Loading...
1h Authorize Inspec Cont TH 212 CITY OF CHANHASSEN 7700 Markel Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax 952.227.1110 Building Inspections Phone 952.227.1180 Fax 952.227.1190 Engineering Phone 952.227.1160 Fax 952.227.1170 Finance Phone 952.227.1140 Fax 952.2271110 Park & Recreation Phone 952.227.1120 Fax 952.227.1110 Recreation Center 2310 Couller Boulevard Phone 952.227.1400 Fax 952.227.1404 Pianning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone 952.227.1300 Fax 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.ci.chanhassen.mn.us i-l( MEMORANDUM TO: ryO Paul Oehme, City Engineer/Public Works Director I ' Matt Saam, Assistant City Engineer /)ll I; FROM: ~. DATE: March 4, 2005 SUBJ: Authorize Inspection Contract for TH 212 - Project No, 03-09 REQUESTED ACTION (Simple Majority Vote) ¡ ~i f I I i ~I ~. I' ", The City Council is requested to approve a Consultant Work Order with Kimley- Horn and Associates in the amount of $122,635 for engineering services on City- related improvements for the upcoming TH 212 project. BACKGROUND On July 28, 2003, the City Council adopted a resolution supporting the accelerated funding of new TH 212. On March 22, 2004, the City Council adopted a resolution granting Municipal Consent of the TH 212 project. DISCUSSION The TH 212 project consists of the design and construction of a four-lane arterial highway. The project in Chanhassen generally consists of roadway, trail, screening/noise berms, noise walls, ponds, signals, lighting, signing, and bridge construction. Additional major responsibilities include but are not limited to environmental coordination and utility improvements. Traffic control scheduling and maintenance of traffic plan review is also a part of the scope. MnDOT has hired a Vérification Consultant (VC) to review plans and specifications produced by the Design-Build (DB) team and are also under contract for inspection of the entire project, including the City of Chanhassen improvements, Based on the City's experience with TH 5 improvements and due to the complexity, amount and tight schedule of the TH 212 project, staff is requesting to have additional oversight of the design and inspection services, City staff does not have anyone internally that can be dedicated to the plan review and inspection of the project. Since the TH 212 project is only 30% designed, many changes are anticipated and will need to be worked out in a relatively short amount of time. The contract for TH 212 states that the local agencies will have 10 days to review and comment on plans submitted, This includes drainage :i, ! ~. ! ! ~ ~ The City 01 Chanhassen' A growing communl~ wilh clean lakes, quality schools, a charming downlown, Ihrivlng businesses, winding Irails, and beaulitul parks. A greal place 10 live, work, and play. Paul Oehme March 4, 2005 Page 2 calculations, traffic issues, bridge design, utility improvements, etc. Again, staff does not have anyone that can be dedicated to this oversight. In anticipation of the upcoming design and construction process, staff recently solicited proposals from two of the engineering firms in the City's pool. The following table lists the proposals that were received from the two firms: ENGINEERING FtRM PROPOSAL COST Kimley-Horn $122,635 Bolton & Menk $157,585 It is staff's opinion that the low cost from Kimley-Horn can be attributed to their experience in the area of TH 212 from the Municipal Consent process and AUARlMUSA projects. Kimley-Horn's proposal includes design verification, construction inspection, and meetings related to the various City-related improvements of TH 212. Also, Kimley-Horn has worked on the utility improvements for the 2005 MUSA area to be built in conjunction with the TH 212 project. The goal of the work order is to provide the City of Chanhassen with oversight for the design and construction inspection in all procedures associated with the design and construction of the City of Chanhassen projects. The Consultant will work with City staff, MnDOT, the VC, and the DB contractor to verify the City's portion of the project is constructed in reasonable conformity with Chanhassen' s standard details and specifications. Assistance with coordination of traffic maintenance work will also be required. The contract will be over a 3-year period on an as needed basis, This averages out to approximately $41,000 per year. The consultant will be required to submit time sheets verifying the hours worked on the project. Staff will review these time sheets for accuracy. Funding for this project was budgeted for in the 2005 CIP as Project #ST-014. c: Jon Horn, Kimley-Horn Marcus Thomas, Bolton & Menk g:\eng\th 312\inspection rfp\approve consultant contraCt.doc