Loading...
1e-1 Lynmore Addition FinalPlatCITYOF City Center Drive, PO Box 147 ~anhassen, Minnesota 55317 Phone 612.937.1900 ;eneral Fax 612.93Z 5739 ;ineering Fax 612.937.9152 ~lic Safety Fax 612.934.2524 i'b www. ci. chanhassen, mn. us MEMORANDUM TO: Scott Botcher, City Manager FROM: Bob Generous, Senior Planner DATE: June 14, 1999 SUB& Final Plat and Planned Unit Development Approval, Lynmore Addition, Rezoning of 6.39 acres fi.om A-2, Agricultural Estate District to PUD-R, Planned Unit Development-Residential PROPOSAL SUMMARY The applicant is requesting final plat approval creating eight (8) lots, two outlots and associated right-of-way for Lynmore Addition. The applicant is also requesting final approval for the planned unit development and rezoning of the property from A2 to PUD-R. BACKGROUND On April 12, 1999, the City Council approved the General Concept and Preliminary PUD Development Plan, the first reading of the Rezoning of 6.39 acres from A-2, Agricultural Estate District to PUD-R, Planned Unit Development-Residential and Preliminary Plat approval to subdivide 6.39 acres into 8 single family lots and 2 outlots. On April 12, 1999, the City Council approved the Conditional Use Permit to permit development within the Bluff Creek Overlay district subject to the following condition: 1. Outlot A, Lynmore Addition, is permanently preserved as passive open space. The City Council approved the vacation of a portion of a .utility and drainage easement located on Lot 9, Block 1, Stone Creek 6th Addition, that was located within the development. ',i~y vf Chanhassen. A growing community with clean lakes, quality schooh, a charming downtown, thriving businesses, and beautifiul parks. A ~reat olace to live, work, and pla~. ~.5.0 9~o6~ o 1 g 8 Lynmore Addition Final Plat June 14, 1999 Page 2 FINAL PLAT GRADING The easterly half of the site is proposed to be graded to prepare the house pads and street subgrade. Outlot A is proposed to remain undisturbed except for construction o£a storm water pond. The pond configuration has been changed to limit tree loss and minimize grading. Utility extension from the north along Galpin Boulevard will also require grading a 30-foot wide pathway along Galpin Boulevard through Outlot B. A drainage and utility easement shall be dedicated over the westerly 20 feet ofOutlot B on the final plat for the sanitary sewer line. The quantity of earthwork is unknown at this time; however, the applicant should be advised if exporting or importing of material is necessary, a detailed haul route and traffic control plan will be required prior to site grading commencing. In addition, if material is being exported or imported from another Chanhassen site, that property will also be required to obtain the necessary earthwork permits in accordance with City ordinance. Grading will also occur along the west side of Galpin Boulevard in conjunction with extension of the sanitary sewer to the site. The work is proposed to be completed within the right-of-way for Galpin Boulevard and drainage and utility easements in Trotters Ridge. The existing home utilizes a well and septic system. The well and septic system have been located on the grading plan. The site grading will not impact either of the utilities. The septic site will be preserved on the site until municipal City sewer and water have been extended along Bridle Creek Court and tested and accepted by the City. DRAINAGE The majority of the site sheet drains north, east and south. The proposed grading will maintain the pre-developed drainage pattern in the area for the most part. Grades along the south property have been adjusted to keep runoff from the site from discharging into the Stone Creek development south of this proposal. The resulting drainage area to the south and east of the property will be reduced after construction. The plans propose to drain the street and front yard areas of the lots into a storm sewer system which will convey the runoff into a storm pond on Outlot A for pretreatment before discharging into Bluff Creek. The street grade has been adjusted to accommodate drainage from Lots 6 and 7 out to the street. Lot 6 will maintain its current drainage pattern. A driveway culvert is proposed to maintain drainage underneath the new driveway for Lot 6. The existing ravine through Lots 4 and 5 down to Bluff Creek is being preserved for the most part. The proposed house pad on Lot 4 could experience wet areas on both sides of the house due to drainage through the area. These drainage constraints should be considered and resolved in conjunction with the design of the home for Lot 4. Lynmore Addition Final Plat June 14, 1999 Page 3 The construction plans have incorporated a drain tile system behind the curbs to address household sump pump discharge for those lots not adjacent to a storm water pond or wetland. UTILITIES Municipal utility service is indirectly available to the site. Water service is proposed to be extended along Bridle Creek Court from Galpin Boulevard: Sanitary sewer service has been a point of discussion in the past. The sewer line to service this site is located approximately 750 feet north of the site near Lukewood Drive. Extension of this sanitary sewer would be very difficult given the terrain and vegetation. In addition, the applicant would have to obtain permanent and temporary easements from the adjacent property owner (Schmidt) to extend the utilities to service this development. The developer has attempted to acquire easements from the Schmidt's, however, to no avail. Sanitary sewer service is now proposed to be extended along the west side of Galpin Boulevard. This design appears feasible and will ultimately service the parcel to the north (Schmidt) as well. This sewer proposal, however, will not serve Outlot A without a lift station. Outlot A will not have gravity sewer service unless extended through_ Schmidt's parcel. The utility improvements proposed to service the site have been designed and will be constructed in accordance with the City's standard specifications and detail plates. Upon completion of the utility improvements, the utilities will be turned over the City for maintenance and ownership. Detailed utility and street construction plans and specifications in accordance with the City's latest edition of Standard Specifications and Detail Plates are also submitted with this application for City Council approval. The developer will be required to enter into a Development Contract with the City and provide the necessary financial security to guarantee conditions of approval. The financial security shall be in the form of a letter of credit or cash escrow. The existing house on Lot 6 will be required to hook up to the new sewer line in Bridle Creek Court within 30 days after the utilities have been accepted by the City. Connection to City water is not necessary unless the well fails on Lot 6. The lots in the plat will also be subject to deferred assessments as a result of the City's Upper. Bluff Creek Trunk .Improvement Project No. 91-17B. The parcel was previously assessed for only one trunk sewer and water assessment. Upon final platting of the property, seven (one per lot) sewer and water trunk hookup charges shall be pending. The trunk sewer and water charges shall be collected at time of building permit issuance. The 1999 trunk sewer utility hook-up charge is $1,252 per unit and trunk watermain hook-up charge is $1,632 per unit. STREETS Access to the development is proposed from Galpin Boulevard/County Road 19. This road is classified in the City's Comprehensive Plan as a collector street. The minimum right-of-way width of Galpin Boulevard shall be 100 feet wide. The final plat will be dedicating the required Lynmore Addition Final Plat June 14, 1999 Page 4 right-of-way. A 10-foot wide trail easement is also required over Lot 2 and part of Lot 1 to cover the existing trail. The final plat proposes a 60-foot wide right-of-way with a 60-foot radius for the cul-de-sac in accordance with City Code. A landscape island is also proposed in the cul-de-sac. The City, however, shall not be responsible for maintenance of the landscaped island. The developer or their assignee such as a homeowner's association would be responsible for maintenance. The site is currently accessed through a shared gravel driveway off of Galpin Boulevard with the Schmidt property to the north. As a result of platting the property, a public street (Bridle Creek Court) will be extended to service the development as well as the Schmidt parcel. A 30-foot wide driveway easement still needs to be deeded over Outlot B to provide access to Schmidt's. Staff has recommended that a future private driveway through Outlot B be reserved to service future subdivision of the Schmidt parcel. The Carver County Public Works Department also believes that the Schmidt parcel should access Bridle Creek Court through Outlot B with a private driveway. The Schmidt parcel does not appear to have the capability to subdivide into more than four single-family lots based on current ordinances and topographic features. Outlot B as currently proposed is not a buildable lot. There is a parcel of land that is owned by the Schmidt's that is needed to be acquired to develop Outlot B into a buildable parcel. Bridle Creek Court is proposed to be constructed to City urban street standards within a 60-foot wide right-of- way. Detailed street construction plans and specifications have been submitted with final plat consideration. Staff has reviewed the plans and finds them acceptable. A street light is proposed at the end of the cul-de-sac. Access to the existing house on Lot 6 must be maintained during construction from both a public safety standpoint and a resident standpoint. Once Bridle Creek Court has been constructed, the existing home will be required to change their driveway access and street address to Bridle Creek Court and the existing access through Lots 7 and 8 and Outlot B will be removed. EROSION CONTROL Erosion control and tree protection fencing have been incorporated onto the grading, drainage and erosion control plan. PARKS & RECREATION The Park and Recreation Commission reviewed the Lynmore Subdivision on February 23, 1999 and the revised plan on March 23, 1999. The Park and Recreation Commission was very clear that without the preservation of the primary zone, they would not support this application. Lynmore Addition Final Plat June 14, 1999 Page 5 The Park and Recreation Commission recommended that the commission offer the applicant full park fee credit, $8,400, in exchange for fee title ownership of Outlot A. This trade off is not required to ensure the outlot remain open space. The land is already protected by the Bluff Creek ordinance. The credit is offered as an inducement to the applicant to transfer fee title to the city. In this particular situation, fee title is desirable as the outlot abuts Stone Creek Park. COMPLIANCE TABLE AREA (SQ. FT.) Code Avg. 15,000 minimum 11,000 Lot 1 15,800 53.5 # Lot 2 14,626 35.4 # Lot 3 12,795 51.7 # Lot 4 30,744 37.9 # Lot 5 20,663 34.5 # Lot 6 33,724 95.2 Lot 7 12,416 89.15 * Lot 8 11,137 87.2 * Outlot A 89,410 Outlot B 9,315 Right-of-Way 27,719 Total 278,348 Average Lot Size 18,984 FRONTAGE DEPTH (FT.) (FT.) 90 100 SETBACKS 176.8 F, S, G 145.8 P, F, S, G 125.4 P, F, S 151.2 P,F, S,B 272.2 F, S, B 196 F, S,B 135.3 P, F, S, B 121.7 P, F, S variance from standards approved with plat to provide flexibility to preserve open space. meets requirements at the building setback Minimum setbacks: PUD exterior (P): Front yard (F): Rear yard ( R): Side yard (S): Bluff Creek (B): Galpin Blvd. (G) thirty (30) feet twenty-five (25) feet, except Lot 6 at twenty (20) thirty (30) feet ten (10) feet forty (40) feet fifty (50) feet Lynmore Addition Final Plat June 14, 1999 Page 6 REVIEW OF CONDITIONS OF APPROVAL Staff has reviewed the conditions of approval and made a determination of the compliance with the conditions. 1. The applicant shall guarantee any transplanted trees for a minimum of one year. Transplanted trees shall be counted as replacement plantings. *This condition still applies. Buffer yard plantings shall be installed along Galpin Boulevard. Minimum planting requirements are 5 over story trees, 7 under story trees, and 11 shrubs. The landscape plan shall be submitted to the city for approval. *This condition has been met. 3. One tree shall be planted in each front yard per city ordinance. *This condition has been met as part of the landscaping plan. 4. Install tree protection fencing at grading limits prior to construction. o *This condition still applies. The applicant shall revegetate the area around the proposed storm water pond with a native seed mixture approved by the city. The applicant may refer to MnDOT seeding manual mixture 50 for an acceptable seed mix. *This condition still applies. The accessory structure located on proposed Lot 6 shall be removed prior to recording of the plat. *This condition has been met. Outlot A shall be reserved through park dedication. Fee title to Outlot A shall be granted to the city in exchange for full park fee credit. If ownership is not transferred to the city, then the developer shall place a conservation easement over Outlot A. *This condition shall be modified as follows: Fee title to Outlot A shall be granted to the city in exchange for full park fee credit in the amount of $8,400.00. The developer shall place a Lynmore Addition Final Plat June 14,1999 Page 7 conservation easement over those parts of Lots 4, 5, and 6, Block 1, Lynmore Addition within the Bluff Creek Corridor primary zone. o The development shall comply with the following setbacks: Front (F) - 25 feet, Rear (R)- 30 feet, Side (S) - 10 feet, Primary Zone (PZ) - 40 feet, Perimeter PUD setback (P) - 30 feet, Galpin Blvd. (G) - 50 feet. Lot 6, Block 1 may have a 20 foot front yard setback for a porch addition as presented in sketch plans presented to the Planning Commission on 4/7/99. *This condition still applies. 9. The Primary Zone boundary shall be shown on the building permit plans for Lots 4, 5, and 6, Block 1, Lynmore Addition. *This condition still applies. 10. Lot 8 shall be reconfigured to meet the 90 foot minimum frontage requirement as well as the 11,000 square foot minimum lot area requirement. *This condition has been met. 11. Revise the preliminary grading & utility plan to show the proposed dwelling pads with standard designations and indicate the lowest level floor, entry level floor and garage floor elevations. This should be done prior to final plat approval. *This condition has been met. 12. Obtain demolition, moving and/or road use permits for existing buildings to be relocated. This should be done prior to any grading on the property. *This condition has been met. 13. The proposed single family residential development of 4.25 net developable acres is responsible for a water quality connection charge of $3,400 and a water quantity fee of $8,415. These fees are payable to the city prior to the city filing the final plat. *This condition shall be modified as follows: The proposed single family residential development of 4.25 net developable acres is responsible for a water quality connection charge of $3,400 and a water quantity fee of $8,415. The applicant has provided a water quality pond to treat 2.1 acres which will waive $1,680.00 of the water quality fee. The developer shall pay a total Storm Water Management fee of $10,135.00 to the city prior to the city filing the final plat. Lynmore Addition Final Plat June 14, 1999 Page 8 14. Install a fire hydrant at the intersection of Bridle Creek Court and Galpin Blvd. *This condition has been met. 15. A ten foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, NSP, US West, cable TV, and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance 9-1. *This condition still applies. 16. Dead-end fire apparatus access roads in excess of 150 feet in length shall be provided with approved provisions for the turning around of fire apparatus. The cul-de-sac as currently designed will not allow proper turning around of fire apparatus. Submit redesigned dimensions to Fire Marshal and City Engineer for review and approval. Fire Marshal will not approve building permits until redesign of cul-de-sac is submitted. *This condition has been met. 17. If trees are to be felled on site, they must either be chipped or hauled off site. No burning permits will be issued. *This condition still applies. 18. (The final construction plans shall include the following) The grading plans shall include the first floor, lowest floor and garage floor elevations of the existing home on Lot 6. Show existing well and septic site on Lot 6 with provisions for protection. Install drain tile behind the curb in accordance with City detail plates 5232 and 5234 to address household sump pump discharge. Provide pond maintenance access route between Lots 4 and 5. The grade of the access route shall not exceed a 4 to 1 slope. Provide erosion control measures and tree preservation fencing on the grading plan. The lot grade on Lots 6, 7 and 8 and/or street grades shall be revised to provide front yard Lynmore Addition Final Plat June 14, 1999 Page 9 drainage from the homes out to Bridle Creek Court. Provide traffic control signage and street light locations. The centerline street grade through the cul-de-sac shall be a minimum of 1% and the first 75 feet of Bridle Creek Court shall not exceed 3.0%. Provide drainage swale on the south side of Lots 3 and 4 to prevent runoff from leaving the site. *These conditions have been met. 19. The existing home on Lot 6, Block 1, Lynmore Addition, shall connect to city sewer within 30 days after the utilities are accepted by the city. When the existing well on Lot 6 fails, the home shall connect to city water. *This condition still applies. 20. The developer shall dedicate to the city 50 feet of right-of-way for Galpin Boulevard and a lO-foot wide trail and utility easement along the west line of Lots 1 and 2 and Outlot B. *This condition shall be modified as follows: The developer shall dedicate on the final plat drainage and utility easements over the west 20 feet of Outlot B and 1 O-foot wide drainage and utility easements over the rear yards of Lots 2, 3, 4, 6, 7 and 8. The developer shall dedicate to the city a 1 O-foot wide trail easement along the west lot line of Lot 2 and the southerly 30 feet of the westerly 10 feet of Lot 1, Block 1, Lynmore Addition. 21. During design and construction of a home for Lot 4 the surface water runoff must be managed to avoid flooding of the home. The lowest opening of the home shall be a minimum of one foot above the existing/proposed grade at the south property line adjacent the home. *This condition still applies. 22. At time of building permit issuance each lot except Lot 6 shall be charged a sewer and water hook-up charge. Should Outlot B be platted in the future, this parcel will also be subject to sewer and water hook-up charges in accordance with city ordinance. *This condition still applies. 23. The existing home on Lot 6 shall change their street access and address once Bridle Creek Court is paved with a bituminous surface. In addition, the existing driveway access through Lynmore Addition Final Plat June 14, 1999 Page 10 Lots 7 and 8 and Outlot B shall be removed and restored with topsoil, seed and mulch. *This condition shall be modified as follows: The existing home on Lot 6 shall change their street access and address once Bridle Creek Court is paved with a bituminous surface. 24. If the exporting or importing of earthwork material is required, the developer shall supply staff with a haul route and traffic control plan for review and approval. *This condition still applies. 25. The appropriate drainage and utility easements shall be dedicated to the city on the final plat for all utilities, existing drainageways and ponding areas lying outside the right-of-way. The minimum easement width shall be 20 feet wide. *This condition has been met. 26. The developer shall be responsible for the extension of sanitary sewer service to the site and acquisition of the necessary temporary and/or permanent utility easements. If the developer is unable to acquire the necessary utility easements, the plat shall be considered premature for development. *This condition still applies. 27. The applicant will need to develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook and the Surface Water Management Plan requirements for new developments. The plan shall be submitted to the city for review and formal approval in conjunction with final plat submittal. *This condition has been met. 28. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. *This condition still applies. 29. All utility and street improvements shall be constructed in accordance with the latest edition of the City's Standard Specifications and Detail Plates. Detailed street and utility plans and specifications shall be submitted three weeks prior to final plat consideration for staff review and City Council approval. Lynmore Addition Final Plat June 14, 1999 Page 11 *This condition has been met. 30. The applicant shall provide detailed storm sewer calculations for 1 O-year and 100-year storm events and provide ponding calculations for stormwater quality/quantity ponds in accordance with the City's Surface Water Management Plan for the City Engineer to review and approve. The applicant shall provide detailed pre-developed and post-developed stormwater calculations for 100-year storm events and normal water level and high water level calculations in existing basins, created basin, and/or creeks. Individual storm sewer calculations between each catch basin segment will also be required to determine if sufficient catch basins are being utilized. In addition, water quality ponding design calculations shall be based on Walker's Pondnet model. *This condition has been met. 31. The applicant shall enter into a PUD agreement/development contract with the city and provide the necessary financial security to guarantee compliance with the terms of the development contract. *This condition still applies. 32. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Carver County, Watershed District, Metropolitan Waste Control Commission, Health Department and Minnesota Pollution Control Agency. *This condition still applies. 33. A 30-foot wide access easement shall be deeded to the Schmidt's over Outlot B for future driveway access to the property to the north. Staff and the developer shall work together in determining the alignment. *This condition shall be modified as follows: A 30-foot wide access easement shall be deeded to the Schmidt's over the west 30 feet of Outlot B, Lynmore Addition, for future driveway access to the property to the north. 34. Staffwill review condition 18 regarding grading on Lot 6 as it pertains to drainage. Staffwill also talk with the developer regarding conditions 7 and 8. *This condition has been met. Lynmore Addition Final Plat June 14, 1999 Page 12 35. Staff will review the tree inventory to recommend to City Council the best way to preserve the trees along the project boundaries. Tree preservation easements shall be provided on both the north and south project boundary. *This condition shall be modified as follows: The developer shall place a tree conservation easement over the northerly 10 feet of Lots 7 and 8, Block 1 and the southerly 10 feet of Lots 2, 3 and 4, Block 1, Lynmore Addition. 36. Staff will address the issue about reimbursement for the sanitary sewer extension to the parcel to the north. Any reimbursement will be done similar to how city has treated other developments. Finalization of this condition shall be presented at final plat. *This condition shall be modified as follows: The developer shall be entitled to compensation for providing sewer service to the parcel to the north of the plat (Schmidt - PID 25.0150800). The city shall reimburse the developer 95 percent of the cost of two future sanitary sewer connection charges collected from the Schmidt parcel when connection is made to the sewer system. 37. A landscape island shall be included in the cul-de-sac. The home owners association shall be responsible for landscape maintenance. *This condition shall be modified as follows: The home owners assOciation shall be responsible for landscape maintenance within the landscape island in the cul-de-sac. Though a condition of the vacation of the drainage and utility easement approved concurrent with the preliminary plat, the applicant has not provided a legal description of the easement to be vacated. Therefore, staff is recommending the addition of the following condition: Prior to the recording of the final plat, the developer shall provide a legal description of the drainage and utility easement vacated as part of the preliminary plat and have the vacation document recorded at the county. RECOMMENDATION Staff recommends that the City Council adopt the following motion: "The City Council approves PUD #98-1 granting Final Plat approval for Lynmore Addition for 8 lots and 2 outlots and second and final reading of the Rezoning of 6.39 acres from A~2, Agricultural Estate District to PUD-R, Planned Unit Development-Residential subject to the following conditions: Lynmore Addition Final Plat June 14, 1999 Page 13 1. The applicant shall guarantee any transplanted trees for a minimum of one year. Transplanted trees shall be counted as replacement plantings. 2. One tree shall be planted in each front yard per city ordinance. 3. Install tree protection fencing at grading limits prior to construction. The applicant shall revegetate the area around the proposed storm water pond with a native seed mixture approved by the city. The applicant may refer to MnDOT seeding manual mixture 50 for an acceptable seed mix. o Fee title to Outlot A shall be granted to the city in exchange for full park fee credit in the amount of $8,400.00. The developer shall place a conservation easement over those parts of Lots 4, 5, and 6, Block 1, Lynmore Addition within the Bluff Creek Corridor primary zone. The development shall comply with the following setbacks: Front (F) - 25 feet, Rear (R)- 30 feet, Side (S) - 10 feet, Primary Zone (PZ) - 40 feet, Perimeter PUD setback (P) ~ 30 feet, Galpin Blvd. (G) - 50 feet. Lot 6, Block 1 may have a 20 foot front yard setback for a porch addition as presented in sketch plans presented to the Planning Commission on 4/7/99. 7. The Primary Zone boundary shall be shown on the building permit plans for Lots 4, 5, and 6, Block 1, Lynmore Addition. The proposed single family residential development of 4.25 net developable acres is responsible for a water quality connection charge of $3,400 and a water quantity fee of $8,415. The applicant has provided a water quality pond to treat 2.1 acres which will waive $1,680.00 of the water quality fee. The developer shall pay a total Storm Water Management fee of $10,135.00 to the city prior to the city filing the final plat. A ten foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, NSP, US West, cable TV, and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance 9-1. 10. If trees are to be felled on site, they must either be chipped or hauled off site. No burning permits will be issued. 11. The existing home on Lot 6, Block 1, Lynmore Addition, shall connect to city sewer within 30 days after the utilities are accepted by the city. When the existing well on Lot 6 fails, the home shall connect to city water. Lynmore Addition Final Plat June 14, 1999 Page 14 12. The developer shall dedicate on the final plat drainage and utility easements over the west 20 feet of Outlot B and 1 O-foot wide drainage and utility easements over the rear yards of Lots 2, 3, 4, 6, 7 and 8. The developer shall dedicate to the city a 1 O-foot wide trail easement along the west lot line of Lot 2 and the southerly 30 feet of the westerly 10 feet of Lot 1, Block 1, Lynmore Addition. 13. During design and construction of a home for Lot 4 the surface water runoff must be managed to avoid flooding of the home. The lowest opening of the home shall be a minimum of one foot above the existing/proposed grade at the south property line adjacent the home. 14. At time of building permit issuance each lot except Lot 6 shall be charged a sewer and water hook-up charge. Should Outlot B be platted in the future, this parcel will also be subject to sewer and water hook-up charges in accordance with city ordinance. 15. The existing home on Lot 6 shall change their street access and address once Bridle Creek Court is paved with a bituminous surface. 16. If the exporting or importing of earthwork material is required, the developer shall supply staff with a haul route and traffic control plan for review and approval. 17. The developer shall be responsible for the extension of sanitary sewer service to the site and acquisition of the necessary temporary and/or permanent utility easements. If the developer is unable to acquire the necessary utility easements, the plat shall.be considered premature for development. 18. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. 19. The applicant shall enter into a PUD agreement/development contract with the city and provide the necessary financial security to guarantee compliance with the terms of the development contract. 20. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Carver County, Watershed District, Metropolitan Waste Control Commission, Health Department and Minnesota Pollution Control Agency. 21. A 30-foot wide access easement shall be deeded to the Schmidt's over the west 30 feet of Outlot B, Lynmore Addition, for future driveway access to the property to the north. Lynmore Addition Final Plat June 14, 1999 Page 15 22. The developer shall place a tree conservation easement over the northerly 10 feet of Lots 7 and 8, Block 1 and the southerly 10 feet of Lots 2, 3 and 4, Block 1, Lynmore Addition. 23. The developer shall be entitled to compensation for providing sewer service to the parcel to the north of the plat (Schmidt - PID 25.0150800). The city shall reimburse the developer 95 percent of the cost of two future sanitary sewer connection charges collected from the Schmidt parcel when connection is made to the sewer system. 24. The home owners association shall be responsible for landscape maintenance within the landscape island in the cul-de-sac. 25. Prior to the recording of the final plat, the developer shall provide a legal description of the drainage and utility easement vacated as part of the preliminary plat and have the vacation document recorded at the county." ATTACHMENTS 1. Location Map 2. Letter from Scott A. Botcher to Dave Moore dated June 3, 1999 3. Letter from Dave Moore to City of Chanhassen dated 5/20/99 4. Final Plat g:\plan\bg\lynmore add. final plat.doc CITYOF ~i7 Center Drive, PO Box 147 anhassen, Minnesota 55317 Phone 612.937. I900 ieneral tax 612.937.5739 .'ineering tax 612.937.9152 lic Safe7 tax 612.93<2524 b wwu:ci, chanhassen, mn. us June 3, 1999 Mr. Dave Moore, Partner Lynmore Addition Edina Realty 7812 Market Boulevard Chanhassen, MN 55317 Dear Mr. Moore: I met with Community Development and Engineering staff regarding your request dated May 20, 1999. It appears as if there is a fundamental misunderstanding as to a critical component of this development. Staff has advised me that in exchange for having a portion of the site not developed, additional clustered density was granted above what might normally be expected or approved by the city. Additionally, it is my understanding that Outlot A is not developable without a sewer extension through a neighboring property. In my mind, this alone eliminates any assertion on your part that Outlot A may have a market value of nearly $500,000 at this point in time. From my perspective, increased density was granted in exchange for payment of the appropriate fees. Therefore, absent the park fee credit, the balance of your request cannot be supported by city staff. I assume that your request is being made so it can be acted upon by the council at the same time the final plat approval is considered. Final plat approval is scheduled, at this point, for the June 14 council meeting. As such, unless we hear differently, we will place this request upon this agenda along with this response for council deliberation. Please contact me if you have any questions or would like to provide further clarification. City Manager c: Kate Aanenson, Community Development Director Anita Benson, City Engineer Todd Hoffman, Park & Recreation Director g:\user~scottb\moore.doc ' of(7.han/~arce...4 arn.,hte cam..,.;,~, .,/th c/.../.b.c m,./;t,, ~.l, 0.1~ . ,4,.,..;.o- .4,,,,,., ...... ~1~;.,;.. ~.,~; ......... d ~.~.,.;g,l ..,.l.. a ...... .! ..... I: ......... l. ~,,.~ .l~., Letter of Transmittal To.' City of Chanhassen 690 Coulter Drive P.O. Box 147 Chanhas,en, MN 55317 Ma)' 20, 1999 Project: L,~qraore Subdivision ~ Chanhasser[ Mi~mesota As we have discussed, we have made many -changes and concessions to the city in the layout of the aforementioned subdivision. These concessions have been made to respect the serkqitivity of the city towards the Bluff Creek watershed. In working with City sta_{f, we lmve conceded 3 to 4 lots with a market value of nearly $500,000 in the area now designated as Out. lot A on the associated plat. By accepting the desires of the city staff and elim.inating lots on Outlet A, we have: · P!im-ma~ed the need for a lift station. Minimized t. he impervious area thereby decreasing the runoff to the Bluff Creek watershed. · Preserved tree and canopy cover. Wa have also cooperated on issues such ~s providing a 30 foot dr/veway easement for the property to the north across Outlet B to eliminate the direct access onto Galpin in the future for [hat parcel With our cooperation m~d compliance with the Bluff Creek Priority Watemhed Dish'ict zoning, we we requesting that [he city allow for the following comper~qation cro. dits for the dedication of Outlut A: City install the sanitary sewer to the subdivision. This inst, allat~on would be from the e×isLmg manhole on the west side of Galpin Boulevard to manholo # 2 as shown on the consb-uchon plma~. Our engineering firm will have all the plans and permits completed for the installalion Detailed estimate of cost ~s attached. This would allow the City to collact proper reimbursement from the property owner to the north ff that property is developed in the future. $48,950.00 No SWMP Water Quality Fees be assessed. Since we are providing a site treatment pond the $800/acre wi Jif not apply. $0.00 Full Park Fee Credit. As per staff recommendations dated March 17, 1999, $8,400.00 Waiver of SWMP Water Quantity Fees. ,58,415.00 Total Credits By the City $65,765.00 OuLlot A Dedication M AY 2 0 1999 ~.,t~ ~ ur ~,m~I~iHASSEN We feel strongly that we have crea~ed much benefit to the res/dents of the Cid' o£ Chanhassen and ask the compensation credits hq excha~ge for the dedication of Outlot A. Please review tlxis request to the city as we would like to have discussion and decision at the May 24, 1999 City Cormcil consideration of the final plat. We appreciate your consideration and cooperation m the pursuit of equitable compensation. $/,ncerely, Dave Moore, Partner Lynmore Addil:ion Outlot A Dedication PROJECT: LYNMORE SUBDIVISION CHANHA.~gEN, MINNESOTA SUBDIVISION SEWER EXTENSION CONSTRUCTION ESTIMATE {ITEM DESCRIPTION TOTAL t QUANTITY UNITS I UNIT PRICE 19tMay/99 I TOTAL SITE PREPARATION AND RESTORATION SEED, FERTILIZE, AND MULCHING ISODDJNG (ALONG GALPIN) SILT FENCE EROSION MAT 1000 SY $0,40 600 SY $2.00 400 LF $1.50 1000 SY $2.50 $400.00 $1,200.00 Seoo.oo $2,500.00 ISUBTOTAL SITE PREPARATION ,$4,700.00 IBIKE TRAIL REPLACE BIKE TRAIL SAWCUT PAVEMENT 320 SY 18 LF $12.00 $2.50 $$,§40.00 $40.00 [SUBTOTAL PAVING $3,880.00 I3ANITARY SEWER SYSTEM: 8-1NCH PVC SANITARY SEWER 48: PRECAST CONCRETE MANHOLE(0:8') 48 PRECAST CONCRETE MANHOLE(8 +) 60" PRECAST CONCRETE MANHOLE(0-8°) t60" PRECAST CONCRETE MANHOLE(8'+) MANHOLE CASTINGS D.I.P. DROP SECTION CONNECT TO EXISTING 12" STEEL CASING 463 LF $20.00 I EA $1,000,00 7 LF $200.00 1 EA $1,200.00 8 LF $225.00 2 EA $215.00 7 LF $40.00 1 EA $2,000.00 115 LF $200.00 $9,260.00 $1,000.00 $1,400.00 $1,200.00 $1,800.00 $430.00 $280.00 $2,000.00 $23,000.00 ISUBTOTAL SANITARY SEWER $40,370.00 ITOTAL CONSTRUCTION ESTIMATE $48,950