this change order will be $177,554.05. The actual construction dollar value completed is $171,282.74. The City of Shorewood will be reimbursing Chanhassen $1,420 for work completed within their jurisdictional authority. I recommend approval of Change Order No, 1 for the Infiltration/Inflow Drainage hnprovement Project No. 98-2. Attachment: Change OrderNo. 1 g:\¢ng\public\98-2\change order 1 memo.doc CITY OF CHANHASSEN CHANGE ORDER CONTRACTOR: Wickenhauser Excavating, Inc. ADDRESS: 350 Villa Drive Cologne, MN 55322 ORIGINAL CONTRACT AMOUNT: $173,846.50 CHANGE ORDER NO. DATE 11/22/1999 SHEET 1 of 1 PROJECT NO. 98-2 PROJECT NAME: Infiltration/Inflow Drainage Improvement Project TYPE OF WORK: Installation of Draintile Original +/' Previous Spec. Change Increase Decrease No. Item No. Item of Work Unit Quantity Quantity +/- Unit Price Amount Amount 2 6" P.E. Pipe (24" Trench) LF 8120 -5582 14.45 0.00 -80,65~:90 2A 6" P.E. Pipe (18." Trench) LF 0 6163.5 13.70 8'4,439.95 0.00 0.00 1 8" P.E. Pipe (24" Trench) LF 450 -450 15.5~) 0.00 -6,975.00 lA 8" P.E. Pipe (18" Trench) LF 0 468 14.75 6,903.00 TOTALS 91,342.95 .87,634.90 Net INCREASE due to this Change Order: Previous Change Orders: Net INCREASE to date: Due to this change, the contract time: ~iI is increased/decreased by ~ working days. is increased/decreased by ~ calendar days. is not changed. may be revised if the work affects/affected the controlling operation. 3,708.05 3,708.05 EXPLANATION OF CHANGE IN PLAN RECOMMENDED (Attach additional sheets if necessary) Due to conflicts with existing utilities. (telephone, natural gas, cable TV) the trench width was revised from 24 inches to 18 inches resulting in a unit price reduction for the pipe installation. The actual pipe quantity installed was increased to address drainage problems identified during construction. CONTRACTOR SIGNATURE /"-% CITY ENGINEER SIGNATURE CITY INSPECTOR SIGNATUR~ ,~/ ~¢ . ..-~ DATE . ~ . change order 1.xls