Loading...
1b Budget for Street Maintnce.CITYOF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen MN 55317 Adrninislralion Phon~'~ 952 2271100 Fax 952227 !110 RnildinD Inspections Phone 952 227 1180 Fax: 9522271190 Engineermg Phor}e: 952227 1160 Fax: 9522271170 Finance Phone: 9522271140 Fax: 952227 1110 Park & Recreation Phone 9522271120 Fax: 952 2271110 Recreation Ceoter 2310 Coulter Boulevard Phone: 9522271400 Fax: 952 227 1404 Planning & Natural Resources Phone:9522271130 Fax: 9522271110 Public Works 1591 Park Road Phone: 952 2271300 Fax 952 227 1310 Senior Center Phone 952.2271125 Fax 952.227 1110 Web Site ww¢,, cJ 8i!aohassefl is/r/us MEMORANDUM TO: FROM: DATE: SUB J: Todd Gerhardt, City Manager Paul Oehme, City Engineer/Dir. of Public Works July 6, 2004 - Consider Adjusting the Maintenance Materials Budget for the Street Depatlment REQUESTED ACTION Approve adj UStlnent to the maintenance materials budget for Street Department. DISCUSSION At the Julle 29, 2004 work session, staff reviewed the Pavement Management Program with Council. The review covered the street network's current pavement condition and needs to protect the street network investment. One item discussed was to complete more crack sealing, pavement patching, spot mill and overlays and spot concrete curb replacements this summer. By perlbrming more routine maintenance and some preventative maintenance work now, pavement life will be lengthened. The 2004 maintenance materials budget is currently set at $66,700. Approximately $15,000 of this budget is spent annually on sand and salt for winter snow plowing operations. Staff has identified a need for an additional $50,000 to perform additional crack sealing, pavement patching, spot milling and overlays and spot concrete curb replacements this year. The street maintenance crews have the necessary equipment, laborers, and time to perform this work, except for spot concrete curb and gutter replacement. The spot concrete curb and gutter replacement work is proposed to be quoted out to contractors and brought back to Council for authorization. Funding for this increase expenditure is proposed fi'om the Municipal State Aid Fund (415). Typically, MSA funds can only be used for MSA street segment construction projects or for street maintenance. This year, the City's share of MSA funding was about $550,000 of which $33,000 was set aside for street maintenance. Staff is proposing to draw the requested $50,000 for street maintenance from the MSA fund. The remainder of the funds would still be set aside for future construction projects. RECOMMENDATION Staff recomlnends that the City Council authorize $50,000 for street maintenance from Fund 415 for 2004. g:\cng\pmgmt\bkgrd lnat budget aulh 062804,doc The 6it¥ of Chanhassen" A qrowlr g (;,3mrnbni',y with cdan lakes ( ualih