TO: Scott Botcher, City Manager
FROM: Anita Benson, City Engineer
DATE: December 8, 1999
SUB J: Approve Plans and Specifications for TH 5/West 78th Street
h'nprovement Project No. 97-6
The plans and specifications for the TH 5/West 75th Street project have been
prepared by MnDOT's consulting engineer, Barton-Aschman Associates, Inc. The
plans and specifications for which Council approval is sought consists of
construction of TH 5 from Powers Boulevard to TH 41 and West 78th Street from
its current terminus at Lake Ann Park to Century Boulevard. The complete
construction plans are available in my office for review.
The segment of West 78th Street from Century Boulevard to TH 41 is currently
under design as a separate project. Council approval of those plans and
specifications will be sought in the winter of 2000. The construction of this
segment will be concurrent with the TH 5/West 78th Street Project. MnDOT is
designing the bridge structures and the traffic signal systems for the Highway 5
project, therefore, those plans will be brought to Council at a future date for
approval. Other items not included in the plans and specifications prepared by
Barton-Aschman Associates are landscaping improvements and the street lighting
system. The landscaping improvements plans and specifications will be prepared
separately by MnDOT. The street lighting system will be installed as a separate
project by the City of Chanhassen. Plans and specifications for the landscaping
and street lighting system will be presented to Council at a future date.
I have reviewed the plans and specifications for the TH 5/West 78th Street
Improvement Project which includes the installation of city sewer and water
utility infi'astructure throughout the design process. I recommend approval of the
plans and specifications as prepared by Barton-Aschman Associates dated
November 24, 1999.
j Ill S
Attachments. 1. Memo fi-om Jane Krebsbach dated December 1, 1999.
2. Sheets 1-3 of 407.
\\elk 1 \vo12\cng\public\97-6*,plans & specs.doc
c ~' ;:.' ( / (' ;4. :-,'5,',w;.,. d t,'ow/,¢. ,'oi,,/::/:'~?r w/th ('[c,,¢, &kc:-. (,¢~d,"/;' ;chooh. a ch(m/zi, e (./ow;,'/ow¢z. tt, rit..i,¢ b,si,esses, and bea¢;ti¢#
Minnesota Department of Transportation
Memo
Metro Division
Consultant Design
1500 W. County Road B2
Roseville, MN 55113
Office Tel:
Fax:
651-582-1767
651-582-1131
December 1, 1999
To:
From:
Subject:
Joe Korzelius, GV Materials
Charles Hudrlik, GV Traffic
Dennis Larson, WRE
Brian Henry, GV Surveys
Mark Panek, Eden Prairie Construction
Dave Dahlberg/Steve Ellis, Bridge
Keith Slater, PJW
Robb Urquhart, State Aid
Anita Benson, Chanhassen City Engineer
Roger Gustafson, Carver Co Engineer
Jane Krebsbach 4~
Consultant Design 'Project Manager
S.P. 1002-61 (TH 5)
Enclosed for your review is a set of preliminary plans for S.P. 1002-61 (TH 5). It is a
consultant designed project. The plan has been previously distributed for your review at the
30%, 60% and 95% and 100% completions and at this point all comments should have been
addressed. The programmed letting date for this project is March 24th, 2000. Our anticipated
plan turn in date is December 17th, therefore I will be requesting signatures the week of
December 13th. Please call if you have any questions regarding the plan or the schedule.
Enclosures: plan sheets 1-407