Loading...
1h-1. Highlands Temp Slope EsmtCIT¥OF CHANHASSEN Administration Building Inspections Engineering ' ~ ~ !Ii Park & Recreation P-,:~ 9/227 Planning & Natural Resources Public Works Senior Center p'~,,r-, '-52 ~!7 ~?~ ,,, ~ ,,~,711~, Web Site ,W,,'. : :; !:::i([ ]" : MEMORANDUM TO: FROM: DATE: Todd Gerhardt, City Manager Todd Hoffman, Park and Recreation Directo~ll~ ,~ June 9, 2004 SUB J: Temporary Slope Easement for Trail Construction; Highlands of Bluff Creek The final plat for the Highlands at Bluff Creek is scheduled for consideration by the City Council at the City Council meeting on Monday, June 14. During a field inspection conducted on June 8, it was determined that a temporary slope easement on the westerly 25 feet of the south 600 feet of the Highlands of Bluff Creek plat will be necessary to construct the Highway 41 trail connector. Tree removal will occur within the slope easement, but the overall canopy effect in the area will be preserved. Grading will not occur within the entire slope easement area. The 25-foot width is the maximum area required to match the grade to the new trail. Please include this requirement as a condition of approval for the final platting of the Highlands at Bluff Creek. RECOMMENDATION The following condition shall be added to Planning Case No. 04-20: "A temporary slope easement on the westerly 25 feet of the south 600 feet of the Highlands of Bluff Creek plat shall be granted to the City for the construction of the Highway 41 trail." C: Matt Saam, Assistant City Engineer Jill Sinclair, Environmental Resources Coordinator Mark Statz, Bonestroo G:\park\th\highlands of bluff creek easement.doc The CityofChanhassen, :: , :: ,- ,:: 7 . ? ? / i ? ? i / B.~. WEST 78TH STREET