Loading...
1c. Hwy 41 Trail Connect ProjCITYOF CHAN SEN 7700 Market Boulevard PO Box !47 Chanl,assen NdN 55317 Administration Phone: 952 227 1100 Fax: 952 227 1110 Building Inspections Phone: 952.227 1180 Fax 9522271190 Engineering Phone 952227 1160 Fax: 952 227 1170 Finance Phoae: 9522271140 Faxz 952 227 1110 Park & Recreation Phone 952 227 1120 Faxz 9522271110 Recreation Center 2310 Coulter Boulevard Phone: 952.2271400 Fax: 952227 1404 Planning & Naturat Resources Phone: 952.2271130 Fax: 952 227 !110 Public Works 1591 Park Road Phone: 952 227 1300 Fax 9522271310 Senior Center Phone: 952 2271125 Fax 952 227 1110 Web Site '¢¢ww ci char~hassen r;qn us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Todd Hoffman, Park and Recreation Director DATE: May 14, 2004 SUB J: Approval of Plans, Budget Amendment and Authorize Advertising for Bids, Highway 41 Trail Connection Project. On March 22, 2004, the City entered into a consultant agreement with Bonestroo, Rosene, Anderlik and Associates to perform design and construction services associated with the Highway 41 Trail Connection Project. The project schedule called for a May 24th deadline for the preparation of plans and specifications. Our consulting engineer, working in concert with staff, affected property owners and other governmental agencies, has met this timeline. Attached to this memorandum please find a cover letter from Mr. Phil Gravel, Project Engineer and a proposed plan set. The project schedule with a completion date of October 2004 is included in Mr. Gravel's letter. The Highway 41 Trail Connector was moved up in the capital project plan as a means of increasing safety at this location. The newly installed "Arboretum Village" trail was terminated in the ditch of State Highway 41. Trail users began utilizing the shoulder of the highway as a means of making a connection to trails located to the north and south of the terminus point. These missing trail links need to be constructed and will connect the Arboretum Village trail with the Woods at Longacres trail and the West 78th Street Trail. Two Projects Become One: The "Woods at Longacres trail connection is programmed in the city's 2004 Capital Improvement Program. The estimated budget for this section was set at $120,000. Staff originally anticipated that the West 78th Street trail connection would be constructed as a component of the development of the McAllister property. In these circumstances, the developer is responsible for the bidding and construction of the trail. Upon completion and inspection of the trail, the developer is then reimbursed for the costs associated with this portion of their public improvements. Considering the lag in the timing of the townhome project slated for the McAllister parcel, staff elected to combine the two trail projects into one allowing for a more seamless construction process. The West 78th Street trail connector is nearly identical in length to the Longacres connector and will require a similar investment in resources. The City ofChanhassen,Agrowingcommunitywdhcieanlakes qua!tyschoole,~charmm!d{;",!,,,,,, '~.uci',,F ,x : :: ~ Mr. Todd Gerhardt May 14, 2004 Page 2 The estimated construction cost for both sections is $233,100. The current proposed funding source for this project is the park dedication fund. RECOMMENDATION It is recommended that the City Council approve the Plans, Budget Amendment and Authorize Advertisement for Bids for the Highway 41 Trail Connection Project. ACTION REQUIRED: Simple Majority of Council Members present. ATTACHMENTS: 1. Cover Memo from Phil Gravel, Project Engineer 2. Project Plans 3. Engineer's Reports dated March 26th - April 30th. C~ Bruce & Evonne Geske, 7325 Hazeltine Blvd., Excelsior, MN 55331 Bud & Mary Olson, 7331 Hazeltine Blvd., Excelsior, MN 55331 Bruce DeJong, Finance Director Paul Oehme, City Engineer/Public Works Director Bill Bement, Engineering Technician IV Kate Aanenson, Community Development Director Jim Olson, Carver County Deputy Dale Gregory, Park Superintendent Phil Gravel and Mark Statz, Bonestroo, Rosene, Anderlik & Associates Haw 13 2004 15:04 BOHESTRO0 ROSEHE RHDERLIK 651~3~1311  B onestroo ~_~ Rosene Anderlik & ~t Associates Engineers & ~rchltects Office: 65]-636-46013 · Fax: wwwDonestroo.com May 13, 2004 Mr. Todd Hoffman City of Chanhassen 7700 Market Boulevard, PO Box 147 Chanhassen, MN 55317 Re- 2004 T.H. 41 Trail Improvements Plan and Spec Approval Our File 393-04-144 Dear Todd: Attached for your approval are final construction plans for the 2004 T.H. 41 Trail Improvement Project. The proposed trail is located on the east side of Highway 41 north of West 78~ Street. In late April, the plans were submitted to MnDOT and a Limited Use Permit was requested. Onsite meetings have been held with residents along the proposed alignment. The current estimated construction cost is $233,100. The current schedule for the project is as follows: Council Approve Plans and Specifications and Authorize Bidding MnDOT Issue Limited Use Permit Receive Construction Bids Council Award Bids Begin Construction Complete Construction May 24, 2004 June 2004 July 2, 2004 July 12, 2004 August 2004 October 2004 At this time, it would be appropriate for the City Council to approve thc construction plans and authorize advertisement for bids for the 2004 T.H. 41 Trail Project. Feel free to contact Mark Statz or me if you have any questions or require any further assistance. Sincerely, BONESTROO ROSENE ANDERLIK AND ASSOCIATES Phil Gravel · St. Paul, St, Cloud, Rochester, V~illrnar, MN · Milwaukee, WI · Chicago. IL ~a, fffrrnative Action/Equal Opportunity Employer amd Employee Own~c~ o 1oo 200 $ca~e ;n f~t Bonestroo Rosene Ander/ik & Associates Engineers & Architects CITY OF CHANtIASSEN ENGINEER'S REPORT BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC. April 30, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. Lift Station No. 1 Renovation and New Forcemain (01-11) Contactor hopes to repair bituminous patch next week if mix is available. LS-P3.34 - Phase I (SWMP 12-X) The contractor has indicated that he will be starting the work on the spoil pile. 3. 2004 Residential Street Improvements (04-01) 2004 T.H. 41 Trail Pro. ject (RA-649) The first draft of the plans has been sent to MNDOT for their comments. LL-P 7. 5 Lotus Lake Pond (Frontier Trial Pond) Active Private Inspection Pro.iects · Powers Ridge Apartments (00-04) · Lake Lucy Ridge (01-03) · Arboretum Village (01-06) · Arboretum Village 2nd Addition (02-03) · Ashling Meadows 2nd Addition (02-07) · Vasserman Ridge (02-10) · Holiday Inn Express (03-08) · Arboretum Shopping Center (03-09) · Vasserman Ridge 3rd Addition (04-04) CITY OF CItANItASSEN ENGINEER'S REPORT BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC. April 23, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. Lift Station No. 1 Renovation and New Forcemain (01-11) LS-P3.34 - Phase I (SWMP 12-X) Jennifer Hildebrand, of our office, is keeping close tabs on the spoil pile issues and has reached and agreement with the contractor to have all erosion control items completed by the end of the month. 2004 Residential Street Improvements (04-01) Plans have been printed and sent to bidders. The bid date is May 13tu. 2004 T.H. 41 Trail Project (RA-649) The first draft of the plans should be completed sometime next week. The draft plan will be sent to MNDOT for their comments. LL-P 7. 5 Lotus Lake Pond (Frontier Trial Pond) City staff is working with residents to resolve easement issues. Next steps may include developing a concept plan and presenting it to the Beachfront Association. Active Private Inspection Proiects · Powers Ridge Apartments (00-04) · Arboretum Village (01-06) · Arboretum Village 2nd Addition (02-03) Arboretum Shopping Center (03-09) · Lake Lucy Ridge (01-03) · Ashling Meadows 2nd Addition (02-07) · Vasserman Ridge (02-10) CITY OF CIIANHASSEN ENGINEER'S REPORT BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC. April 16, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. Lift Station No. 1 Renovation and New Forcemain (01-11) Waiting for spring to repair a bituminous patch, then the job can be finalled. A letter will be sent to remind the contractor of this repair prior to May lst. LS-P3.34 - Phase I (SWMP 12-X) A punch list was sent to the contractor outlining remaining seeding and restoration work at the site. A deadline of May 15, 2004 was set to accomplish these tasks. Once these items are complete and IC-134 forms and Lien Waivers are received, we will recommend final payment. 2004 Residential Street Improvements (04-01) Plans are being printed. Bid date is May ,:~ . 2004 T.H. 41 Trail Project (RA-649) A revised design was sent to the two property owners abutting ~he project with easements and notation as requested by the residents. Contact has been made with MNDOT regarding the Limited Use Permit (L[JP), Wetlands boundaries have been delineated and GPS'd. Small marsh at north end of trail is a wetland. LL-P 7. 5 Lotus Lake Pond (Frontier Trial Pond) Potential pond location was staked in the field. City staff has met with residents to review layout. We will come up with a modified concept design. Active Private Inspection Projects · Powers Ridge Apartments (004)4) Arboretum Village (01-06) Arboretum Village 2~"~ Addition (()2-()3) Arboretum Shopping Center (034)9) Lake Lucy Ridge (014)3) Ashling Meadows ?d Addition (024)7) Vasserman Ridge (02-10) (':'.Docmnents and ScttiugsVl'oddH\Local Scttiug~;Vl'cml)orary lntcrnet I::iles\f)LKC6\4 16 04.doc Page I of l CITY OF CHANHASSEN ENGINEER'S REPORT BONESTROO ROSENE ANDERLIK & ASSOCIATES INC. March 26, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. i. Lift Station No. 1 Renovation and New Forcemain (01-11). Waitit~g ~or spring to repair a bituminous patch. Then the job can be t'inalled. LS-P3.34 - Phase I (SWMP 12-X). A letter was sent to the contn-sctor by Lol:i Haak outlining steps needed for erosion control at the spoil site. Upon completion of: these items, the contractor will be paid the amount on the second pay request. 2004 Residential Street Improvements (04-01). Final plans, specifications, cost estimate, schedule and an update on permits will be submitted to the city mid next week. The ad for bid will also be submitted to the city to be sent to the paper on the 8th. 'ff'/"~ 3.~04 T.H. 41 Trail Project. Preliminary survey work has begun and will be finalized by mid next week. Design will begin immediately after the survey is finished. 4. LL-P 7. 5 Lotus Lake Pond. Prc(iect on hold until easement issues can be resolved. o Active Private Inspection Projects. Powers Ridge Apartments (00-04) · Arboretum Village (01-06) · Arboretum Village 2nd Addition (02-03) · Lake Lucy Ridge (01-03) · Ashling Meadows 2nd Addition (02-07) · Vasserman Ridge (02-10) End of memo - C ',l)ocuments and ScttiugsVl'odd}iSLoca! Sctdngs\Tcmporaz) Interact l:'~ilcs\OLKC6\3-26-(}4.doc P~'igc I of 1