Loading...
1c TH 7/41 Imp Proj PW067D-4CITYOF HAN SEN .i{y Center D~ive, PO Box I47 ~nhassen, Minnesota 55317 Phone 612937.1900 ?neral £ax 612.937.5739 ;neering £ax 612.937.9152 ic SafeO, ]ax' 612.934.2524 ; www. cl. chanhassen, m,. us MEMORANDUM TO: FROM: DATE: Scott A. Botcher, City Manager Anita L. Benson, City Engineer ~ June 23, 1999 SUB J: Approve TH 7/41 Intersection Improvement Project File No. PW-067D4 The City of Shorewood has entered into a cooperative agreement with the Minnesota Department of Transportation to construct roadway improvements in the area of the Trunk Highway 7 and Trunk Highway 41 intersection. The proposed improvements are outlined in detail in the attached letter dated May 11, 1999 from Mr. Charles Rickart, the consulting engineering firm project manager. Mr. Rickart gave a presentation of the proposed improvements at the May 17, 1999 City Council work session. Within the City of Chanhassen, temporary construction easements will be taken at The Crossings mall shopping center and Super America as well as at the property to the east adjacent to Trunk Highway 41. One access closure will occur at the residence located across from the Minnetonka West Middle School. This residence currently has two driveway accesses onto Trunk Highway 41. The City of Shorewood is responsible for purchasing and acquiring right-of-way and easements. Staff was directed at the May 17, 1999 work session to investigate the feasibility of constructing a trail from Minnewashta Park to The Crossings shopping center concurrently with the project. An approximate cost estimate for the construction of this trail is $65,000 based upon a per foot cost basis of the recent trail construction project along Trunk Highway 7. Since any costs for trail construction in conjunction with the TH 7/41 project would be the responsibility of the City of Chanhassen, it is recommended that the trail be constructed under a separate City contract. Preparation of a feasibility report in the future will allow prioritizafion with other City trail needs. The proposed project is scheduled to begin construction in August or September of 1999. Since this is a cooperative agreement project, the City of Shorewood is the lead agency for bidding and awarding of the project and MnDOT will provide the construction administration for the project. A copy of the complete plans and specifications for the project are available for review in the Engineering Department. It is recommended the City Council approve the TH 7 and TH 41 Intersection Improvement Project S.P. 1008- 58. Attachments 1. Letter from Charles Rickart dated June 21, 1999. 2. Letter from Charles Rickart dated May 11, 1999. C~ Larry Brown, City Engineer, City of Shorewood Kevin Hoglund, MnDOT Charles Rickart, WSB & Associates Todd Hoffman, Park and Recreation Director g:hmgMnita~cc~h 7&41 intersection.doc y ofChanhassen. A growin~ community with clean lakes, quality schooh, a charming downtown, thriving businesses, and beautifulparks. A great place to live, work, and play. ~ dssociates, Inc. 350 Westwood Lake Office 8441 Wayzata Boulevard Minneapolis, MN 55426 612-541-4800 FAX 541-1700 B,A. Mittelsteadt, P.E. Bret A. Weiss, P.E. Peter R. Willenbring, P.E. Donald W. Sterna, P.E. Ronald B. Bray, P.E. June 21,1999 Ms. Anita Benson, P.E. City Engineer City of Chanhassen 690 City Center Drive Chanhassen, MN 55317-0147 JUN 2, 2, 1999 ~'~IGINEF.,RING DEPT, Re: TH 7 at TH 41 Intersection Improvements Request for City Approval S.P. 1008-58 (TH 41) WSB Project No. 1122.00 Dear Ms. Benson: The final plans and specifications for the TH 7 at TH 41 (SP-1008-58) intersection improvements had been completed. A set of plans was sent to you in May for your review and comment. If you have no comments or concerns with the plans, we would request that the City approve the plans and specifications for construction. The proposed schedule of the project is to advertise for bids in July/August and begin construction in August / September. The City of Shorewood will be the lead agency for the bidding and awarding of the project. The Minnesota Department of Transportation (Mn/DOT) will provide the construction administration for the project. Either myself or someone from our office can be in attendance at your June 28, 1999 city council meeting if you would like a short presentation. If you have any que, stions or need any additional information, please do not hesitate to give me a call at 612-277-5783. Sincerely, WSB & Associates, Inc. Charles T. Rickart, P.E. Project Manager C~ jw/nm Larry Brown, City of Shorewood Kevin Hoglund, Mn/DOT lnfi'astructure Engineers Planners EQUAL OPPORTUNITY EMPLOYER F:\WPWIN\I 122.00\062199ab Iff. fiB Associates, Inc. 350 Westwood Lake Office 8441 Wayzata Boulevard Minneapolis, MN 55426 612-541-4800 FAX 541-1700 B.A. Mittelsteadt, P.E. Bret A. Weiss, P.E. Peter R. Willenbring, P.E. Donald W. Sterna, P.E. Ronald B. Bray, P.E. Memorandum From: Ms. Anita Benson, P.E. - City Engineer City of Chanhassen Charles Rickart, PE - Project Manager WSB & Associates, Ina Date: May 11, 1999' Re: TH 7 at TH 41 Intersection Improvements WSB Project No. 1122. O0 CITY OF CHANHASSEN 1 2 1999 ENGINEERING DEPT. Background The City of Shorewood requested and was approved for Mn/DOT F.Y. 1999 cooperative agreement funding in January of 1998. These funds were for the closing of accesses on Trunk Highway (TH) 7 at Pleasant Avenue, Seamans Drive, Wood Drive, and Lake Linden Drive. The funds also included the addition of a southbound mm lane at Eureka Road and the realignment and improvement to the north leg (Shorewood Mall entrance) of TH 7 at TH 41. WSB~& Associates was retained by the City of Shorewood to provide preliminary and final design services for the proposed improvements. During the preliminary design phase of the cooperative agreement project, Mn/DOT requested that additional work be completed in the intersection of TH 41 at TH 7. The improvements that MnfDOT requested included: I. Westbound TH 7 to southbound TH 41 dual left turn lane. 2. Installation of a new traffic signal system. 3. Improved drainage including stormwater ponding. Better delineation of lanes for mining on TH 41 between the Minnetonka West middle school and TH 7. Min n eap o lis · St. Clo u d Infrastructure Engineers Planners EQUAL OPPORTUNITY EMPLOYER F:\WPWF!~1122.00~051199ab.wlxt May 11, 1999 Page 2 Proposed Improvements As a result of the preliminary design and several meeting with the City of Shorewood and Mn/DOT, a concept layout was developed with the following characteristics: Reconstruct the north leg of the intersection to accommodate better flow of traffic into and out of the shopping center and Lake Linden Drive. Provide for a dual left turn lane for westbound TH 7 to southbound TH 41. 3. Mill an overlay TH 7 through the intersection with TH 41. Widen TH 41 from the intersection of TH 7 south through the intersection with the Minnetonka West middle school. This will include two lanes in each direction with left mm lanes at the shopping center access school access, and Chaska Road. o Realign the access into the Crossings Mall shopping center to accommodate better flow of traffic for trucks and vehicles into and out of the shopping center. Provide a pedestrian path from the Crossings Mall shopping center through the intersection of TH 7 to the Shorewood Mall. Right-of-Way/Easements As part of the proposed project permanent right-of-way, temporary construction easements and access closures will be acquired. All permanent right-of-way is located north of TH 7 adjacent to and around the shopping center. Within the City of Chanhassen, temporary construction easements will be taken adjacent to the Crossings Mall shopping center and Super America as well as the property to the east adjacent to TH 41. One access closure will be taken at the residence located across from the Minnetonka West middle school. This resident currently has two driveway accesses onto TH 41. All properties along the corridor that are impacted by the construction have been contacted by the right-of- way agent. The City of Shorewood is responsible for purchasing and acquiring these right-of-ways and easements. Schedule Final design is proceeding based on the preliminary design layout. Construction is anticipated to begin in July 1999, with completion in late October 1999. F:\WPWINM 122.00\051199ab.v May 11, 1999 Page 3 Project Contacts If additional comments or questions arise with respect to these improvements, the following persons may be contacted. Charles Rickart. Project Manager Larry Brown, Public Works Director Kevin Hoglund, Cooperative Agreements Engineer WSB & Associates, Inc. 8441 Wayzata Boulevard, Suite 350 Minneapolis, MN 55426 612-277-5783 City of Shorewood 5755 Country Club road Shorewood, MN 55331-8927 612-474-3236 Minnesota Department of Transportation Metopolitan Division/Waters Edge 1500 West County Road B2 Roseville, MN 55113 651-582-1370 F:\WPWINX1122.00\051199ab.wpd