Loading...
1f Change Order 1, MSA StreetCITYOF CHAN SB 7700 Market Boulevard PO Box 147 Chanhassen MN 55317 Administration Phone: 9522271100 Fax: 952 227 1110 Building Inspections Phone: 9522271180 Fax: 9522271190 Engineering Phone 9522~71 60 Fax: 9522271170 Finance Phc/e: 952 2271140 Fax 9522271110 Park & Recrealion Phone: 952227.1120 Fax: 952227 11!0 Recreation Center 2310 Coulter Boulevard Phope: 952227 1400 Fax: 9522271404 Planning & Natural Resources Phone: 9522271 !30 Fax: 9522271110 Public Works 1591 Park Road Phone: 952 2271300 Fax: 9522271310 Senior Center Phone: 9522271125 Fax: 952227 1110 Web Site www ci chanhassen r~/n us MEMORANDUM TO: FROM: DATE: Todd Gerhardt, City Manager Paul Oehme, City Engineer/Dir. of Public Works 3, 2004 August SUB J: Consider Change Order No. 1 for MSA Street hnprovements Project No. 04-02 BACKGROUND At the June 29, 2004 Work Session, staff reviewed the Pavement Management Program with Council. The review covered the street network's current pavement condition and needs to protect the street network investment. One item discussed was to complete more crack sealing, pavement patching, spot mill and overlays and spot concrete curb replacements this summer. By performing more routine maintenance and some preventative maintenance work now, pavement life will be lengthened. At the July 12, 2004 Council meeting, Council authorized the street maintenance budget be increased by $50,000. The 2004 maintenance materials budget was set at $66,700. Approximately $15,000 of this budget is spent annually on sand and salt for winter snow plowing operations. The street maintenance crews have the necessary equipment, laborers, and time to perform this work, except for spot concrete curb and gutter replacement. Replacement of damaged concrete curb and gutter is necessary to improve drainage and to keep water from entering the pavement subgrade. It is also important to replace damaged curb for safety and aesthetics reasons. Staff has obtained two quotes for spot concrete curb and gutter replacements as follows: Larry Barrett Construction Creative Curb $31,170.00 $28,2O2.5O Creative Curb is currently working on the 2004 MSA Street Improvement Project in the downtown area. Their work has been acceptable. Staff is requesting a change order be drafted in the amount of $28,202.50 for the 2004 MSA Street Improvement project spot curb and gutter replacements throughout the city. The remaining funds will be used by the street maintenance crews for crack sealing, pavement patching, and spot mill and overlays. Funding for the increase expenditure was proposed from the Municipal State Aid Fund account (415). Attachment c: Mike Wegler, Street Superintendent G:\ENG\t'UBL[(7\04 02\Change order i request 80204.doc The City of Chanhassen · A growing coarnunity with clean lakes qualdy SOhLh)Is a charmi~,:l '* ~:': l~ kir:; t',u: ~:ss(> ,¢,i~clir i !,al :%1 :;,:-/,1' I. [::~rk A ,,~,: ~ ,,; i', :,:itl, afl ',,ii', FI'EM Il DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAl. ['rice includes: By others: * All taxes * CB adj rings * Bond or bond chg * Grade +- .10ft * CB adi up to 3-2" rings * Backfilling * Granular material -- * 'Fraftic_ 0012~_ol * Staking * Testing * CB adj over 3-2" rings at $25.00 per rh~g lfnot accepted in 30 days in writing this quote is fully voidable ano the prices it reflects will not bc honored without eonsem ofCreatlve Curb Contractors, Inc. - Proposal Pa e No. ct Pages 6741 Hopi Road · Chanhassen, Minnesota 55317 · ¢F~1-P) 474-8853 PROPOSAL SUBMITTED TO Chanhassen P,_,b!ic ~Nork~ STREET 1591 Park Road PHONE JOB NAME 227-1303 DATE 8/1/2004 CITY, STATE AND ZIP CODE JOB LOCATION fx 227-1310 Chanhsn., MN 55317 ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for Curb and gutter demo and replace in Chanhassen: 899 If of curb at $30.00 per ft 28 basin adjustments @ $150.00 per basin, to re use all existing basins.. All flagging and barricades by others... $26,970.00 $4,200.00 We Propose hereby to furnish material and labor -- complete in accordance with above specifications, for the sum of: $31,170.00 dollars ($ ) Payment to be made as follows: $10,000.00 Down, balance on completion. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices, Any alteration or deviation from above specifications involving extra costs will be executed only upon written order& and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control Owner to carry tire, tornado and other necessary insurance. Not responsible for damage/vandalism done after workers have left job site. All cbncrete poured will be done on a firm compacted base. Concrete will be reinforced with steel Signature :~ .~_'[?.,~v ti .'~L./ Note: This proposal may be withdrawn by us if not accepted within days, and/orwire mesh. Due to the severe Minnesota winter freeze- thaw cycles, hairline cracks may or may not occur. L B.C. will guaranty any concrete cracking and heaving to a dangerous or unuseable height for a period of 2 years. LB.C. may not be held responsible for hairline cracks. NOTICE OF MINNESOTA STATUTE We are required to notify you of the Lien Law, as stated in the Minnesota Statutes: PERSONS OR COMPANIES FURNISHING LABOR OR MATERIALS FOR THE IMPROVEMENT OF REAL PROPERTY MAY ENFORCE A LIEN UPON THE IMPROVED LAND IF THEY ARE NOT PAID FOR THEIR CONTRIBUTIONS, EVEN IF SUCH PARTIES HAVE NO DIRECT CONTRACTURAL RELATIONSHIP WITH THE OWNER. MINNESOTA LAW PERMITS THE OWNER TO WITHHOLD FROM HIS CONTRACTOR SO MUCH OF THE CONTRACT PRICE AS MAY BE NECESSARY TO MEET THE DEMANDS OF ALL OTHER LIEN CLAIMANTS, PAY DIRECTLYSUCH LIENSAND DEDUCT THE COST TH EREOF FROM THE CONTRACT PRICE, OR WITHHOLD AMOUNTS FROM HISCONTRACTOR UNTIL THE EXPIRATION OF 120 DAYS FROM THE COMPLETION OF THE IMPROVEMENT UNLESS THE CONTRACTOR FURNISH ES TO THE OWNER WAIVERS OF CLAIMS FOR MECHANIC'S LIENS SIGNED BY PERSONS WHO FURNISHED ANY LABOR OR MATERIAL FOR THE IMPROVEMENT AND WHO PROVIDED THE OWNER WITH TIMELY NOTICE. Acceptance of Proposal - The above prices~ specifications and conditions are satisfactory and are hereby acceptecL You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature. Signature_