1c Electrical Imp Lift St #2
CITY OF
CHANHASSEN
7700 Market Bou!evarrj
PO Box 147
Cllallhassol'. MN 55317
Administration
PI'0110 952.227.1100
Fax 952.227.1110
Building Inspections
Prime 952.227 1180
Fax 952.227.1190
Engineering
952.227.1160
Fax 952.2271170
Finance
952.227.11<10
Fax 952227.1110
Park & Recreation
phoria 952 227.1120
Fax 9522271110
Cel'I'!]í
2310 Boulevalo
Pr,o'lü 952227 1400
952227 1404
Planning &
Natural Resources
Phc'18 952 227 1130
952 227 1110
Public Works
1591 Road
[152.227.1300
9SU21131O
Senior Center
Pllooe 952.2271125
Fax 052 227.1110
Web Site
I
'I
MEMORANDUM
TO:
Todd Gerhardt, City Manager
FROM:
y;::;: 0 .
':.,. ,.
Paul Oehme, City Engineer/Dir. of Public Works
O~.
DATE:
October 28,2004
SUBJ:
Consider approving Electrical Improvements and quote for Lift
Station No.2 Project 01-11C
REQUESTED ACTION
Approve Electrical Improvements and quote for Lift Station No.2
BACKGROUND
On September 24, 2001, the City Council authorized the preparation of a
feasibility study to look at improvements to Lift Stations 1,2 and 10.
On July 8, 2002, the City Council approved the feasibility study and ordered
projects for improvements to Lift Stations 1 and 10.
On September 27, 2004, the City Council approved plans and specifications and
authorized the advertisement of bids for Lift Station 2 improvements.
On October 25,2004 Council awarded a contract for the forcemain pipe
improvement portion of the Lift Station #2 improvements.
DISCUSSION
Approval of the electrical quote is the last item for the improvements to Lift
Station No.2. The foreemain project and the electrical work were separated
because the electrical components could be quoted out separately from the
forcemain work. By separating the two items the city would not incur prime
contractor markup for the electrical work. The improvements consist of bring
three -phase power lift station 2, installing a panel with telemetry and new
pumps. Due to the increased size of the pumps the electrical power will need to
be upgraded. Xeel will need to extend power to the lift station. The estimate cost
for this work is $10,000. The panel and telemetry unit is consistent with the new
panels and telemetry the City is installing on other new lift stations and is
consistent with the City's proposed future SCADA improvements system wide.
The City is trying to have a consistent unit in the field so City crews only have to
be training on one panel unit and the city will only need to stock spare parts for
one type of unit. The cost for the panel and telemetry unit is $24,700. The last
item needing replacement are the pumps. The pumps are old and should be
replaced at this time. Also the pumps are larger then the existing pumps to handle
the present and future pumping requirements.
The City of Chanhassen · A growing cCrillTlun!.ty with cleanlakos. qual,ìy
Irails allillJoalltlíul parks A groat place to live. work. and play
Staff has reeeived two quotes as follows:
· Braun Pump & Controls $7,519.60 per each or $15,039.20 for two pumps
· Quality Flow System $ 16,125 for two pumps
The lift station requires two pumps. Staff recommends approving the Braun Pump
quote for $15, 039.20. The City has ABS pumps from Braun Pump at other lift
stations which have preformed adequately.
The quote from Quality Flow Systems included pump aceessories and installation.
The pump aceessories are not required and the installation of the pumps will be done
by City crews.
The total electrical work which includes bring 3-phase power to the lift station, panel
with telemetry and pumps is $49,739.20. The forcemain improvements approved by
council on October 25, 2004 was in the amount of $73,048.00. The total cost for this
project is $122,787.20. On September 27,2004 background staff estimated the cost of
this work to be $130,000.
At this time Staff recommends approving the electrical work and quote for pumps
from Braun Pump & Controls.
Attached
J
/'
~
""'-
"--::.-
.'
N
A
F Lift Station 2
orcemain I
mprovements
',,-
~~
September, 2004
G:\ENG\/o/een .
\EngPro¡ects\Pau/\Lft t .
I S atwn2\LS2FM.mxd
OCT. 28. 2004 8: 55RM
.--
QURLITY FLOW SYSTEMS 952 7589661
NO.691 P.1/11 I \ 10
_ d'-ð 1 -'
7')ð"
mp· ~rwÎT)
.ll-~ ~;JJwJ..~~ -:-
Qf/s Quality Flow Systems. Inc.
800 6th Street NW
New Prague, Minnesota 56071
Phone: (952) 758·9445 Fax: (952) 758-9661
Fax
JÆ." ?~\ à~Y\"4-
TO:~
From: Patrick Maley
Fax: (952) 227-111 D
Pages: 2
Phone: (952) 227-1311
Dllte~ I Ø/24104
Re:
Uft Station #2 Quote #40111
cc:
X Urgent
o For Review
o Pleas. Comment 0 Plea.e Reply
o ".ase Recycle
Kelley.
As we d1lcus5ed ~_t.nlay, your new design condition for 11ft station #2 would be 450 Sprn
@ 93' TDH. I spoke to professor Reardon and he states the pumps 81'8 three phase. You had
a limited service available from Xcel ene'VY. It would be necessary to upgrade the existing
three phase service to 200 amp .ervice vs. the current 100 amp .ervice. Pete stated that
we could slide the new pumps down your mdsUng ABS guide system and use the existing
ADS slide brackeb on the pumps. We would be responsible far Installing the pumps,
assisting the city electrician in installing the controlsl teremGtty, and overall start-up
service. You would need to coordinate the boring of the new foreemaln, tIe In of the new
main, and abandonment of the old main. I have prepared a proposal to fumlsh new pumpS,
controls, and t.remaby.
Lift Station Eaulnrnent::
Two (2)
IIKSB" Model KRT F10o.3161234X. 28
duty submersible pump capable of pu
the followingc
50' of power coni
stainleu st.elllfUng chain
Handl.
OCT.28.2004 9: 32RM
QURLITY FLOW SYSTEMS 952 7589661
NO.693
P.2/2
28hp, 230148013 ptwse exploslonaproof motor
One (1)
"US FI'ter Control 8ystams" Nema 4X duplex control panel (FastPack) to
control the above P1l1bPS in a pump down mode. To Include the LC3000
telarnlltly, radio, and antenna. To be controlled by the D152 controll.r.
One (1)
InstallaUon of the pumps using the existing ADS guide system and .Oda
bracUt.
One (1)
StBrt-up and training as required.
Lf!:> I z.,. t)C>
TobIl DeIIweNd hlllng Prl-=- - - - ~ (+ tax)
After dtscussing this wtth ".te I ..1 V1tI'Y comfortable with this project. "... and I would
be aVIIllable to assist the ølectrtclan with the Installation of the new controls and lnaur. a
smooth tfansltJon.
If Paul or younsulf have any quHtlOns, ple_ Slve me a call.
J[k_'
~ck~
$¡'j It-$" -
1> IPÇ - '/
c--r~
~v'~oJ
-
(2-)?~ wI ~ ~
~
P )~O'3()
p~ wl~
L '2~ SDö
'5jk ~ J:w\st-q..H~ ~ --. \
,~
-;;¡.f1~ J A,..::t · ( þ~
$ 1- 0/ 100
I
. Page 2
Oct·28, 2004 12:23PM
BRAUN PUMP AND CONTROL
No.9451
P, 1
BRAUN PITMP & (JONTnOI~S
_. ... .......'... ,
Oclohl;:r 28, 2004
Fa.< It
, :SER·V·l'C£
City of Chanhassen
Kelly Jane~
690 Cily Cl;:nter Dr
Chanhassen MN 5531740147
Dear Kelly,
We arc þ18a~ed to offer you this quote for replaçl;:ment pumps asfollows:
(2) ADS Pump Modc1 AFP 1047 rated for 450 GPM ~ 93'TDH
PTÏc..:e Per Each $ 7,519.60
Price docs nolincludl;: tax, freight or instal1.
Note: The pnmþ~ c..:ome with a 5 year 10,000 hour non-prorated warranty.
Please give Tnl;: a call regarding also allowing Braun Pump to quote the controls Thank
you.
Sincerely,
[)ð/6f
Dave Brau.n
DB/sT